Home

Norfolk District

Run scraper

Appalachian Power Company (AEP)proposes to upgrade the existing Cloverdale Extra High Voltage (EHV) Transmission System. As a result of the completion of the Regional Transmission Expansion Plan (RTEP)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Appalachian Power Company (AEP)proposes to upgrade the existing Cloverdale Extra High Voltage (EHV) Transmission System. As a result of the completion of the Regional Transmission Expansion Plan (RTEP), PJM Interconnection, the regional transmission organization has determined that the upgrades are necessary for AEP to meet mandatory reliability criteria. In order to address the voltage and thermal problems, congestion and equipment obsolescence, AEP will be installing new transformers, constructing new transmission lines, constructing a new 500 kV substation (East Yard), expanding the existing West 765 kV and North 345 kV Yards, constructing four new EHV transmission lines between the existing and new yards and relocating 4 existing high voltage transmission lines.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas