You can copy from here when filling out the rest of the page.
Langley Air Force Base proposes to construct in the same vicinity of an existing fuel pier, a new fuel pier facility that will include about 65,000 cubic yards of dredging, with the dredged material to be transported and discharged at the Norfolk Ocean Disposal Site (NODS).