Home

Norfolk District

Run scraper

Waterfront Marine proposes to complete a design build project that will replace the old truss steel bridge in the Nottaway River at Route 35 in Courtland

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Waterfront Marine proposes to complete a design build project that will replace the old truss steel bridge in the Nottaway River at Route 35 in Courtland, Virginia. The modern bridge will be 902 feet in length and will be in the same location as the old bridge. Public comment period ends Aug. 25, 2014.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas