Home

New England District

Run scraper

MassDOT-Highway Div-Bridge #W-37-009

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

MassDOT-Highway Div-Bridge #W-37-009; Waterway & loc: conveying Hopper Rd., over the Green River,

MassDOT-Highway Div-Bridge #W-37-009; Waterway & loc: conveying Hopper Rd., over the Green River, Williamstown, Mass. Public Comment Period Begins: 4/15/2014 Ends: 5/15/2014

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas