The applicant proposes to further develop Sunoco's Nederland Facility

Full Public NoticeProject Plans The applicant proposes to further develop Sunoco’s Nederland Facility. This proposed development will consist of demolition of the existing bulkhead and marine structures, mechanical and hydraulic dredging of approximately 55,000 cubic yards of material consisting of virgin bank and existing bottom, construction of 900 linear feet of sheetpile bulkhead, 11 new monopole breasting dolphins, a new access road and parking area, foundations for on-shore equipment and re-location of two existing drainage outfalls. This project will reconfigure 725 linear feet of existing shoreline along the Neches River, place 7,500 cubic yards of clean fill into 0.23 acre of open water in manmade canals and excavate 2.38 acres of existing river bottom to a depth of 15 feet below mean low tide. The dredged material will be placed in one or more authorized placement areas including Placement Areas 18, 21, 22, 23, 24, 25, or an approved beneficial use site

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas