The applicant's stated purpose for the concrete cable matting is to protect the shoreline from erosion and flooding. The stated purpose for the groin is to protect the entrance of Bar Harbor Lagoon from sedimentation and to trap sediment for the proposed shoreline stabilization area to the west of the groin.

The applicant proposes to construct a shoreline stabilization project, including the placement of concrete cable matting, stone rip-rap and a groin structure. The matting would be placed in two separate areas: A) from the Seabright Avenue right-of-way extending approximately 160 feet to the east; and B) from the western edge of Bar Harbor Lagoon extending approximately 110 feet westward along the shoreline. Sand would be placed in the void areas of the matting where saltmarsh cord grass (Spartina alterniflora) is to be planted. Any areas below the mean low water line that require stabilization would be back-filled with ¾-inch stone rip-rap. The total area below the high tide line (HTL) impacted by the proposed stabilization would be 470 square feet (0.011 acre), with 28 cubic yards of concrete matting and stone rip-rap.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas