The applicant proposes to modify the existing Pier 1A (originally approved by this office on 3 February 2004 under Department of the Army individual permit CENAP-OP-R-200300936). The proposed modification is the extension of 150 linear feet of new crane railway on top of the existing decking. The railway extension would require the placement of approximately nine (9) new 16 inch diameter concrete filled steel piles below the mean high water line and relocation of existing utilities on or within the deck surface but not below the water. Piles to be placed would include the discharge of a total of 7 cubic yards of poured concrete within 12.5 square feet of waterway below the high tide line.

This District has received an application for a Department of the Army permit pursuant toSection 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the CleanWater Act (33 U.S.C. 1344). The purpose of this notice is to solicit comments and recommendations from the publicconcerning issuance of a Department of the Army permit for the work described below.

APPLICANT: South Jersey Port Corporation AGENT: Mr. Kevin R. Casey, S.T. Hudson Engineers, Incorporated, 840 CooperStreet, Fourth Floor, Camden, New Jersey 08102 WATERWAY: Delaware River LOCATION: Broadway Terminal, 2500 South Broadway, identified as Lot 1, Block41, City of Camden, Camden County, New Jersey.

The applicant proposes to modify the existing Pier 1A (originally approved bythis office on 3 February 2004 under Department of the Army individual permit CENAP-OP-R-200300936). The proposed modification is the extension of 150 linear feet of new crane railwayon top of the existing decking. The railway extension would require the placement ofapproximately nine (9) new 16 inch diameter concrete filled steel piles below the mean highwater line and relocation of existing utilities on or within the deck surface but not below thewater. Piles to be placed would include the discharge of a total of 7 cubic yards of pouredconcrete within 12.5 square feet of waterway below the high tide line. The applicant has described the subject piling driving as follows. Each pile would be driven tothe point of refusal by vibration with the balance of driving completed by impact hammer. Thebest approximation for vibrating time would be 180-seconds per pile (give or take 30 seconds).The estimated amount of impact 'blows' would be around 500 per pile (depending on siteconditions). When impact hammering is used, a cushion would be employed as comprised of ahigh impact phenolic laminate, alloyed nylon blocks and rubber matting with plastic & wood.The cushion protects the pile driver as well as deadens sound.The applicant has stated that no dredging of regulated waters would be required for thecompletion of the project.

PURPOSE: The applicant's stated purpose for rail extension is to accommodate all tenantsutilizing the pier in a more efficient manner. The applicant states the current configurationrequires continual backward and forward motion of the ship to load and un-load materials.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas