The proposed project is located at 1501 North Albany Avenue, Atlantic City, Atlantic County, New Jersey. The applicant proposes to construct a docking system consisting of 18 linear feet of new vinyl sheet pile bulkhead within 24 inches of the existing bulkhead to match the existing vinyl bulkhead, construct a 15' x 18' concrete pad to match the existing concrete pad, construct two (2) 6' x 40' floating docks for the re-fueling area, construct a 3' x 30' ramp, a 6' x 35' floating dock and two (2) 6' x 120' floating docks with eight (8) 4' x30' finger piers, and eighteen (18) 5' x 14' jet ski floats. There will be sixteen (16) 10" x 40' piles associated with the proposed work. All materials utilized for improvements will be constructed of non-polluting materials.

This District has received an application for a Department of the Army permit pursuant toSection 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).The purpose of this notice is to solicit comments and recommendations from the publicconcerning issuance of a Department of the Army permit for the work described below. APPLICANT:

Ole Hansen and Sons, Inc. 523 South Leipzig A venue Cologne, New Jersey 08213

Agent

Shoreland Environmental P.O. Box 1729 Absecon, New Jersey 08201

WATERWAY: Great Thorofare LOCATION: The proposed project is located at 1501 North Albany Avenue, Atlantic City,Atlantic County, New Jersey. The property is also known as the Atlantic City TransportationCenter. The property is located at latitude: 39.370483 °N; longitude: -74.475888 °W. ACTIVITY: The applicant proposes to construct a docking system consisting of 18 linearfeet of new vinyl sheet pile bulkhead within 24 inches of the existing bulkhead to match theexisting vinyl bulkhead, construct a 15' x 18' concrete pad to match the existing concrete pad,construct two (2) 6' x 40' floating docks for the re-fueling area, construct a 3' x 30' ramp, a 6' x35' floating dock and two (2) 6' x 120' floating docks with eight (8) 4' x30' finger piers, andeighteen (18) 5' x 14' jet ski floats. There will be sixteen (16) 10" x 40' piles associated with theproposed work. All materials utilized for improvements will be constructed of non-pollutingmaterials. All associated piles will be jetted irtto the bottom and air hammered to finish grade with anoise dampener. Appropriate turbidity control measures, such as silt curtains or equivalent, shallbe utilized to reduce the impact from turbidity during the pile driving activity. There is no intenton supplying water or electricity to the proposed slips. Currently the water depths are sufficientand dredging is not needed. The finger piers and Jet Ski floats will be removed seasonally andstored in an upland area onsite. See Attachment for details and plans

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas