The application is for the construction of a secondary fire protection pond.

The applicant proposes to construct a 25-foot tall by 200-foot long earthen dam using approximately 700 cubic yards (cys) of clayey sand, 420 cys of sandy clay, and 280 cys of shale. The surface area ofthe fire pond would be 6.6 acres and would convert approximately 1,425 linear feet of intermittent stream channel to open water habitat. This project would require bulldozers, scrapers, front-end loaders, and trucks. The boat ramp and spillway would be constructed using concrete and steel rebar.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas