The application is for the construction of an interchange for access to east and west Interstate 40 from Radio Road.

The applicant proposes the placement of fill material into an on-stream pond (FS 14) of 0.7 acre; 2,764 linear feet of intermittent stream (FS 8) and four adjacent wetlands consisting of a forested/emergent wetland (FS 11) of 1.94 acres; a forested/scrub-shrub wetland (FS 12) of 0.08 acre; a scrub-shrub/emergent wetland (FS 13) of 0.05 acre; and an emergent wetland (FS 15) of 0.11 acre (see Enclosures 2 and 3).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas