The basic purpose of this work is to expand facilities to increase the gaming area

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The basic purpose of this work is to expand facilities to increase the gaming area, and recreational and entertainment opportunities in the Tulsa area.

Description of Work: The applicant proposes the placement of fill material into jurisdictional waters within 505 linear feet (It) of Fred Creek (FC) and approximately 1,100 If of a low-flow channel of Joe Creek (JCLFC), both stream channels are within confluence of the Arkansas River following the left descending bank. Approximately 18.76 acres of earthen fill material would consist of mixed rock material and sand to be excavated from within the Arkansas River channel and distributed to project areas as patt of the improvement project (See Figure I, Enclosure 1 0).

Location

Sand

Soil

Rock

Concrete

Total(cvs)

Acres

ARl

2

,875

611

620

4

,106

2.55

AR2

15

,500

4,502

2

,200

22,202

2.75

AR3

16,500

5,490

5,490

27,480

1.42

AR4

5,000

996

3,000

8,996

0.93

AR5

I

00,100

39,929

4

,000

250

144,279

9.94

S02B

(JCLFC)

12

,063

4

,021

4,021

20

,105

0.75

S03 (FC)

1

,133

2

10

550

2,333

4

,226

0.42

Project Total

153

,171

55,759

1

9,881

2

,583

231,394

18.76

The placement of fi ll material within the Arkansas River and the method of removing the accumulated sediment is a "discharge" of dredged material. This includes the addition, placement, or redistribution of dredged or excavated materials within waters of the United States. A total of approximately 231,394 cubic yards (cys) of earthen material would be used to reclaim land to construct the casino expansion area. The eroded riverbank would be reformed using a combination of the adjacent river sand, select fill, topsoil and armoring comprised of manmade stone and natural stone material, and geotextile fabric for stabi lization. A 3,400 If bank stabilization project would be constructed using vegetated riprap and would tie into the stabilization work of the Joe Creek Ecosystem Restoration Project to FC right descending bank and from FC left descending bank to the end of the project boundary. In FC, the concrete lined channel would be extended 250 If using reinforced concrete or large block system or a similar concrete lined trapezoidal channel. The proposal includes the construction of two pedestrian bridges, one vehicular bridge over FC, a proposed overlook, a boat ramp, an observation area, and a new pedestrian and biking trail that extends from Joe Creek to the southern end of the property. These bridge construction projects would be authorized under Nationwide Permit 14 for Linear Transportation Crossings. The applicant has also proposed to use concrete and reinforced concrete around stormwater outfall structures made of precast reinforced concrete pipes and box structures. Work would be done using wheeled and tracked excavation equipment (backhoes, track hoes, dozers, dump trucks, and front-end loaders), drilling rigs, concrete trucks, concrete pumping equipment, compactors, and graders.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas