The application is for the replacement of approaches and the U.S. Highway 259 bridge over the Red River. The basic purpose of this work is to replace a structurally deficient bridge to maintain safe and reliable traffic along this segment of highway.
The applicant proposes the placement of fill material into jurisdictional waters located within the Red River. Permanent impacts from fill material would consist of approximately 670 cubic yards (cys) of concrete that total 0.010 acre for construction of 66 drill shafts and 15 bridge bents. Temporary impacts from fill material would consist of approximately 13,550 cys of dirt and sand (clean fill) that total 2.50 acres for construction of a haul road, 3,400 cys of rock riprap would be used for bank stabilization of the temporary work road, and 25 linear feet of fill material would be used for construction of cofferdams that are necessary to cutoff the existing piers in the Red River.
During construction of the new bridge, the existing structurally deficient bridge would remain open to traffic. All dredged material would be hauled off-site to an upland disposal area. The work performed in the wetlands and uplands would be completed using conventional earthmoving equipment.