Home

St. Louis District

Run scraper

The Eliza Point/Greenfield Bend Phase 3 Project proposes the construction of a rootless dike at Mississippi River Mile (RM) 3.0L and four bendway weirs at RM 2.6R

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Eliza Point/Greenfield Bend Phase 3 Project proposes the construction of a rootless dike at Mississippi River Mile (RM) 3.0L and four bendway weirs at RM 2.6R, 2.5R, 2.3R, and 2.2R. Placement of rock training structures would provide a sustainable alternative to repetitive maintenance dredging. Fill material would consist of quarry run limestone consisting of graded “A” stone. The Eliza Point/Greenfield Bend Phase 3 Regulating Works Project is located in the Middle Mississippi River (MMR) between River Miles (RM) 2.0 and 3.0 in Mississippi County, Missouri and Alexander County, Illinois near the town of Cairo, Illinois.

P-2852

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas