You can copy from here when filling out the rest of the page.
The project proposes to construct a rootless dike at Mississippi River Mile (RM) 173.4L and place backline revetment at four locations on the left descending bank (L) from RM 171 to 175. Fill material would consist of quarry run limestone consisting of graded “A” stone. The Mosenthein/Ivory Landing Phase 4 Regulating Works Project is located in the Middle Mississippi River (MMR) between River Miles (RM) 170 and 175 in St. Louis City, Missouri and St. Clair County, Illinois.
P-2853