The project proposes to construct a rootless dike at Mississippi River Mile (RM) 173.4L and place backline revetment at four locations on the left descending bank (L) from RM 171 to 175. Fill material would consist of quarry run limestone consisting of graded “A” stone. The Mosenthein/Ivory Landing Phase 4 Regulating Works Project is located in the Middle Mississippi River (MMR) between River Miles (RM) 170 and 175 in St. Louis City, Missouri and St. Clair County, Illinois.

P-2853

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice