Home

St. Louis District

Run scraper

The applicant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant, Pinnacle Land Development, L.L.C., seeks authorization to conduct grading and filling activities in jurisdictional waters of the United States to develop the project area into a multi-use retail/commercial development. The applicant proposes to clear, grub, and fill approximately 15.47 acres of wetland consisting of approximately 3.66 acres of emergent wetland, 2.60 acres of scrub-shrub wetland and 9.21 acres of forested wetland. The wetlands are situated adjacent to and/or abutting the Meramec River and the fill area is proposed to be raised above the 100-year flood elevation. The project area is located between Highway 141, Highway 21 and the Meramec River in unincorporated Jefferson County, Missouri. The Public Notice opens December 12, 2013 and closes February 10, 2014.

P-2855

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas