You can copy from here when filling out the rest of the page.
The U.S. Army Corps of Engineers, St. Louis District (USACE) proposes to construct the Grand Tower Phase 5 Project as part of its Regulating Works Project. The Proposed Action includes the construction of two chevrons and the extension of one dike in the Crawford Towhead between RM 72 and 74. The Vancill Towhead project is located between RM 67.0 and 70.0 and includes construction of 3 weirs, 3 diverter dikes (S-dikes), repair of dike 67.8, revetment at 67.3 and shortening of dikes 67.3 and 67.1. Placement of rock training structures would provide a sustainable alternative to repetitive maintenance dredging. Fill material would include approximately 35,000 tons of quarry run limestone consisting of graded “A” stone. The Grand Tower Phase 5 Regulating Works Project is located in the Middle Mississippi River (MMR) between River Miles (RM) 67.0 and 74.0 in Cape Girardeau County, Missouri and Union County, Illinois near the town of Cape Girardeau, Missouri.
P-2856