James Holm is the Regulatory point-of-contact for this permit application from Columbia Crossings for dredging work at three sites (Island Cove, Jantzen Bay and Tomahawk Bay) on the Columbia River in Portland, Ore.
PUBLIC NOTICE for Permit Application30-Day Notice
Issue Date: June 5, 2012
Expiration Date: July 5, 2012
US Army Corps of Engineers No: NWP-2010-141-4
Oregon Department of State Lands No: 48395-RP
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineersnumber shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
James Holm james.a.holm@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Columbia Crossings, 515 NE Tomahawk Island Drive, Portland, Oregon 97217
Location: The maintenance-dredging project includes three facilities on the Columbia River, in Portland, Multnomah County, Oregon. The sites include the Island Cove, Jantzen Bay, and Tomahawk Bay moorages. The Island Cove and Jantzen Bay moorages (11678 NE Island Cove Lane) are in Section 34 of Township 2 North, Range 1 East and the Tomahawk Bay moorage (515 NE Tomahawk Island Drive) is in Section 2 of Township 1 North, Range 1 East.
Waterway: Columbia River, near river mile 106
Project Description: The proposed maintenance-dredging project entails dredging each of the three sites four times over the next ten years, as shown on the page 2 table. The proposed dredging method is a hydraulic suction dredge and either piped to a barge or directly to the in-water placement site on the Oregon side of Columbia River Federal Navigation Channel at river mile 106. The dredge placement area is approximately 50 acres and sediments will be placed by a pipeline that is ten feet below the water surface. The layer will be approximately 1.5 feet thick up to a depth of -19’ Columbia River Datum.
The work will be conducted during the approved in-water work window based on coordination with the National Marine Fisheries Services, Oregon Department of Fish and Wildlife, and interested Native American Indian Tribes.
Site
Dredge Area (acres)
Dredge Volume (cy)
Dredge Depth (feet in CRD)
Dredge Cycle 1 (2012)
Island Cove
3
4,500
-9
Jantzen Bay
14
55,000
-9
Tomahawk Bay
10
90,000
-9
subtotals
27
149,500
Dredge Cycle 2 (2015)
Island Cove
4
15,000
-9
Jantzen Bay
6
15,000
-9
Tomahawk Bay
8
35,000
-9
subtotals
18
65,000
Dredge Cycle 3 (2018)
Island Cove
4
15,000
-9
Jantzen Bay
6
15,000
-9
Tomahawk Bay
8
35,000
-9
subtotals
18
65,000
Dredge Cycle 4 (2021)
Island Cove
4
15,000
-9
Jantzen Bay
6
15,000
-9
Tomahawk Bay
8
35,000
-9
subtotals
18
65,000
TOTAL
344,500
The sediments consist of 71 to 82 percent sand, 15 to 26 percent fines, and 0.1 to 1.4 percent gravels. The dredge prisms were evaluated in 2010 under the Sediment Evaluation Framework and were acceptable for unconfined, aquatic placement. The post-dredge surfaces were acceptable for unconfined, aquatic exposure.
Mitigation: The applicant has not proposed a compensatory mitigation plan for periodic maintenance dredging because the work only temporarily removes the sediments, as the sites are located in depositional areas and they will be replaced over time. Additionally, the dredged sediments are not proposed for removal from the Columbia River system.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to maintain previously authorized operational depths and access for boathouses, boats, and public safety vessels, as well as moorage infrastructure.
Drawings: Thirteen drawings are attached and labeled Corps No. NWP-2010-141-4 enclosure.
Additional Information: Additional information may be obtained fromJames Holm, Project Manager, U.S. Army Corps of Engineers by telephone at 503-808-4385 or by e-mail at james.a.holm@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time, the Corps is unaware of any cultural resource surveys of the project area.
The Corps coordinated with the Oregon State Historic Preservation Office and interested Native American Indian tribes on recent permits issued for the Island Cove moorage (NWP-2010-141-1, NWP-2010-141-2, NWP-2010-141-3). During those reviews, no historic properties or cultural resources were identified at the Island Cove moorage.
This notice has been provided to the Oregon SHPO, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation,water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
NWP-2010-141-4
W Htj, SI
l,
E 15~6'1
:!;
·
1
-
U
i
EslherShor1
.
E!.. I
Sho!1 Park
~.
£f ilktoogOlin B/wI:I
~~
",.., ."
E H1I)SI
Officers
Row
!!>
Enclosure (1)
Ctntral PIJI'\I.
E t.QI Plmn aNd
Hud$lJn Bay
z
Fan vancouver
National
H'$.Iorle Sile
N
[
r fM
r
E E\le..""
[>
·
Pearson
!
Field
i
...
Lewis and CIaTto:.Hwy
®
CQlu
W,
-
JA.NTZEN BAY
MANAGEMENT \ ;
AREA
...... ~\
,..--.-
i
-.~--
-
·
\
,A,
/.~'~I"
ItfParl/
Expo Center
ISLAND COVE
MANAGEMENT
......
Eest
Columbl.
NE t.illll:te
·
Dt
-
Oelill
Park East
.
;,
Cok!mtWt
ChtI()'f'r\'1I
r
f
Col\Jmbla
Ed!)ewater
~OIf Club
AI,)orerum
R\IIerSldC
country 0
,
Svn
',000
2,000
',000
COLU MBIA R!VER - WLE 106
LAT: 45· 36'28..41" N
LON: 122·40"39.27" W
OATUM:CRO
oundSlfHeg,e!n
DATE:
O2I22J12
PROJECT NAME:
DRAWN 8Y: _ _ V. BACHMANN
PROJECT NUMBER
eJ-IECKED BY _ " "
STREET AOORESS
CAD FILE. _ _ 04S8-003_SlTE_VlCINfTY
C/TY,ST,I.,TF
TOM.t.H.\WK ISlANO PROPERTY
0-158-003-01
TOW.HAWK ISLAND
PORTlAND. OREGON
FIGURE 1
PROPERTY LOCATION MAP
NWP-2010-141-4
Enclosure (1)
o
·
I
!
ound .. t.
DATE:
2/2112012
DRAWN BY, _ _ " "
CHECKeD BY ___ '""
CAD FILE: _ _ _ 04M-003_SEDlMEHT
PROJECT NAMe:
PROJECT NUMBEfI
STREET f.OOAESS
CITY. STAT£-
TOMAHAW!I( ISlAND Pf'IOPeRlY
~..."
TOMAHAWK ISlAND
POIUtAND, OREGON
FIGURE 2
PROPERlY PLAN
NWP-2010-141-4
Enclosure (1)
-COLUMBIA
CROSSINGS
TW.s WOP US PRePARED fOil
.ts:;'[ss..o!' f't.RP05E 010.. y
PLAT MAP
FROM MULTNDMAli COUNTY
ASSESSORS OFFICE
SECTION 2 T.IN. R.IE. W.M.
t',
C'q-
DATUM: eRD
"
V{,-A
--+-..f'PROX.
-
~'"
--\l
·
,",
·
LON: 122"40'18.:u" W
.
PORTL.AND
I
COLUMBIA
RIVER 106
LAT: 45' 36'22..37" N
& INDEX
'00'
" AI'f'ROx.
"
-r---
NOTTOSCALE
IN IE 2
MULTNOMAH COUNTY
"
·
I
,
SLOUGH
,
-17t.t---?
I
o o§
~ ~~
-0
~
---
;
S! ~ §;
"- ~ ~
~
SEE MAP
IN IE 2A
c
'"::>w !~.I'
~~
'00
OREGON
~~
lii"
M ~~
¥
·
~
~.
m~
T
.
HI.
-UJ~:2
'00 ......... -.
-~
··
...
<'
.o\.,.'>
"- .... "'t;
'"
SEE MAP
IN IE ZC
!J!J
.... ~
",,,,..,«1
"a·
~.~<-
'00
201
' " C>
,
,,0
~\~
l
~0~
f
·
/;_'
c.
nut
I
~~'
~.W.COll.
SAR.W ." 'iON "EOIIS
",:,~-!o,c ..
!J___.,\
SEE MAP
\,
IN IE 2C
,
I '
-C-
_---L~~.
.
"
,,
IoIAP '" It II ..
g
i
W
..
~I
~f"
~>~~
"'Sw"
CJ ;;;::
., s
~~~~
=- ,!
m~!
.g~
-~
,
5 !
NWP-2010-141-4
Enclosure (1)
·.-"-.
~~S~~
2··
.. me
!£ ..... ~!£
oo
~~6g>
£t;
."'5>
c .... [:l
,··'.
~!::l
~~
~>
., 0
0
~~ r-
d~ H c:
n. 3:
'>
~~
··
,m
80
m ..
~?< III
o~
~
H
,.
~
~~
0'
;;
0
;tJ
0
(/)
~~
!!!
~
(/)
0m
Z
Cl
<
m
.--z=
DATE:
oundStratel
212112012
PROJECT NAME;
TOMAJ-IA.WK ISLAND PROPERTY
DRAWNBY: _ _ ~
PROJECT NUM8ER'
CHECKED BY _ _ "'"
CAD FILE, - _ _ 0453..0(KCTOM-f't..AN
STREET ADDRESS
""'"
erN, STATE '
TOMAHAWK ISlAND
POR.ll..AND, OREGON
FIGURE 4
TOMNiAWK BAY t.lANAGEMENT AREA
BATHYMETRIC SURVEY CONTOURS
WITH CROSS SECTION LOCATIONS
"
· ·
. ..
NWP-2010-141-4
..
r.
®
,~,
Ii
!,
°
g ·"
~~~!~
.
J: ... ~;IIii:
~..! ! IJI
..
£t~r;;5>
...
,~
· · ,··
~
8
~
i
Enclosure (1)
0..,.:
·z
·
"~
m
III
.
"~
"0<
~~~
~~~
~~~
~;;:m
"~
°a"
o '
.,m
"0,
1m
Ii
i
~I~
·~
"r
=m~
~~
<.
~o
m
~
~
c
<
m
~
~
Slrategit·
o
~~
0,
~~
h
:,;.~
x~
o~ 'l
Quod. ·tL
.
H
~~
··
m
~
DATE:
11/1412011
DRAWNSY: _ _ " ,
CHECKED BY, _
".
CAD File: _ _ _ I)o(58-003_TOM..f>I.AN
PROJECT NAME:
PROJECT NUMBER
STREET ADDRESS:
CITY. STATE'
TOMAHA.Wl<: ISlAND PROPERTY
""""'"
TOMAHAWK ISlAND
PORTl..ANO, OREGON
FIGURE 5
TOMAHAWK BAY PlAN WITH OREDGE
VOlUME CALCULATIONS AND CROSS
SECTIONS
NWP-2010-141-4
~z
Enclosure (1)
___
"
=
,,
··
·
;::
cv>
,, ,
·
~
z
V>
'"
'" ;::'"
~
~
'"
~
,"
~CO
Z '
o~
;::~
~
~~
CON
o!"
C-
ZOO
~
co -u
·U
~
r'"
-<~
~
,.
l::
SU .. . ·IOO.)· [)C
ound: .
DATE:
OAAWN BY, _
_
2/2812010
""
CHEClPROJECT NAME'
PROJECT NUMSER
STREET ADDRESS;
CITY, STATE
FIGURE 6
T()t.WiAWK ISLANO
PORn.AND. OREGON
JANTl:EN BAY MANAGEMENT AREA
PLAT MAPWlTll sITe LOC'IT1ON
NWP-2010-141-4
Enclosure (1)
·\
·\
\·
.
\
-~ \
\.
~L;~~~
.
\
o
8
DATE:
oundt
r.'
Slrala9,e!
212612010
DRAWN BY: _ _ ""
CHECKED BY: _
"'"
CADF1LE: _ _ ()458-003_T~
PROJECT NAME:
PROJECT NUMBER'
STREET ADDRESS:
CITY, STATE'
TOMAWIWK ISlANO PROPERTY
""""
TOMAHAWK ISlNlO
f>ORT\.ANO. OREGON
FIGURE 7
JNITZEN BAY MANAGEMENT AREA
BATHYMETRIC SURVEY CONTOURS
WITH CROSS SECTION LOCATIONS
NWP-2010-141-4
Enclosure (1)
·
ffi
··
o
o
ound.
DATE'
21211/2010
DRAWN BV: _ _ """
CHECIPROJECT NI.ME,
TOMAHAWK ISLAND PROPERTY
PROJECT NUMB£R
0458.0G3
STREET ADDRESS
CflY, STI'.TE"
TOMAHAWK ISlAND
PORTlAND. OREGON
FIGURE 8
JANTZEN BAY PlAN WITH DREDGE VOLUME
CAlCULATIONS.-.NO CROSS 5ECllONS
'
Z
~
_
NWP-2010-141-4
Enclosure (1)
___-
,[
.r,I'
j
·
IE
.<
"'..... "
".~· "S
'
q~ :;- ..........
"
...,'
N
0
!
··
I
~"
i' ,
'",
... -.. . "'.
f!
l'
·
,!
.,
"""";'"
.
"
~
-.".~
.",
"'" ........ ~ .....
.,
I'
1-
~
,I /3'}
/
,"
"
"
I
/'
1
,1 'g
, '"
~
i<
c~
,
'.'
,'i
,'.
N
"
~
~
\.,
~
r
·
;
~
j
;
·
,
su....,lt>.,·)t
~
~
~
"
>
~
,
·i
~(
:,f
~
q
·
,! ,
,·
l
~n
z'
o~
i"'~
n'"
of'
C
/'
(j
r~
~
/
~
')
~~
'Of
If
,
zx>
~
~"'
~
f::
NWP-2010-141-4
Enclosure (1)
o
__
~_ :z:~
=
DATE:
212112012
DRAWN BY: _ _ "",
CHECKED BY,_"'"
CAD FILE; _ _ G4S6..00USl-COVE....PU.N
TOMAHAWK ISlAND PROPERTY
PROJECT NMtE:
PROJECT NUMBER"
STREET AODfU:SS
TOMAHAWK ISlAND
CllY, STATE"
PORltANO, OREGON
~...,.
FIGURE 10
ISlANOCOVE MANAGEMENT AAEA
aATHYMETRIC SURVEY CONTOVRS
WIlli CROSS SECTION LOCATIONS
NWP-2010-141-4
~j
~o
~~
~i\
m.
~N
'0
~~
X~
..
···
·
0
~
®
·
·
Ii
··
8
"~
·
g
~
·· ··
II'
i,1I
m
~
!
II
II
m
0
0
m
,
··
Enclosure (1)
~~I
'I
i'l
~!,
§ih
5
8
0-
-'..
III'
,Ii
iI~'~··
I
IIIi
· I!
® ,
Ii, i
~
g
., I 1m
;.~
... e
~
I®
00
~~::t~
31::";';1::(;
.. I::: · I:
Q.:::;:W
c"'l oJ1!!
.~~
O.
···z
·
8
n
~
m
··
!
cr-!;O
0
m
~
·"
~ ~Iz
~~
~
~
~
~
m
cz
"
00
~
~
0
~
·
~
c~
<
m
·
§
" ~
ound
"
DATE:
212112012
DRAWN aY, _ _ _
CHECKED ay: _ ' ' ' ' '
C"l)
--~
FILE. _ _ 1W58-003_ISl-COVE_XS
PROJECT NAME:
PROJECT NUMBER·
STREET ADDRESS;
CITY, STATE:
TOMNiAWK ISlAND PROPERTY
()458-(103
TOMAHAWK ISLAND
PORTlAND, OREGON
FIGURE 11
ISLAND COVE PI..AN WITH DREDGE VOLUME
CALCUl..ATlONS AND CROSS SECTIONS
NWP-2010-141-4
Enclosure (1)
i~
' 00
~ oo
il r- r~~
~ cc
~o , :;: :;:
';;I
!II
g '" !II
-< ~ l> l>
~ a::u
n
· - ;II
0<0
~ ~m
~ ~ ;II en
0
· co c::r ~
~ rll » Z
0
Z ~ en C)
m
<
m -
~ z
~
"
0
8
~
.,,
\.
(----,
I
/
If /
i
~~
(
(
/
r
un
""~I!J
p>{;i:!!
or~-"
·
go~~
· e
iQ~
g
~
~
_.
-..,
·
§
en
NWP-2010-141-4
Enclosure (1)
r
~!
i
(
- . _.i
I
I
I
I
I i
'I
·
~oundSI ategif1
.1n
I
-..,............,.....,...,..
OATE:
DRAWNBV:
CHECI212812010
~,
"'"
0458-003_TOM·PLAN
PROJECT NMtE;
PROJECT NUMBER:
TOMAHAWK ISlAND PROPERTY
STREET IDORESS'
TOMAHAWK ISlAND
POR~D. OREGON
CITY. srATE;
FIGURE 13
COLUMBI ... RWER BASIN PROPOSED FILL
AR9. FOR DREDGED SErnMENTS · PlAN
VlEW AND CROSS SECTIONS