James Holm is the Regulatory point-of-contact for this permit application from Shore Terminals LLC for maintenance dredging on the Willamette River at the applicant's P2 dock.

Public Notice for Permit Application

Issue Date: August 30, 2012 Expiration Date: September 30, 2012 US Army Corps of Engineers No: NWP-2012-302-2 30-Day NoticeOregon Department of State Lands No: 51437

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan. Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address: U.S. Army Corps of Engineers James Holm, james.a.holm@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: Shore Terminals LLC, 9420 NW St. Helens Rd., Portland, OR 97231 Location: Willamette River, River Mile 5.1, 9420 NW St. Helens Road, Portland, OR 97231, Multnomah County, Section 11 ofTownship 1 North, Range 1 West Waterway: Willamette River Project Description: The proposed project is maintenance dredging in the Willamette River at the applicant's P2 dock.The dredging location is part of the Environmental Protection Agency Portland Harbor Superfund site.The dredge area is a trapezoid shape connecting the dock to the federal navigation channel.The P2 berth is 800 feet wide along the front of the dock, 1,288 feet wide along the federal navigation channel, and extends 244 feet from the face of the dock to the federal navigation channel.The total dredge is expected to be 45,288 cubic yards in order to maintain a depth of -40 feet Columbia River Datum with a possible 2-foot over depth (-42 feet CRD). The dredge material is composed of coarse silt to fine silt and to a lesser degree, fine sand to medium gravel. The P2 berth is an area of deposition where sediment builds up and maintenance dredging is necessary to keep the berth usable. The dredging operation will not occur on a continuous basis because work will stop each night, during equipment movement and maintenance, and when barges are hauled offsite and replace with new barges.The exposure of the sediment to the water column is limited to 40 consecutive days of mechanical dredging and potential capping activity (rock or sand), excluding Sundays. Dredging is currently planned for 2013 using the mechanical dredging method (environmental bucket) and dump scow barges.The cable arm environmental bucket provides a complete capture of the sediment and closes completely to minimize any interactions between the water column and the sediment. An environmental bucket with a closed-lip mechanism will reduce the potential for re-suspension of sediment into the water column while the bucket ascends. There remains the likelihood of re-suspension of sediment during the dredging and capping process, which is unavoidable; however, implementation of best management practices greatly reduces any re-suspension. On the dump scow, the weep holes would be plugged so no material will be allowed to flow overboard and mix with the water column. Excess water would be pumped into storage containers, then treated, tested, and discharged via a NPDES-approved disposal method. The dredge residuals will be pumped into storage vessels while dredging is occurring for appropriate disposal once tested. Each dump scow would then be transported to Waste Management’s Columbia Ridge Recycling (Subtitle D Landfill (Non-hazardous)) in Arlington, Oregon, or Roosevelt Regional Landfill, operated by Allied Waste Services in Klickitat County, Washington. A decision regarding the capping method will not be decided until late 2012, when a sediment evaluation of the dredge material and post-dredge sediment surface review will take place. At that point, it will be determined if the dredged area will have no cap, a rock cap, or a sand cover. If a cover is necessary, a second public notice may be issued at that time. Purpose: The objective of the proposed project is to perform maintenance dredging at the P2 dock (Willamette River Mile 5.1) to maintain ship berth depths for long-term operations. The maintenance dredging is necessary to maintain a -40 feet CRD, including a 2-foot overdepth. The dredging is required to keep the berth commercially viable and competitive at the Portland terminal. Drawings: Five drawings are attached and labeled Corp No. NWP-2012-302-2 attachment. Additional Information: Additional information may be obtained Mr. James Holm, Project Manager, U.S. Army Corps of Engineers at (503) 503-808-4385 or e-mail: james.a.holm@usace.army.mil. Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States. Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States. Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification. Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act. Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing. Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed. Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects. Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

IMap 1. Vicinity Map USGS 7.S-minute Series (Linnton, OR)

Z

E

g &

III C>

'"

z

Z E g

.

~I1tIlliE .~.I'II"''''' ~

~

~

o

." ....,......'"

'"

co

~

co

11'1

'" P2 Dock N 45 0 35.656' W 122 0 46.676'

o

S17 000m E.

NA D27 Zone lOT s18 000m E.

J

jMU ooo MH£RS

9... F3 UXk) fEEr 9 *+±H FA S!lL E+H d Printed from TOPO! C2000 National Geo,lIBphk Holdin~ (\\....\'W. topo.com) Reference Number: Applicant: Shore Terminals LLC Adjacent Property Owners: ExxonMobil Oil Corp. Brix Maritime Co. Proposed Project: Maintenance Dredging In: Willamette River (RM 5.1) Near: Linnton County: Multnomah State: OR Date: 04/09/2012 Sheet 1 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

IMap 2. Parcel Map ';'CCT ION I: T .IN . R.'YI.

ru .1.

1"1 I:; 1\ &. 1:100

COR T1_ ~'~ 9

5'

::-

( ~ .... ;

, >t ,!

~a:

..:.

.r"' ;"

"'.....

'4)\

. E!I

Project Site 9420 NW St Helens Rd . Portland OR 97231

P2 Dock N 45° 35.656' W 122° 46.676'

: .:~

,,~

"

...'

2, I ~ I OLX POR II AI~ I}

...,t'iv-J

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 2 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

"" ' ,

Portland OR 97231 N 45 0 35.656' W 122 0 46.676'

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 7 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

IMap 8.

Dredging Plan View

WILLMtETTE RJV1!R RiVER ~I LE 5. ~ EBB

~ FLOOD

.-.~-~,.~,;~~~-~,-=·.~:::~~:.~-\" \~:~~'::~~~~-=~o-~_'~~_~_~~_1_?~~- , ~~,'-~~-:=,- _~:_E:_':_~~_.~_":=':'-'-'''T---__

-.e'r_--l

TOP OF COCK Elf\'. 32.JJ±

P2 DREDGE PLAN

150'

0'

1~O'

~--

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 8 of 9

NWP-2012-302-2

Norwest Engineering CONSULTING ENGINEERS 4110 N.E. 122nd Ave., Suite 207 Portland, Oregon 97230 Phone: (503) 254-0110 Fax: (503) 256-1239

300

i

IMap 9.

Dredge Cross Section (Typical)

CilOINARYHlGHWAlER 'MRK ELEVA1IO.~;JOC.' CRt) ~ ______ _ _ ~~ OR~~E!'~'_ " I'IATER SURFACE lliV ATlIME Of'~: ~X, CRO

--"-+- - - - - + - - - - --t- - - -,,-+-------

,-_

-t- - - - -

-F- --

_ _ _-,._ _ _ _ _''_ ,-_'' ________''_

--

_ --.i..

f - - , , - - - + - - - ---+--"-

I ... -_.. _..-._-_ ...... ".... _.-" ... ..... -.-._......"..__......... .....:!Q..

-2Q

\

\

\

DREDGE SECTION A-A HORllONTAl SCALF; 1- = 50' VERTICAL SCALE; 1" = 6'

i-=.--.======c-o=-ol ~c-u~~~.~

~

uSIa.·

2330l.oop 1604· 1'1 MSnn Antonio, Te][as 78248 ORIGINAL PROJECT NO. 918-2000 ",., 1 -600-866-9060 f-:-:--,-----+--==:::-:-::::------------r.:=--1

~Tel: (210)

EnergyLP.

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 9 of 9

NWP-2012-302-2

SHEET 2 OF 6 PORTLAND TERMINAL P2 DOCK DREDGE CROSS SECTIONS

Ia'.,

DRAW]NG NO'A-3546-P2-D

Norwest Engineering CONSULTING ENGINEERS 4110 N.E_ 122nd Ave., Suite 207 Portland, Oregon 97230 Phone: (503) 254-0110 Fax: (503) 256-1239

" A

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas