Dominic Yballe is the Regulatory point-of-contact for this permit application from Oregon's Dept. of Transportation for work at Upton Slough and Whetstone, Swanson and Lone Pine creeks, on Highway 62, in Medford, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: October 04, 2012 Expiration Date: November 04, 2012 US Army Corps of Engineers No: NWP-2010-593 30-Day Notice Oregon Department of State Lands No: NA

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Dominic Yballe PO Box 2946 Portland, OR 97208-2946

Applicant: Oregon Department of Transportation – Region 3 Attn: Anna Henson 100 Antelope Rd. White City,OR 97503-1674

Location: The project is located on Oregon Hwy. 62, from Bullock Rd. to East Gregory Rd. The site is in the city of Medford, Jackson Co., Ore. Start: 42.35511 N; -122.868631W End: 42.418146N; -122.854469W

Waterway: The project will potentially affect Whetstone Creek, Swanson Creek, Upton Slough, Lone Pine Creek, and adjacent wetlands.

Project Description: The Oregon Department of Transportation is proposing a new 5-mile bypass on Oregon Highway 62 to the west and generally parallel to the existing alignment. The new bypass will be composed of four 12-foot travel lanes, one 10-foot center median, and two 8-foot wide shoulders. Construction includes grading, erosion and sediment controls, drainage preparation, utility installation, paving, stormwater treatment and other related improvements. The project involves the discharge of 131,175 cubic yards of fill, impacting approximately 9.756 acres of wetlands, and the discharge of 4,276 cubic yards of fill impacting 0.554 acres of waters below the ordinary highwater mark. The project will occur in two phases as funding allows. Phase I will extend from the southern terminus to just south of Vilas Road. Phase II will extend north from Vilas Road to the Medco Haul Road past Justice Road.

Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan that combines debiting wetland mitigation credits from the ODOT Vernal Pool Mitigation and Conservation Bank and off-site restoration of a 63-acre portion of a 116-acre vernal pool site identified as the Kincaid Property Mound Site. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose of the project is to alleviate traffic congestion, improve intersection operation, enhance transportation safety, and provide multimodal opportunities in the Crater Lake Highway corridor between Medford and White City.

Drawing(s): Thirty-four (34) drawings are attached and labeled Corp No. NWP-2010-593.

Additional Information: Additional information may be obtained from Mr. Dominic Yballe, Project Manager, U.S. Army Corps of Engineers at (503) 808-4392 or via email at dominic.p.yballe@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated by the Federal Highways Administration as the lead federal agency for this project. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

JOINT PERMIT APPLICATION FIGURES

Figure1: Project Location Map Figure 2: Wetland Impact Design Sheet Index Figures 3-A through 3-O: Wetland Impact Design Sheets (Phase 2) Figures 4-A through 4-P: Wetland Impact Design Sheets (Phase 1)

White City Agate Rd

OREGON OREGON Jackson County Project Location

Project Location Map

Gregory Rd. Corey Rd

WH ET S TONE CREE K

Gregory Rd.

Figure 1

Lotus Ln

Jus tic

eR

Crater Lake Hwy

Table Rock

July 2012

d

N SW AN SO

N

CR EE K

Map Features

E Vilas Rd

Construction Footprint

ON PT U

S

L

O

GH U

Medco Haul Rd

Streams CONSTRUCTION PHASE 2 CONSTRUCTION PHASE 1

Streets

¬ « 62

Rogue Valley InternationalMedford Airport Commerce Dr

E N PI E

EEK CR

City of Medford

0

N LO

Whittle Ave

K I-5

Bullock Rd

EE CR

§ ¦ ¨

Biddle Rd

R EA

K:\Hwy_62\_MXD\Exhibits_for_tech_reports\All_rpts_Figure_1.7.mxd

B

Background Topographic Map Source: USGS

Copyright:© 2011 National Geographic Society, icubed, Copyright:© 2012 ESRI, NAVTEQ, DeLorme

Miles 0.45

0.9

JPA FIGURE 2- WETLAND IMPACT DESIGN SHEET INDEX

JPA FIGURE 3-A THROUGH 3-O: WETLAND IMPACT SHEETS (PHASE 2 FROM NORTH TO SOUTH)

JPA FIGURE 4-A THROUGH 4-P: WETLAND IMPACT SHEETS (PHASE 1 FROM NORTH TO SOUTH)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas