Debra Henry is the Regulatory point-of-contact for this permit application from the Port of Toledo for work on the Yaquina River at River Mile 12.3 in Toledo, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: October 12, 2012 Expiration Date: November 12, 2012 US Army Corps of Engineers No: NWP-2000-1067-2 30-Day Notice Oregon Department of State Lands No: N/A

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Debra Henry, debra.j.henry@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: Port of Toledo P.O. Box 428 496 NE Hwy. 20, Unit 1 Toledo, OR 97391

Location: The project is located at Port of Toledo (formerly theFred Wahl Marine Boatyard), Lincoln County on the Yaquina River at river mile 12.3, Toledo, Oregon, (Section 18, Township 11 South, Range 10 West).

Waterway: Yaquina River

Project Description: The Port proposes to dredge approximately 3,000 cubic yards of sediment from under the boatyard dock and drydock area in the Yaquina River. The sediment to be removed is located in the subtidal zone. The contractor will use a combination of long reach excavator and clamshell dredge to remove the shallow sediment material and wood debris within the dredge prism. The sediment to be removed will include copper and tributyltin which exceeds DEQ ecological screening levels. Water-tight trucks will be used to transport the saturated sediment. The dredge spoil material will be trucked to a contained upland disposal site located on Port property above the 100 year flood plain. The material will be placed in a berm created to hold the spoil while it dewaters. Dredging will take place through August 15 to September 15 timeframe and approximately take four weeks. Erosion and sediment control measures consist of silt fencing around the project. Inlet protection and straw wattles will be placed on any adjacent slopes exceeding 10%. Mitigation: If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: This is a consent judgment case # 104629C State of Oregon/Port of Toledo mandated a clean-up of the former Fed Wahl Marine boatyard. The port has proposed a cleanup dredging plan as described in ART Sediment Characterization Report and dredge prism which was accepted by DEQ. Proposed volume is estimated at 2,991 cubic yards with the average depth to hard material of 2 feet. The dredging extent will be confirmed by bedrock surface.

Drawings:Sixdrawings are attached and labeled Corp No. NWP-2000-1067-2 enclosure.

Additional Information: Additional information may be obtained from Debra Henry, Project Manager, U.S. Army Corps of Engineers at 503-808-4391 or email debra.j.henry@gmail.com.

Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PORT OF TOLEDO FORMER FRED WAHL DRYDOCK SEDIMENT DREDGING PROJECT

PROJECT

LOCATION MAP

"PARTNERS IN SERVICE"

NOT TO SCALE

N

EROSION SEDIMENT CONTROL PLAN

PROJECT SITE

BASE MAP: USGS 7.5' QUADS, TOLEDO NORTH & TOLEDO SOUTH (1984), OREGON

VICIVINTY MAP 0

2000'

4000'

RENEWAL: 12/31/2013

SHEET INDEX C1 C2 C3

COVER SHEET CONTAINMENT BERM PLAN & SECTION EROSION CONTROL DETAIL

C1

3

SEDIMENT FENCING DETAILS Scale: NTS

BIO-FILTER CHECK DAM DETAILS Scale: NTS

EROSION CONTROL DETAILS

1

"PARTNERS IN SERVICE"

2

3

WATTLE DETAILS Scale: NTS

4

STOCKPILE MANAGEMENT Scale: NTS

RENEWAL: 12/31/2013

C3

3

NOTE: NEW SURFACE MATERIAL (NSM)ELEVATION WILL BE WEATHERED SILTSTONE SURFACE. SILTSTONE SURFACE EXTRAPOLATED FROM VIBRACORE SAMPLE LOCATIONS, SILTSTONE DEPTH MAY VARY. DREDGE PRISM APPEARS TO BE .BELOW SUB-TIDAL ZONE

VERTICAL DATUM CONVERSION

MLLW (FT)

NGVD 88 (FT)

MEAN HIGHER HIGH WATER (MHHW): MEAN HIGH WATER (MHW): MEAN LOW WATER (MLW): MEAN LOWER LOW WATER (MLLW)

8.83 8.15 1.27 0.00

9.63 8.95 2.07 0.80

STATION ID: 9435362 CUT SECTION (SEDIMENT TO BE DREDGED)

DREDGE SECTION, FIGURE 3

"PARTNERS IN SERVICE"

APPROXIMATE ELEV. OF WEATHERED SILTSONE

1

1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas