Heidi Firstencel is the Regulatory point-of-contact for this permit application from the Medford Water Commission for work affecting vernal wetlands adjacent to the Rogue River.

PUBLIC NOTICE for Permit Application Issue Date: October 30, 2012 Expiration Date: November 28, 2012 US Army Corps of Engineers No: NWP-2008-726/2 30-Day Notice Oregon Department of State Lands No: 48143-RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments or questions should be directed to:

U.S. Army Corps of Engineers Heidi Firstencel (heidi.firstencel@usace.army.mil) Eugene Field Office 1600 Executive Pkwy., Suite 210 Eugene, OR 97401-2156 541-465-6765

Applicant: Medford Water Commission 200 S. Ivy St., Rm. 177 Medford, OR 97501-3189

Location: The project is located at the Duff Water Treatment Facility at the corner of Table Rock Road and Kirtland Road, in Central Point, Jackson Co., Ore. The site is in Section 13 of Township 36 South, Range 2 West. Latitude 42.4378 ̊, Longitude -122.8911̊

Waterway: Vernal pool wetlands adjacent to Rogue River

Project Description: Metropolitan Water Commission proposes to discharge fill material into waters of the United States to develop approximately 8.3 acres of land to upgrade the existing Duff Water Treatment Plant facility, and to prepare the site to accommodate an expansion planned for 2021. The DWTP site is approximately 42 acres with 14 acres currently fully developed with the existing water treatment plant. Work associated with the first phase of the project would result in the direct loss of 0.28 acre of vernal pool wetlands by placing fill material into 5.5 acres of vernal pool complex, and would include site grading, drainage, access driveways and utilities. This phase of the project is expected to be completed within one year. The vernal pool complex extends off the project site and the applicant has indicated that the excavation/construction of a discharge water settling lagoon could result in adverse modifications/loss of an additional 2.045 acres of vernal pool complex (0.045 acre of vernal pool wetlands), by either decreasing or increasing hydrology input to this area.

Subsequent development, planned for 2021, on the 8.3 acres would include: an expansion of the existing water treatment plant (new administration and operations buildings, a membrane water treatment facility, a chemical storage facility, two water reservoirs, a treated water pump station and a discharge water settling lagoon). No additional impacts to waters of the United States are anticipated during this subsequent development. All of the proposed work would occur within the construction limit lines as shown on the attached drawing.

Stormwater conveyance from new impervious parking areas proposed northwest of the existing facility would be directed to an existing drainage to the Rogue River. Catch basins with oil/water separators would be installed to remove pollutants prior to discharging into the drainage.

Mitigation: The applicant has proposed a wetland mitigation plan to protect and manage up to 17.03 acres of Agate Desert vernal pool complex habitat as compensatory mitigation. The mitigation site would be located adjacent to the 53-acre Agate Desert Preserve which is owned and managed by The Nature Conservancy. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To provide potable water to meet existing and predicted public needs within the Metropolitan Water Commission’s service area over the next 30 years.

Drawings: Six drawings are attached and labeled Corps No. NWP-2008-726-2 attachments.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may adversely affect endangered or threatened species and their critical habitat. Three listed species can be found within vernal pool habitats of Jackson County. These include the Vernal pool fairy shrimp (Branchinecta lynchi), Large-flowered woolly meadowfoam (Limnanthes floccosa ssp. Grandiflora), and Cook's lomatium (Lomatium cookii). The applicant submitted a Biological Assessment (BA), dated August 18, 2011, which stated that the impact site was surveyed for ESA species, but that none were found. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed. Cultural Resources: An historic properties investigation and cultural resources survey has been completed for the 41-acre water treatment plant site. No sites determined eligible for or listed on the National Register of Historic Places were found. The proposed mitigation area has not been surveyed for the presence of cultural resources and/or human buried remains. However, no earth-disturbing activities are proposed at this location. The Corps has made a determination the proposed project will have “no effect” to cultural resources or historic structures. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Corps No. NWP-2008-726/2 Medford Water Commission - Site Location Map

Figure 1 of 6

Corps No. NWP-2008-726/2 Medford Water Commission - 2010 photo - Existing Site Conditions. Fig. 2 of 6

Below Ordinary High

Water~

WTP Outfall Swole Drainage Ditch A Drainage Di tch 8

9379 465 400

f

GRAPHIC 9CAIB

100 0 50 100 200 ~~~ ~(IN FEET)

400

I

I

1 Inch = 200 tt.

Th e data collected for this mopping has been collected to a positional occurocy of at least 0.5' horizontally & vertically.

\ City of Medford

Tl 800

\

12

&·..

~ . 1)<

21

Z11i?

2 21 ,.

,. 2

'"

?J~ UIJ

D"2J

30

Kirtland Road

Study Area Boundary

Northwest Biological Consulting

Jurisdictional Wetland Waterway Ditches

Habitat Restoration, Environmental Planning CA Engineering Contractor OR General Contractor

1-:-"""""~!:f::!!tlli!.!..-..j

324 Terrace SL P.O. Box 671 nwbiolog.com 1-==:::_-----~ -=-...-!'-- Ashland, OR 97520 Ph/Fax (541) 488-1061 ~~~~~!.!:!::~-!

Corps No. 2008-726/2 Medford Water Commission

Fig. 3 of 6

"

. EXISTING ; IMPROVEMENTS -"""-._ BOUNDARY

I /1\_,..---~ ·

) ~PROPERTY LI.N~ .-- J

~

(~

KIRTLAND ROAD

NEW STRUCTURES- LEGEND 1. NEW W ASHWATER LAGOON 2. N EW C LEARWELL 3. NEW MEMBRANE BUILDING 4. NEW OZO NE CONTACTORS 5. NEW PLATE SETTLER & FLOCULATION 6. NEW CHEMICAL BUILDING 7. NEW A D MINIS TRATION & PRECONDITIONING BUILDING 8. NEW CLEARWELL 9. NEW HIGH SERVICE PUMP STATION Fi . No.

..... ..... 0 N ..

,

.., ..J

JOINT PERMIT APPUCAllON

SCALE: 1' · 250'

Northwest Biological Consulting .

®

. ·-..~. Habitat Restoration,

PROPOSED IMPACT SITE PLAN ::·-~ = ~ \cA DUFF WATEA PLANT EXPANSION ..

·

Environm ental Planning Engineering Conlraclor

OR Genen!l Contractor

324 Terrace St. P.O. Box 671 nwbiolog.com

Ashland, OR 97520

Kerbo Eng ·I nee r·I ng 541-290-8600

Ph/Fax (541) 488-1061

Revisio n :

File:

JOINT FILL PERMIT SITE PLAN

J o b:

NB-1-0 1

Corps No. 2008-726/2 Medford Water Commission

Fig. 4 of 6

AGENCY REQUIRED MITIGATION AREA CALCULA llON VERNAL VERNAL VERNAL VERNAL TOTAL

POOL POOL POOL POOL

WETIED WETTED UPLAND UPLAND

AREA DIRECT IMPACT AREA INDIRECT IMPACT COMPLEX DIRECT IMPACT COMPLEX INDIRECT IMPACT

RATIO ACRES MIN. MITIGATION ACRES DSL CORPS IMPACTED DSL CORPS 1.5 3 0.28 0.84 0.42 0 1.5 0.045 0 0.07 0 1.5 6.40 0 9.60 0 1.5 1.10 0 1.65 7.83 0.84 11.74

SF I ACRES JURISDICTIONAL DITCHES DITCH A 465 I 0.011 DITCH B 400 0.009 OU1f ALL DITCH 9 379 I 0.215 TABLE ROCK ROADSIDE DITCH* SEE NOTE 10244 0.235 TOTAL * NOTE: THE ROADSIDE DITCH IS WITHIN THE ODOT RIGHT OF WAY AND WAS NOT DEUNEATED. 1

147 . 7 5 Acres

\

L ~ We tl and Li m i t s - P S Field Ph o l o W/ Oir eclion 1 Vernal Pools

[ZZJ

Direcl lmpocled Areas

cs:=s:J

lndirecl lrn po cled Areos

GRAPHIC SCALE

100

~

0

50 100

LJ--rJ

200

400

I

I

{ IN FEET )

- - - Pr o oo s e d Impr ovem ent s

1 inch

=

200 ft.

iological Consulting

Direct and Indirect Impacted Vernal Pool Areas

_,_Habitat Restoration, Environmental Planning CA Engineering Contractor OR General Contractor

324 Terrace St. P.O. Box 671 nwbiolog.com Ashland, OR 97520 Ph/Fax (541) 488-1061

l----~ll:l!G!~~L--1

f----------1

Corps No. NWP-2008-726/2 Fig. 5 of 6

u 0:::: Q)

Q_

GRAPHIC SCALE

0

""-·----

300

Q)

0 150 300

600

600 I

( IN FEET ) inch = 300 fl.

c:: <(

l:)

3i

Vernal Pool We\londs

~=---~= === ] Wetland Complex Area (17.03± Acres)

'' '' '

'

Proposed Fencing Ci\y of Medford (20.00 Acres)

[·~:_. -~-: ~: ~.:~;:J 20' Water Line Easem en \

'JO' Public U\ili\y Easement The Nature Conservancy

(49.42 Acres)

\

Existing Preserve T'ne Nat ure Conservancy 3.58 Acres 49.42 Acres 53.00 Acres Proposed Commission

Wetland Miti gat io n Site 1/.03 Acres (Hatched) 70.03 Acres Total (Of the 17.03 Wetland Complex Acres, 3,67 Acres are Vernal

Pool Wetlands) Properly acreages shown are within an expected

tolerance of 0.01 acre

Vernal Pools within Mitigation Site area P ool

1 2 3 4 5 6 9

acreage

10 11 14 15 18 19 21 22 23 24 27

37 38 40 45 46 47 51 52 54 55 Tot al

Habitat Restoration, Environmental Planning

#

Acreage

2.1373 0.4201 0.1846 0.0653 0.1651 0.154 7 0.0946 0.0934 0.0242 0.0545 0.0531 0.0293 0.0365 0.0135 0.0237 0.0237 0 0213 0.0178 0.0094 0.0090 0.0079 0.0059 0.0053 0.0047 0.0039 0.0038 0.0030 0.0006 3 .6662

Pariani Land Surveying

CA Engineering Contractor OR General Contractor

324 Terrace St. P.O. Box 671 nwbiolog.com ~~~~~!If~~~ Ashland, OR 97520 Ph/Fax (541) 488-1061 j.!

NnMNM CorpscORPSc No. NWP-2008-726/2 Medford Water Commission BGHBGFHFGH Fig. 6 of 6

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas