Benny Dean Jr. is the Regulatory point-of-contact for this permit applicaton from the Springfield School District for work in unnamed wetlands in Springfield

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Benny Dean Jr. is the Regulatory point-of-contact for this permit applicaton from the Springfield School District for work in unnamed wetlands in Springfield, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: November 20, 2012 Expiration Date: December 19, 2012 US Army Corps of Engineers No: NWP-2012-207-1 30-Day Notice Oregon Department of State Lands No: 52078-RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Benny A. Dean Jr. <Benny.A.Dean@usace.army.mil> Eugene Field Office 1600 Executive Pkwy., Suite 210 Eugene, OR 97401-2156

Applicant: Springfield School District John Saraceno 525 Mill St. Springfield, OR 97477-4548

Location: The project is south of Quartz Avenue at 60th St. and east of Bob Straub Pkwy. in Springfield, Lane Co., Ore. The site is in Section 3 of Township 18 South, Range 2 West.

Waterway: A total of 9.99 acres of unnamed wetlands were delineated on the property.

Project Description: Springfield School District proposes to discharge fill material into waters of the United States for the development of a site for a multi-use recreational facility/community park. Up to 4.31 acres of wetlands will be filled for the development of a basketball court, grass play fields, a playground, and a parking area. Up to 7,718 cubic yards of material will be removed from 4.31 acres of wetland to allow sloping of the site. Approximately 8,540 cubic yards of material will be discharged to level the site. The site currently slopes from the east to the west and does not meet the American’s with Disabilities Act requirements for access to the site. The site will be leveled and materials removed from the eastern portion will be used to fill the western portion of the site.

A swale will be constructed near the southern portion of the site to convey surface runoff and subsurface hydrology to a stormwater detention pond constructed in the southwest corner of the site.

Three smaller stormwater swales will be constructed throughout the site to direct flows to the stormwater pond. All stormwater from the site will be treated before it leaves the site to minimize impacts to the aquatic ecosystem and other species downstream.

Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for the impact to 4.31 acres of wetlands by purchasing 4.31 acre credits from the Coyote Prairie North Wetland Mitigation Bank. The wetlands at the project site are slope class wetlands, which is the same class of wetlands at the proposed bank. The purchase of credits from the Coyote Prairie North Wetland Mitigation Bank will provide replacement of lost functions and values within the same watershed.

If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The project purpose is to develop a site for recreational opportunities within the urban growth boundary of the City of Springfield.

Drawings: Three drawings are attached and labeled Corps No. NWP-2012-207-1 enclosure.

Additional Information: Additional information may be obtained from Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers at 541-465-6769 or email Benny.A.Dean@usace.army.mil

Authority: This permit will be issued or denied under the following: Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not required for the described activity.

Cultural Resources: An Cultural Resources Survey and a historic properties investigation has been conducted within the permit area. No cultural resources or historic sites were found in the project area. No historic sites potentially eligible for listing or known listed sites on the National Register of Historic Places were found to exist within the permit area. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

The applicant has identified several other approvals/requirements for the project which includes reviews by the City of Springfield for Discretionary Use, Land Drainage and Alteration Permit, Building Permits, and a Site Plan Review. The County requires approach permits for access to Bob Straub Parkway and to Quartz Avenue since the site is not annexed to the City of Springfield. The State requirements include an archaeological concurrence/clearance, an Oregon Department of State Lands Removal/Fill Permit, an Oregon Department of Environmental Quality (DEQ) 1200-C erosion control permit, and a DEQ stormwater management plan 401c approval.

,, ~

-

.;-- ....

·.

A\

509

#

...

,

~---

'

~

',,.,

' ..

l

\:::$

\

-~,

~·

. .·.' .. ·..·Projec·~ L ~-;_,;:,;.~ . ·."' .. ~· --' ~~.

I

,. ..·£''

.

l (;-········-

"---'·

;[

.

.ri~~--~---'

-~··

. .

l.sc,-'

'" ""

·~·

>0>;

,..,

fi; """;:,

--.

'

:Jt ..."'·'

..

~

'-""

·"

..

>·

..

._.,.- . . ·> .__,.I __,.. ~'

.~·-'"'

·

~·

'

-~--~ Springfield School District {NWP-2012-207/1) {Section 10 of Township 18 S, Range 2 W)

Source: http://resources.esri.com/arcgisdesktop

-- -0.05

0.1

0.2

--

0.3

0.4

Miles

II GCS WGS 1984: NAD 1983 Datum: D WGS 1984

1802033400193

1802033300100

1802030000600

18020900001 00

"Z. !l

\

~

~

\

Figure 2. Springfield Public Schools Jasper Natron Community Park Springfield School District Lane County, Oregon

0 Q

Area of Potential Impact (API) /'V Proposed Contours

[I] Proposed Construction Access/Staging Area

Permanent Wetland Impacts

/-./ Proposed Swale

B3

Avoided Wetland Lane County Tax Lots

/V' Existing Contours (1' Interval)

Cross Section

M&cG 1 inch = 150 feet

··=::~···II Feet

Proposed Stormwater Pond/Swale Proposed Site Plan

\

37.5

N

75

150

Source: Data from Springfield School District. Imagery from Bing aerial maps (accessed 10123/2012). Data reproduced for infomatlon purposes and may not be suitable for

A

legal, engineering or surveying purposes. Conclusions drawn are lheresponsibilityoftheuser. Flgure2_JPA 1012312012

SN01183S 31\S

A.n:punoe JU

OlaA&Q

\

!

[\ I

1\

\

I I I I

''""~""

\

'

\ I

i

!

i

!

I~

I

\ U)

I(_)

<: Q.

I I

" !

I

~

h

I I I

I

i

I I I I I I

'

~

l\

\\

(/)

z

\

!

0

10

\1

I

w

(/)

w

1-

'

C/)

Q.

;:;

I

0

gj

A"'punoa

.

wawoorahaa

5::

I

\

~

I

I

~

0

z

"

:s

IUJ

f-------!

5:

! I

!

~\

i I i

I

ip' ~

!I

i

!

I\\]

!

f

Alepunoa "uBiiiiloaha

uoeAa

0

·

\\

"~~oo

iii

--CorpsNo-:-NWP=20 12-207IT _______

""'1"""13

~~~~~~~~~~~~~~~~iJIJii~'

' '

I

__.!_____ .I.JI!punos lUeWdof9hBQ

~\

UOIIIM1113

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas