Benny Dean Jr. is the Regulatory point-of-contact for this permit application from Cascade Pacific Pulp, LLC, for work on the Willamette River at RM 147.4 near Halsey, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: December 6, 2012
Expiration Date: January 4, 2013
US Army Corps of Engineers No: NWP-2000-486/3
30-Day Notice Oregon Department of State Lands No: 50674-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil)
Eugene Field Office
1600 Executive Pkwy., Suite 210
Eugene, OR 97401-2156
Applicant:
Cascade Pacific Pulp, LLC.
P.O. Box 400
30480 American Dr.Halsey, OR 97348-0400
Location: The project is located on the Willamette River, Mile 147.4, near Halsey, Linn Co., Ore. The site is in Section 1 and 6 of Township 14 South, Range 4 and 5 West.
Waterway: Willamette River, RM 147.4
Project Description: Up to 22,600 cubic yards of material will be excavated from a gravel bar along the right bank of the Willamette River to construct a permanent side channel. The new channel will be utilized to direct flows in front of the water intake and minimize sediment build-up. The fish screen on the water intake will be updated and replaced with a fish-friendly intake. To prevent flows from being cut-off by sediment build up, the applicant will maintain the side-channel for 10 years by removing the accumulated materials and discharging the materials downstream of the intake. Haul roads will be used to place the removed materials in a stock pile area, and coarser material will be used to stabilize the roadways.
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for the impacts to 0.30 acres of riverine flow-through wetlands by purchasing credits from a mitigation bank with riverine flow-through wetlands. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To maintain a long-term water supply for Cascade Pacific Pulp and Georgia Pacific pulp processing plants.
Drawings: Thirteen drawings are attached and labeled Corps No. NWP-2000-486-3 enclosure.
Additional Information: Additional information may be obtained from Benny Dean Jr., Project Manager, U.S. Army Corps of Engineers at 541-465-6769 or email Benny.A.Dean@usace.army.mil
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) have been initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The gravel bar has built over time and consists of alluvial materials with debris deposited from upstream areas. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
The applicant has provided a list of permits and approvals attained for the project, which include a Landowner easement received Aug. 22, 2012, an Oregon Department of State Lands easement submitted on Nov. 7, 2012, a fish screen design submitted for approval by the Oregon Department of Fish and Wildlife and National Marine Fisheries Services, and a wetland delineation submitted to the Oregon Department of State Lands on Nov. 7, 2012. Additional approvals still needed include the Oregon 1200-C Permit, Linn County Grading Permit, and Linn County Building Permit. There is no land use permit needed since the project is compatible with Linn County’s Comprehensive Plan and Land Use Regulations.
By: E!llsEcologicaiServlcos,
M·Y 2012
Source: BLM REO
US<7S2012
Corps No. NWP-2000-486/3
liM
Page 6 of 18
n
(/)~ 8~
>-
0
-a
l!)
CASCADE PACIFIC PULP, LLC
SIDE CHANNEL RECONNECTION
rJ)
z
~
z
·;·"~
~- ~%
~ ~~
i'
2 ~
l: u~
;:;:;
0:::
SHEET INDEX
ABBREVIATIONS
"g
PROJECT OVE'FMEW AND SIT£ ACCESS
C4
EXISTING CONDITIONS
g~.o
C6.1
C6.2
"
"
C8
COVER SHEET
CONSTRUCTION NOTES
!
STOCKPILE AND STAGING AREA PLAN
0\IE:IiALI- CHANNEL GRADING PlAN
CH-\NNEl. GRADING PLAN AND PROFILE
l
CHANNEL GRADING PlAN AND PROFILE
CONSTRUCTION SEQUENCE AND EROSION CONTROL PLAN
CONSTRUCTION DETAILS
RMGETATIONPLAN
AVERAGE
AW.
cc
CONCRETE
g~
CUBIC YAROS
DIAMETER
EXISTING
lfb
(XISnNG GROUND
"·
E'LEVAnDN
FG
'"·
FINISHED GRADE
FEET
INCHES
LINEAR FEET
(')
,,.
(NIC)
NOT lN CONTRACT
FT.
=·
LF
N.T,S.
D.C.
ON CENTER
~~K
SWPPP
rao
PROJECT DESCRIPTION
1YP
THESE DRAWINGS PROVIDE" PLAi>jNING-LE\1£!. DESIGN DETAILS TO AOORESS WATER OLI.oiUIY AND WATEfi
SUPPLY CONC(IINS AT A DISCADE PACIFIC WATER INTAKE ON THE MAINSJ'El.l WILU.METTE RIVER, JUST
WEST OF HA!._SEY, OREGON. THE PROPOSED PROJECT CONSISTS OF ACTIVE R£CQNNf:C110N Of HISTORIC
"''
WS£
"
SID( CHANNELS WITH THE WlLLAME'TTE fiNER AT ITS UPSTR£\M END TO INCR£ASE THE FlOW Of WATER
PAST THE WATER INTAKE.
~tq~<;i'o~~L MAP
GRADING SUMMARY
1.
cur..
ffiL·
VO!!!Mf ({;!JSIC YAROS)
22.soo
W
\
\
GRADING SUMMARY STOCKPILE AREA:
!Tfl.l
cur...
Fill..
VOl liME (Cr!El!G YARDS)
o
17,150
GRADING SUMMARY TEMPORARY ACCESS ROADS:
CUT=
fill""
--0
5,400
PINEGRO~
THE ASOV£ OUANTinES ARE APPROXIMATE IN-PLACE \IOLUMES CALCUU\TED FROM THE
DIFFERENCE BETWEEN EXISTING GROUND AND PROPOSE"O FINISH GRAD£. EXISTING GROUND IS
DEFIN£0 BY THE TOPOGRAPHIC CONTOURS AND/OR SPOT ELEVAnONS ON THE PLAN. PROPOSED
FINISH GRAD£ IS DEFINED AS THE DESIGN SURfACE ELEVAnON OF EARTH TO BE CONSTRUCTED.
THE ABOVE QUANTinES ARE FOR PERMIT PURPOSES ONLY AN!I HAVE: NOT BEEN fACTORED TO
INCLUDE ALLOWANCES FOR SULKING, CLEARING AND GRUBBING, SUBSIDENCE, SHRINKAGE, OVER
EXCAVAnON, RECOMPACTION, AND CONSTRUCnON METHODS.
THE ABOVE QUANTITIES WERE: CALCUI.ATEO fROM .2008 UOAR OEM AND ARE APPROXII.IATE.
GROUND SURFACE MAY HAVE CHANGED FROM THE LOCATION SHOWN ON THE" DRAWINGS.
"tl
ROCK SLOPE PROTECTION
SPIKE
SQUARE FI:ET
STORMWATER POLLUTION PREVENTION PI.AN
TO BE DETERMINED
TYPICAL
UNKNOWN
:r
0::
f-0
2
~
~
oo
ii':::J
~
!(
WATER SURf"ACE ELEVATION
YEAR
I
J
I
PREPARED AT THE REQUEST OF:
JIM HARPER
FOR:
BROWN AND CALDWELL
6500 SW MACADAM AVIt
SUITE200
PORTlANO,ORg72.39
2.
AERIAL TOPOGRAPHIC SOURCE:
WATERSHED SCIENCES, INC.
42.1 SW 611-1 AVE
SUIT£800
PORTLAND, OR 97204
DATE" flOWN: SEPTEMBER 5, 2008
J
BATHYMETRIC SURVEY SOURCE:
SOLMAR HYDRO
88.35 N. EDISON ST
PORTlAND, OR g720J
CASCADE PAC(F/C PULP, t.LC
30480 AMERICAN DRIVE
HALS£Y, OR !17.:548
~~
~
~~
8ili
&_Jz
wO
4.
CONTOUR INTERVAL: ONE fOOT
5
ELEVAnON DATUM: NAVD88
15.
BASIS OF BEARINGS: CONTACT BROWN AND CAL.DWEU.
7.
INDIVIDUAL TREES WERE NOT LOCATfO DURING THIS SURVEY.
B. THIS IS NOT A BOUNDARY SURVEY.
PROPERTY UNES SHOWN HEREON AAE APPROXIMATE,
FOR PRELIMINARY PLANNING PURPOSES ONLY.
/
..J
LU
0:::
GENERAL NOTES
GRADING SUMMARY PROPOSED CHANNEL:
ITfM
u
~
NOT TO SCALE
RADIUS
RELATIVE COMPACTION
RSP
<{
c..
~~~~
:.c.
0
<~5
"-ooz
<(Wa:
()
THE
)z
SECTION AND DETAIL CONVENTION
SECTION OR DETAIL IDENTIFICATION
(NUMBER OR LETTER)
GRADING OF THE PROPOSED CHANNEl WILL PRODUCE APPROXIIMTEL'I' 11,500 C'l' Of SILTY SAND
AND 11.100 CY OF SILTY GRAVEL
~
(1)
00
i!: .~!!~
I
00
0'\
........
~~g~
UJ 15
u
0:::
>- 5;::
.j::..
0
.....,
5 vl
I
N
0
0
0
-..l
·
5
50% DESIGN
~
'
~ ~~b
<(
5
2
REI'tRENCE SHEET FROM WHICH
DETAIL OR SECTION IS TAKEN
ICINITY MAP
N.T.S.
REfERENCE SHEET ON WHICH
SECTION OR DETAIL IS SHOWN.
DESIGNE"O SY:
J.M
DRAWN BY:
J.M.
CHECKED BY;
M.W.W.
DATE:
11/6/12
JOB NO.:
12-009
BAR IS ONE INCH ON
ORIGINAL DRAWING,
ADJUST SCALES FOR
REDUCED PLOTS
0~1~
COOGLE
C1
1
OF
11
8IJO 8 ;:}~Ud
£/9817-000Z-d.M.N "ON sdJO:)
~~en
~iil
~~z
?,;·~
)>
~
"m
~~
[:gO
~
-"'l>
mz
go
~
)>
~~
0
"'JijJ1
£'-!--Z.~
0
G-1
1~0 ~~~~
!~ ~~~
~:~: p 80J~
8~oili
~:!'"'
::~'"1-JiJ~ ~~s~:
PROJECT
CASCADE PACIRC
SIDE CHANNEL
OVERVIEW
AND SITE
RECONNECTION
ACCESS
PLAN
f'AS"ARED AT THE AEOUEiST OF:
CASCADE PACIFIC
PULP,LLC
PRELIMINARY ~~~o~~!~~c
NOT FOR CONSTRUCTION I ' 22 ~~t."ci:!'~i~
'""
Ptt($03)227-5979 //FAX:(8811)619-61147
WWW.WA'lWA'rS.COA.I
81 JO 6 <:J8Ud
£/98v-OOOZ-di\\N ·oN sd.Io;)
'e>"'
c)
>,.-~
21
"~
·~
I.
I
~~
I
_z
_z::_
~s;:
-
I
I
L_
..
\-
-
'
:
--.\~
----- --
-----~
--
.CY'~--\_,_,r-·-·)
:iil~~(/)
~~
z
...
a~
i~
L~
~\.
Jl
w
m
::JJ
~
13NNVH~
&
H~nOlS
~-
I§
i5
,!I;
i-<
o
01
Eo~ g~2~~
I~~""· ~-- g~~
~ ~~~~
'
;~;
::~'"r~:l! ~h~~
CASCADE PACIFIC
SIDE CHANNEL
RECONNECTION
STOCKPILE
ffiEPARED AT TIE FIEOUEST QF;
AND
STAGING
AREA PLAN
PRELIMINARY! tBcoNSULTJNG
WATERWAYS
INC.
CASCADE PACIAC
PULP. LLC
NOT FOR CONSTRUCTION
522 SW S1li A'IENUE ~II'.. IUU
POffilAND. OR 97204
ptt(500)n7-5979 / / f'AX;(II88)H19-6&47
WWW.WATWAYS.COM
woo·SAYMLVM·~
ltll!i-6Ul(89!1)')(YJ//8L&;-a:z(toS)'J.Id
oot !~~n~~~~ us
NOIJ.Jn~lSNO::> ~Od J.ON
'JNI:mmnsNoJ~ ).~J'VNJW/l::J~d
SAVM'cl31VM
Corps No. NWP-2000-486/3
oll'dlnd
01:::110\>'d 30\>'08\>'0
N\fld
DNIO\>'I:lO
l3NN\>'HO
TM:EIAO
NOil.::l3NN0~38
13NN\>'HO 3018
OldiO\>'d 30\>'CJS\>'0
Page 10 of 18
("')
0
.a
0
I
.·.· All
z"'
j
~
EXISTING TREES (NOT SHOWN) GREATER THAN 18' DSH REMMO DURING
CHANNEL CONSTRUCTION SHAll BE STOCKPILED ON-SITE FOR USE IN LOG
STRUCTURES.
0
z
EXCWATED MATERIAL IS SILTY SAND OVER POORLY GRADED SILTY GRAVEL.
STOCKPILE SILTY SAND IN THE STOCKPILE AREA SHOWN ON SHEET CS.
PLACE
'
:l FT MA>: OF SILTY GRAV(L OVER EXISTING HAUL ROADS. STOCKPILE SILTY
GRAVEL TO BE USED AS BACKFILL MATERIAL FOR LOG STRUCTURES WITHIN NEW
CHANNEL STOCKPILE THE' REMAINDER Of SILlY GRAVEL IN THE STOCKPilE
~
"""/
I(
STOCKPILE LOGS AND BACKFILL MATERIAL TO BE USED IN lOG STIIUCWRES
N
0
0
0
DIRECTLY ADJACENT TO CHANNEl. CONSTRUCTION ARE-\ AS OIRECTfll SY THE
ENGINEER.
FOLLOWING WORK, RESTORE ORIGINAL GRADES AT DISTURBED AREAS ALONG
TEMPOR,I,R'f AND PORTIONS OF EXISTING ACCESS ROADS AS DIRECTED BY TH£
ENGINEER AND SCARIFY TO PREP,I,RE SEED BEO.
I
.j::..
-·
0
,
/
/ /st:c' n~h~
'<·'I==
~w
LU u
z
>-
0
a:::
<(
i=
u
:::>
g:
2:
~
I:
STABILIZE PISTURBEO AR£6.5 ALONG CHANNEL BANKS PER THE REVEG£TATION
PLAN,SHE£TCJO.
00
0\
0
1-L..
/
f
,(jy LOO STRU~TURE TYf;
""'
I
'
(
w
~
(f)~:d
~ pz "·"'
....._
o; !>
S 5 ~~'i~
.,. . ,. ~ ~~~i
0
u
-l
\:;:3
0::
0
LU
lo..
a:::
a..
~
I
~
!<
I
f-
a
z
~
oo
0:::1
gj~
132
~
~~z
zO:)
~(.)~
~~--
_
~-~IJI~~· ---
'"
_ · c ; _ _o_-
0i~,)
(N) GROUND
LVARI£S
Jo·---l
35'MAX
Q...JZ
~!.!!0
JY~I?~~ CHANNEL SSECTION,®
1
OOi§
g~&l
<(CJlo:
(.)
"i:i
~
~
270
FlNISHEOGRADE
ATINLE12H.9.±.
'"
'
270
,~,...
'\;·
..;..... ,... <·---·:r""'"""'__
g~~~~Egy,BY·
4 _ _ _ _ ··· - , - -
·· ,..
.....
.
:s-=Mii
.!"-"'-")""'--.
CHECKED BY:
OAT£:
JOB NO.:
~:~:
IJ.W.W.
11/6/12
12-009
BAR IS ON£ INCH ON
ORIGINAL OAAWJNG,
H20
-4-+40
4+50
4+80
5+00
5+20
5+40
5+60
5+80
6+00
6+20
6+40
7+00
7-1-20
7+40
7+60
7+80
8+00
8+40
8+60
8+80
9+00
10+20
10+40
10+60
10+80
11+00
11-t20
11+~
11+60
11+80
12+00
12+20
AOJUSTSCAL£SfOR
REDUCED PLOTS
0~1"
0
.....,
00
PROFILE - PROPOSED CHANNEL
SCALE;I .. JO
C6.1
7
OF
11
z
8IJO I ;}lJBd
£/9817-000Z-dA\N "ON sdJO:)
?'
\l
· ·
l ' -----. I~
'----1'-----
jJ, l
>
}
--.-,.._ _)
..
. ------
)~~~~t
\ '- - --- ""
/1 .
'I J
./
·.,I·. I .... .\ \\ ·.
i!\ < .
. ·.'
'
·- .
·.\
\ ··.~:\ ..
..
,:
\
·\<
\
\
.
\ \
\ \ \ .··
\
··c
\.\
l~
":»
~
,"
~
g
-"Tl
I
i]
iQ
8
0
~
,
.
\,
:JJ
~
g
~I;
"'"'o
z
l0fH
I
1
*:1:
0
I~
:
li'rfi
~
,
el
g
m
~~)---
0
0
2\
<'
o·r·
I
:»
t
z
8
m
+ L __ __j
u;~ ~ fS ~ ~ ~
~~ ~ ;~~~ ;~:~:
>
~
·.
~
.. -------.:::~~~
:,~noo
~ ~~~~ ~sil~~
CASCADE PACIFIC
SIDE CHANNEL
RECONNECTION
CHANNEL
GRADING
PLAN
PAEPAAED AT 1HE AEOUEST op.
CASCADE PACIRC
PULP,LLC
PRELIMINARY
NOT FOR CONSTRUCTION
WATERWAYS
f21P>coNSULTINGINc.
=
~t."i,~"~,S,~""'
PH:(50J)2V-5979 / / FAA";(8511)819-61H7
WWW.WATWAYS.COitl
n
0
:a
Vl
z
z
~
0
I
N
0
0
0
CONSTRUCTION SEQUENCE .\
NOTE: EXCAVATION OF PROPOSED CHANNELS MUST oCCUR DURING LOW FLOW CONDITIONS,
CONSTRUCT NORTii SIDE CHANNEl CONNECTION FIRST.
!.
2
J
j
INSTALL TURBIDITY CURTAINS AT THE DOWNSTREAM ENDS Of THE PROPOSED Cw.NNELS.
INSTALL COFFER DAMS AND PUMP PONDED WATER UPSTREAM OF COFFER DAMS.
EXCAVATE PROPOSED CHANNElS FROM THE WEST 51~ OF THE" DOWNSTREAM COFFER DAMS TO
THE EAST SiDE OF THE UPSTREAM EARTHEN PLUGS.
u
j
<('
~
ALLOW TURBIDITY TO SETTLE OR PUMP
TURBID WATER TO APPROVED LOCATION
4
INSTALL TURBIDITY CURTAINS AT THE" UPSTREAM ENOS OF THE PROPOSED CHANNELS.
CXl
0\
w
i=
u
:::>
z
SEEDBED.
I
.j::.
g, THE DEWATERING PLAN SHOWN HEREON IS SCHEMATIC. F1NAL PLAN WILL llE DESIGNED BY THE
~
(/)
z0
I:
CONTRACTOR TO ACCOI.tMODATf CHANNEL TOPOGRAPHY AND WATfR LEVELS PRESENT AT THE TIME
OF CONSTRUCTION. THE DOWNSTREAM COFFER OAMS MAY BE OMrTTED IF WATER LEVELS ARE
SUF'FICIENTLY LOW TO ALLOW WORK TO BE: PERFORMED FROM THE BANKS (E G., BY DRAG UN£
OR LONG RE.A.CH EXCAVATOR), IN THIS EVENT, A nJRBIOITY CURTAIN WOULD STILL BE REQUIRED
IN CONJUNTION WITH PUMPING AND/OR fiLTRATION, AS NEEDED TO COMPLY WITH WNER QUALITY
REQUIREMENTS ~ET FORTH IN THE PERMIT CONOffiONS.
"'
-I
0::
UJ
f2
c...
:z
Ck:
-
~
~~
LEGEND
i llll
EARTHENPUJG
EXCAVATION OF' AREA WEST OF UPSTREAM
EARTHEN PLUG
';;
~
i______c_:_J
I
I
'
f
0
Ck:
REMOVE THE UPSTREAM TURBIDITY CURTAINS. EXCAYAT£ UPSTREAM EARTHEN PLUG TO 1' ABOVE
LOW WArER 1'11EN REI.K/VE REMAINING PORTION OF' UPSTREAM EARTHEN PLUG.
ll. FOLLOWING WORK. RESTORE ORIGINAL GRADES AT DISTURBED AREAS AND SCARIFY TO PREPARE
~w
~~fil
~ R
:z
>-
6. REMOVE: THE DOWNSTREAM TURBIDITY CURTAINS AND COF"FER o,.ws ALLOWING WATER TO ENTER
THE EXCAVATED CHANNElS.
7,
u
3:
/
5. EXCAVATE AREA WEST OF THE UPSTREAM tARlliEN PLUG WHILE PUMPING TURBID WATffi FROt.l
CONSTRUCTION ACTIVITIES TO APPROVED LOCATION.
~
~ ~ ~ ~
<:( 5 ~~~8
3: iil ~-~~
ex ~ ~~~~
its
IG~
f-
a
~
~~
@~
~
()
z_j
~~~~@~j
(I)::>I
Q_j:Z
!bwo
~ZF
a_Z()
BOUNDARY FENCE SEE
w:l!!:!
O()Z
OtTAILJ, SHEtTCS
EROSION CONTROL F'ASRIC AT
CHANNE"LOPENINGPERTHE
0/RECTION OF' THE ENGINEER
/·/:
(N) GROUNf?__
IF' POOR CONDITIONS ALONG THE NEW
CHANNEL BED EXIST, AS DETERMINED
BY THE ENGINEER, OVEREXCAYATE AND
REPlACE WlTH UP TO 12"0F' GRAVEL.
<3~8
~Cii[.l!
()
fiBER ROLL AT
MIDSlOPE,TYP.
SEE DETAIL 2, SHEET CS
/
DESIGNED BY:
DRAWN BY:
CHECI""0
~
(D
......
w
0
.....,
......
CXl
DATE·
JOS NO.:
J.M
J.M
M.W.W.
11/5/12
12-009
BAR IS ONE INCH ON
TYPICAL EROSION
CONTROL SECTION
0~
fA\
'Qls;7'
ORIGINAL DRAWING,
ADJUST SCALES fOR
REDUCED PLOTS
0~1"
SCALE:N.T.S.
~m=.~~0AN
C7
9
OF
11
n
0
.a
j
"'z
0
"MIRAF/ SILT FENCE" OR
EQUIVALENT
z
I
(/)~ 8i
>- "' ~;"
~ ·
s ~ ~~~~
<( z
tY ~ ~~~~
w 8 ~d~~
s~~ d~i~sI
~
~
>-
..,.
w
STEEL OR
TIMBER POST
I
~
(/)
1. DIG TRENCH FIRST, THEN ERECT FENCE IN TRENCH.
BAC~Flll
"'''D COMPACT SOIL TO SECURE FACiRIC .
2. PR0\110£ 1' MINIMUM OVERlAP AT FENCE SPLICES.
J. SILT FENCE SHALL 8£ PLACED ON SLOP£ CONTOURS.
00
0\
:z:
a:: g
I
N
0
0
0
4. INSPECT AND REPAJR FENCE AFTER EACH STORM £V£NT AND
HABITAT LOG
REMOVE ACCUMULATED SEDIMrNT, TO AN APPROVED AR£,1,.
_J
gitt.!iNfEtB_~K~~INAnONS SHOULD Sf TURNED UPSlOPE TO
a::
~
UJ
a::
a..
@
SILT
Ei;;NCE
SCALE:1oo2
SEND REBAR TO CONFORM TO LOG
SURFACE.
NOTCH LOG TO CREATE ROOM FOR
C
MINIMUM RADIUS Of SEND
(MEASURED ON THE INSIDE OF SEND)
R£8ARBEN0(7YP).
SHALLSEJINCHES(TYP).
~
~
~ ~~
~
®
~~(~;m CONNECTION
1-
w ·
~~
~ ~a.
\(
~
()
~
(N) TOP'"' TOE OF BANK
~...
~n
\
~
>·
·~
~·. -~~~c~q.!f?!.T l.e~o :IS; LOG LOCATIONS SHOWN ON DRAWINGS ARE APPROXIMATE. EXACT LOCATIONS
.,,.,..,LL ..,._ "~ ,...,,~,_,._I.J BY THE ENGINEER. BURY LOGS WITH A MINIMUM OF 4' COVER OVER A MINIMUM
OF" 20FT Of LOG.
FIBER ROLL
SCALE: 1"-1'
12\
'~a'
SOUND AND fREE Of SIGNiflCANT DECAY. fOR
R001WAOS INTACT. HOWEVER, IT IS PREFERABLE
SRANCHES AND ROOTS INTACT, TO MAXIMIZE
IN THE STRUCTURES SHALL MEET THE FOLLOWING
MAX
ITEM
QIA!.fU[R (!Nl
16-24
18-24
c--------G '
~----==~01~
lfNGIH CIT)
.35-+0
.35-40
CO!JNT
18
9
4. ~ CONNECTIONS SHALL CONSIST Of LOG/LOG CONNECTIONS, AS SHOWN ON DETAIL 4, THIS
SHEET. PRO\IJDE A MINIMUM OF" ONE (1) LOG/LOG CONNECTION PER LOG, OR AS DIRECTED BY nJE
ENGINEeR. ALL CONNECTIONS SHALL BE PI.AC£0 TO MINIMIZE \llSUAl IMPACT.
5.
~PlACE
TOP OF FOOTER LOGS AT OR BELOW LOW WATE"R E~EVATIOI>I OR AS OJRECTEO 9Y
THE ENGINEER.
6 ~PlACE SANOY GRAVEl (EXCAVATED DURING CHANNEL GRADING ACTMTIES) AS SALLAST
MATERIAL, PLACE SANDY GRAVEL 2FT. DEEP X J FT. WIDE" TRENCH OVER THE BURIED LENGTH OF EACH
LOG. S-I>.CKFIU TOP 1' OF TRENCH WITH SIL1Y SAND EXCAVATED DURING CHANNEL GRADING ACTIVITIES.
'"0
Pl
-
C§
..,.
0
.....,
00
BOUNDARY FENCE DETAIL@
SCALE: 1 ·4-
·
!0-,·J.··.'!··.:,.1:
25'MIN~-
J . .QlJM.IDllES..:
LOG WITH ROOfWAD
LOG WiTHOUT R001WAD
7. SJ.e.Sb'.: 20-JO FT. PIECES WITH BRANCHES RETAINED, ADD SLASH TO LOG STRUCTURES AS DIRECTED 9Y
THE ENGINEER.
CS, 7C
J;Y~I?~L LOG STRUCTURE PLANcs·.W
~tu
:z:O
LOG STRUCTURE NOTES
2 . .I..QGi:. LaGS SHALL BE COTTONWOOD OR CONIFEROUS,
ClARITY, MOST LOGS ARE SHOWN WITHOUT BRANCHES OR
THAT LOGS BE SUPPLIED WITH THE IJAXJMUM NUMBER 01'"
PE:RFORMANCE OF nJE STRUCTURES. MATERIALS FOR USE
SIZE" CRITERIA·
t5
5~
:::l<(
I I
I I
I I
I I
I I
I I
8
()
U:..JZ
[jWO
<(Hi
"-<(IIJ
~i52
<(wO
i;lQ@
<(Ula:
()
LJ
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
JOBNO.;
J.M.
J.M.
M.W.W.
11/6/12
12-009
BAR iS ON£ INCH ON
ORIGINAL DRAWING,
ADJUST SCALf:S FOR
REDUCED PLOTS
0~1·
CB
10
OF
11
u
(")
0
(f):S
J :s§
I
~>-
...,
Vl
z~
z
~
!ABLE 1· E'LANIING
Location/
Elevation
I
N
0
0
0
ChenrmiEdge Comuaatolor!ll'era
I
w
Botanical name
Common Nama
Propagation
Method
Stza
Growth Percent
SpaclngJNotes
Quantity
Fonn of Group
4ft length,
'""
(3ftabow
Sflllxeeoulerlana
channel bed
.j::.
00
~
'
~~i.
~=f~
0::~
LUB ~:~~
"0
0\
...._
.
8
>-l?
<(z
"
PFIOPOSEo"'-CHANNa
CONtECllON
Retl.¢sl~rdogwood
Cutllng
Seo!.!lerwlllow
Cutlln
aCC!lnroadl)
Paclncwlllow
Cutting
~rage5110.C.
4fllllnglh,
0.75to2-lnch
tllameler
Alerage51tO.C.
4ft length,
totopofbank
andll!lmporary
,/AND TEMPOAAAY ACCESS ROAD
LJMJT OF_PI...ANTINQ AND SEEDING ~
0.75ta 2~nc:h
diameter
0.751o2-lnch
Sa!lxlaslandra
diameter
4fthmglh,
Awrage5110C.
0.7Sto:2.-incll
Saltx<c!lenala
Sib willow
Cultrng
diameter
AYerageSIIO.C ·
... ,..
... ,..
...
... ,,.
25%
~~?~
~~~
z
f=
0
0::
u
<(
1178
~
(/)
z
lLJ
I:
1179
_J
1178
:;)
z
1178
0
u
0:
0
lL.
10
0::
a_
~
t
~
z
~
~
~~
w "
~
0~
!(
I
136:
j
sffiz
oi
w
~
REVEGETATION NOTES
~_JZ
IMMEDIATELY FOi.LOW!NiiCONSfflUCTION C0M?LrnbN, SEEii-CHANNEl-B.ANlSEED CHANNEL BANKS (J' ABOVE BED ELEVAnDN TO TOP OF a-INK), TrMPORARY ACCESS ROADS
ADJACENT TO NEW CHANNElS AND PORnON OF STOCKPILE ACCESS ROAD WITH "RIPARIAN FOREST"
MIX IN LAT! WINTER OR EARLY SPRING FOLLOWING PROJECT COMPLWON PER TABLE 2, THIS SHEIT.
B.
SEE:O THE STOCKPILE AREA ANO PORTION OF STOCKPILE" ACCESS ROAD IN !.ArE WINTER DR
SPRING WITH "UPlAND fOREST" MIX PER TABLE" 2, THIS SHEET.
u!J!S
~::&l
w:r:z
~oz
EA~LY
16~§
IMMEDIATELY fOLLOWING SEEDING WITH "REGREEN" OR APPROVED EQUAL, INSTALl. FIBER ROLL AND EROSION
CONTROL FABRIC AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
<(CJJcr
0
COLLECT AND PREPARE PlANT MATERIAL ON-SITE. PLANT NEW CHANNns (J' ABOVE BE"D ELEVATION TO TOP
OF flANK) AND TEMPORARY ACCESS ROADS A[).JACE:NT TO NEW CHANNELS PER TABLE I, THIS SHEET.
MIX PLANT MATERIAL TO REFlECT OENSIDES OF EXISTING ON-SITE I.IAT£RIAL
"ti
DO NOT DISTURB AREAS OUTSIDE OF THE DESIGNATED LIMITS OF DISTURBANCE, UNLESS AUTHORIZED IN
WRinNG BY THE ENGINEER. All ASSOCIATED RESTORATION AND REVEGETATION OF DISTURBED AREAS OUTSIDE
OF THE DESIGNATED LIMITS Of DISTURBANCE, AS SHOWN ON THE DRAWINGS, SHALL BE BOURN£ SOLEL'r' 8'1'
THE CONTRACTOR.
~
0
ORIGINAL DRAWING,
ADJUST SCALES FOR
REDUCED PlOTS
0~1"
SITE PLAN
SCALE: I
00
~:~
M.W.W.
11/oS/12
12-009
6AR IS ONE INCH ON
........
Vo
0
.......,
OESIGNEOB'I':
DRAWN BY:
CHECKED BY.
OAT£:
JDBNO.;
~300
C9
11
OF
11
n0
.:a
Cll
z
z
~
0
I
r@
~
ir=ll-1
dL
-· ~-cc ~c=- c;~
---=-- --=~I
;;ID=
--- --·--
af=
>0::
N
0
0
0
KEYNOTES:
8 2
®
0
COMP~ESSOR
0 EXISTING
FISH SCREEN TO BE DEMOLISHED AND OPENING
COVERED WITH STEEL GRATING, TYP OF 2,
0
0 REQUIRED IN FUTURE).
NEW 7'x9' STAINLESS STEEL INCLINED PLATE FISH
SCREENS MOUNTED TO STEEL STRUCTURE.
I
2 NEW gx7,B STAINLESS STEEL MOTOR OPERATED SLIDE
GATES IN EXISTING BAR SCREEN CHANNEL.
.j::..
00
0\
AIR PiPE ROUTED TO AIR
w
g
<{
BUILDING,
PRESSURE REDUCING VALVE, TYP OF 2.
:z
~
a
-
U)
l:
-
u
-l
a::
UJ
5:
CL.
~
0::
f-
WATER SUPPLY FOR SWEEPING VELOCiTY SYSTEM (IF
0
SIDE CHANNEL
OF
WII.LAMEITE
RIVER
MOUNTING BRACKET FOR FUTURE PIPING TO PROVIDE
SWEEPING VELOCITY IF NEEDED.
~
m
~0
~ 0: :l
t
WET
WELL
~ ~~
i
0
!!.!
W::J
>:;f-
~()
z~
-fC/)
~
!tj:
~ ~~
i~i!!
~~~~~
~§~~~
""0
Pl
(Jq
(Jl
........
0\
0
.....,
........
00
- - - - - - - - - - - - ---
~
-~
!NTAKE STRUCTURE
PLAN
----- - -
n
0
.:a
"'z
0
z
~
+:>.
00
0
0::
N
0
0
0
I
z
>-
I
KEY NOTES:
0
CD
~~6P~~/~h.B
G)
0'1
--..
w
z
~
NEW SLIDE GATE, SEE KEYNOTE 2JM100.
:L
u
2 NEW 9'x7.5' STAINLESS STEEL SLIDE GATEOPERATORSAND
STRUCTURES.
-l
2 NEW 7'x9' STAINLESS STEEL INCLINED PLATE FISH SCREENS
MOUNTED TO STEEL STRUCTIJRE.
CD SWEEPING VELOCITY SYSTEM PRESSURE REDUCING VALVE.
0 AIR BURST HEADER PiPING TO BE PROVIDED BY FISH SCREEN
VENDOR
0 MOUNTING
BRACKET FOR FUTURE PIPING TO PROVIDE
SWEEPING VELOCITY IF NEEDED.
0
f=
u
<(
INSTALL GRATE OVER EXISTING FISH SCREEN OPENING
~
0
ll::
~
IJ.J
0::
f0
ll..
z
~
()
~
Ill .
l ~~
~ ~~
~ ~
l
EL2SB.40'
ANNUAL H.W.
~
LU::>
~g
-Zo::.rn
~~ul~;
~~~~5
EL 245 ~0'
ANNUALL.W.
~Qo~§
~~~~!
$1~~~-i&As
"i:i
~
(1)
.._J
0
.....,
.......
00
INTAKE STRUCTURE
SECTION@
n
0
.a
"'z
0
z
~
>- iSj:::
a::
I
N
0
0
0
KEYNOTES:
0
0
0
0
I
.j::.
00
0\
---w
~
~
NEW INCLINED Pl.ATE FISH SCREEN, SEE KEY NOTE 1/M100, TYP
OF2.
NEW SliDE GATE, SEE KEY NOTE 21M100, TYP OF 2.
BLANK OFF OPENING WITH STEEL PLATE, TYP OF 2,
SUDE GATE STEM AND OPERATOR, TYP OF 2.
® MOUNTING
BRACKET FOR FUTURE PIPING TO PROVIDE SWEEPING
VI:.LOCITIES IF NEEDED.
u
<(
z
::J
-l
0::
~
L: u~
~
UJ
a::
a..
~
m
i~
10
z
~o:l
ll.
w ·
\( Q~
e~
~
UJ
oc
W::>
~b
!z~
~
-~-
(/)
IE
~~
i~~~~
~M~
0
"'tl
P:l
~
00
0
>-+,
_.
00
INTAKE STRUCTURE FRONT
SECTION@
~~