Benny Dean Jr. is the Regulatory point-of-contact for this permit application from Oregon's Parks and Recreation Dept. for work in the Calapooia River, River Mile 28.5, near Brownsville, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: March 5, 2013 Expiration Date: April 3, 2013 US Army Corps of Engineers No: NWP-1994-729-2 30-Day Notice Oregon Department of State Lands No: RP-1226

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil) Eugene Field Office 1600 Executive Pkwy., Suite 210 Eugene, OR 97401-2156

Applicant: Oregon Parks and Recreation Dept. 32655 Boston Mill Rd. Shedd, OR 97377

Location: The project is located on the Calapooia River, River Mile 28.5, at the bifurcation location with Sodom Ditch, near Brownsville, Linn Co., Ore. The site is in Section 34 of Township 13 South, Range 3 West.

Waterway: Calapooia River

Project Description: The applicant proposes to dredge approximately 200 cubic yards of gravel (mostly river cobbles, rock with some fines and potentially a few logs) from the Calapooia River each year for the next five years. Every year, gravel builds up at the mouth of the Calapooia River at the bifurcation (fork) with Sodom Ditch. Oregon Department of Fish and Wildlife fish biologists recommend 57 cfs flow going down the Sodom Ditch bypass channel during the fish migration period, and a minimum of 14 cfs remaining in the Calapooia River to assist with fish migrations. The applicant proposes to do the work each year if necessary at low water levels to minimize turbidity.

The applicant will access the east river bank from an existing gravel road and the west bank by crossing farm fields. Equipment needed to complete the work includes a track excavator, front end loader, crane and dump trucks. The applicant proposes to use an excavator or loader to construct a small push up berm out of dry gravels at the water’s edge.This serves to minimize turbidity by separating the active gravel removal area (dry land) from the water line in the river channel. The excavator and/or loader will scrape away at the gravel buildup, placing each bucket into a dump truck. The dump trucks will haul the removed gravel offsite and the material will be placed in an upland area. The applicant states there will be no return water.

Mitigation: The applicant has not provided a compensatory wetland mitigation plan for the removal of sediment build-up from the river. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The project purpose is to maintain flows in the Calapooia River for fish passage.

Drawings: Four drawings are attached and labeled Corps No. NWP-1994-729-2 enclosure.

Additional Information: Additional information may be obtained from Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers at 541-543-4928 or email Benny.A.Dean@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat.Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: An initial evaluation of the proposed project area indicates the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The permit area has been disturbed by ongoing removal activities that little likelihood exists for the proposed project to affect an undisturbed historic property or any other type of cultural resource.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties.If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest.That decision will reflect the national concern for both protection and utilization of important resources.The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal.To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters.These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished.Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Other permits acquired by the applicant include approvals from the Oregon Department of State Lands and Linn County Planning.No other approvals have been identified by the applicant.

41

4 '

Oregon Parks and Recreation Department (NWP-1994-729/2) (Section 34 of Township 13 S, Range 3 W)

·,~

0

0.05

,......,..._

--

0.1

Scale: 1:1 Ok 0.2

0.3

oA !Miles

Source: http://resources.esri.com/arcgisdesktop GCS WGS 1984 : NAD 1983 Datum: D WGS 1984

==d

~

:l

QJ

n; u

"' ....: II)

UJ

0

-

--

\

-_s--....

... a:>

ttl

u..

QJ

--~-.... I-

.!:!!

0 0 0.

..!:!! Ill u

.,.,

...

....Ill QJ

co N

s

~

~

.s::

... > a:

2

·a. ..l<:

bO

J:

QJ

...>

u

....0 "'s:::

Ill

c::

... 0

"'D

Ill

> 0 E

bO

"'D

C1l

"b.o

... a:>

>

)

CD

Ill

...

Ill

(!)

>

Ill

s:::

0:: Qj

0 Qj

...

..l<:

C1l

Ill C1l

~

c::

.... Ill

"'

...

bO Ill C1l

...0. "'

·

0 I0 I .

Corps No. NWP-1994-729/2

Page 2 of4

FNrT.

(') 0

>8 Cll

z z 0

~

I .,_.

\0 \0

Cross-Section East Bank

+::>. I -....]

N

\0

Stockpile gravel removal from the past

t::3

86 84 82 "t:l

!ll

80

cro (p w

78

East

0.......,

+::>.

76 74 72

70 60

80

100

120

140

160

180

200

220

240

260

270

Cross - Section West Bank

86 84 82 80 78 76

Summer River Level

72 70

60

80

Corps No. NWP-1994-729/2

100

120

140

Page 4 of 4

160

180

200

Pl\Tr'T

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits