Carol Franson is the Regulatory point-of-contact for this permit application from Dr. Neil Kumar for work affecting wetlands abutting Newton Creek in Roseburg, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: March 13, 2013 Expiration Date: April 11, 2013 US Army Corps of Engineers No: NWP-1999-339-4 30-Day Notice Oregon Department of State Lands No: 44960-RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision.Comments should be mailed to the following address:

U.S. Army Corps of Engineers Carol S. Franson (carol.s.franson@usace.army.mil) Eugene Field Office 1600 Executive Pkwy., Suite 210 Eugene, OR 97401-2156

Applicant: Dr. Neil Kumar 2410 NW Edenbower Blvd. Roseburg, OrR 97471-8830

Location: The project is located at the corner of Renann St. and Edenbower Blvd., Roseburg, Douglas Co., Ore. The site is in Section 12 of Township 27 South, Range 6 West. (43.23615, -123.36751)

Waterway: Wetlands abutting Newton Creek are tributaries to the South Umpqua River, which is a Section 10 Traditional Navigable water of the United States.

Project Description: The applicant proposes to modify their existing authorization to fill an additional 0.17-acre of wetland to construct a larger than first designed Phase 2-Renal Vascular Center medical facility with parking.

Previous/Existing Department of the Army Authorizations: February 4, 2004 -Phase I of the project authorized the fill of 3.10-acres of wetland for the construction of a Kidney & Hypertension Center medical facility. Total required compensatory mitigation was 5.94-acres of wetland created/enhanced with 1.55-acres of wetlands avoided onsite.

June 20, 2005 – The fill of an additional 0.193-acre of wetland was authorized to construct additional parking for Phase I of the medical facility. Compensatory mitigation required the purchase of 0.19-acre credits from Cow Hollow Mitigation Bank. Wetlands remaining onsite were 0.83-acre of previously avoided wetland and 0.49-acre of previously designated mitigation wetlands. The compensatory mitigation for this project has been released as successful by the Corps.

March 11, 2011 – Phase 2 authorized the fill of an additional 0.39-acre of wetland to construct a Renal Vascular Center medical facility.The 0.39-acre of impacted wetland consisted of 0.19-acre of previously avoided wetlands and 0.20-acre of previously designated mitigation wetlands. To provide compensatory mitigation for the 0.39-acre of wetland fill, 0.41-acre credits were purchased from the Cow Hollow Mitigation Bank.

Mitigation: For compensatory wetland mitigation, the applicant has proposed to purchase 0.17-acre credits from the Cow Hollow Mitigation Bank in Douglas Co. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To construct additional medical facilities for the City of Roseburg.

Drawings: Eight drawings are attached and labeled Corps No. NWP-1999-339-4 enclosure.

Additional Information: Additional information may be obtained from Carol Franson, Project Manager, U.S. Army Corps of Engineers at 541-465-6894 or email carol.s.franson@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not required for the described activity.

Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area. The described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The permit area has been so extensively modified by modern development that little likelihood exists for the proposed project to affect an undisturbed historic property or any other type of cultural resource.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

SEC.12 T.27S. R.6W. W.M. DOUGLAS COUNTY 1.

ON

27 6 128 & INDEX ROSEBURG

pp 1996·7

585,000

27

128 & INDEX

ROSEBURG

2

8

3

8

\

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas