The U.S. Army Corps of Engineers and the Washington Dept. of Ecology have received an application from the Port of Vancouver to perform work in the Columbia River, river miles 103.5 to 105.5, near Vancouver, Wash.
Joint Public Notice
Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management Consistency Concurrence
U.S. Army Corps of Engineers
Regulatory Branch
P.O. Box 2946
Portland, OR 97208-2946
Telephone: 503-808-4386
Attn: Tom Taylor, Project Manager
WA Dept. of Ecology
SEA Program
P.O. Box 47600
Olympia, WA 98504-7600
Telephone: 360-407-6068
Attn: SEA Program, Federal Permit Coordinator
Public Notice Date: March 14, 2013
Expiration Date:
April 15, 2013
Reference: NWP-2007-916-1
Name: Port of Vancouver
Interested parties are hereby notified that the U.S. Army Corps of Engineers and the Washington Department of Ecology have received an application to perform work in waters of the United States as described below and shown on the enclosed drawings.
The Corps will review the work in accordance with Section 10 of the Rivers and Harbors Act. Ecology will review the work pursuant to Section 401 of the Clean Water Act, with applicable provisions of State water pollution control laws.
APPLICANT: Port of Vancouver, USA, 3103 Lower River Rd., Vancouver, WA 98660
LOCATION: The project is located in and adjacent to the Columbia River, River Miles 103.5 to 105.5, near Vancouver, Clark Co., Wash., in sections 19, 20, 28 and 29, Township 2 North, Range 1 East.
PROJECT DESCRIPTION: The Port currently is authorized to conduct maintenance dredging, known as Phase 1, at its marine facilities, including the Grain Terminal and Berths 1, 2, 4, 5, 7, 8, 9, 10, 13, and 14. This dredging was previously authorized by U.S. Army Corps of Engineers Permit NWP-2007-916, valid January 2009 through February 2019. The current project warrants renewal of the existing Washington State Department of Ecology, CWA Section 401 Water Quality Certificate and the Department of Fish and Wildlife Hydraulic Project Approval that expire in October 2013 and December of 2013, respectively.
The Port is proposing the following modifications to the existing project with respect to dredging and placement methods:
● Modify Dredge Depths at Berths 1 and 5 (Terminal 2) and Berths 10 and 13 (Terminal 4). The Port will deepen Berths 1 and 5 and Berths 10, 13, and 14 at Terminal 4 (known as Phase 2) to an authorized depth of -43+2 feet (ft.) advance dredging and allowable overdredging Columbia River Datum from the current maintenance a depth of -40+2 ft. CRD.
The ongoing maintenance of these berths to the newly authorized depth of -43+2 will continue as necessary. The total annual volume of dredge material generated from the deepening and ongoing maintenance of the Port’s marine terminal berths (both Phase 1 and Phase 2) will continue to be a maximum of 50,000 cubic yardsannually as currently permitted.
● Adjust the dredging location at Berth 10.
The Port will dredge the slope adjacent to the north and west sides of and beneath Berth 10 to remove accumulated sediment that could potentially interfere with the existing floating dock. This area is located between the previously planned dredge limits and the shoreline.
● Clarify that hydraulic dredging may be used at Berth 10.
Although the Port is currently authorized to use a clamshell bucket or a long-arm excavator as its preferred dredging technology, the dredging method at Berth 10 may include hydraulic dredging. This modification is because of the difficulty of accessing the accumulated sediment beneath the Berth 10 dock.
● Verify placement site locations.
In addition to the currently authorized use of upland placement sites Parcel 1A, Parcel 3, and Parcel 8, the Port may use Terminal 5 West for potential dredge material placement.
● Potentially change the permitted in-water work window:
Although currently authorized to conduct in-water work between Nov. 1 and Feb. 28, the Port will conduct in-water work within the window currently authorized by the state and federal agencies with regulatory jurisdiction.
● Extend work hours to allow night time activities: Due to possible schedule limitations that could
result from a modified in-water work window period, dredging operations could include night shifts when necessary.
As currently authorized, approximately 21.3 acres of berthing area will be affected by this modified project. The majority of the dredging will take place at least 50 feet from shore and in water depths between -30 feet and -45 feet CRD.
As currently authorized, dredging will be performed mechanically from the water.Sediments dredged using mechanical methods will be placed on a barge, dewatered through barge scuppers and offloaded at Berth 4, Berth 9 and/or Berth 10. The material then will be trucked to a permitted placement site.
Sediments dredged using hydraulic methods will be pumped upland to a constructed dewatering containment near the dredge site for dewatering. The dewatering containment area will be constructed of ecology blocks and filter fabric, and will be approximately 1 to 2 acres in size. Drainage will be captured and sediments will be allowed to settle out before the water is released through a weir and discharged to the river.
Best Management Practices
The following Best Management Practices (BMPs) and conservation measures will be implemented to minimize environmental impacts during dredging:
● Dredged material aboard the barge will be observed daily for the presence of juvenile salmonids to ensure that they are not being impinged by the clamshell. If impingement is occurring, crane operations
will be adjusted (slowed) to increase opportunity for juveniles to avoid the bucket.
● Turbidity and other water quality parameters will be monitored to ensure construction activities are in
compliance with Washington State Surface Water Quality Standards (1730201A WAC), or other
conditions as specified in the Water Quality Certificate .
● Appropriate BMPs will be employed to minimize sediment loss and turbidity generation during dredging, including the following:
o Eliminating multiple bites while the bucket is on the bottom
o Not stockpiling dredged material on the riverbed
o Maintaining suction head at the river bed to the extent practicable
● Depending on the results of the water quality monitoring program, enhanced BMPs may also be
implemented as follows:
o Slowing the velocity (i.e., cycle time) of the ascending loaded clamshell bucket through the water
column
o Pausing the dredge bucket near the bottom while descending and near the water line while
ascending
o Placing filter material over the barge scuppers to clear return water
● The barge will be managed such that the dredged sediment load does not exceed the capacity of the
barge. The load will be placed in the barge to maintain an even keel and avoid listing. If determined to be
necessary based on sediment sampling results, hay bales and/or filter fabric may be placed over the
barge scuppers to help filter suspended sediment from the barge effluent.
Hazmat/SPCC BMPs
● Dredge vessel personnel will be trained in hazardous material handling and spill response, and will be
equipped with appropriate response tools, including adsorbent oil booms. If a spill occurs, spill cleanup
and containment efforts will begin immediately and will take precedence over normal work.
● The dredging contractor shall be responsible for the preparation of a Spill, Prevention, Control, and
Countermeasure (SPCC) Plan to be used for the duration of the project. The plan shall be submitted to
the Project Engineer prior to the commencement of any construction activities. A copy of the plan with any updates will be maintained at the work site by the contractor. Elements of the SPCC shall include:
o The SPCC Plan shall identify construction planning elements and recognize potential spill sources at the site. The SPCC Plan shall outline responsive actions in the event of a spill or release and shall describe notification and reporting procedures. The SPCC Plan shall outline contractor management elements such as personnel responsibilities, project site security, site inspections, and training.
o The SPCC Plan will outline what measures shall be taken by the contractor to prevent the release or spread of hazardous materials, either found on site and encountered during construction but not identified in contract documents, or any hazardous materials that the contractor stores, uses, or generates on the construction site during construction activities. These items include, but are not limited to, gasoline, oils, and chemicals. Hazardous materials are defined in RCW 70.105.010 under “hazardous substance”.
o The contractor shall maintain, at the job site, the applicable equipment and material designated in the SPCC Plan.
Transport and Placement Site BMPs
● The contractor will be required to use a tightly sealing rehandling bucket and to monitor for spillage
during transfer operations.
● Visual water quality monitoring and, if necessary, follow-up measurements will be conducted around the barge at the removal and upland transfer area to confirm that material is not being released.
● If stockpiling of dredged material becomes necessary, BMPs will be employed as appropriate to control runoff and erosion, including: (1) installing silt fences, hay bales, and/or containment berms, (2) managing runoff and elutriate water, and (3) routinely inspecting the stockpile areas to ensure BMPs are functioning properly.
The sediment quality of the dredged material proposed to be removed as part of this project will be confirmed based on implementation of a Sampling and Analysis Plan that was prepared in accordance with Sediment Evaluation Framework for the Pacific Northwest guidelines dated Sept. 20, 2011, (revised Aug, 9, 2012). The SAP has been conditionally approved.
MITIGATION: There is no mitigation proposed for this project.
PURPOSE: The purpose of the project is to maintain berthing depths to allow cargo vessels to safely access and moor at the Port of Vancouver Terminals. Such depths would be commensurate with the authorized navigation depth of -43 +2 CRD in the federal channel.
ADDITIONAL INFORMATION: Additional information may be obtained from Tom Taylor, Project Manager, U.S. Army Corps of Engineers at 503-808-4386 or e-mail thomas.j.taylor@usace.army.mil
ENDANGERED SPECIES: Preliminary determinations indicate that the proposed activity may affect endangered or threatened species or their critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been reinitiated with the National Marine Fisheries Serviceand U.S. Fish and Wildlife Service. A permit for the proposed activity will not be issued until the consultation process is completed.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. The proposed action would impact EFH in the project area. The Corps has determined that the proposed action will adversely affect designated EFH for federally managed fisheries in Washington waters. The Corps has initiated EFH consultation with the NMFS.
CULTURAL RESOURCES: Under the original permit (NWP-2007-916), the Corps coordinated with
Native American Indian tribes and the Washington Dept. of Archeology and Historic Preservation for all dredge placement sites and berths proposed for dredging herein, except Terminal 5 West and Berth 3. The described activities at the Terminal 5 West and Berth 3 sites are not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The Corps has notified interested Native American Indian tribes and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential affects.
ADDITIONAL REQUIREMENTS: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters.These state requirements must be met, where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority, previously indicated, may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application.Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.
EVALUATION – CORPS - The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Native American Nations or tribal governments; Federal, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for the work. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity.
EVALUATION—ECOLOGY: Ecology is soliciting comments from the public; Federal, Native American Nations or tribal governments, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Ecology will be considering all comments to determine whether to recertify or deny certification for the proposed project.
COMMENT AND REVIEW PERIOD: Conventional mail or e-mail comments on this public notice will be accepted and made part of the record and will be considered in determining whether it would be in the public interest to authorize this proposal. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the permit applicant’s name and reference number as shown below. Either conventional mail or e-mail comments must include the permit applicant’s name and reference number, as shown below, and the commentor’s name, address, and phone number. All comments whether conventional mail or e-mail must reach this office, no later than the expiration date of this public notice to ensure consideration.
CORPS COMMENTS: All e-mail comments should be sent to thomas.j.taylor@usace.army.mil. Conventional mail comments should be sent to U.S. Army Corps of Engineers, Regulatory Branch, Attn: Tom Taylor, P.O. Box 2946, Portland, OR 97208-2946
ECOLOGY COMMENTS: Any person desiring to present views on the project pertaining to a request for water quality certification under Section 401 of the CWA may do so by submitting written comments to the following address: Department of Ecology, Attn: SEA program – Federal Permit Coordinator, P.O. Box 47600, Olympia, WA, 98504-7600, or e-mail to ecyrefedpermit@ecy.wa.gov
To ensure proper consideration of all comments, responders must include the following name and reference number in the text of their comments: Port of Vancouver, NWP-2007-916-1.
Encl: Twelve (12) drawings on 12 sheets, labeled NWP-2007-916-1
1.
2.
J.
4.
5.
COVER SHEET
e.
SITE PLAN 4
SITE PLAN 5
7.
8.
9.
10.
11.
12.
OVERALL SllE PLAN
SITE PLAN 1
SITE PLAN 2
SITE PLAN 3
SITE PLAN 6
BERni DREDGING SECTIONS 1
BERTH DREDGING SECTIONS 2
UNDER DOCK DREDGING SITE PLAN AND SECTION
UNDER DOCK DREDGING TEMPORARY
CONTAINMENT AREA
WASHINQTal KEY MAP
NE
Ar
Keney
n
,_....,....W·39th St
Part
...
LOCATION MAP
0
PROPOSED UPLAND
PLACEt.1EN T Sl TE
PURPOSE: TO CREATE AND MAINTAIN BERTHING
DEPTHS TO ALLOW DEEP DRAFT SHIPS
SAFE ACCESS TO lliE PORT OF
VANCOUVER MARINE FACIUTIE5
I OCA]ON· 45' 38' 36.09·N, 122' 42' 14.45·W
2000
4000
SCALE IN FEET
PORT OF VANCOUVER
BERTH DREDGING PROJECT
VICINITY MAP
.llAIUir1:.. CRD
APPUCAllON BY: PORT OF VANCOUVER
NWP-2007-916-1
RIVER WAlER LEVELS (aD)
15.1'
-0.7'
MAXIIoiUt.l RIVER STAGE
t.11Nit.1Ut.l RIVER STAGE
PROPosED· MAINTENANCE DREDGING
REfEBENCE NUMBER:
NWS-2007-916
l.l!t..
COLUMBIA RIVER, Rill 10J.5 TO RM 105.5
AI;_
VANCOUVER
~
SHEET
1
CLARK
OF 12
~WASHINGTON
llAlE:... 12/18/12
ENCLOSURE
I
/
I
I
I
I
I
I
I
r
I
J,
I
r'f
!
I
,,
i
!
!
I
r
r
I
I
r I:
I
I
I
I
I
I
~
/
ta !
I
I
CD
<
w
I-
w
~
0
w
~
:I "a:fi3
I
1
1
I
0
Vl
~~
Cll
I I:
t~
0
~
\I \
~
<
u
0
Vl
~
1
~
0
I
\, \
\\
\\
r\
\\
I
\
I
\
I
'
I
'
I
..
\
~
..
I
\
>a:
<
0
z
\ \'
' '
\· \
\
::l
0
[[l
--~./
PORT OF VANCOUVER
BERTH DREDGING PROJECT
LOCADON· 45' 38' 36.09"N, 122' 42' 14.45"W
OVERALL SITE PLAN
Mlillt.. CRD
APPUCATlON BY: PORT OF VANCOUVER
NWP-2007-916-1
PROPOSED· t.4AIN1ENANCE DREDGING
REFERENCE NUMBER:
NWS-2007-916
lli.;_
COLUMBIA RIVER, RM 103.5 TO RM 105.5
AI:..
VANCOUVER
~
SHEET
2
CLARK
OF 12
.siA1E.;_ WASHINGTON
OAlE;_
12/18/12
ENCLOSURE
~
I
:::0
0
-1"
0:
~
I
\
OUlO-i
..,~tao
NWP-2007-916-1
~ j;Jl:i!~
--
........ ~_/
· ZUlUll"'l
~§~a~
_/------
f5· :::onFz
rii>>>
~~nco
-
]>Gl~~
· Z-ifTlZ
"""l"'loq:j>
/
""'
\o
~
/
I
r
..
~ :::OUlc~
/
r-
'-I
"! ~:i!oz
~ o~~m
~~;g~~ ~
~
,
__ _, ... ...__ : ~,,
~
. =---=..:=;;.
z
Ul ~
"
~
...______
_,~..J
600.0'
.
380.0'
aJ
m
:g
~ ~'~~~~~'>~~-·~q..:=~~DREDGE
~~1}
~
..... .
n
]>
:::t
~0
~
0
z
[IJ
~
""tl
m"Tl
8<
z
~~~8..---·
~····-··
~
~
Si1
......
j;
z
§
rii
:::0
m:::o
~
~~§~F.
z
-i:<u
]>
z
0
E
.,.,
> 8riic:
:::0
>
......
"
::::c
n
ENCLOSURE
0
~
~I~
~ ~
~
!f!
0> ......
z
- "az
~
:;:;c
~
~
z
iTl
z
~
z
0 5l
~
a~
:::o'
~ ~
-
0
[."
Ul
DREDGING PLAN
~
[""I
Ul
~
FLOW DIRECTION
~
[IJ
:::0
~
COLUMBIA RIVER
I
1"'1
(l)
0
J.;l
0
AI
1"'1
0
"z
"
LEGEND
----
- -
--
CHANNEL BOUNDARY
CHANNEL CENTERLINE
FENDER PILE
~
EXISTING DOCK STRUCTURE
c::::::::J
BERlH BOTIOM AREA
H
100
----'
200
I
SCALE IN FEET
NOTES:
1.
1.
2.
3.
4.
BERlH AREA DREDGE WIDlH VARIES AND EXTENDS FROt.l USACE CHANNEL
NORlH BOUNDARY TO EDGE OF DOCK FENDERING.
BAlHYt.IETRIC SURVEY SHO\I!N BY ETRAC DATED OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STATE PLANE SOUTH, NAD83 (US FEET)
VERTICAL DAl\JM: COLUMBIA RIVER DAl\Jt.l {CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPlHS BELOW
CRD 0.0 FEET.
~
~
I
:::0
0
cJ
..
I
I
NWP-2007-916-1
\
--
'""--
-----
').~fT".;Ifflf!~;i;;iEEsi!!!E51i5';::a::==J
......__
r-
.....-.-.-- ~\) ~ <"-.
~
/
~
L
'
,..--
.
--- ,.....r'--..--..__-
f,
(/ l
"
"
r~~--·,
:tr .. ~\
.._ - ---.. . .....__
. . . . -...___
aJ
m
~~
~
n
]>
:::t
~
~ 0 lb~J.tl.~.J..
m
CD
0
z
~
[IJ
~
-'11
8Zz);
"""0
""tl
~
~
z
Si1
j;
z
~ ·.~
J>.-J>.-.-·.-.-·... ...
~8
1\)
~~
§
rii
:::0
m:::o
~
COLUMEIA RIVER
~~§~F.
z
I
fT1
-i:<
0
""'"
z E
ENCLOSURE
n
~
.,.,
> 8riic:
:::0
>
......
"
::::c
0
~
:;:;c
~
[IJ
~
z
iTl
z
~
:::0
~
z
[""I
"' ~
~ !f!
:::01
0> ......
z
~
~
"d
z
0 5l
~
d ~
~ ~
~
0
[."
Ul
DREDGING PLAN
~
~I~
Ul
~
FLOW DIRECTION
(l)
0
J.;l
0
AI
fT1
0
"z
"
LEGEND
----
- -
--
CHANNEL BOUNDARY
CHANNEL CENTERLINE
FENDER PILE
~
EXISTING DOCK STRUCl\JRE
c::::::::J
BERlH BOTIOM AREA
H
100
----'
200
I
SCALE IN FEET
NOTES:
1.
1.
2.
3.
4.
BERlH AREA OREOGE WIOlH VARIES AND EXTENDS FROt.l USACE CHANNEL
NORlH BOUNDARY TO EDGE OF COCK FENDERING.
BAlHYt.IETRIC SURVEY SHO\I!N BY ETRAC DATED OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STATE PLANE SOUlH, NAD83 (US FEET)
VERTICAL DAl\JM: COLUMBIA RIVER DAl\Jt.l (CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPlHS BELOW
CRD 0.0 FEET.
~
~
I
:::0
0
\
- 1I
-----------=
.
. ______.--·
_
ft
a
.
-n:-
.
~
:::;;
~
.
"-- ·__:_
r---3- r;:;-
.._
NWP-2007-916-1
aJ
m
~~
>
c~
n
]>
:::t
~~
C/)
0
z
~
[IJ
~
~
-1
~~~- --..q ..,....~·i:j)~
~~.., ~
z8~
-a
-c
;_..v;
...
mO
,-~~~'O'h'CIIr ..
"CJ·~·- .. I'II""J'
·
1..
..
...
. . . "'
. ....
~
~
"T1
j;
z
i/o~"li'>-
~,P~OI ~o.\0:.:1~o.\0~.:1!
~~
n
....
~ p;o:e~~~
~
c-> ~8
0
t~~
0
c
rii
:::0
.
~
-r~1<..!
~~~·~~~~~~.:0~ ti'J~
COLUMBIA RIVER
~
fT1
~
I§z ~ F.
I
-l:<
0
U1
ENCLOSURE
0
"T1
......
"'
z
n n
>
c
0
:::0
rii
>
"
:;:;c
::::c
~
,~
~
~
-
::e
"' >
.......
(/)
-0> :J:
.......
z
-
"'
E
~
c;)
dz
~
[IJ
z
iTl
z
z
~
:::0 CD
~(l)
U1
LEGEND
(")
-1 0
0
[."
DREDGING PLAN
>
z
-~I5l
.U1 "'0
0
r---------------------------------------------------------------------------------------------------------------------------------
~
~
;:o
:::0
~
FLOW DIRECTION
fT1
0
AI
fT1
0
c;)
z
c;)
----
---
- -
~
c::::::::J
8
CHANNEL BOUNDARY
CHANNEL CENTERLINE
0
H
100
----'
200
I
SCALE IN FEET
NOTES:
FENDER PILE
1.
EXISTING DOCK STRUCTURE
1.
BERTI-I BOTTOM AREA
2.
3.
4.
ASH CREEK ASSOCICATES, INC.
SEDit.IENT SAt.IPLE LOCATIONS (DECEMBER 2011)
BERTI-I AREA DREDGE WIDlH VARIES AND EXTENDS FROt.l USACE CHANNEL
NORlH BOUNDARY TO EDGE OF DOCK FENDERING.
BAlHYt.IETRIC SURVEY SHOWN BY ETRAC DATED OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STATE PLANE SOUlH, NAD83 (US FEET)
VERTICAL DAl\JM: COLUMBIA RIVER DATUt.l {CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPlHS BELOW
CRD 0.0 FEET.
~
I
:::0
0
-1"
0:
~
1
)-""'-----.......
I
OUlO-i
..,~tao
NWP-2007-916-1
~ ~Jl:i!~
/
\.
)
>
j.J
- dl!f! ~·
~§~a~
~ :t
f5· :::ooF
rii>>>
2
f·6.-'\
/
-~-.......
~ CI""-~ ~
~ jift
~ ~oo 0
- >Gl~~
~ :::OUlo~
· Z-ifTlZ
"""l"'lo!ti>
I
J
\
J
D
(
~~~ ~
· ZUlUll"'l
I
0
-,_ .......
r--/~/
I
/
./
~
../
_,..
<.
/
J
"! ~:i!oz
~ o~~m
:,..
0:.
~"tl:::j~
1"'1 0
~ Ul~
:i!
z
"
aJ
m
~~
>
"tl
"tl
c
C)
>
~~
en
:::t
0
z
0
~
8~
!; ->
Zz
~
z
~
[IJ
~
mO
""'0
"tl
0
:::0
-i
z
"T1
~8
~~
C)
0
c
1ii
:::0
m:::o
I
~
I§ ~ F.
0
"T1
> 81iic
:::0
>
......
"
::::c
~
ENCLOSURE
"'
~I~
"' ~
~ !f!
0> ......
z
"'- "az
:;:;c
I
~
iTl
z
Ul
0
("")
z
0
~
:::0 CD
~Cl
0
CHANNEL BOUNDARY
DREDGING PLAN
>
z
-~I5l
.Ul "'0
[."
_.--------
~
~
0
---------------------------------------------------\-------------------------------------------------------------------
z
:::0
-i
---
~
[IJ
:::0
~
~
FLOW DIRECTION
1"'1 z
-i:< 0
"'
z r
C)
COLUMBIA RIVER
1"'1
0
AI
1"'1
0
"z
"
LEGEND
----
- -
--
CHANNEL BOUNDARY
CHANNEL CENTERLINE
FENDER PILE
~
EXISTING DOCK STRUCTURE
c::::::::J
BERlH BOTIOM AREA
H
100
----'
200
I
SCALE IN FEET
NOTES:
1.
1.
2.
3.
4.
BERlH AREA DREDGE WIDlH VARIES AND EXTENDS FROt.l USACE CHANNEL
NORlH BOUNDARY TO EDGE OF DOCK FENDERING.
BAlHYt.IETRIC SURVEY SHOWN BY ETRAC DATED OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STATE PLANE SOUlH, NAD83 (US FEET)
VERTICAL DATUM: COLUMBIA RIVER DATUM (CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPTHS BELOW
CRD 0.0 FEET.
~
I
:::0
0
-1"
0:
_....'\...
~
OUlO-i
..,~tao
NWP-2007-916-1
~ ~Jl:i!~
:!::
I~
)lo 1"'1
dl!f!
- xI· ~
r 10>
· ZUlUll"'l
~§~a~
----
......---
_____
- ----- ---~-----~--~~-~--
"--
___ __
;t \_ - __..,>· -
~-
"
~I
f5· :::ooF
rii>>>
2
~ ~oo 0
- >Gl~~
~ :::OUlo~
· Z-ifTlZ
"""l"'lo!ti>
"! ~:i!oz
~ o~~m
:,.. ~"tl:::j~
0:.
1"'1 0
~ Ul~
:i!
z
"
aJ
m
~~
~
C)
~~
>
:::t
(I)
0
z
~
[IJ
~
"tl
§~
->
Zz
cg
-oc
""0
~
~
z
Si1
~
z
(11
~rii
§
1ii
:::0
m:::o
COLlJMBlA RNER
~
~~§~F.
z
I
1"'1
-i:<.. >
z
> 8c:
C)
ENCLOSURE
0
0
E
~
.,.,
:::0
1ii >
......
"
:;:;c
~
~I~
~ ~
~
!f!
0> -z
......
- "az
~
~
z
::::c
iTl
z
~
z
0 5l
~
a~
:::01
~ ~
-
0
[."
Ul
DREDGING PLAN
~
[""I
Ul
---------------------------------------------------------------------------
~
[IJ
:::0
~
~
(l)
D
J.;l
0
AI
1"'1
0
"z
"
LEGEND
----
- -
--
CHANNEL BOUNDARY
CHANNEL CENlERLINE
FENDER PILE
~
EXISTlNG DOCK STRUCTURE
c::::::::J
BERTH BOTIOM AREA
H
100
----'
200
I
SCALE IN FEET
NOTES:
1.
1.
2.
3.
4.
BERTH AREA DREDGE WIDTH VARIES AND EXlENDS FROt.l USACE CHANNEL
NORTH BOUNDARY TO EDGE OF DOCK FENDERING.
BATHYt.IETRIC SURVEY SHO\IIN BY ETRAC DAlED OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STAlE PLANE SOUTH, NAD83 (US FEET)
VERTlCAL DATUM: COLUMBIA RIVER DATUt.l (CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPTHS BELOW
CRD 0.0 FEET.
~
I
::0
0
""""
0:
~
")"\"'"> ~.-~
\/
~
AI ~Ri2
~~!&-~~~~
~
OUl0-1
..,~tao
NWP-2007-916-1
~ j;Jl:i!~
·
"'C"
_;:..-""~
~
ZUlUlfTl
~ §~d~
f5· ::onFz
rii>>>
~
s:::noo
- >Gj~il:
~ ::OUlo~
·
Z-lfTlZ
""""moq:J>
"! ~:i!oz
~ o~~m
:,..
0:.
~"C:::j~
:i!
fT1 0
z
~ Ul~
(;")
aJ
m
~~
>
"C
"C
c
n
>
:::t
0
z
[IJ
~~
~
mO
z
~8
0
8~
!);: ->
Zz
j;
(J)
~
""'0
"C
0
::0
-1
"T1
z
~~
n
c
rii
0
m:::o
::0
I
~
fT1
~
I§z ~ F.
I
-l:< 0
CD
z
r
ENCLOSURE
"T1
n 8
>
c
rii
::0
>
......
"
::::c
0
"'
"' ~
~ !f!
~
iTl
CD ......
z
(;")
dz
::0
-~I5l
.Ul "'0
0
s::: z
-1 0
~
::0 CD
il:(l)
0
[."
Ul
D
fT1
::0
fT1
0
(;")
z
(;")
#-----------------------------
DREDGING PLAN
z
>
z
("")
##-
.#
z
~
0
_
s:::
::0
~I~
"'
:;:;c
~
[IJ
LEGEND
----
----
I20a
c::::::::J
CHANNEL BOUNDARY
CHANNEL CENlERLINE
FENDER PILE
EXISTlNG DOCK STRUCTURE
BERTH BOTTOM AREA
H
100
----'
200
I
SCALE IN FEET
NOTES:
1.
1.
2.
3.
4.
BERTH AREA DREDGE WIDTH VARIES AND EXlENDS FROt.l USACE CHANNEL
NORTH BOUNDARY TO EDGE OF DOCK FENDERING.
BATHYt.IETRIC SURVEY SHO\IIN BY ETRAC DAlEO OCTOBER 23-24, 2012.
HORIZONTAL DATUM: WASHINGTON STAlE PLANE SOUTH, NAD83 (US FEET)
VERTlCAL DATUM: COLUMBIA RIVER DATUt.l (CRD), FEET.
ALL HYDROGRAPHIC SOUNDING DATA POINTS REPORTED AS DEPTHS BELOW
CRD 0.0 FEET.
EXISTING STRUCTURE
0
0D:
3
t
z
0
F
~
~
w
0
-5
-5
-10
-10
-15
-15
-20
-20
-25
-25
-30
EXISTING GROUND
-30
-35
-35
-40
EL£VA110N -40'
-45
-50
-40
~R~EQ~U~IR;E~D~D~R~E~DFGE~-----~~~~~
-- /
- - - - - - - -2:
::a::~
..--
-55
-60
0+50
0+75
1+00
1+25
~
~
w
-50
OVERDEPTH
-60
0+25
z
0
F
-45
-55
-65
0+00
0D:
3
t
1+50
-65
2+00
1+75
DISTANCE, FT
TYPICAL SECTION - BERTHS 1. 5. 10. 13. 14
(INTERit.4 MAINTENANCE)
>-
0
....10::
0
<~
-5
w<
zc
zz
-5
IO
om
-10
0
D:
3
IY..
z0
F
-10
-15
-15
-20
-20
-25
-25
-30
/FY.IS.NG GROUND
-30
-35
-35
<
>
~
w -40
-40
-45
-50
-55
-60
0+00
-
0+25
0+50
0+75
z0
F
<
>
~
w
/
---- --------2' ALLOWABLE OVERDEPTH
/
D:
IY..
-45
/
/
0
3
1+00
1+25
-50
-55
1+50
-60
2+00
1+75
DISTANCE, FT
TYPICAL SEC110N - GRAIN TERMINAL AND BERTHS 1. 2. 3. 4. 5. 7. 10. 13. 14
(AUTHORIZED DEPTH)
LEGEND
EXISTING GROUND (OCTOBER 23, 2012)
DREDGE AREA
HORIZ. 0
H
VERT.
0
25
50
12.5
SCALE IN FEET
25
----'
I
NOTES:
1.
BERTH AREA DREDGE WIDTH VARIES AND
EXTENDS FROM USACE CHANNEL NORTH
BOUNDARY TO EDGE OF DOCK FENDERING.
APPROXIMATE SLOUGHING AREA
PURPOSE· TO CREATE AND MAINTAIN BERTHING
DEPTHS TO ALLOW DEEP DRAFT
SHIPS SAFE ACCESS TO THE PORT
OF VANCOUVER MARINE FACIUllES
PORT OF VANCOUVER
BERTH DREDGING PROJECT
LOCA]ON: 45' 36' 36.09"N, 122' 42' 14.45"W
BERTH DREDGING SECTIONS 1
JlA1lJM;_ CRD
APPUCAliON BY: PORT OF VANCOUVER
NWP-2007-916-1
PROPOSED; MAINTENANCE DREDGING
REFERENCE NUMBER·
NWS-2007-916
lli;_
COLUMBIA RIVER, RM 103.5 TO Rt.4 105.5
AI;_
VANCOUVER
~
SHEET
CLARK
9
OF 12
.s.IAIE;_ WASHINGTON
MIT;_
12/16/12
ENCLOSURE
-15
-15
-20
c
It:
B
t
-20
EXISllNG GROUND
c
-25
-25 a::
-30
-30
-40
...J
-45
~
w
w
t
-35 ;i
;i -35
0
F
B
0
REQUIRED DREDGE
ELEVAllON -40 , . -
-40 F
NAl1.JRAL
ANGLE OF
REPOSE
/
/
-50
-55
0+00
/
0+25
0+50
0+75
1+00
1+25
1+50
-45
...........~
-50
-55
2+00
1+75
DISTANCE, FT
TYPICAL SECTlON - BERTHS 8 AND 9
~
(INTERIM MAINTENANCE)
.._a::
...
Olt::
we
-15
~~
-20
c
It:
B
t
-15
oz
-20
c
-25
-25 a::
-30
-30
~
w
...J
w
-40
-45
t
-35 ;i
;i -35
0
F
B
-40
REQUIRED DREDGE
ELEVAllON -46.5'
-50
-55
-55
-60
-60
-65
0+00
~
...
-45 'j
/
-50
0
F
0+25
0+50
0+75
1+00
1+25
1+50
-65
2+00
1+75
DISTANCE, FT
TYPICAL SECTlON - BERTHS 8 AND 9
(CONTAMINANT REMOVAL)
cIt:
B
....
I-
-15
-15
-20
-20
-25
-25 a::
c
-30
-30
;i -35
~
w
w
...J
....
I-
-35 ;i
0
F
B
0
-40
-45
REQUIRED DREDGE
ELEVAllON -43' ,.,
-55
0+00
NAl1.JRAl
ANGLE OF
REPOSE
/
/
-50
0+25
-40 F
-45
...........~
-50
0+50
0+75
1+00
1+25
1+50
-55
2+00
1+75
DISTANCE, FT
TYPICAL SECTlON - BERTHS 8 AND 9
(AUlHORIZED DEPlH)
LEGEND
EXISllNG GROUND (OCTOBER 23, 2012)
DREDGE AREA
APPROXIMATE SLOUGHING AREA
PURPOSE· TO CREAllE AND MAINTAIN BERlHING
DEPTHS TO ALLOW DEEP DRAFT
SHIPS SAFE ACCESS TO lHE PORT
OF VANCOUVER MARINE FACIUllES
HORIZ. 0
H
VERT.
0
25
----'
50
I
PORT OF VANCOUVER
BERTH DREDGING PROJECT
BERTH DREDGING SECTIONS 2
APPUCAllON BY: PORT OF VANCOUVER
NWP-2007-916-1
1.
BERlH AREA DREDGE WIDlH VARIES AND
EXTENDS FROM USACE CHANNEL NORlH
BOUNDARY TO EDGE OF DOCK FENDERING.
12.5
25
SCALE IN FEET
LOCA]ON: 45' 3B' 36.09"N, 122' 42' 14.45"W
.llA1lJM;_ CRD
NOTES:
PROPOSED; MAINTENANCE DREDGING
REFERENCE NUMBER·
NWS-2007-916
lli;_
COLUMBIA RIVER, RM 103.5 TO Rt.l 105.5
AI;_
VANCOUVER
~
SHEET
CLARK
10 OF 12
.s.IAIE;_ WASHINGTON
MIT;_
12/16/12
ENCLOSURE
t::J"
\
. . _\ )
1'- /'\_ ,........--L-
---~'----.---~--....~~----/J\
/
r~
10 UNDER DOCK
/~II>REIDGI~~G TEMPORARY UPLAND
...__...._/
UNDER DOCK
DREDGE AREA
LIMITS, ELEVAllON
VARIES, SEE NOTE 3.
SIDE SLOPES NOT
SHOWN, SEE NOTE 2.
..
,c,
0
CHANNEL BOUNDARY\_
[
-4
1 - - - - 240.0'
-:F~L~OW~D-=IR-=EC::-::11:-::0=N
....J
·-----------------------------------------------------------SITE PLAN
(BERTH 10 0
H
UNDER DOCK DREDGING)
100
200
----'
I
SCALE IN FEET
FLOAliNG DOCK
10
5
0
........
0
0:::
LJ..c.:>
-5
:.::F
-10
oz
u(§
<...J
/
[I]LJ..
//
LL.
z0
/
'
-20
EXISliNG
-25
< -30
>
w
w -35
...J
-40
/
-45
/
--
--------- -
ABOVE
-15' FT CRD
~
-/
../"
-10
00:::
-15
8
-20
/'"-ESliMATED NAlURAL
ANGLE OF REPOSE
GROUND~
F
-50
/
-- -
~ L __ t-~_o_ ~l~~~ ~LL.Q.~Q.
8-15
!-
/
1LL.
z
-25o
F
REQUIRED DREDGE
1
EUEVAliON -25
-30~
w
-35G:J
1' ALLOWABLE OVER DEPTH
-40
/
(BERTH 10 UNDER DOCK DREDGING)
2.
DREDGE AREA
HORIZ. 0
TEMPORARY UPLAND DREDGE
CONTAINMENT AREA
VERT.
BERTH BOTTOM AREA
PURPOSE· TO CREATE AND MAINTAIN BERTHING
DEPTHS TO ALLOW DEEP DRAFT
SHIPS SAFE ACCESS TO THE PORT
OF VANCOUVER MARINE FACIUllES
1.
SECTlON
EXISllNG GROUND (OCTOBER 23, 2012)
CHANNEL BOUNDARY
NOlES:
DISTANCE, FT
LEGEND
0
25
50
12.5
SCAUE IN FEET
25
PORT OF VANCOUVER
BEAlH DREDGING PROJECT
LOCAllON: 45" 3B' 36.09"N, 122' 42' 14.45"W
UNDER DOCK DREDGING SITE
PLAN AND SECTION
APPLICAllON BY: PORT OF VANCOUVER
NWP-2007-916-1
3.
PIPELINE CORRIDOR BETWEEN BERTH 10 UNDER
DOCK DRED~NG AREA AND UPLAND
TEMPORARY CONTAINMENT AREA NOT SHOWN.
3H:1V DREDGING SLOPES NOT SHOWN. TOP OF
DREDGING SLOPES NOT SHOWN AND WILL
VARY DEPENDING ON SITE CONDillONS AT THE
llME OF CONSTRUCliON.
DREDGE AREA Llt.IITS TO BE WITHIN AREAS
DEEPER THAN EL -15.0' CRD.
PROPOSED: MAINTENANCE DREDGING
REFERENCE NUMBER·
NWS-2007-916
.1.tt.
COLUMBIA RIVER, RM 103.5 TO RM 105.5
AI;_
VANCOUVER
~CLARK
SIAIE;_ WASHINGTON
SHEET
MIT;_
11 OF 12
12/16/12
ENCLOSURE
0
z
~
~
1-
1-
Lo.
Lo.
w
w
::!::
w
w
w
::!::
LO
w
--'
<(
--'
<(
(,)
(,)
Ul
Ul
0
--'
:;;:
It:
0
~
:::::1
C)
C)
z
~
LEGEND
xw
EXISTING GROUND
DREDGED MATERIAL
PURPOSE· TO CREATE AND MAINTAIN BERlHING
DEPTHS TO ALLOW DEEP DRAFT
SHIPS SAFE ACCESS TO lHE PORT
OF VANCOU\IER MARINE FACIUTlES
LOCA]ON: 45" JB' 36.09"N, 122" 42' 14.45"W
JlA1lJM;_ CRD
PORT OF VANCOUVER
BERTH DREDGING PROJECT
UNDER DOCK DREDGING
TEMPORARY CONTAINMENT AREA
APPUCATlON BY: PORT OF VANCOU\IER
NWP-2007-916-1
PROPOSED; MAINTENANCE DREDGING
REFERENCE NUMBER·
NWS-2007-916
lli;_
COLUMBIA RI\IER, RM 103.5 TO RM 105.5