Teevin Brothers Land and Timber Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Michael LaDouceur is the Regulatory point-of-contact for this permit application from Teevin Brothers Land and Timber Company for work in the Columbia River at River Mile 66.55, in Rainier, Ore.

PUBLIC NOTICE for Permit Application Issue Date: March 20, 2013 Expiration Date: April 18, 2013 US Army Corps of Engineers No: NWP-2003-674-2 30-Day Notice Oregon Department of State Lands No: 53169

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Michael LaDouceur P.O.Box 2946 Portland, OR 97208-2946

Applicant: Teevin Brothers Land& Timber Company, Shawn Teevin, 42894 Old Hwy. 30, Astoria, OR 97103

Location: The proposed project is located in the Columbia River (RM 66.55), in Rainier, Columbia County, Ore., Sections 8 and 17 of Township 7 North, Range 2 West.

Waterway: Columbia River

Project Description: The proposed project involves constructing a sheet pile dock with a 125 foot face, approximately 58 feet waterwards of the Ordinary High Water Mark. Existing riprap will be removed with an excavator or clamshell, from the area where the sheetpile will be installed and stockpiled on site for later placement or used on other projects. Three hundred fifty linear feet of sheet pile will be installed and fill, consisting of rock and sand, will be placed behind the sheet pile bulkhead and an asphalt deck will be paved. Approximately 25 to 30 temporary piles will be used during the installation of the sheet piles. A vibratory hammer will be used as much as possible, but an impact hammer may be necessary to reach the design elevation. Following installation of sheet piles, the remaining riprap will be cleared from the enclosed area before fill is placed. Approximately 1, 500 square feet of riprap will be placed by excavating the existing substrate to a depth of approximately 3 feet, roughly 4 feet from the face of the sheet pile wall for scour protection. Over 11,000 square feet of in-water structure will be constructed with 7,500 cubic yards of fill. In-water work is proposed to begin Oct. 1, 2013, and be completed by Feb. 1, 2014.

A fendering system will be installed to protect the new structure. Approximately 14 permanent 24- inch diameter fender piles will be installed. A high density polyethylene pipe will cover the fender piles.

Six mooring dolphins will be installed along the face of the new dock. Three dolphins will be installed upstream and three downstream. Each dolphin will consist of five 24-inch steel pipe batter piles and a steel pile cap. Thirty-five temporary piles may be necessary during the installation of the mooring dolphins.

A new stormwater outfall to the Columbia River will be constructed. The dock will be graded to collect stormwater on land to be treated prior to discharge into the Columbia River.

Mitigation: The applicant has proposed that 0.26 acre of created shallow water habitat serve as compensatory mitigation. The creation of 0.26 acre of shallow water habitat was completed in February 2013 on Dibblee Point, 1.75 miles downriver of the project site; if a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: Increase efficiency to meet capacity demands and decrease truck traffic by 7,000 trips annually.

Drawings: Eight drawings are attached and labeled Corp No. NWP-2003-674-2 enclosure.

Additional Information: Additional information may be obtained from Michael LaDouceur, Project Manager, U.S. Army Corps of Engineersby telephone to:503-808-4337 or e-mail to:Michael.A.Ladouceur@usace.army.mil

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat.Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties.If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest.That decision will reflect the national concern for both protection and utilization of important resources.The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters.These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

FIGURE 1 ·Vicinity Map

LOCATION; Rainier, Oregon

IN; Columbia River

N

PROPOSED PROJECT; Construct barge dock for Import/Export.

LATILONG; 46· 5' 55 .465" N/122· 57' 26484'' W

NEAR/AT: Rainier

DATUM; NAND 88

COUNTY; Columbia

PAGE 1 OF 11

STATE: Oregon

i

ADJACENT PROPERTY OWNERS: Whlteney, Ziemer, Benson, Deaton, Smith and Wendelle

DATE : 2/14/2013

0 0.25 0.5 1.5 all:lll:l··==:=J··sa'W!Ei::ll*lllt:'·a··=====:=:~· Miles NWP-2003-674 (2)

1 of 8

FIGURE 2 - Existing Conditions: Project Site PROPOSED PROJECT: Construct barge dock for Import/Export. ADJACENT PROPERTY OWNERS: Whiteney, Ziemer, Benson. Deaton. Smith and Wendelle

LOCATION: Rainier, Oregon

IN: Columbia River

N

LATILONG: 46° 5' 55.465" N/122· 57' 26.484" W

NEAR/AT: Rainier

DATUM: NAVD 88

COUNTY: Columbia

PAGE 2 OF 11

STATE: Oregon

i

DATE : 2/1412013

0

250

500

1,000

1.500

I<~*E:2HI'II::::::llaii$MIISIIIICIMII::::::::::::J1 Feet

NWP-2003-674 (2)

2 of 8

LIMITS OF/ GRADING

.......

~EXISTING

......

PAVEMENT ~

LEGEND OHWM · 14.1' NAVO 88 100-YEAR FLOODPLAIN - 20' NAVO 68 FILL BELOW OHWM: 11.048 SF 7.610CY

FIGURE 3 · Site Plan

LOCATION: Rainier, Oregon

IN: Columbia

PROPOSED PROJECT: Construct barge dock for import/export

LAT/LONG: 46" 5' 55.465" N/ 122" 57' 26.484" W

NEAR/AT: Rainier

DATUM: NAVD 88

COUNTY; Columbia

PAGE 3 OF 11

STATE: Oregon

ADJACENT PROPERTY OWNERS: Whitney. Ziemer, Benson. Deaton, Smith and Wendelle

DATE: 2/14/2013

uo

0

e;::;;e;:;;

NWP-2003-674 (2)

3 of 8

110

l.lC I

EXIS11NG GRADE ~

FINISHGAAOI

- - R!FER!NC! LINE

~ ~

(FACE OF SHEET) STEEL FENO£A SYSTEM XISTING RIPAAP Sl.OPE, ,-FACE OF FENDER PILE

R!MOV! PRIOR TO INSTALLING SHEET PILING

r

+lOQ'MA< El ·16.5' t l4 1 (OHV/1

..,sz

·H 0' q: TIE ROO

t S,4' !MU.W}

~

+1.94' (0.00 CRDI

0.0' (NAV088)

6

t,.~~J!~I NARY CROSS SECTION (SHEET PILE WALLL

II II II .~..__ _ _ _ _ _1 I--!E~L·~39~ .s·==="' OF COM PUENT SOtl

N

TO~

u~

LEGEND

~

FllL BELOW OHWM z7,6lOCV

·

RIP RAP Fill BElOW OHWM · 110 CV

IMPACT TOTALS OOCI< AND BACKfiLl. ·ll,D4B Sf

DOLPHIN PilES · HZ SF

F!NO!R!NG STST!M · 44 SF

FIGURE 4- Dock and Fender Cross Section

LOCATION: Rainier, Oregon

IN: Columbia River

PROPOSED PROJECT: Construct barge dock for import/eJ

LAT/LONG: 46' 5' 55.465" N/122· 57' 26.484' W

NEAR/AT: Rainier

DATUM: NAVD 88

COUNTY: Columbia

PAGE40F 11

STATE: Oregon

ADJACENT PROPERTY OWNERS: Whitney, Ziemer, Benson. Deaton. Smith and Wendelle

NWP-2003-674 (2)

DATE: 2/14/2013

4 of 8

24' !il SAND FILlCO $TCCL PIPC FENO[~ PILE. BATTCRCO 2:12, 'NP (PilCS 1 & 21

DOLPHIN - TOP VIEW SCJ\1.£: I" · 5'

SO' MIN EMBEDMENT, T'll'

ED

l&'l.~f.~IN -FRONT YIEW PIPt90LlMO

t l"CAP

· 5.4 '(MLLW)

·0. 7' 80 HOPE 0 O'INAVD 88)

L

SAND rii.UD 24"(il d/2' WALL PIPE PILE-.....

MIN liP £L -70.0

FIGURE 5 -Dolphin Cross Section

LOCATION: Rainier. Oregon

IN: Columbia River

PROPOSED PROJECT: Construct barge dock for Import/export.

LAT/LONG: 46° 5' 55.465" N/122° 57' 26.484" W

NEAR/AT: Rainier

DATUM: NAVD 88

COUNTY: Columbia

PAGE 5 OF 11

STATE: Oregon

ADJACENT PROPERTY OWNERS: Whitney, Ziemer, Benson. Deaton, Smith and Wendelle

NWP-2003-674 (2)

DATE: 2/14/ 2013

5 of 8

WATER QUALITY TREATMENT FACILITY OR MANHOLE EXISTING GRADE= 21'±

-

~

a._

12" ¢

..........

OUTF~l J

~

OUTFALL IE = 16.0'± 14.1' (OHW)

\7 -::-

1.5 1

1 ~ EXISTIN G

SLOPE

0 .0' (NAV D 88)

EB

FIGURE 6 - Stormwater Outfall Cross Sectlon PROPOSED PROJECT: Construct barge dock for Import/export. ADJACENT PROPERTY OWNERS: Whitney, Ziemer, Benson, Deaton, Smith and Wendelle

NWP-2003-674 (2)

~?.~~WATER OUTFALL CROSS ~E~IION

LOCATION: Rainier. Oregon

IN: Columbia River

LAT/LONG: 46· 5' 55.465" N/122· 57' 26.484" W

NEAR/AT: Rainier

DATUM = NAVD 88

COUNTY: Columbia

PAGE 6 OF 11

STATE: Oregon

DATE: 2/14/2013

6 of 8

Restoration/Creation Area MHHW (9.6') OHWM (13.8')

FIGURE 7 · Dibblee Point Existing Conditions PROPOSED PROJECT: Construct barge dock for import/export. ADJACENT PROPERTY OWNERS: Whlteney, Ziemer, Benson, Deaton, Smith and Wendelle

LOCATION: Rainier. Oregon

IN: Columbia River

N

LAT/LONG: 46· 5' 55.465" N/122· 57' 26.484" W

NEAR/AT: Rainier

DATUM: NAVD 88

COUNTY: Columbia

PAGE 7 OF 11

STATE: Oregon

i

DATE: 2/14/2013 0 I

NWP-2003-674 (2)

7 of 8

25

"t=-' -

50

100

Wfi ! a .;t

150

200

1 ¢ e:&J:A Feet

APPROXIMATE PO~D SHOR:LIN~ EXISTING DIBBLEE POND

--:....----:....__

_r·

,..,--,

-

~

19-+00 SECT~~N

--.,-

.

-"'

)

0

_

_,

EXISIING TOPOGRAPHY

',_,.r-- CREST EXCAVAIION

m

~ PROPOSED EXCAVATION

0.26 ACRES BELOW 9.6' MHHW

OHWM = 13.8' MHHW= 9fi'

FIGURE 8 - Dibblee Point Grading Plan

LOCATION: Rainier, Oregon

IN: Columbia

PROPOSED PROJECT: Construct barge dock for import/export.

LAT/LONG: 46· 5' 55.465' N/122" 57' 26.484' W

NEARJAT: Rainier

DAIUM: NAVD 88

COUNTY: Columbia

PAGE 8 OF 11

STATE: Oregon

ADJACENT PROPERTY OWNERS: Whitney, Ziemer, Benson, Deaton, Smith and Wendelle

DATE: 2/14/ 2013

25

50 I

NWP-2003-674 (2)

8 of 8

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas