Heidi Firstencel is the Regulatory point-of-contact for this permit application from Oregon's Parks and Recreation Dept. for work at Dexter Reservoir near Lowell, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: March 27, 2013
Expiration Date: April 10, 2013
US Army Corps of Engineers No: NWP-2011-409-1
15-Day Notice Oregon Department of State Lands No: 48073-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision.Comments or additional information requests should be directed to the following Corps Project Manager:
U.S. Army Corps of Engineers
Heidi Firstencel, heidi.firstencel@usace.army.mil
Eugene Field Office
1600 Executive Pkwy., Suite 210
Eugene, OR 97401-2156
541-465-6765
Applicant: Oregon Parksand Recreation Dept.
725 Summer St., NE, Suite C
Salem, OR 97301-1266
Location: The project is located at the Lowell State Park, on Dexter Reservoir, near Lowell, Lane Co., Ore. (Section 15, Township 19 South, Range 1 West).
Waterway: Dexter Reservoir
Project Description: The Oregon Parks and Recreation Department proposes to conduct maintenance dredging within an existing marina by removing up to 550 cubic yards of accumulated sediments from a 0.21-acre area below the ordinary high water mark of Dexter Reservoir.Excavated materials would be removed by an excavator and transported off-site via dump trucks to a secure upland location.
On October 12, 2012, a permit was issued to the OPRD to dredge up to 210 cubic yards from a 0.11-acre area.Based on additional site assessment, OPRD has requested a modification to that permit to increase the volume and area of the dredging activity.
Non-jurisdictional activity would include the replacement of the existing docks with new materials and aluminum gangways.
Mitigation: The applicant has not provided a proposed compensatory wetland mitigation plan. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation.The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To maintain access and moorage by water vessels.
Drawings: Three drawings are attached and labeled Corps No. NWP-2011-409-1 enclosure
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state.Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species/Essential Fish Habitat: The Corps, in consultation with the National Marine Fisheries Service, concluded that the original proposed activity was not likely to adversely affect the Upper Willamette River Chinook salmon (Oncorhynchus tshawytscha), a species protected by the Endangered Species Act, its critical habitat, or Essential Fish Habitat. The Corps believes the potential effects associated with the expanded dredging prism would be consistent with those previously evaluated and would therefore not necessitate additional consultation with NMFS.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places.At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity.Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal.To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters.These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished.Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
250
500
750
SCALf IN FffT
APPR. BY:
DESIGN BY:
DRAWN BY: SGS
OA T£:
NWP-2011-409/1
08/11
Page 1 of 3
OAT£
REVISIONS
BY
SH££T
OF
2
5
FIL£:
I
I
\
I
i
I
I
~~ I
I /
10I 11
~ I
Ii
, c::,'0
\
\
/~ ~ ~
I;:;;;
\
~\
\
\
~\
_ i.;;WE~~
s-AT£ PARK, LAN£ COUNTY
.
NWP-2011-409/1
.
~
·. ~
.
~ .
\
\\\
~~\\
.
'
.
/
_\::) .
j ·
I
.I
/
I/.-·:· ,·/
I
~\\
·o_·a
\\
\I
NWP- 201 1-L09
I
OREGON PARKS AND RECREA T! ON DEPT.
I
SHEET _:2 CF 2.
_APPR~!!.!.!.____DESIGN BY:
DRAWN
Ot7EGON PARKS AND R£CR£A TION
I
I
C')
) ·.· .
.i\
, 2:-z PU ,'-1 EXHIBIT
./J.. Pi:~"t. DCiCK REPLACEMENT
'i
; _··..
. ; I0.·. .··, ~ . · ·I
.i
\
~\\~
; I
~~,-'I._·- ~
/
j
I
I
~ ~~~-j_~_:VJSJONS
08/11
Page 2 of 3
j ; c.·;;
/ _: _·.. . .
/ '. .
/ ./ :-':/
_j_!Y
J rSH££T l 0~
-- -- ---+-----------____j___l
sY:-5(;5·-- E---=--=~±:':=_-
- - -- ----- -
DAT£:
I
[ '··j·.·
----
_ _ ___ I
·- -
3 . l !:J
ll
i=::j [r;,r, -·· -..
I
~~
I
j
Page 3 of 3
//
NOTES:
I. OWNER SUPPLIED DOCKS ARE STORED IN
THE MAINTENANCE YARD AT ELIJAH
BRISTOW STATE PARK, 38263 WHEELER RD.,
DEXTER, OR 97431, 6 MILES FROM THE
LOWELL MARINA . CONTRACTOR SHALL LOAD,
TRANSPORT AND OFFLOAD ALL DOCKS AND
HARDWARE TO THE LOWELL MARINA.
2. ALL DOCK CONNECTIONS ARE HINGED.
ALL PILE POCKETS CAN BE OPENED TO
EASE INSTALLATION.
~
§!
[!;
tl
C>:
EAST DOCK
NWP-2011-409/1
3. FINGER DOCKS WILL NOT FLOAT UPRIGHT
UNTIL ATTACHED TO THE MAIN DOCK.