You can copy from here when filling out the rest of the page.
Michael Ladouceur is the Regulatory point-of-contact for this permit application from the city of Hillsboro for proposed work in Hillsboro, Ore., affecting South Fork Waible Creek, Waible Creek, Glencloe Swale, two stormwater conveyances and three on-site wetlands.
PUBLIC NOTICE for Permit Application
Issue Date: April 8, 2013
Expiration Date: May 8, 2013
US Army Corps of Engineers No: NWP-2013-115
30-Day Notice Oregon Department of State Lands No: Unknown
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Michael LaDouceur, Michael.A.Ladouceur@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: City of Hillsboro, Charlie Shell, P.E., Public Works Dept., 150 East Main St., 4th floor, Hillsboro, OR 97123
Location: The proposed project is located on NW 253rd Ave. from the intersection with NW Evergreen Rd., north to NW Meek Rd. in Hillsboro, Washington Co., Ore., in Section 21 of Township 1 South, Range 2 West.
Waterway: The impacted Waters of the U.S. include South Fork Waible Creek, Waible Creek, Glencloe Swale, two stormwater conveyances and three on-site wetlands.
Project Description: The proposed project involves the extension and widening of NW 253rd Avenue between NW Meek Rd. and NW Evergreen Rd.The construction will be completed in two phases.The final build-out of the road will consist of a 50-foot paved road with curbs, planter strips, and two 5-foot-wide sidewalks. An arch bottom culvert with natural channel bottom will be installed where the road crosses Waible Creek and another at the South Fork Waible Creek Crossing.The existing culvert at NW 253rd Ave. and Glencoe Swale will be extended.Two roadside conveyances will be filled to widen the current road. Wetland impacts include permanent fill for the road widening and a temporary trench for the installation of a stormwater pipe.A total of 0.96 acre of wetlands and 0.12 acre of waters will be impacted.Stormwater will be collected and treated using three dry ponds, providing stormwater treatment for the newly created impervious surface as well as for the surrounding lots.
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for the purchase of 0.96 credit of the same Cowardin and HGM classes as the impacted wetlands from the Tualatin Valley Environmental Bank and the purchase of 0.11 stream credits from the Half Mile Lane In-Lieu Fee site.If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation.The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: NW 253rd Ave. will provide access to NW Meek Rd. Current access to NW Meek Rd. is via Brookwood Parkway. Safety improvements to the US Highway 26 Helvetia Brookwood Parkway interchange will close access to Meek Rd.The new route will provide access for residents to their neighborhood.It is also anticipated that the improved access will be needed for future development in the area.
Drawings: Ten drawings are attached and labeled NWP-2013-115 enclosure.
Additional Information: Additional information can beobtained from Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers, 503-808-4337 or e-mail: Michael.A.Ladouceur@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application.Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identifiedabove inthis notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest.That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments.All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity.Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal.To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters.These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
#M~it±1t
2S!J
NWP-2013-115
500
1 of 10
Enclosure
;;:.;'i;
~~;;;;;;;;;;;;;;!!I!!!!!!!IL
.........
'':'i;u~:,,,,,,,
-;~;::::~:::·nui!IHIIIHIHIHII!IU!i!i;!i;;;'!!;! hi!
NWP-2013-115
2 of 10
Enclosure
!!liN
AAJ)a 790'
(40 WPH AASHTO - 2.51)
NW 253RD AVE ALIGNMENT - OPTION 3
Decen'Cet20, 2012
*
GM Job 2120550..00
NWP-2013-115
3 of 10
Enclosure
NWP-2013-115
4 of 10
Enclosure
i
!
II
-~~i~
~i
fs
II
~
{!
li
I
li
i
~
...-:
(\1
a:
~
~
~
~
i
! ; i
I II
I
§
§
NWP-2013-115
5 of 10
Enclosure
_
~"'-'"'_:;: :·~~
NWP-2013-115
6 of 10
iii
-I
~~~~r
~
Enclosure
I
J
1:
~
I
· 15
i
I':
(\,1
a:
'i
~
~
~
i
I
I
I5
i
!
Jj
I
§
ig
I
I
I
~~
l
I
I
I
I
I
I
I
<0
~~
~~wli
@
f
~
.
I
f.
Ii
0
0
....+
~
NWP-2013-115
7 of 10
Enclosure
I.
~
NWP-2013-115
8 of 10
Enclosure
i
1!1
· Ia
i
I
,;g
r.:
I
d~
$2
~
I
'i
1l!
~
I5
§
I'
~
~-~-1.
I~
~~~.....,...~ p
~~~~
NWP-2013-115
9 of 10
Enclosure
I~
I
t;
!I!
~
"~""";
~
I
~
q
~
I5
§
I.
I
11
gl
~~+il
~L
~~
~
NWP-2013-115
10 of 10
Enclosure