Tyler Krug is the Regulatory point-of-contact for this permit application from the Oregon International Port of Coos Bay for work in Coos Bay, mile 5.5-15.0, near Empire and Coos Bay, Ore.

PUBLIC NOTICE for Permit Application Issue Date: May 21, 2013 Expiration Date: June 20, 2013 US Army Corps of Engineers No: NWP-2007-5 30-Day Notice Oregon Department of State Lands No: -

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Tyler J. Krug: Tyler.J.Krug@usace.army.mil North Bend Field Office 2201 N. Broadway, Suite C North Bend, OR 97459-2372

Applicant:Kathy Wall Oregon International Port of Coos Bay 125 West Central Avenue, Suite 300 P.O. Box 1215 Coos Bay, OR 97420-0311

Location: The project is located at the in Coos Bay, Mile 5.5 through 15.0, near Empire and Coos Bay/North Bend in Coos County, Ore. The docks are located in Sections 4, 15, 18, 22, 26, 35, and 36 of Township 25 South, Range 13 West.

Waterway: Coos Bay, Mile 5.5 through 15.0, near Empire and Coos Bay/North Bend in Coos Co., Ore.

Project Description: The purpose of this Public Notice to inform the public of the need on behalf of the Corps of Engineers to seek Environmental Protection Agency concurrence for the Oregon International Port of Coos Bay’s unified dredging permit regarding the transport of dredged material to EPA managed Ocean Dredged Material Disposal Sites “F' and "H” near Coos Bay, Ore. Corps permit No. NWP-2007-5 currently authorizes the dredging of 17 deep draft dock areas in the Coos Bay area with the Port acting as the primary permit holder. In July, 2013, the Corps Section 103 of the Marine Protection, Research and Sanctuaries Act component authorization will expire. The Corps is seeking concurrence from the EPA to authorize the Port to dredge materials during the 2013 in-water work window (Aug. 1 to Dec. 15). This Section 103 re-concurrence will only be valid for the 2013 season.

Port proposes to dredge up to 57,000 cubic yards of material this in-water work window to maintain access to 17 deep draft docks on Coos Bay. The location of the each dock is shown on pages 4 through 10 of the attached drawings. Dredging would be carried out with a clamshell, hopper or pipeline dredge. The dredged material shall be discharged at EPA-approved Ocean Dredged Material Disposal Sites “F' and "H” if concurrence is granted.

The depth of dredging and the amount dredged each cycle would vary annually and by facility as shown.

In August, 2010, it was brought to the Corps attention there existed a topographical error on the Port’s previous project drawings regarding “Dock B”. The overall dimensions and cubic yardages were understated by the Port, hence they appear incorrect on the original project drawings. The actual dredge prism of Dock B measures 1,400-feet long, 100-feet deep and is dredged to a -40-foot Mean Lower Low Water elevation. Concurrently, up to 3,000 cubic yards of material is dredged annually from Dock B. The Corps modified the Port’s permit Aug. 27, 2010.

Site F coordinates:

43 22'54.8887''

124 19'28.9905''

43 21'32.8735''

124 20'37.7373''

43 22'51.4004'' W

124 23'32.4318''

43 23'58.4014'' W

124 22'35.4308''

Site H coordinates:

43°22'58.00"

124°19'32.00"

43°21'50.00"

124°20'29.00"

43°22'52.00"

124°23'28.00"

43°23'59.00"

124°22'31.00"

Material to be dredged has been previously reviewed under the 2009 interagency Sediment Evaluation Framework for the Pacific Northwest. Material originating from routinely dredged locations has been found acceptable for unconfined in-water placement while material originating from non-routinely dredged locations may require further sediment evaluation before dredging is authorized. Depending on how recent sediment testing concurrence is, some dredging locations may require further sediment testing before dredging is authorized. Sediments found to be suitable for unconfined in-water disposal will be discharged at EPA-approved Ocean Dredged Material Disposal Sites “F' or "H” while sediment found to be unsuitable for unconfined in-water placement will be discharged at an approved upland disposal site.

Mitigation: No mitigation is proposed for this project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To provide access for recreational and commercial vessels to existing docks and other infrastructure at the seventeen proposed locations.

Drawings: Fourteen drawings are attached and labeled NWP-2007-5 enclosure.

Additional Information: Additional information may be obtained from Tyler Krug, Project Manager, U.S. Army Corps of Engineers at 541-756-2097 or email Tyler.J.Krug@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.

Water Quality Certification: Certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217) has been obtained from the Oregon Dept. of Environmental Quality for this project. Certification was obtained by the Port on May 21, 2009.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest has been evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: The Corps received Section 7 of the Endangered Species Act concurrence from the National Marine Fisheries Service for this project on July 17, 2008.

Cultural Resources: The Corps received recommendations from the State Historic Preservation Office on June 19, 2007, requesting a qualified archaeologist conduct cultural resource surveys prior to the work if dredge spoils are placed on shore instead of on a barge. The SHPO also recommended caution during future ground disturbing activities and recommended that work should cease immediately in the event that any cultural resource is discovered. The recommendations obtained from the SHPO are current special conditions of the existing permit.

An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This re-notification has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

°For discussion and potential modification.

Port of Coos Bay Unified Permit

New Prev

ID

ID

1.00 ~

Dock Name -Dock

River MHe 5.6

Dredce Prism 150x 100

Est. Annual Volume

levi 500

Est. olume (cy)

Depth

_.fvr

It·

Syun 2,500

(MLLW) 20'

Port Web Drawlnl Map

,_,

ID

cy)

~ed ~/Alii

izoos

(cy)

(cy) Dredpd Od/Nov

(cy)

ZOlD-

FebZO/Z9

Z009

Z011

zou

3

B

-

-

··-··

··-··

16270

13629

Dred&ed Dredced

(cy)M· (cy)

Disposal: Upland,

21,1013 ODMDS Elllllfl IIE,F,H) ISe!ltZOU Auth U,F

Dredced

1-toSbllh Lllely need for Dredalnl within 5 year [permit qde 4

SEF status

Shoreslde Comer Points

7 .. ~-·"''f't.

.:...

-

~

2.00 B

Roseburg Forest Products

7.9

1400x 100

7,000

35,000

40'

4

E

c

Ocean Terminals

11

1600x 115

7,000

35,000

40'

4

F

CEDCO 11.5 2700x 100 Tyree Oil Terminal 12.4 80Dx 100 Oregon Chip Terminal 12.5 1000x 100 Sauce Bros. Bayshore Dock 12.6 53Dx 100 Fay Family/Ei Conquistador 12.7 700x 100 Citrus Dock 12.9 250x 100 Dolphin Terminals 13.1 700x 100

10,000 1,500

50000 7,500

40' 40'

5 5

G

7,000

35,000

40'

6

H

2,500

12,500

40'

6

I

2,500 1,500 2,500

12,500 7500 12,500

40' 20' 40'

7 7 8

J K

130x20 950x 100

500 1,000

2,500 5,000

20' 40'

8 9

730x 100

1,000

5,000

40'

78Dx 100

1,000

5,000

550x 30

1,000

755x 100

14.9 1450x 100

3.00

4.00 M 5.00 D 6.00 E 7.00 F 8.00 L 9.00 0 10.00 N 11.00 p 12.00 G

16.00 J

Orcas Dock 13.2 Central Dock 13.3 Coos Historical Society 13.4 Sauce Bros. Hillstrom Dock 13.8 City of Coos Bay Moorage Dock 14.2 Oregon Resources Corporation 14.8

17.00 K

Georgia Pacific

13.00 H 14.00 I 15.00 Q

6612

16100

U, F

5

U, F

5

UF U,H

1 1

U,H

5

U,H

1

U,H U,H U,H

1 2 2

U,H U,H

3 1

9

U,H

1

25'

10

U,H

1

5,000

25'

10

U,H

3

3,500

17,500

40'

11

M

U,H

2

7,000

35,000

40'

11

0

U,H

5

8400

5812

12048

1663

663

7845

11398

10500

150

2010+ 5 =2015 09-2012+ 2 =2014 2009+ 7 =2016

43 25.497'/124 15.487' 43 25.522'/124 15.272' 43 24.576'/124 13.206' 43 24.640'/12413.194' 43 23.946'/124 13.060' 43 24.173'/124 13.152'

2005 +7 =2012

43 23.266'/12413.186' 43 23.420'/12413.136'

2012

43 22.782'/12413.006' 43 22.799'/12413.023'

1D-2009+ 7 =2016

43 21.663'/12412.245 43 21.738/124 11.990

Project Location

NOTE: Prism diagrams information for each location.

are not to scale. Please see the text box and spreadsheet for additional

#1.00 TDOCK 25S 13W 18 105Z1 90418 TransPacific Parkway, North Spit of Coos Bay Prism: 150x100 to 20MLLW at River Mile: 5.6

#2.00 ROSEBURG FOREST PRODUCTS 25S 13W 04 300 66237 Jordan Cove Road, North Spit of Coos Bay Prism: 1400x100 to 40MLLW at River Mile: 7.9

#3.00 OCEAN TERMINALS 25S 13W 10 600 At the foot of California Street, North Bend Prism: 1600x115 to 40MLLW at River Mile: 11

#4.00 CEDCO 25S 13W 15 100 At the foot of State Street, North Bend Prism: 2700x100 to 40MLLW at River Mile: 11.5

#5.00 TYREE OIL TERMINAL 25S 13W 22AD 200 341 Newmark Street, North Bend Prism: 800x100 to 40MLLW at River Mile: 12.4

#6.00 OREGON CHIP TERMINAL 25S 13W 22AD 2700 US 101 at Tower Street, North Bend Prism: 1000x100 to 40MLLW at River Mile: 12.5

#7.00 SAUSE BROS. BAYSHORE DOCK 25S 13W 22DA 100/101Z 2580 Bayshore Drive, US 101, Coos Bay Prism: 530x100 to 40MLLW at River Mile: 12.6

#8.00 FAY FAMILY/EL CONQUISTADOR 25S 13W 22DA 399Z1 Highway 101 at the foot of Teakwood Avenue, Coos Bay Prism: 700x100 to 40MLLW at River Mile: 12.7

#9.00 CITRUS DOCK 25S 13W 22DD 5100 2100 Bayshore Drive, Coos Bay Prism: 250x100 to 20MLLW at River Mile: 12.9

#10.00 DOLPHIN TERMINAL 25S 13W 22DD 6600 1610 Bayshore Drive Hwy 101 at the foot of Kingwood Avenue, Coos Bay Prism: 700x100 to 40MLLW at River Mile: 13.1

#11.00 ORCAS DOCK 25S 13W 26BB 100 Highway 101 at the foot of Juniper, Coos Bay Prism: 130x20 to 20MLLW at River Mile: 13.2

#12.00 CENTRAL DOCK 25S 13W 26BB 400 Hwy 101 at the foot of Hemlock and N. 3rd St, Coos Bay C Prism: 950x100 to 40MLLW at River Mile: 13.3

#13.00 COOS HISTORICAL SOCIETY 25S 13W 26BD 101 1210 N. Bayshore Drive, Coos Bay Prism: 730x100 to 40MLLW at River Mile: 13.4

#14.00 SAUSE BROS. HILLSTROM DOCK 25S 13W 26BD 200 912 N. Front Street, Coos Bay Prism: 780x100 to 25MLLW at River Mile: 13.8

#15.00 CITY OF COOS BAY MOORAGE DOCK 25S 13W 26CD 400 200 S. Bayshore Drive, Coos Bay Prism: 550x30 to 25MLLW at River Mile: 14.2

#16.00 OREGON RESOURCES CORPORATION 25S 13W 35 399A1 1 Mullen Street, Coos Bay Prism: 755x100 to 40MLLW at River Mile: 14.8

#17.00 GEORGIA PACIFIC 1170 Newport Avenue, Coos Bay Prism: 1450x100 to 40MLLW at River Mile: 14.9

Attatchment A Roseburg Forest Products North Bend Export Chip Facility Taxlot 300 Gov·t Lots 3 & 4, Section 4, T25S, R13W De

lin~~ tecl

\VetlQncls

DisposoJ Area_ SCALE

t·~

300'

Property Line

Property Line

@3

D

Existing work dock

...

l~·:~~~_:_(_L···~~ . :t:: 3·ut) ~ .1 LV). .. ·

.TYnPICAiL sEciiixfti ·. D/OCK ARE4. ·

·. ·.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas