Tyler Krug is the Regulatory point-of-contact for this permit application from the Oregon International Port of Coos Bay for work in Coos Bay, mile 5.5-15.0, near Empire and Coos Bay, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: May 21, 2013
Expiration Date: June 20, 2013
US Army Corps of Engineers No: NWP-2007-5
30-Day Notice Oregon Department of State Lands No: -
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Tyler J. Krug: Tyler.J.Krug@usace.army.mil
North Bend Field Office
2201 N. Broadway, Suite C
North Bend, OR 97459-2372
Applicant:Kathy Wall
Oregon International Port of Coos Bay
125 West Central Avenue, Suite 300
P.O. Box 1215
Coos Bay, OR 97420-0311
Location: The project is located at the in Coos Bay, Mile 5.5 through 15.0, near Empire and Coos Bay/North Bend in Coos County, Ore. The docks are located in Sections 4, 15, 18, 22, 26, 35, and 36 of Township 25 South, Range 13 West.
Waterway: Coos Bay, Mile 5.5 through 15.0, near Empire and Coos Bay/North Bend in Coos Co., Ore.
Project Description: The purpose of this Public Notice to inform the public of the need on behalf of the Corps of Engineers to seek Environmental Protection Agency concurrence for the Oregon International Port of Coos Bay’s unified dredging permit regarding the transport of dredged material to EPA managed Ocean Dredged Material Disposal Sites “F' and "H” near Coos Bay, Ore. Corps permit No. NWP-2007-5 currently authorizes the dredging of 17 deep draft dock areas in the Coos Bay area with the Port acting as the primary permit holder. In July, 2013, the Corps Section 103 of the Marine Protection, Research and Sanctuaries Act component authorization will expire. The Corps is seeking concurrence from the EPA to authorize the Port to dredge materials during the 2013 in-water work window (Aug. 1 to Dec. 15). This Section 103 re-concurrence will only be valid for the 2013 season.
Port proposes to dredge up to 57,000 cubic yards of material this in-water work window to maintain access to 17 deep draft docks on Coos Bay. The location of the each dock is shown on pages 4 through 10 of the attached drawings. Dredging would be carried out with a clamshell, hopper or pipeline dredge. The dredged material shall be discharged at EPA-approved Ocean Dredged Material Disposal Sites “F' and "H” if concurrence is granted.
The depth of dredging and the amount dredged each cycle would vary annually and by facility as shown.
In August, 2010, it was brought to the Corps attention there existed a topographical error on the Port’s previous project drawings regarding “Dock B”. The overall dimensions and cubic yardages were understated by the Port, hence they appear incorrect on the original project drawings. The actual dredge prism of Dock B measures 1,400-feet long, 100-feet deep and is dredged to a -40-foot Mean Lower Low Water elevation. Concurrently, up to 3,000 cubic yards of material is dredged annually from Dock B. The Corps modified the Port’s permit Aug. 27, 2010.
Site F coordinates:
43 22'54.8887''
124 19'28.9905''
43 21'32.8735''
124 20'37.7373''
43 22'51.4004'' W
124 23'32.4318''
43 23'58.4014'' W
124 22'35.4308''
Site H coordinates:
43°22'58.00"
124°19'32.00"
43°21'50.00"
124°20'29.00"
43°22'52.00"
124°23'28.00"
43°23'59.00"
124°22'31.00"
Material to be dredged has been previously reviewed under the 2009 interagency Sediment Evaluation Framework for the Pacific Northwest. Material originating from routinely dredged locations has been found acceptable for unconfined in-water placement while material originating from non-routinely dredged locations may require further sediment evaluation before dredging is authorized. Depending on how recent sediment testing concurrence is, some dredging locations may require further sediment testing before dredging is authorized. Sediments found to be suitable for unconfined in-water disposal will be discharged at EPA-approved Ocean Dredged Material Disposal Sites “F' or "H” while sediment found to be unsuitable for unconfined in-water placement will be discharged at an approved upland disposal site.
Mitigation: No mitigation is proposed for this project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose:
To provide access for recreational and commercial vessels to existing docks and other infrastructure at the seventeen proposed locations.
Drawings: Fourteen drawings are attached and labeled NWP-2007-5 enclosure.
Additional Information: Additional information may be obtained from Tyler Krug, Project Manager, U.S. Army Corps of Engineers at 541-756-2097 or email Tyler.J.Krug@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.
Water Quality Certification: Certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217) has been obtained from the Oregon Dept. of Environmental Quality for this project. Certification was obtained by the Port on May 21, 2009.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest has been evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: The Corps received Section 7 of the Endangered Species Act concurrence from the National Marine Fisheries Service for this project on July 17, 2008.
Cultural Resources: The Corps received recommendations from the State Historic Preservation Office on June 19, 2007, requesting a qualified archaeologist conduct cultural resource surveys prior to the work if dredge spoils are placed on shore instead of on a barge. The SHPO also recommended caution during future ground disturbing activities and recommended that work should cease immediately in the event that any cultural resource is discovered. The recommendations obtained from the SHPO are current special conditions of the existing permit.
An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This re-notification has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
°For discussion and potential modification.
Port of Coos Bay Unified Permit
New Prev
ID
ID
1.00 ~
Dock Name
-Dock
River
MHe
5.6
Dredce
Prism
150x 100
Est.
Annual
Volume
levi
500
Est.
olume
(cy)
Depth
_.fvr
It·
Syun
2,500
(MLLW)
20'
Port
Web
Drawlnl Map
,_,
ID
cy)
~ed
~/Alii
izoos
(cy)
(cy)
Dredpd
Od/Nov
(cy)
ZOlD-
FebZO/Z9
Z009
Z011
zou
3
B
-
-
··-··
··-··
16270
13629
Dred&ed Dredced
(cy)M·
(cy)
Disposal:
Upland,
21,1013
ODMDS
Elllllfl
IIE,F,H)
ISe!ltZOU Auth
U,F
Dredced
1-toSbllh
Lllely need
for Dredalnl
within 5 year
[permit qde
4
SEF status
Shoreslde Comer Points
7 .. ~-·"''f't.
.:...
-
~
2.00 B
Roseburg Forest
Products
7.9
1400x 100
7,000
35,000
40'
4
E
c
Ocean Terminals
11
1600x 115
7,000
35,000
40'
4
F
CEDCO
11.5 2700x 100
Tyree Oil Terminal
12.4 80Dx 100
Oregon Chip
Terminal
12.5 1000x 100
Sauce Bros. Bayshore
Dock
12.6 53Dx 100
Fay Family/Ei
Conquistador
12.7 700x 100
Citrus Dock
12.9 250x 100
Dolphin Terminals
13.1 700x 100
10,000
1,500
50000
7,500
40'
40'
5
5
G
7,000
35,000
40'
6
H
2,500
12,500
40'
6
I
2,500
1,500
2,500
12,500
7500
12,500
40'
20'
40'
7
7
8
J
K
130x20
950x 100
500
1,000
2,500
5,000
20'
40'
8
9
730x 100
1,000
5,000
40'
78Dx 100
1,000
5,000
550x 30
1,000
755x 100
14.9 1450x 100
3.00
4.00 M
5.00 D
6.00 E
7.00 F
8.00 L
9.00 0
10.00 N
11.00 p
12.00 G
16.00 J
Orcas Dock
13.2
Central Dock
13.3
Coos Historical
Society
13.4
Sauce Bros. Hillstrom
Dock
13.8
City of Coos Bay
Moorage Dock
14.2
Oregon Resources
Corporation
14.8
17.00 K
Georgia Pacific
13.00 H
14.00 I
15.00 Q
6612
16100
U, F
5
U, F
5
UF
U,H
1
1
U,H
5
U,H
1
U,H
U,H
U,H
1
2
2
U,H
U,H
3
1
9
U,H
1
25'
10
U,H
1
5,000
25'
10
U,H
3
3,500
17,500
40'
11
M
U,H
2
7,000
35,000
40'
11
0
U,H
5
8400
5812
12048
1663
663
7845
11398
10500
150
2010+ 5
=2015
09-2012+ 2
=2014
2009+ 7
=2016
43 25.497'/124 15.487'
43 25.522'/124 15.272'
43 24.576'/124 13.206'
43 24.640'/12413.194'
43 23.946'/124 13.060'
43 24.173'/124 13.152'
2005 +7
=2012
43 23.266'/12413.186'
43 23.420'/12413.136'
2012
43 22.782'/12413.006'
43 22.799'/12413.023'
1D-2009+ 7
=2016
43 21.663'/12412.245
43 21.738/124 11.990
Project Location
NOTE: Prism diagrams
information for each location.
are not to scale. Please see the text box and spreadsheet for additional
#1.00
TDOCK
25S 13W 18 105Z1
90418 TransPacific Parkway, North Spit of Coos Bay
Prism: 150x100 to 20MLLW
at River Mile: 5.6
#2.00
ROSEBURG FOREST PRODUCTS
25S 13W 04 300
66237 Jordan Cove Road, North Spit of Coos Bay
Prism: 1400x100 to 40MLLW
at River Mile: 7.9
#3.00
OCEAN TERMINALS
25S 13W 10 600
At the foot of California Street, North Bend
Prism: 1600x115 to 40MLLW
at River Mile: 11
#4.00
CEDCO
25S 13W 15 100
At the foot of State Street, North Bend
Prism: 2700x100 to 40MLLW
at River Mile: 11.5
#5.00
TYREE OIL TERMINAL
25S 13W 22AD 200
341 Newmark Street, North Bend
Prism: 800x100 to 40MLLW
at River Mile: 12.4
#6.00
OREGON CHIP TERMINAL
25S 13W 22AD 2700
US 101 at Tower Street, North Bend
Prism: 1000x100 to 40MLLW
at River Mile: 12.5
#7.00
SAUSE BROS. BAYSHORE DOCK
25S 13W 22DA 100/101Z
2580 Bayshore Drive, US 101, Coos Bay
Prism: 530x100 to 40MLLW
at River Mile: 12.6
#8.00
FAY FAMILY/EL CONQUISTADOR
25S 13W 22DA 399Z1
Highway 101 at the foot of Teakwood Avenue, Coos Bay
Prism: 700x100 to 40MLLW
at River Mile: 12.7
#9.00
CITRUS DOCK
25S 13W 22DD 5100
2100 Bayshore Drive, Coos Bay
Prism: 250x100 to 20MLLW
at River Mile: 12.9
#10.00
DOLPHIN TERMINAL
25S 13W 22DD 6600
1610 Bayshore Drive
Hwy 101 at the foot of Kingwood Avenue, Coos Bay
Prism: 700x100 to 40MLLW
at River Mile: 13.1
#11.00
ORCAS DOCK
25S 13W 26BB 100
Highway 101 at the foot of Juniper, Coos Bay
Prism: 130x20 to 20MLLW
at River Mile: 13.2
#12.00
CENTRAL DOCK
25S 13W 26BB 400
Hwy 101 at the foot of Hemlock and N. 3rd St, Coos Bay C
Prism: 950x100 to 40MLLW
at River Mile: 13.3
#13.00
COOS HISTORICAL SOCIETY
25S 13W 26BD 101
1210 N. Bayshore Drive, Coos Bay
Prism: 730x100 to 40MLLW
at River Mile: 13.4
#14.00
SAUSE BROS. HILLSTROM DOCK
25S 13W 26BD 200
912 N. Front Street, Coos Bay
Prism: 780x100 to 25MLLW
at River Mile: 13.8
#15.00
CITY OF COOS BAY MOORAGE DOCK
25S 13W 26CD 400
200 S. Bayshore Drive, Coos Bay
Prism: 550x30 to 25MLLW
at River Mile: 14.2
#16.00
OREGON RESOURCES CORPORATION
25S 13W 35 399A1
1 Mullen Street, Coos Bay
Prism: 755x100 to 40MLLW
at River Mile: 14.8
#17.00
GEORGIA PACIFIC
1170 Newport Avenue, Coos Bay
Prism: 1450x100 to 40MLLW
at River Mile: 14.9
Attatchment A
Roseburg Forest Products
North Bend Export Chip Facility
Taxlot 300
Gov·t Lots 3 & 4, Section 4, T25S, R13W
De
lin~~ tecl
\VetlQncls
DisposoJ Area_
SCALE
t·~
300'
Property
Line
Property
Line
@3
D
Existing work dock
...
l~·:~~~_:_(_L···~~
. :t:: 3·ut) ~ .1 LV). .. ·
.TYnPICAiL sEciiixfti ·.
D/OCK ARE4. ·
·. ·.