Steve Gagnon is the Regulatory point-of-contact for this permit application from Dan Luckett, Columbia Pacific Bio-Refinery, for work on the Columbia River at River Mile 53, near Clatskanie, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: July 15, 2013
Expiration Date: August 13, 2013
US Army Corps of Engineers No: NWP-2007-998
30-Day Notice Oregon Department of State Lands No: 54129
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Steve Gagnon
P.O. Box 2946
Portland, OR 97208-2946
Or by email: nwp-2007-998@usace.army.mil
Applicant: Dan Luckett, Columbia Pacific Bio-Refinery, 81200 Kallunki Rd., Clatskanie, OR 97016
Location: The proposed project is located at Port Westward near Clatskanie, Columbia Co., Ore., in Section 16 of Township 8 North, Range 4 West (46.1814, -122.1832).
Waterway: Columbia River, River Mile 53
Project Description: The proposed project involves the modification of an existing dock and the addition of new associated structures at Port Westward. The proposed work includes installing four breasting dolphins and associated cat walks, three mooring dolphins and associated catwalks, and a pile supported pipe rack with associated catwalk; temporarily removing the trash boom and upstream approach of the dock for barge access; and, replacing other creosote-treated structurally inadequate piles with steel piles.
Mitigation: The applicant has provided a proposed compensatory mitigation plan for the removal of 600 linear feet of rail trestle along shallow water habitat. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to repair and upgrade the existing dock to accommodate Panamax-class vessels, as well as other commercial vessels, for the shipping of liquid commodities.
Drawings: Thirteen drawings are attached and labeled Corps # NWP-2007-998 enclosure.
Additional Information: Additional information may be obtained from Steve Gagnon, Project Manager, U.S. Army Corps of Engineers, at 503-808-4379 or e-mail: nwp-2007-998@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties is justified and would be required prior to the Corps’ final permit decision.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
Exhibit 1: Vicinity Map
Robert6onRo
Collf'ls Rd 1
Collins Rd2
(
I
\
).
e..~-.'t"4
~ ~s.ll.s,
Clatska~ ('0/t 'm bla Riyeri-t.vy
'..
~
~
~
8
U!Cberg Rd
cJ
-- -- -- - ------------
REFERENCE NUMBER:
APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
-.FIR
EXHIBIT 1 OF 13
Page 1 of 13
Exhibit 2: USCG Vicinity Map
""co
I
--- - -l
!I
----------
2000'
1"-2000'
COLUMBIA PACIFIC BIO-REFINERY
REFERENCE NUMBER:
CL.AlSKAIIIE
APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
1000'
DR
ETHANOL/PETROLEUM MARINE DOCK
USGS VICINITY MAP
DRWN.
m
tiiir\
EXHIBIT 2 OF 13 ~
SCAlE 1"-
2QOQ'
DWC NO. 02511-JPA-112
NORWEST BIGIIIEEFIINQ
CONSil.liNC ENGINEERS
!103-~4-011 D
N.E.
I
4110 NE 122ND NiE f207 RY-02511
POR'1l.NID. OREilON
Page 2 of 13
Exhibit 3: Tax Lot Map
oa 04 16 oo 1
W.M.
goo·
o·
450'
900'
1800'
1"·900' . . . . . - - - - - - - -
COLUMBIA PACIFIC BIO-REFINERY
REFERENCE NUMBER:
CLATSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
EXHIBIT 3 OF 13
OR
ETHANOL/PETROLEUM MARINE DOCK
TAX LOT MAP
ORWN. FTR
~
SCALE 1"· 900'
DWG NO. 0258-JPA-03
NORWEST ENGINEERING
'CY gg~=~~~~ 1 ~~GINEERS
4110
N.E.
N~0~~~t'~Rt~g~ Rv-
Page 3 of 13
I
0258
Exhibit 4: Aerial Map
000'
4110'
0'
000'
1800'
I
1"-aoo' - - - - - - - -
COLUMBIA PACIFIC BIG-REFINERY
REFERENCE NUMBER:
ClATSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
EXHIBIT 4 OF 13
OR
ETHANOL/PETROLEUM MARINE DOCK
AERIAL MAP
DRWN.m
~
SCIU 1"· 900'
DWG NO. 0258-.JPA-04
NORWEST BDEEFW«l
;::~~~1~NEERS
4110
N~~~
Page 4 of 13
N.E.
f
RV-0258
Exhibit 5: Site Plan Dock
NOTES:
1. EUVAliONS IIASED ON COLUIIIM
liiYEI! DAT\IM (CliO)
2. CQNTOURS PER BAnMIEIRIC SU~
PERFORIIED BY ~ HlDRO
ljC., .w!ES GV£SER, MAY 8TH 2012.
3. OHWII FIElD LOCATED BY NORTHERN
RESOURCE CONSWLllNG. INC. ON
MAY 31, 2013·
' I
I
I
{ I
I
j
I'
· .I I/
f
I
I I
. I
j
I
1
RDIOVE AND REPlACE ElCISTINC
TRASH BOOM f>5 NEEDED FOR
CONST1lUCTlON ACCESS
~
[]
DOCIC 10 liE
AND REI'\ACED
FOR CONSTRUCIION
I(X;ESS
4I' YS
I
I I
~
I£W 4'
LONG
.
I
!
I
. I
.\ II
I
I
I
~
~
l!\
I
iii::11
//
1\
~
\
1/
I
l \
il
SUPPORTS
2-P1L£ BENTS
I
v
\ I
. I
..
!
\ ~~
iii
~
I
.. 1
~~~
\. ~I
\ I
\ \I
I
I
..
I
..
·'
I
25l'
12S'
D'
~·
25)'
I
1"·250' - - - - - - -
COLUMBIA PACIFIC BIG-REFINERY
REFERENCE NUMBER:
ClATSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
EXHIBIT 5 OF 13
OR
ETHANOL/PETROLEUM MARINE DOCK
SITE PLAN - DOCK
DRWN. F1ll
tiiiJ\
SCALE 1·. 250·
DWG NO. 0251!-.I'A-05
NORWEST B«JN:EFW«l
~ ~~1~NEERS
4110
N.E.
f
N~=D~~ RV-0258
Page 5 of 13
Exhibit 6: Site Plan Trestle Mitigation
NOlES:
1. EL£VA110NS MSal ON COLUMBIA
RIVER DAl\JII (CRD)
2. CONTOURS PER ~l'H'I'METRIC SURVEY
PERFORMED BY NOR1HWEST HYDRO
INC., .IIINES G~ MAY 6TH 2012.
3. OHWII FIELD LOCA1ED BY ~ERN
RESO~ CONSLUL11NG, INC. ON
MAY 31, 2013.
i
~, o
~
r
,1 ,
~
IIOOI.F OF RAIL nmm£ TO BE
REMOI'ED FOR CONSTRUcnON ~
FINAL LOCATION(S) TO BE DEIERIIINED
IN lHE FIELD
~\
rv
~0
:i
'~
-l
I
25)'
1:ZS'
0'
~·
25)'
I
1"·250' - - - - - - -
COLUMBIA PACIFIC BIG-REFINERY
REFERENCE NUMBER:
ClATSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
OR
ETHANOL/PETROLEUM MARINE DOCK
SITE PLAN - RAIL
DRWN. F1ll
tiiiJ\
SCALE 1·. 250·
DWG NO. 0251!-.I'A-05
NORWEST B«JN:EFW«l
EXHIBIT 6 OF 13 ~ ~~1~NEERS
4110
N.E.
f
N~=D~~ RV-0258
Page 6 of 13
Exhibit 7: Mooring Dolphin
12'-0"
R~NF.
CONCRElE CM'
AND PILE CONNEC~ONS
ALL YlllH CONCRETE
SLOPE 10 CONE
s··
NPS X-STROOG PIPE
WELDEO IN PLACE.
CAP BOlH ENOS.
(12) 24"f SIEEL
PIPE PILES
BOI.l..Afl)
NlS
REINF. CONCRETE CAP
AND PILE CONNEC~ONS
C12l PILE DOI..PHN PLAN
NlS
~~~----~~~--~~9.90±0HW
(12) 24"f SIEEL PIPE
PILES
+t--i+-------\-'1:--'lc\--~'--"'7.48 ±
ELEVA~ONS PER
OOLLMBIA RIVER
DAlUM
C12) PILE DCli..PHN ELEVATION
NlS
COLUMBIA PACIFIC BIO-REFINERY
REFERENCE NUMBER:
a.ATSIWIIE
APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
MHHW
EXHIBIT 7 OF 13
OR
ETHANOL/PETROLEUM MARINE DOCK
MOORING DOLPHIN
DRWN.FTR
tiiiil\
~
DWG NO. 0258-JPA-06
NORWEST 8\IGtEERf.IG
CONSULli503-254-0110
N.E. f
4110 NE 122ND AVE #207 RV-0258
PORTI.NI), OREGON
Page 7 of 13
Exhibit 8: Breasting Dolphin
REINF. CONCRETE CM'
AND PILE CONNECTIONS
6"11 NPS X-SlRONG PIPE
WElDED IN PLACE.
CM' BOlli ENDS.
If_"\
I
1
--
BOLLARD)\
'i-'\I
I
_
'i-"'\
I
I
.. __ ,1
....
I
...'b
I
c+')
I'"- I
I
I
b.J
c+')
{+')
I'"- I
I
I
I'"- I
I
I
b.J
b.J
BOI..l..Afl)
NlS
I
16'-0"
(18) PILE
DOLPHN PLAN
NlS
16"11 SlEEL
FENDER PIL.E(lYP)
Willi 18"11 HOPE
PIPE SLEEVE (1YP)
_,~~r-~rr~r--Hr-~1~294±
"/R. FLOOD
-H-++---+-1--+~-++----->L--""9.90 ± 0Hvt4
/--,f--+---++-++--+r---"---'-'-7.48 ± MHHW
ELEVATia.IS PER
COLUMBIA RIVER
DAlUM
(18) PI..E DOI...PI-WII a.EVA110N
NlS
COLUMBIA PACIFIC 810-REFINERY
REFERENCE NUMBER:
ClAlSIAPPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY
PROPOSED PROJECT· MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
EXHIBIT 8 OF 13
OR
ETHANOL/PETROLEUM MARINE DOCK
BREASTING DOLPHIN
DRWN.m
tiiil\
SCioLE N1S
DWG NO. 0258-.IPA-07
NORWEST BDEEFW«l
~ ;::~~~1~NEERS
4110
N.E.
f
N~~~ RV-0258
Page 8 of 13
Exhibit 9: Walkway Detail
1 - - - - - - - - - - - - I I I S T A N C E VMIES. SEE PlAN Sl££1'
------------1
(±J
ID
®
(!)
·'·
~
~
I
I
CONNECT PRCPDSCI
'1/N...KVAY Ttl EXISTING
IIIICK STRUCTURE
I
4' WltJJPRCPIISED
STEEL FRofiMING
VI GRATING
16·11 STEEL
PIPE PD..E
-40~
r
UDU~NE~~------~~---------+-+-------
1
\
\
\
I
\
Cl
\
\
I
I
I
I
\
\
\
!!I
\
~
I
\
Ill
I
\
\
\
I
\
\
\
(2)
\
L_j
~----------------- L_j
PILE EENT B..EVATION
NTS
COLUMBIA PACIFIC 810-REFINERY
REFERENCE NUMBER:
aATSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
SHEET 9 OF 13
OR
ETHANOL PETROLEUM MARNE DOCK
4'WALKWAY BENT
DRWN.m
tiiiiJ\
~
DWG NO. 0258-.IPA-08
NORWEST BKJN:EFW«l
CONSULTING ENGINEERS
503-254-01 10
N.E.
I
4110 NE 122ND IN£ #'817 RV-0258
PORTlAND. DREilON
Page 9 of 13
Exhibit 10: Pipe Rack
U~E
r:J
i:j
~
l·
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
\
I
I
\
\
\
I
\
I
I
\
\
I
I
\
I
\
I
\
\
\
\
\
\
\
\
\
\
L_j
....!.....___ L_l
PFeNAY a.EVA110N
NTS
REFERENCE NUMBER:
APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCATION: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
SHEET 10 OF 13
tiiiJ\
NORWEST BDEEFW«l
~ ~~~~1~NEERS
4110
N.E.
f
N~~~ RV-0258
Page 10 of 13
Exhibit 11: Dock Profile near Mooring Dolphin 1
rw
..-
0
0
0
0
<(
O::::a::::N
0
0
a:J
(f)
N
>oo
::Jo
::E
ri-
uiro
o:::l-r
:::::>
_J
0
1-(f)<(
ww"""
u
~:;::"""'
r:r
_
z
0
I
Il-0:::
,.........1-0:::W
OCl<(Q(J')
wa::::rnzw
(/) ()
<(
.._.,o::: r
_j
m~~rn'-'
(/) :::::>
0
(/)
t"')
N
0
0
0
0
0
0
0
0
....0
I
0
0
0
0
0
0
0
0
0
......
L{)
I
I
I
I
N
t"1
0
0
0
0
0
0
0
0
0
"I
tO
I
0....
~
N
0
0
0
ro
0
0
0
O"l
I
I
lr:;:;::='
II
I
~
0
0
u
0
0
0
L{)
LL
0
zi-CJ)wW
o1-Cl:::Ja::::<(
ffi1-LL .. w >ozo:::u
(/)_j_
wz
~wo:::uo.._
0.
z,....
N
.
~
I PI
~
I
I
I
I
I
~
1\
0
\j
0
0
0
L{)
I
~
0
0
0
t"')
0
0
0
N
0
0
0
....
0
0
0
0
0
0
....
I
0
0
0
0
0
0
0
0
0
I
I
N
t"')
I
I
I
0
0
0
"I
tO
0
0
0
ro
0~
~I
0
O"l
I
I
CLAlSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCA110N: COLUMBIA RIVER MILE 53.2
NWP-2007-998
L{)
0
0
0
0
0
0
COLUMBIA PACIFIC 810-REFINERY
REFERENCE NUMBER:
DATE 06/04/2013
......
0
0
0
I
EXHIBIT 11 OF 13
OR
ETHANOUPETROLEUM MARINE DOCK
NEAR MOORING DOLPHIN #1
Jsc:.u
DRWN. FTR
tiiif\1
~
NTS
IDWG NO.
0261h1PMJII
NORWEST ENGN:EFW«l
CONSULTING ENGINEERS
603-2~110
I N.E. I
4110 NE 122NDA.VE-7
PORTLAND. OREGON
Page 11 of 13
RV-0258
Exhibit 12: Dock Profile near Mooring Dolphin 2
rw
N
..-
>oo
0
<(
O::::a::::N
0
0
0
a:J
::Jo
0
0
(f)
::E
I
ri-
uiro
o:::l-r
:::::>
_J
0
1-(f)<(
ww"""
u
~:;::"""'
r:r
_
z
N
.._.,o::: r
0
0
0
,.....
0
I
0
0
0
0
0
0
0
0
0
"I!)
(()
I'
I
I
I
I
N
I
n
0
0
0
0
0
0
0
0
0
0
0
0
0
0
I
I
00
0
m
I
0
0
Nl
lcy::;:::::::J
0
Il-0:::
,.........1-0:::W
OCl<(Q(J')
wa::::rnzw
(/) ()
<(
0
0
~
0
0
0
_j
m~~rn'-'
(/) :::::>
0
I!)
(/)
zi-CJ)wW
o1-Cl:::Ja::::<(
ffi1-LL .. w >ozo:::u
(/)_j_
wz
::;--~
K
~wo:::uo.._
0.
z,....
N
1\
.
0
0
0
1\
0
0
0
I!)
I
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0,.....
0
0,.....
N
0
0
n
0"'¢
I!)
(()
I
I
I
N
I
I
I
0
0
0~
0
0
0
0
0
0
I
I
I'
00
~I
0
m
I
COLUMBIA PACIFIC 810-REFINERY
REFERENCE NUMBER:
CLAlSKANIE
APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY
PROPOSED PROJECT: MARINE DOCK UPGRADE
LOCA110N: COLUMBIA RIVER MILE 53.2
DATE 06/04/2013
NWP-2007-998
0
0
EXHIBIT 12 OF 13
OR
ETHANOUPETROLEUM MARINE DOCK
NEAR BREASTING DOLPHIN #2
DRWN. FTR
Jsc:.u NTS
IDWG NO. 0261h1PMJII
tiiif\1
~
NORWEST ENGN:EFW«l
CONSULTING ENGINEERS
603-2~110
I N.E. I
4110 NE 122NDA.VE-7
PORTLAND. OREGON
Page 12 of 13
RV-0258
Exhibit 13: Piling Removal and Insertions
16" Round Steel
In-Water Pile Installation Totals
24" Round Steel
64
Breasting Dolphin Piles
20
Fender Piles
36
Mooring Dolphin Piles
Catwalks
22
Pipe Bridge Piles
90
Trash Boom
9
Upstream Approach
20
Dock Maintenance
60
Contingency 10%
Total Piles
23
244
10
110
Permanent Fill Below OHWE
New Piles
16" Piles @ 4.15 cy volume
80 ft embedment
for
24" Piles @ 10.5 cy volume
for 90 ft embedment
64
Breasting Dolphin Piles
20
Fender Piles
36
Mooring Dolphin Piles
Catwalks
22
Pipe Bridge Piles
90
Upstream Approach
20
Dock Maintenance
60
Contingency
20
10
Total Piles
232
110
Total Pile Area (FTSQ)
Total Volume (CY)
324
963
154
1155
Fill Removal Below OHWE
Piles Removed or Replaced
Trash Boom
16" Piles @ 3.63 yd3 volume
for 70 ft embedment
9
35
Upstream Approach
Dock Maintenance
60
Rail Trestle
255
Total Piles
359
Total Pile Area (FTSQ)
Total Volume (CY)
501
1303
In-Water Piles Removed
Piles Removed
16" Creosote Timber Piles
Trash Boom
35
Upstream Approach
Dock Maintenance
60
Rail Trestle Mitigation
Total Piles
255
350
Shade Mitigation
Above Water Surface Area (FTSQ)
Breasting Dolphin Caps
Mooring Dolphin Caps
Total Surface Area
576
Cat Walks
1,516
Pipe Rack Gross Area
5,860
Trestle Removal Mitigation (600 LF)
Total Shade (FTSQ)
8,976
NWP-2007-998
Surface Removed
1,024
9,000
9,000
Page 13 of 13