Steve Gagnon is the Regulatory point-of-contact for this permit application from Dan Luckett, Columbia Pacific Bio-Refinery, for work on the Columbia River at River Mile 53, near Clatskanie, Ore.

PUBLIC NOTICE for Permit Application Issue Date: July 15, 2013 Expiration Date: August 13, 2013 US Army Corps of Engineers No: NWP-2007-998 30-Day Notice Oregon Department of State Lands No: 54129

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Steve Gagnon P.O. Box 2946 Portland, OR 97208-2946 Or by email: nwp-2007-998@usace.army.mil

Applicant: Dan Luckett, Columbia Pacific Bio-Refinery, 81200 Kallunki Rd., Clatskanie, OR 97016

Location: The proposed project is located at Port Westward near Clatskanie, Columbia Co., Ore., in Section 16 of Township 8 North, Range 4 West (46.1814, -122.1832).

Waterway: Columbia River, River Mile 53

Project Description: The proposed project involves the modification of an existing dock and the addition of new associated structures at Port Westward. The proposed work includes installing four breasting dolphins and associated cat walks, three mooring dolphins and associated catwalks, and a pile supported pipe rack with associated catwalk; temporarily removing the trash boom and upstream approach of the dock for barge access; and, replacing other creosote-treated structurally inadequate piles with steel piles.

Mitigation: The applicant has provided a proposed compensatory mitigation plan for the removal of 600 linear feet of rail trestle along shallow water habitat. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The project purpose is to repair and upgrade the existing dock to accommodate Panamax-class vessels, as well as other commercial vessels, for the shipping of liquid commodities.

Drawings: Thirteen drawings are attached and labeled Corps # NWP-2007-998 enclosure.

Additional Information: Additional information may be obtained from Steve Gagnon, Project Manager, U.S. Army Corps of Engineers, at 503-808-4379 or e-mail: nwp-2007-998@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties is justified and would be required prior to the Corps’ final permit decision.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Exhibit 1: Vicinity Map Robert6onRo

Collf'ls Rd 1

Collins Rd2

(

I

\

). e..~-.'t"4

~ ~s.ll.s,

Clatska~ ('0/t 'm bla Riyeri-t.vy

'

..

~

~

~

8

U!Cberg Rd

cJ

-- -- -- - ------------

REFERENCE NUMBER: APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

-.FIR

EXHIBIT 1 OF 13 Page 1 of 13

Exhibit 2: USCG Vicinity Map

""co

I --- - -l

!I

----------

2000' 1"-2000'

COLUMBIA PACIFIC BIO-REFINERY

REFERENCE NUMBER:

CL.AlSKAIIIE

APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

1000'

DR

ETHANOL/PETROLEUM MARINE DOCK USGS VICINITY MAP DRWN.

m

tiiir\

EXHIBIT 2 OF 13 ~

SCAlE 1"-

2QOQ'

DWC NO. 02511-JPA-112

NORWEST BIGIIIEEFIINQ CONSil.liNC ENGINEERS !103-~4-011 D

N.E.

I

4110 NE 122ND NiE f207 RY-02511 POR'1l.NID. OREilON

Page 2 of 13

Exhibit 3: Tax Lot Map

oa 04 16 oo 1

W.M.

goo·

o·

450'

900'

1800'

1"·900' . . . . . - - - - - - - -

COLUMBIA PACIFIC BIO-REFINERY

REFERENCE NUMBER:

CLATSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013

NWP-2007-998

EXHIBIT 3 OF 13

OR

ETHANOL/PETROLEUM MARINE DOCK TAX LOT MAP ORWN. FTR

~

SCALE 1"· 900'

DWG NO. 0258-JPA-03

NORWEST ENGINEERING

'CY gg~=~~~~ 1 ~~GINEERS

4110

N.E.

N~0~~~t'~Rt~g~ Rv-

Page 3 of 13

I

0258

Exhibit 4: Aerial Map

000'

4110'

0'

000'

1800'

I 1"-aoo' - - - - - - - -

COLUMBIA PACIFIC BIG-REFINERY

REFERENCE NUMBER:

ClATSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

EXHIBIT 4 OF 13

OR

ETHANOL/PETROLEUM MARINE DOCK AERIAL MAP

DRWN.m

~

SCIU 1"· 900'

DWG NO. 0258-.JPA-04

NORWEST BDEEFW«l ;::~~~1~NEERS

4110

N~~~

Page 4 of 13

N.E.

f

RV-0258

Exhibit 5: Site Plan Dock NOTES: 1. EUVAliONS IIASED ON COLUIIIM liiYEI! DAT\IM (CliO) 2. CQNTOURS PER BAnMIEIRIC SU~ PERFORIIED BY ~ HlDRO ljC., .w!ES GV£SER, MAY 8TH 2012. 3. OHWII FIElD LOCATED BY NORTHERN RESOURCE CONSWLllNG. INC. ON MAY 31, 2013·

' I I I { I I

j

I'

· .I I/ f

I

I I . I

j

I

1

RDIOVE AND REPlACE ElCISTINC TRASH BOOM f>5 NEEDED FOR CONST1lUCTlON ACCESS

~

[]

DOCIC 10 liE AND REI'\ACED

FOR CONSTRUCIION

I(X;ESS

4I' YS I

I I

~

I£W 4'

LONG

.

I

!

I

. I .\ II I

I

I

~

~

l!\ I

iii::11

//

1\

~

\

1/

I

l \

il

SUPPORTS 2-P1L£ BENTS

I

v

\ I . I

..

!

\ ~~

iii

~

I

.. 1

~~~ \. ~I \ I

\ \I I

I

..

I

..

·'

I

25l'

12S'

D'

~·

25)'

I

1"·250' - - - - - - -

COLUMBIA PACIFIC BIG-REFINERY

REFERENCE NUMBER:

ClATSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

EXHIBIT 5 OF 13

OR

ETHANOL/PETROLEUM MARINE DOCK SITE PLAN - DOCK DRWN. F1ll

tiiiJ\

SCALE 1·. 250·

DWG NO. 0251!-.I'A-05

NORWEST B«JN:EFW«l

~ ~~1~NEERS

4110

N.E.

f

N~=D~~ RV-0258 Page 5 of 13

Exhibit 6: Site Plan Trestle Mitigation NOlES: 1. EL£VA110NS MSal ON COLUMBIA

RIVER DAl\JII (CRD) 2. CONTOURS PER ~l'H'I'METRIC SURVEY PERFORMED BY NOR1HWEST HYDRO INC., .IIINES G~ MAY 6TH 2012. 3. OHWII FIELD LOCA1ED BY ~ERN RESO~ CONSLUL11NG, INC. ON MAY 31, 2013.

i

~, o

~

r

,1 , ~

IIOOI.F OF RAIL nmm£ TO BE REMOI'ED FOR CONSTRUcnON ~ FINAL LOCATION(S) TO BE DEIERIIINED IN lHE FIELD

~\

rv

~0

:i

'~

-l I 25)'

1:ZS'

0'

~·

25)'

I

1"·250' - - - - - - -

COLUMBIA PACIFIC BIG-REFINERY

REFERENCE NUMBER:

ClATSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

OR

ETHANOL/PETROLEUM MARINE DOCK SITE PLAN - RAIL DRWN. F1ll

tiiiJ\

SCALE 1·. 250·

DWG NO. 0251!-.I'A-05

NORWEST B«JN:EFW«l

EXHIBIT 6 OF 13 ~ ~~1~NEERS

4110

N.E.

f

N~=D~~ RV-0258 Page 6 of 13

Exhibit 7: Mooring Dolphin 12'-0" R~NF.

CONCRElE CM' AND PILE CONNEC~ONS ALL YlllH CONCRETE SLOPE 10 CONE

s··

NPS X-STROOG PIPE WELDEO IN PLACE. CAP BOlH ENOS.

(12) 24"f SIEEL PIPE PILES

BOI.l..Afl) NlS

REINF. CONCRETE CAP AND PILE CONNEC~ONS

C12l PILE DOI..PHN PLAN NlS

~~~----~~~--~~9.90±0HW (12) 24"f SIEEL PIPE PILES

+t--i+-------\-'1:--'lc\--~'--"'7.48 ±

ELEVA~ONS PER OOLLMBIA RIVER DAlUM

C12) PILE DCli..PHN ELEVATION NlS

COLUMBIA PACIFIC BIO-REFINERY

REFERENCE NUMBER:

a.ATSIWIIE

APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

MHHW

EXHIBIT 7 OF 13

OR

ETHANOL/PETROLEUM MARINE DOCK MOORING DOLPHIN DRWN.FTR

tiiiil\ ~

DWG NO. 0258-JPA-06

NORWEST 8\IGtEERf.IG CONSULli503-254-0110

N.E. f

4110 NE 122ND AVE #207 RV-0258 PORTI.NI), OREGON

Page 7 of 13

Exhibit 8: Breasting Dolphin REINF. CONCRETE CM' AND PILE CONNECTIONS

6"11 NPS X-SlRONG PIPE WElDED IN PLACE. CM' BOlli ENDS.

If_"\ I 1 --

BOLLARD)\

'i-'\I

I

_ 'i-"'\

I

I

.. __ ,1

....

I

...'b I

c+')

I'"- I I I

b.J

c+')

{+')

I'"- I I I

I'"- I I I

b.J

b.J BOI..l..Afl) NlS

I

16'-0"

(18) PILE

DOLPHN PLAN

NlS

16"11 SlEEL FENDER PIL.E(lYP) Willi 18"11 HOPE PIPE SLEEVE (1YP)

_,~~r-~rr~r--Hr-~1~294±

"/R. FLOOD

-H-++---+-1--+~-++----->L--""9.90 ± 0Hvt4

/--,f--+---++-++--+r---"---'-'-7.48 ± MHHW

ELEVATia.IS PER

COLUMBIA RIVER DAlUM

(18) PI..E DOI...PI-WII a.EVA110N NlS

COLUMBIA PACIFIC 810-REFINERY

REFERENCE NUMBER:

ClAlSI

APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY PROPOSED PROJECT· MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013

NWP-2007-998

EXHIBIT 8 OF 13

OR

ETHANOL/PETROLEUM MARINE DOCK BREASTING DOLPHIN DRWN.m

tiiil\

SCioLE N1S

DWG NO. 0258-.IPA-07

NORWEST BDEEFW«l

~ ;::~~~1~NEERS

4110

N.E.

f

N~~~ RV-0258 Page 8 of 13

Exhibit 9: Walkway Detail

1 - - - - - - - - - - - - I I I S T A N C E VMIES. SEE PlAN Sl££1'

------------1 (±J

ID

® (!)

·'·

~

~ I I

CONNECT PRCPDSCI '1/N...KVAY Ttl EXISTING IIIICK STRUCTURE

I

4' WltJJ

PRCPIISED STEEL FRofiMING

VI GRATING

16·11 STEEL PIPE PD..E

-40~

r

UDU~NE~~------~~---------+-+-------

1

\

\

\

I

\

Cl

\

\

I

I I I

\ \ \

!!I

\

~

I

\

Ill

I

\

\

\

I

\

\

\

(2)

\

L_j

~----------------- L_j

PILE EENT B..EVATION

NTS

COLUMBIA PACIFIC 810-REFINERY

REFERENCE NUMBER:

aATSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

SHEET 9 OF 13

OR

ETHANOL PETROLEUM MARNE DOCK 4'WALKWAY BENT DRWN.m

tiiiiJ\ ~

DWG NO. 0258-.IPA-08

NORWEST BKJN:EFW«l CONSULTING ENGINEERS 503-254-01 10

N.E.

I

4110 NE 122ND IN£ #'817 RV-0258 PORTlAND. DREilON

Page 9 of 13

Exhibit 10: Pipe Rack

U~E r:J i:j ~

l·

I

I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I

\

I

I

\ \ \ I \ I I \ \ I I \ I \ I \ \ \ \ \ \ \ \ \ \ L_j

....!.....___ L_l

PFeNAY a.EVA110N NTS

REFERENCE NUMBER: APPLICANT NAME: COLUMBIA PACIFIC BID-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCATION: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013

NWP-2007-998

SHEET 10 OF 13

tiiiJ\

NORWEST BDEEFW«l

~ ~~~~1~NEERS

4110

N.E.

f

N~~~ RV-0258

Page 10 of 13

Exhibit 11: Dock Profile near Mooring Dolphin 1 rw

..-

0 0

0 0

<(

O::::a::::N

0

0

a:J

(f)

N

>oo ::Jo

::E

ri-

uiro o:::l-r

:::::> _J

0

1-(f)<( ww"""

u

~:;::"""' r:r _

z 0

I

Il-0::: ,.........1-0:::W

OCl<(Q(J') wa::::rnzw (/) () <(

.._.,o::: r

_j

m~~rn'-' (/) :::::>

0

(/)

t"')

N

0 0

0

0 0

0

0 0

....0 I

0 0 0

0 0 0

0 0 0

......

L{)

I

I

I

I

N

t"1

0 0 0

0 0 0

0 0 0

"I

tO

I

0.... ~ N

0 0 0

ro

0 0 0 O"l

I

I

lr:;:;::='

II

I

~

0 0

u

0

0

0

L{)

LL

0

zi-CJ)wW o

1-Cl:::Ja::::<(

ffi1-LL .. w >ozo:::u (/)_j_ wz ~wo:::uo.._

0. z,....

N

.

~

I PI

~

I

I

I

I

I

~

1\

0

\j

0 0

0

L{)

I

~ 0 0 0

t"')

0 0 0

N

0 0 0

....

0 0 0

0 0 0

.... I

0 0 0

0 0 0

0 0 0

I

I

N

t"')

I

I

I

0 0 0

"I

tO

0 0 0

ro

0~ ~I

0

O"l

I

I

CLAlSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIG-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCA110N: COLUMBIA RIVER MILE 53.2

NWP-2007-998

L{)

0 0 0

0 0 0

COLUMBIA PACIFIC 810-REFINERY

REFERENCE NUMBER:

DATE 06/04/2013

......

0 0 0

I

EXHIBIT 11 OF 13

OR

ETHANOUPETROLEUM MARINE DOCK NEAR MOORING DOLPHIN #1 Jsc:.u

DRWN. FTR

tiiif\1 ~

NTS

IDWG NO.

0261h1PMJII

NORWEST ENGN:EFW«l CONSULTING ENGINEERS 603-2~110

I N.E. I

4110 NE 122NDA.VE-7 PORTLAND. OREGON

Page 11 of 13

RV-0258

Exhibit 12: Dock Profile near Mooring Dolphin 2 rw

N

..-

>oo

0

<(

O::::a::::N

0

0 0

a:J

::Jo

0

0

(f)

::E

I ri-

uiro o:::l-r

:::::> _J

0

1-(f)<( ww"""

u

~:;::"""' r:r _

z

N

.._.,o::: r

0 0

0 ,.....

0

I

0 0

0 0

0 0

0

0

0

"

I!)

(()

I'

I

I

I

I

N I

n

0 0

0 0

0

0

0 0

0 0

0 0

0

0

I

I

00

0

m I

0

0 Nl

lcy::;:::::::J

0 Il-0::: ,.........1-0:::W OCl<(Q(J') wa::::rnzw (/) () <(

0 0

~

0

0

0

_j

m~~rn'-' (/) :::::>

0

I!)

(/)

zi-CJ)wW o

1-Cl:::Ja::::<(

ffi1-LL .. w >ozo:::u (/)_j_ wz

::;--~

K

~wo:::uo.._

0. z,....

N

1\

.

0 0

0

1\ 0 0

0

I!)

I

0 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

0,.....

0

0,.....

N

0

0 n

0"'¢

I!)

(()

I

I

I

N

I

I

I

0

0

0~

0 0

0 0

0

0

I

I

I'

00

~I 0

m I

COLUMBIA PACIFIC 810-REFINERY

REFERENCE NUMBER:

CLAlSKANIE

APPLICANT NAME: COLUMBIA PACIFIC BIO-REFINERY PROPOSED PROJECT: MARINE DOCK UPGRADE LOCA110N: COLUMBIA RIVER MILE 53.2 DATE 06/04/2013 NWP-2007-998

0 0

EXHIBIT 12 OF 13

OR

ETHANOUPETROLEUM MARINE DOCK NEAR BREASTING DOLPHIN #2 DRWN. FTR Jsc:.u NTS IDWG NO. 0261h1PMJII

tiiif\1 ~

NORWEST ENGN:EFW«l CONSULTING ENGINEERS 603-2~110

I N.E. I

4110 NE 122NDA.VE-7 PORTLAND. OREGON

Page 12 of 13

RV-0258

Exhibit 13: Piling Removal and Insertions 16" Round Steel

In-Water Pile Installation Totals

24" Round Steel 64

Breasting Dolphin Piles 20

Fender Piles

36

Mooring Dolphin Piles Catwalks

22

Pipe Bridge Piles

90

Trash Boom

9

Upstream Approach

20

Dock Maintenance

60

Contingency 10% Total Piles

23 244

10 110

Permanent Fill Below OHWE New Piles

16" Piles @ 4.15 cy volume 80 ft embedment

for

24" Piles @ 10.5 cy volume for 90 ft embedment 64

Breasting Dolphin Piles 20

Fender Piles

36

Mooring Dolphin Piles Catwalks

22

Pipe Bridge Piles

90

Upstream Approach

20

Dock Maintenance

60

Contingency

20

10

Total Piles

232

110

Total Pile Area (FTSQ) Total Volume (CY)

324 963

154 1155

Fill Removal Below OHWE Piles Removed or Replaced Trash Boom

16" Piles @ 3.63 yd3 volume for 70 ft embedment 9 35

Upstream Approach Dock Maintenance

60

Rail Trestle

255

Total Piles

359

Total Pile Area (FTSQ) Total Volume (CY)

501 1303

In-Water Piles Removed Piles Removed

16" Creosote Timber Piles

Trash Boom 35

Upstream Approach Dock Maintenance

60

Rail Trestle Mitigation Total Piles

255 350

Shade Mitigation Above Water Surface Area (FTSQ) Breasting Dolphin Caps Mooring Dolphin Caps

Total Surface Area 576

Cat Walks

1,516

Pipe Rack Gross Area

5,860

Trestle Removal Mitigation (600 LF) Total Shade (FTSQ)

8,976

NWP-2007-998

Surface Removed

1,024

9,000 9,000

Page 13 of 13

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas