Tyler Krug is the Regulatory point-of-contact for this permit application from Janice Barker for work on Adams Creek at Mile 0.2 to 0.7, near Lakeside, Ore.

PUBLIC NOTICE for Permit Application Issue Date: August 5, 2013 Expiration Date: September 4, 2013 US Army Corps of Engineers No: NWP-2002-816/2 30-Day Notice Oregon Department of State Lands No: -

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Tyler J. Krug: Tyler.J.Krug@usace.army.mil North Bend Field Office 2201 N. Broadway, Suite C North Bend, OR 97459-2372

Applicant: Janice Barker 95471 Templeton Ln. North Bend, OR 97459-8714

Location:The project is located in Adams Creek and adjoining tributaries, Mile 0.2-0.7, near Lakeside, Coos Co., Ore. The site is located in Section 29 of Township 23 South, Range 12 West.

Waterway: Adams Creek, Mile 0.2-0.7

Project Description: The applicant proposes to dredge up to 2,869 cubic yards of material from 2,595 linear feet of Adams Creek and 6,226 linear feet of unnamed tributaries to maintain flow through the project site and to allow for agricultural use of the abutting farmed wetland areas. Dredged material would be thinly spread to maximum depth of three inches, onto the abutting farmed wetland pastures. The applicant is seeking a ten-year permit authorization to conduct dredging as-needed to maintain flows.

A rubber-tired, shovel-equipped tractor would be used to conduct the work. The dredging and disposal would be confined to the ODFW preferred in-water work window of July 1 to Sept. 15.

Mitigation: No mitigation is proposed for this project. If a permit is issued, the Corps will determine appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To maintain channel configuration through Adams Creek and abutting tributaries to allow agricultural use of the abutting farmed wetland pastures.

Drawings:Fifteen drawings are attached and labeled Corps No. NWP-2002-816-2 enclosure.

Additional Information: Additional information may be obtained from Tyler Krug, Project Manager, U.S. Army Corps of Engineers at 541-756-2097 or email Tyler.J.Krug@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

. CO/"YR/(OH7

NWP-2002-816/2

Page 1 of 15

ENCL

NWP-2002-816/2

Janice Barker Joint Permit Application

Jul31,2012

Frelllwattr Emergent Frelhwater Forested/Shrub

Estuarine and Marine Deepwater Estuarine and Marine Freshwater Pond Lake

Page 2 of 15

Riverine Other

Digital Scan Non-Digital

-NoData

This map Is for general reference only. The US Fish and Wildlife Service Ia not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the la~r metadata found on the Wet1ands Mapper web site.

User Remarks:

ENCL

1" = 400'

NWP-2002-816/2

Page 3 of 15

ENCL

NWP-2002-816/2

SECT ION 29 T .23S. R.I2W. W.M. COOS COUNTY

TH IS t.AAP WAS PR!:PAREO FOR ASSESSIIENT PURPOSE ONl Y

,.

19

20

23 12 29 & INDEX

'

CANCEllE D &02 102

400'

SEE >lAP 23 12 20CD

SEE IIAP 23 12 20CC

21

30

28

UC.S..lUO

\

.

\

·.

Page 4 of 15

\3-02

I I I I

I I I I I I

I I

I I

ENCL

I

29

31

32

I I I

I

___ ...,

___ ... , . . _ .-.

I

OO ATEO

29

28

32

33

23 12 29 & INDEX

. . .).·_::_:::·..

·.. ----·--·--'- ·

NWP-2002-816/2

Project Area Located in the S 1/2 of the NE 1/4 and fhe N 1/2 of fhe S£ 1/4 of Section 29 Township 23 South} Range 12 WesfJ W.M. 1

Ditch Location Drawn

By Janice Barker

Ten /,.i/e Lake

Page 5 of 15 CROSS SECTION 1":10'

k-(f ~~ PASTURE

LE~L

bllrak-i

.

1

SILT

cro. BE REMOVED)

ENCL

Jqnice Barker Proiect ·\

NWP-2002-816/2 Page 6 of 15 705 S. 4TH ST.

P.O. BOX 118 COOS BAY, OREGON 97420

PHONE: (541) 267-2872 FAX: (541) 267-0588 www.stuntzner.com

Engineering · Land Surveying · Forcsuy · Land l'llllllling · Water Righa

ENCL FJLE NAME.

12-110.dwg

SHEET 2 OF 2

SECTION OF ADAMS CRE.EK West Section

NORTH

\

40

\

~

20

TEMi'LETO

/0

Cli

-, ------ ..9R~.lil

,,,

CREEK· a'-10 WIDE 4'-6' bEEP

DATUM ELEV

0.000 1.{ )

co

v

'¢ tl')

a)

l{)

..-) )

lO

0+00

=

1"1

v

I"J

N ~

t"' 1"1

lui

1 +00

2+00

..-

v 0'<:!" ..... ro ..... .....

'

3+00

4+00

5+00

(()

co

co Ico' .....

.....

~

lO

.....

~

E s

0

l{)

r-...

N

.--

t'

N

0

l{)

1"-N

6+00

SOUTH

,...L, '"'"

40

DITCH\

J_DITC~

1\L-------v ~

I

~

------ ,_O]~f!!-HJ!, li Yf~~ If I

AOALIS CREEK: B'-10 WIDE

....

4'-6' DEEP

DATUM ELEV

0.000 0

rn

CXJ O'l

I':

N

..-N

0+00

Note:

,.,

0)

150' 30'

NO RTH

20

~ ...,

l:lWIII.QL_

I

I

..-

~~

I

""

N N

r-.i ..... r-.i ..-

R

OITCii-.

~MS

Sc ale: Horz : 1 " Vert : 1 "

SOUTH

to

1"--

I~

1"-C'-/ N ..--

1 +00

N

0 l~

I{)

co

N

n

0

(() t'")

to

N .-co co

N N ..--

~

3+00

4+00

5+00

..-

Topographic data was

obtained from DOGAMI 2C·08 Coastal LIDAR flight. Elevations ore beleived to be accur·Jte, however, field verif ication has n ot been conducted f or ~ his project .

0'1 r-... tO v

N ..-- ..--

N

N

2+00

N

..--

N

..--

Ul 0 10

m

lO

0:

..--

lO

6+00

705 S. 4TH ST.

PHONE: (541) 267·2872

P.O.BOX118

FAX:

COOS BAY, OREGON 974\20

www..stuntzner.com

(541) 267..()588

Engineering · .Laud SIIM)'ing- FOI'Ci!Iy -l.a.rul Plmmi.r\g · Woo Rights JOB#: 12-110 DATE: July 18, 2012

Barker JPA Adams Creek FILE NAME: 12·110.dwg

NWP-2002-816/2

Page 7 of 15

ENCL

NWP-2002-816/2

.TytJ. n ~ f () yf~A----1-t o."" / (l la. n-

A-cC.t>$

Ctvt ·$+rt.tc..ftc··l\ · A-( (e ~ 5 .

~

Project Area Located in the 5 1/2 of fhe N£ 1/4 and fhe N 1/2 of the S£ 1/4 of Section 29, Township 23 South} Range 12 WesfJ W.M. Scale ; "=400'

Ditch Location Drawn By Janice Barker

Ten Mile Lake

Page 8 of 15

,

#

·

#

·

FILL , AREA

CROSS SECTION 1"-:. 10' ~({~I

PAS-URELE~ SILT (TOBEREMOVED) ENCL

........

II-~ l

0

Jqnice Barker Proiecf \

NWP-2002-816/2

Page 9 of 15

ENCL

NWP-2002-816/2

Page 10 of 15

ENCL

NWP-2002-816/2

Page 11 of 15

ENCL

NWP-2002-816/2

Page 12 of 15

ENCL

NWP-2002-816/2

Page 13 of 15

ENCL

NWP-2002-816/2

Page 14 of 15

ENCL

NWP-2002-816/2

THIS WoP WAS PREPARED FOR ASSESSUENT PURPOSE ONLY

SECTION 29 T.23S. R.I2W. W.M. COOS COUNTY 1"

19

20

SEE IIAP 23 12 20CC

= ~oo·

23 12 29 & INDEX CANCELLED 602 102

SEE IIAP 23 12 20CD 21

30

28

Page 15 of 15

PARCEL 500

mr

SDATES

ENCL

12 29 INDEX

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas