Home

Portland District

Run scraper

Shore Terminals LLC

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Shelly Lynch is the Regulatory point-of-contact for this permit application from Shore Terminals LLC for work on the Willamette River at River Mile 5.1, in Portland, Ore.

PUBLIC NOTICE for Permit Application Issue Date: August 8, 2013 Expiration Date: August 22, 2013 US Army Corps of Engineers No: NWP-2012-302-2 15-Day NoticeOregon Department of State Lands No: 51437

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Shelly Lynch, michelle.r.lynch@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: Shore Terminals LLC, 9420 NW St. Helens Rd., Portland, OR 97231

Location: The project is located on the Willamette River, River Mile 5.1, 9420 NW St. Helens Road, Portland, OR 97231, Multnomah Co., Section 11 of Township 1 North, Range 1 West.

Waterway: Willamette River

Project Description:

CHANGES TO PROPOSED DESIGN This Public Notice Addendum describes changes to the proposed Shore Terminal Dredging Project as originally proposed in August 30, 2012. The Portland Sediment Evaluation Team reviewed the Shore Terminal Dredging Project and provided three options to the applicant regarding post-dredge surface; sand cover placement; monitored natural recovery; and no PDS management (if concentrations levels were met). The applicant determined that sand cover placement was the appropriate PDS approach. Approximately 5,000 cubic yards of sand will be brought from either the Knife River (RM 64-68) near Longview, Washington or the Federal navigation channel on the Columbia River (RM 102-106) near Vancouver, Washington. The sand cover will be placed on 5.85 acres within the Shore Terminals berth. The sand cover will be placed using a barge-mounted crane and mechanical dredge bucket. The sand cover placement is expected to take 3-5 days to complete.

Purpose: The objective of the proposed project is to perform maintenance dredging at the P2 dock (Willamette River Mile 5.1) to maintain ship berth depths for long-term operations. The maintenance dredging is necessary to maintain a -40 feet CRD, including a 2-foot overdepth. The dredging is required to keep the berth commercially viable and competitive at the Portland terminal.

Drawings: Eight drawings are attached and labeled Corp No. NWP-2012-302-2 enclosure.

Additional Information: Additional information may be obtained from Shelly Lynch, Project Manager, U.S. Army Corps of Engineers, at 541-962-0401 or by e-mail:michelle.r.lynch@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States. Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. The National Marine Fisheries Service issued a biological opinion on July 19, 2013 (NWR-2013-10180) for impacts to migratory aquatic species including salmon and steelhead.

Cultural Resources: This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

z

z

~

E

...A

g

E

g

~

& Ill .,C>

Ill C>

"'

z "-!i."·~~,;jjlgr-L

E g

~ C>

"'

z E

0

~

0

"' P2 Dock N 45° 35.656' W 122° 46 .676'

n

NAD27 Zone lOT s1sooomE .

s

MtLE

L .Jim ff£1 9 m.., eea ,dOOO M tERS Printed &om TOPOl C2000 National GeoJ~RPhic HoldinJ$ (W\\:w.topo.eom) Reference Number: Applicant: Shore Terminals LLC Adjacent Property Owners: ExxonMobil Oil Corp. Brix Maritime Co. Proposed Project: Maintenance Dredging In: Willamette River (RM 5.1) Near: Linnton County: Multnomah State: OR Date: 04/09/2012 Sheet 1 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

IMap 2. Parcel Map Si:CTION I I TJN. R. IVI , 1\' .M.

IN 1'/i II & INDEX POR TL ·\~10

:..< UL INOMAH COuNiY

C..\'"h ~t f\ U".,.;. 2QZ. .. ust:t

m ~

:r·

'-Ot ...u.n

'"'" !Jf!O

·. Project Site 9420 NW St Helens Rd. Portland OR 97231

P2 Dock N 45° 35.656' W 122° 46.676'

.,

;t.: tW H &, INDEX PORlL M~O

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 2 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

Portland OR 97231 N 45° 35.656' W 122° 46.676'

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 7 of 9

NWP-2012-302-2

Norwest Engineering Engineering Services 4110 N.E. 122nd Ave. Suite 207 Portland, Oregon 97230 Phone: (503) 200-5080 Fax: (503) 256-1239

IMap 8.

Dredging Plan View

WILLAMETTE RIVER RM:R t.'ILE 5. 1

~ FLOOD

'

----........

~-47···· -

........_._...._:: -t.s .._. ~-:..~~

"\...__

~~~~~~....::·=.: --· - ·]~ ........___. -·-

_._........,.~...._.._..--

~

244'

P2 DREDGE PI.AN

,......___

150'

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 8 of 9

NWP-2012-302-2

0'

150'

Norwest Engineering CONSULTING ENGINEERS 4110 N.E. 122nd Ave., Suite 207 Portland, Oregon 97230 Phone: (503) 254-0110 Fax: (503) 256-1239

300 I

IMap 9.

Dredge Cross Section (Typical)

__2__ ,------ ~~IN OREOOE ~~

ORDINARY HIGH WA fEll MAliK ElEVAl iON: lO<.X CRO WATER SURFACE ElfV ATl iME Of SUIMY! .,,, CRD

0

..:.!.Q_ --------------- ------------------ - - - - - - -----+-------+----------- --------------

·20

--------------------- ---------------------- _:!Q_

-20

\

\ _,._ - - -

\

~\--'~ \

·40

- - - - - - - -+!- -----+----------

~~I /""""""'"""' BOTTOM kJF DREDGE

:?:

+ 9

~

~

~

-45

8

'$ d - ---"r

'?

~

:& ~

+

0

=-40.K -

--"" C'J "!"

8 +

:i! +

"'

8

--q :&

8

N

M

...

+

DREDGE SECTION A-A HORIZONTAl SCALE: 1" = 50' VERTICAL SCALE; 1" = 5'

1-=.------.==.-===""'-.::-::-:l ~~

NORWES'T ~

~~aMU..'MDDaa

l k~ I .....-a-- 1 ~

· USta.___ ,..._____

2330 l-oop 1604

1- !loo - ess- 9oeo

Reference Number: Applicant Name: Shore Terminals LLC Proposed Project: Maintenance Dredging Location: Willamette River (RM 5.1) Date: 04/09/2012 Sheet 9 of 9

NWP-2012-302-2

w

:>Sna:n Antonio, Texas 78246 .._...-Tel: ( 21 0) 918- 2000

En~rgyL.P.

SHEET 2 Of 6

,....,,

PORTLAND TERMINAL

......., P2 DOCK DREDGE 1=----+--==---=~Ci-iR.;i; O:::: SS:::_:::S:.::::E.:::. CT::.:Ic::. O.:.: N::::.. S _ _ _---i "'"' ORIGINAL PROJECT NO. f=--,-----1--==-=----------,=--; - ·f

DIIAliiNG NO. A-3M6-P2-D

Norwest Engineering CONSULTING ENGINEERS 4110 N.E. 122nd Ave., Suite 207 Portland, Oregon 97230 Phone: (503) 254-0110 Fax: (503) 256-1239

11\EV. A

I

Map 1. Dredging Plan View

1

2

7

5

4

6

3

Core Sample Location Table 1. Composite Plan

Table 1. Sample Point Location and Depth Field Sample Point (SP) Sample

Depth

Subsurface (SSP)

Depth

-32.0 to -42 feet WRD

SSP1

-42.0 to -44 feet WRD

2

-39.1 to -42 feet WRD

SSP2

-42.1 to -44 feet WRD

3

-33.0 to -42 feet WRD

SSP3

-42.0 to -44 feet WRD

-33.0 to -42 feet WRD

SSP4

-42.0 to -44 feet WRD

5

-36.0 to -42 feet WRD

SSP5

-42.0 to -44 feet WRD

6

-33.0 to -42 feet WRD

SSP6

-42.0 to -44 feet WRD

7

-33.0 to -42 feet WRD

SSP7

-42.0 to -44 feet WRD

1

4

SP1 + SP2 + SP3 (DMMU 1)

SP4 + SP5 + SP6 + SP7 (DMMU 2)

Reference Number: NWP-2012-302-2 Applicant: Shore Terminals LLC Adjacent Property Owners: Exxon Mobil Oil. Corp. Brix Maritime Co. Proposed Project: Maintenance Dredging In: Willamette River (RM 5.1) Near: Linnton County: Multnomah State: OR Date: 10/29/2012

NWP-2012-302-2

Norwest Engineering CONSULTING ENGINEERS 4110 N.E. 122nd Ave., Suite 207 Portland, Oregon 97230 Phone: (503) 254-0110 Fax: (503) 256-1239 www.nrcenv.net

Figure 1. Sand Cap Section A-A

12-inch Sand Cap

NWP-2012-302-2

Client: Shore Terminals Project: P2 Dock Dredging Date: 07/30/2013 Location: Willamette River RM 5.1 Corps Ref. No.: NWP-2012-302-2

Northern Resource Consulting, Inc. 1339 Commerce Avenue, Suite 309B Longview, Washington 98632 Phone: (360) 414-5239 Fax: (360) 414-4021

Figure 2. Sand Cap Section B-B

12-inch Sand Cap

NWP-2012-302-2

Client: Shore Terminals Project: P2 Dock Dredging Date: 07/30/2013 Location: Willamette River RM 5.1 Corps Ref. No.: NWP-2012-302-2

Northern Resource Consulting, Inc. 1339 Commerce Avenue, Suite 309B Longview, Washington 98632 Phone: (360) 414-5239 Fax: (360) 414-4021

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas