Dominic Yballe is the Regulatory point-of-contact for this permit application from the Oregon Dept. of Transportation for work on a new highway bypass between OR 99W and OR 219 between the cities of Newberg and Dundee in Yamhill County, Ore.
PUBLIC NOTICEfor Permit Application
Issue Date: September 9, 2013
Expiration Date: October 8, 2013
US Army Corps of Engineers No: NWP-2009-432
30-Day Notice Oregon Department of State Lands No: NA
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Dominic Yballe
P.O. Box 2946
Portland, OR 97208-2946
dominic.p.yballe@usace.army.mil
Applicant: Oregon Department of Transportation – Region 2
455 Airport Rd., Bldg. B
Salem, OR 97301
Location: The project is a new highway bypass located between OR 99W and OR 219 between the cities of Newberg and Dundee in Yamhill County.
Waterway: The project will result in the discharge of fill into 9 wetland areas and 3 tributaries. Refer to Table 3-1 in the application package.
Project Description: The project involves the discharge of 7,730 cubic yards of fill impacting 0.715 acre of wetlands and the discharge of 133 cubic yards of fill impacting 0.017 acre of non-wetland Waters of the U.S. A new Bypass will be constructed and interchanges with existing roads will be modified. This public notice describes Phases 1D, 1E, and 1G of the overall project. These phases will require construction of four new bridges and one culvert replacement that would affect waters of the U.S. Wetlands will be impacted by new impervious surfaces as well as temporary construction, access, and dewatering.
Phase 1D involves construction of the main bypass from South Dundee to Waterfront Road. This phase will construct Culvert 1 (Hess Creek Tributary A), Bridge ND 001 (Hess Creek Tributary A), ND 002 (Hess Creek Tributary B), and Bridge ND 008 (Chehalem Creek). The western end of Phase 1D will connect OR 99W with the Bypass in western Dundee. This phase of the project will impact wetlands 16, 17, 32, 33a, 33b, 34b, 38, and A.
Phase 1E involves construction of the bypass from Waterfront Road to Oregon Highway 219. This phase will construct Bridge ND 013 (Hess Creek North) and a property access road (Wetland 36). Temporary work bridge supports will also impact Wetland 36. Phase 1E will primarily focus on construction of the western portion of the Bypass.
Phase 1G involves road improvements in the Newberg at Springbrook Road, Oregon Highway 219, and Oregon Highway 99W. Improvements include widening, interchange configuration, and stormwater management facilities. The Phase 1G improvements will connect OR 99 West with the new Bypass in the eastern portion of the project. This phase will not have direct impacts to Waters of the U.S.; however, new impervious surfaces may contribute stormwater runoff to areas that support aquatic flora and fauna.
Future Phases will be designed depending on fund availability. These phases will focus on a potential interchange in East Newberg, East Dundee, and potentially continuing the bypass to Dayton.
Mitigation: Wetlands will be mitigated at a 3:1 enhancement ratio, a 1.5:1 creation ratio, and a 1:1 restoration ratio at the mitigation site on the Willamette River. The primary mitigation site is property owned and operated by Chehalem Parks and Recreation District.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The purpose of the project is to improve mobility and safety for highway traffic through the Newberg and Dundee areas. The project will relieve congestion by reducing truck and passenger vehicle traffic on Oregon 99W in these communities.
Drawings: There are thirty-two pages, attached and labeled NWP-2009-432 enclosure.
Additional Information: Additional information may be obtained from Dominic Yballe, Project Manager, U.S. Army Corps of Engineers, 503-808-4392 or email dominic.p.yballe@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. The US Federal Highways Administration is responsible for consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844). A permit for the proposed activity will not be issued until the consultation process is completed.
Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
The project area is within the known range of the coho and chinook salmon. The Federal Highways Administration is the lead federal agency and will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning EFH will be considered in our final assessment of the described work.
Cultural Resources: The US Federal Highways Administration is the lead Federal agency responsible for compliance with the National Historic Preservation Act and with trust responsibilities with Native American Indian tribes. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.