Tom Taylor is the Regulatory point-of-contact for this permit application from the Port of Newport for work in the Yaquina Bay.

PUBLIC NOTICE for Permit Application 15-Day Notice

Issue Date: October 2, 2013 Expiration Date: October 16, 2013 US Army Corps of Engineers #: NWP-2007-832-3 Oregon Department of State Lands #: 44953 RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers ATTN: CENWP-OP-GP (Taylor) P.O. Box 2946 Portland, OR 97208-2946

Applicant: Port of Newport Attn: Don Mann, General Manager 600 SE Bay Blvd. Newport, OR 97365

Location: The project is located on the north side of the Yaquina Bay and estuary, Yaquina River Mile 2.2, in Newport, Lincoln County, Oregon (Section 9, Township 11 South, Range 11 West). The dredged material disposal site is located on the north side of the Bay (RM 2.5) on McLean Point, east of the project area, in Newport, Oregon (Section 9, Township 11 South, Range 11 West).

Waterway: Yaquina Bay

Project Description: The Port proposes to modify its existing U.S. Army Corps of Engineers Section 404/Section 10 permit. The modifications will include additional dredging of the existing shipping berth and the placement of additional riprap on the shoreline. These activities will require approximately eight weeks of in-water work during the Oregon Department of Fish and Wildlife preferred in-water work window for the Yaquina River estuary (Nov. 1 – Feb. 15).

Additional Dredging

The proposed 21,000 cubic yards of additional dredging will cover an area of approximately 2.25 acres. This includes a 0.76 acre area previously dredged under the current authorization to -29.26 feet NAVD, plus approximately 1.49 acres of existing subtidal habitat, including approximately 0.4 acre of undredged area located outside the navigation channel. The proposed dredge area also will include approximately 1.09 acres of the Yaquina River identified as the Federal navigation channel (a.k.a. the turning basin) that prior to 2000 was maintained annually to its congressionally authorized depth of -30 + 2 feet advanced maintenance depth NAVD. The difference in volume between the originally permitted dredging and the proposed dredging is 16,300 cubic yards.

The dredging will be accomplished using a long-reach trackhoe with an open bucket mounted on a flexifloat modular barge that will be anchored in front of the west cargo dock. The trackhoe will have an extended arm with a bucket capable of excavating siltstone that underlies the unconsolidated sediment. On the shore will be a 110-ton crawler crane equipped with a clam bucket. The trackhoe will place the material into a contained area on a barge, where it will then be transferred by the crane to off-highway trucks with higher ends to contain water (i.e., the material will not be set on the dock). The material will then be hauled to an upland disposal area located on McLean Point, east of the International Terminal. Water from the dredge material will not be allowed to immediately enter the Bay, but will first flow overland at the McLean Point disposal area where it will be filtered.

Although maintenance dredging is not included in this modification proposal, the Port estimates that maintenance dredging will be needed approximately every 10 years to remove a volume of approximately 2,000 cubic yards of sediment. The Port will periodically monitor the new dredge prism to determine maintenance dredging needs.

It is estimated that the proposed dredging activity will remove approximately 11,600 cubic yards of unconsolidated material and 9,400 cubic yards of siltstone. Sediments that will be dredged will be evaluated by the Portland Sediment Evaluation Team to ensure compliance with the Sediment Evaluation Framework for the Pacific Northwest.

Riprap Placement

The proposed 180 cubic yards of additional riprap will cover an area of approximately 0.05 acre on the slope near the former west end of the S.S. Paisley. This slope is currently riprapped down to -29.26 feet NAVD to provide structural support for the western sheet pile wall, which must remain stable. The proposed depth of additional dredging will require that the toe of riprap be continued (at a 3:1 slope) to the new dredge depth of -35.00 feet NAVD. The riprap will be placed with a long-reach trackhoe (operating from a barge) onto subtidal sand ranging in depth from -13 to -35 feet NAVD.

Mitigation: The applicant has proposed compensatory wetland mitigation for a.) establishing a 327 acre conservation easement (coordinated with ODFW) located in Sally’s Bend to preserve existing subtidal habitats and adjacent intertidal eelgrass beds from any future impacts, and b.) establishing submerged beds of native oyster habitat. Olympia oyster (Ostreola conchaphila) cultch would be placed at three deep water locations (ranging between -8 and -10 feet MLLW) in the southern portion of Sally’s Slough.

If a permit is issued, the Corps will determine what is appropriate and practicable, compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose of the proposed project is to establish and maintain the corrected navigational depth clearances required for the current fishing vessel operations and the larger and deeper berth for deeper drafting Handysize vessels projected to use the Port facilities.

Drawings: Six drawings are attached and labeled NWP-2007-832-3 enclosure.

Additional Information: Additional information may be obtained from Tom Taylor, Project Manager, U.S. Army Corps of Engineers at 503-808-4386 or via email: thomas.j.taylor@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95 217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect endangered or threatened species and their critical habitat. The Corps will initiate consultation with the National Marine Fisheries Service under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844). A permit modification for the proposed new activities will not be issued until the consultation process is completed.

Cultural Resources: The original permit (NWP-2007-832(2) authorized the renovation of the Port’s International Terminal. This included the installation of a permanent bulkhead wall, the construction of two new docks, the construction of a new Port building and warehouse. These activities involved the remediation of the Pasley and the Hennebique (two concrete-hulled vessels previously used as docks), the removal of the Pasley and the upper deck of the Hennebique, dredging and excavation activities, and the placement of riprap.

Associated with the original permit, the Corps made a “no effect” determination for cultural resources in the project area. The State Historic Preservation Office verified the Corps’ determination in their letter, dated July 28, 2010. As before, the Corps concludes that there are no historic properties that would be affected by the action proposed under the permit modification. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties.

Evaluation: The decision whether to issue a modified permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Proposed Disposal Area

Proposed Dredging Area

N

4540 8/15/13

Proposed Dredging and Disposal Areas Port of Newport ­ International Terminal (Google Earth, 2013)

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2007-832(3)

Page 1 of 6

FIGURE

1

ENCLOSURE

Original Dredge Limits

Original Dredge Limits

YAQUINA BAY

LEGEND

~

Silt Stone {0.75 ac) Unconsolidated {1.45 ac)

0

110

200

100

SCALE IN FEET

Base map Provided by KPFF

Results of Substrate Investigation Within Proposed Dredging Prism Port of Newport International Terminal Renovation - Newport, Oregon Pacific Habitat Services,Inc. Fax (503) 570-0855

NWP-2007-832(3)

Y:\AUTOCAD\4500\4540 Newport Terminal\AutoCAD\Plot Dwgs\MitigationDetermination.dwg, 8/14/2013 1:09:21 PM

2

08-14-13

9450 sti Commerce Circle, Sulle 180 Wll110nvllle, Oregon 97070 Phone: (503) 570-0800

D FIGURE

Page 2 of 6

ENCLOSURE

"'v~--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

N N

/

I

I /

I

---7

c ___~

~

(

J __;

I

I

\

I I

/

/

-

I

f"""

\

-.

I

\

-

--

APPROX. LOCATION OF ~ TIMBER PILES CUT-OFF AT MUDLINE FROM OLD TRIDENT m DOCK r_j

. SHEET PILE WALL (C) REFER TO STRUCTURAL PLANS

---- ------- -

-- -

I

w

(j)

r

0)

.... I

"' "X N

----l

I

\

I

'\

/

(

\

\

/

/ /

\

/

~

/

I

/ /

\

\<\

/''

'~~\

/

/

/

/

/

/

(

/

/

I

/

/

-------.....

,-..::::...._--

<::-,

~

r\

I

/

/

-- --

ORIGINAL DREDGE LIMITS\

;I

~

~

'-...... \ I /"'...

/ /

\

"" \

--.....

/

\

\

-------

\

\

\

~

""\

OF DOCK BERTH 1

II I

"-

u

DC

/

"-

/

' YAQUINA BAY

/

---

FACE OF DOCK BERTH

/

/

I

I

fl

~ ){g7680.68

~

X

"'

4001607.0,Y

1:;/

I I

/ I

I

I

I

\

I I

\ \

\

\

___ J ___ l _

I I I

""

""

$f I

"'-

I

~.___

""

\

\ \ \ · ·

""

U'\

\

"-

"-

~ "-

YAQUINA BAY

/

I

\ \ \

\

\

\ \ \

"" \ \

\

\ \ \

\

'-NI~W

\ \

DREDGE LIMITS

\

\ "-.._

I

CURRENT BATHYMETRY SURVEY: ACOE SOUNDINGS ON MAY 29, 2012 ORIGINAL BATHYMETRIC SURVEY: ACOE SOUNDINGS 2009

NORTH

307815.10

\

.......___

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

~

'\

"-

\ \

\

\

"-

\

\

\

"'.....I

\

\

\

\

\ \

"-

"" \

/

U'\

\ ""\

--.___/

"J"" /

\

"- "-

\

\

\

"' """ "' "' ""

SCALE

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

EME EME MS 11/1/12 7:31pm eeykelbosch 7815-600-sect.dwg C6.0

NWP-2007-832(3)

Page 3 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

C6.0

EXCAVATION / DREDGE PLAN RECORD NO.

307815.60

ENCLOSURE

RECORD DRAWINGS - MARCH 11, 2011

I I I

I

~~--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

"' N N

ORIGINAL DREDGE BREAKDOWN ~ ORIGINAL DREDGE TO REMAIN

·

--7

·

rn

33,050 SQ. FT. (D.76 AC)

(

I

I

NEW DREDGE OVER ORIGINAL FOOTPRINT

33,050 SQ. FT. (0. 76 AC)

NEW DREDGE VIRGIN GROUND

65,000 SQ. FT. (1.49 AC)

~

(

\

I I \

I

49,800 SQ. FT. (1.14 AC)

TOTAL ORIGINAL DREDGE FOOTPRINT

\

98,050 SQ. FT. (2.25 AC)

TOTAL NEW DREDGE

/

\

/ /

\

______ 0

0

"' "' \ "' ............ ............

---~

Cil

r_j

/

\

/

\ \

/

/

/

\

- --

N I

-" ~

\

0

n

I

\..____/

u

,.........-

/

-----l

, ..:".::, " ' - - - - - - - ............

I

-

.............

/

x ......__......__

"'CL:

/

/ /

/ /

/

I

I I

/ / / /

/ /

....-----

::::

/ /

/

/

!

/

/

CXl

c-.

/

I

I

I I

/

/

I

I

(

/

/

I

I

/

/

/

/ I

X

/

/

w

"coc-.

/

I

/

[J]

ADDITIONAL RIP RAP AREA (2,200 SQ. FT.)

/

/

(

I

/

/

I

/

/

/0

/

\

---

-<

/

/

/

I

/

/

/

......__/

1

8+5o

~.*~.A[-+fll43t-+--l

I

/

I I

/

I I I

I I I

I I I

l__

" ""'

/!?

I

"'

............ ......__ ......__

I

/

'\ \

\ \

\

\

\ \ \

'u>

\

~ ......__

I I

YAQUINA BAY

\...

......__

'u>

U'\

\ \ \ \

\

\

\

\

/

'u>

\

''\

......__;

";)~ \

\

......__

..........

......__

'~

"' "' "-

~

'-..... ......__

......__

"-...

~

......

'.J"

......__

........... ........... ...........

~

......__

~

......__

\

"'-._

........,_

"'

""

...........

"' "'

/

'-......

'\ ...........

...........

""-._

""- ""-._

\

\

,.......

I

........... ......__

\

~d'

'<> ""-._

\

"'

\

\

.....

""-._

'....

.....

.....

""-._

'....

'....

""-._

'....

'....

\

'....

'....

'....

""-._

"

""-._

""-._

'....

"'

\

"'

"' "' "' "' \

""-._

'

'....

\

\

I

\

\

'

""-._

"'

\

\

\

\ ""-._

"'

\

\

\ \ \

\

\

........,_

\ \......

\

'

\

\ \

\ \

\

\

\

\ \

\

\

\

\

\

\

\

\ \

\

\

""-._

""-._

""-._

\

\

""-._

""-._

"'

\

\

""-._

\

\

\

\

""-._

""-._

'....

\

.....

\

~

'\

""-._

""-._

""-._ ""-._

\

\

'....

'....

""-._ ""-._

""-._

'....

'....

""-._

""-._

""-._

""-._

""-._

""-._

""-._

""-._

""-._

'....

'....

'....

""-._

""-._

'....

""-._

""-._

'....

""-._ ""-._

'....

\

\

""-._

I

I

'"i.

'.... ""-._

""-._

c;.

~

\'

I

""-._

""-._ ""-._

tO

C\1

""-._

""-._

\

·

\

6<

""-._

'....

""-._

""-._

""-._

""-._

I I I

\

\

~

""-._

""-._

""-._

I.

""-._

""-._ ""-._

""-._

\ \

I \

""-._

\

...........

\

~

\

...........

/

.9\

\

...........

...........

\

\

"''.Jo \

I \ I "6-\

/

\

'\

I I

I I I

___ J ___ l _

: I

I

...........

'-....

"' "' "' "' "'

NORTH

SCALE

307815.10

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

SHEET NO.

EME EME MS 11/1/12 7:24pm eeykelbosch 7815-600-sect.dwg C6.0A

NWP-2007-832(3)

Page 4 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

C6.0A

EXCAVATION / DREDGE PLAN NO.

307815.60

ENCLOSURE

RECORD DRAWINGS - MARCH 11, 2011

I

NEW DREDGE BREAKDOWN

16,750 SQ. FT. (0.38 AC)

NEW DREDGE OVER ORIGINAL FOOTPRINT

I

~~------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

"' N N

LEGEND: 1,~

25

-

\

15

---.___

--'

5 0

'Xx

)< -5

~

Cil

v

/

-10

~

w

U1

I

"c-.

-15

2/ k'l 1 /

-20

X

-,:

I ~

0 D

-25

~

I

u

0> X

co

'

-30

~

c-.

-35

X

-40

u

CL:

~

\ I~....

SLT' TOI\IE EV = -3 1.0±'

"'

-80

-70

-60

-50

-40

EXIST. GROUND

""~ ·i f;f

1 <::;= 90

V"- 2012

A

-30

-20

-10

0

10

I

~~ r-.. t:Q ,..,-h ~ ~~ A Ay ~ ~y~

SECllON 6

CXl

STA. 1+55

c-.

11

t

~{

-~

~

-- j-c

10

I

i= ffi Ill

5

g

0

40

= -35.00 ( -34.26 MLLW)

50

60

I

-

:--- =

1

EXIr T. GR ou ~ o 1

70

80

-5

-10

-10

90

100

110

120

-

-

-15

-15

- -20

-20

-25

-25

-30

-30

--

-35

-35

-

= - 9. 6'

,..

I

-5

DREDGE (BELOW HMT)

EXCAVATION (WITHIN TEMPORARY CONTAINTMENT WALL) FILL

-15 -20

NEW DREDGE (BELOW HMT)

~

J'"$

~ p.. ~

130 - 1 4-40 0

~

~

NEW RIPRAP

~

SECllON 20 STA. 5+87 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1''=1 0'

HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=1 0'

"'o_

~

.· ..

0

10

I

-

5

PROPOSED RIPRAP

~

co

NEW DREDGE UMITS

1/

A.

D

X

I l I I... cRE~GJ ulrri J~ l 1 >0

I

20~

FILTER BLANKET

0

1-

~>'0, ~ 1~

15

0

1---

~ ~

15

5

I~

~ :'<

15

.

li

v ~ v

20

10

It::

~

20

f MT = 11.p1'

I~

v

20

- 11. p1'

I~

I-

--' --'

~

I

~

~ ~ <

CXl

r---

r-g

1\

f

f MT

I/

LLI

Ill

v/ D / '· v ~ v / 1>-

~ /

N

-"

i= 0::

/ / \ ~ /

co

~--- ~---

I

0

~,

/

!'--- 1'---

...:::;

/"'

V")' '" v/Vv /

:X :X )<

v

i-APPROX. OUTLINE OF PASLEY HULL

~

[\

I

1'--- :---._

\

10

r_j

~

25

20

RIPRAP

I

0

c

~'-- :---.. ~ .

- r---. ---.___

15

v

~'--- r---.

i-APPROX. OUTLINE OF PASLEY HULL

~ 1'---

r-r-r-r-r-r-r-r-+-+-+-+-+-+-+-+-+-+-+-~ 20

-

-----r---

15

20

20

15

15

fMT- 11. ~1'

f MT = 11 ~1'

-

10

10

10

10

5

5

5

0

0

0

-5

-5

-5

1---

-10

-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-+-+_, -10

-10

-10

-15

-t--t--t--t--t--l -15

-15

-15

-20

-t--t---l -20

-20

-20

-25

-25

-

-25

-25

-30

-

-30

-30

-35

-

-35

-~90 -80 -70 -60 -50 -40 -30 -20 -10

0

10

20

RECORD DRAWINGS - MARCH 11, 2011

20

.29 ~6'

l\_

30

30 SECllON 26 STA. 7+65 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=10'

SECllON 12 STA. 3+50 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=10'

307815.10

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

SHEET NO.

EME EME MS 11/1/12 7:19pm eeykelbosch 7815-600-sect.dwg EXH-A

NWP-2007-832(3)

Page 5 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

EXCAVATION / DREDGE CROSS SECTIONS

EXH-A SHEET

OF

RECORD NO.

307815.60

ENCLOSURE

Document Path: Y:\Projects Directories\4500\4540 Newport Terminal\Dredge mitigation\Figures\GIS\Oyster.mxd

TL 01100

TL 01200 TL 01300

¯ 1,000

500

0

Approximate Oyster Cultch Location Tax Lots to be Conserved Feet 1,000

Source: Tax Lot lines - Oregon Geospatial data, infrared aerial photo - Lincoln County Data

FIGURE 3 Proposed Mitigation at Sally's Bend Newport, Oregon 08/14/13

NWP-2007-832(3)

Page 6 of 6

ENCLOSURE

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas