Michael LaDouceur is the Regulatory point-of-contact for this permit application from City of Portland Parks and Recreation for work on the Willamette River in Portland, Ore.

PUBLIC NOTICE for Permit Application Issue Date: January 9, 2014 Expiration Date: February 10, 2014 US Army Corps of Engineers No: NWP-2011-187 REVISED 30-Day Notice Oregon Department of State Lands No: 46955RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Michael LaDouceur, Michael.A.Ladouceur@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: City of Portland Portland Parks and Recreation 1120 SW 5th Ave., Room 1302 Portland, OR 97204

Location: The proposed project is located at Willamette Park in Portland, Multnomah County, Oregon in Section 22 of Township 1 South, Range 1 East.

Waterway: The proposed project is located in the Willamette River.

Project Description: The following work was previously noticed on July 19, 2012:

The City’s project consists of maintenance dredging over 0.2 acres of the river, resulting in the removal of 7,200 cubic yards of accumulated sediments. The dredging will occur at the existing boat ramp, transient dock, and wave attenuator structure (debris boom). The target dredging depth is -3.5’ City of Portland datum and may remove up to five feet of sediment. The dredging will be conducted by clamshell dredge. The dredged material was evaluated in 2012 under the 2009 Sediment Evaluation Framework by the Portland Sediment Evaluation Team. The sediment is suitable for unconfined, aquatic placement and the post-dredge surface is suitable for unconfined, aquatic exposure. The floating debris boom may be replaced or repaired to deflect floating debris around the facility. It is anticipated that the landward end of the floating boom will be replaced with an untreated log chained to the remaining structure.

The project has changed to now include:

The dredge material will be loaded onto a hopper barge and disposed of in the flow-lane of the Columbia River at river mile 100.04 to 100.74. The City is requesting a 10 year permit that would allow the dredging and in-water disposal of up to 21,600 cubic yards.

The project also includes placement of 260 cubic yards of riprap below the ordinary high water mark of the Willamette River to repair 0.07 acre of scour damage at the toe of the existing boat ramp. To install the riprap, the City will first dredge the end of the ramp to -3.5 feet COP. A geotextile fabric will be placed at the toe of the ramp and then riprap will be discharged on top of the fabric. The geotextile fabric under the riprap will prevent the rock from sinking into the river sediments. To the extent possible, the riprap to be used will be clean and free of dirt and debris. The riprap will not be end-dumped into the river or dropped through the water column. All heavy machinery will be inspected daily and cleaned as needed prior to working in or over water.

The project is proposed to occur from September 2014 to October 2014 to best accommodate the in-water work windows of the Willamette and Columbia Rivers. The construction site will have a sediment and erosion plan for the project. Complete isolation and de-watering of the work area is not feasible. Therefore, a turbidity curtain will be deployed and the rate of dredging will be monitored to minimize and contain turbid waters.

Mitigation: The applicant has not proposed a compensatory mitigation plan because the dredging is expected to have temporary effects to the river. It is expected that the site will continue to accumulate sediment and will not convert shallow-water habitat to deep-water habitat. The placement of riprap to prevent toe scour at the boat ramp is considered maintenance work. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The project purpose is to maintain vessel access at the existing boat ramp and improve the safety of boaters during low-water conditions.

Drawings: Nine (9) drawings are attached and labeled Corp No. NWP-2011-187 enclosure.

Additional Information: May be obtained from Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers at 503-808-4337 or e-mail: Michael.A.Ladouceur@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States. Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.

Cultural Resources: An initial evaluation of the proposed project area indicates that an initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PROJECT SITE

PROJECT MANAGER JON ADKINS EXELTECH 87Z9 COMMERCE PlACE DRM: N£, SUfT£ A LACEY, WA 985 16

OWNER'S REPRESENTATIVE EMILY ROTH PORTlAND PARKS &: RECREATION 64J7 Sf DIVISION ST. PORTlAND. OREGON 97206 50J-82J-9225 50.3-823-2246 FAX

SITE MAP NTS

ABBREVIATIONS AGG. APPROV. APPROX. BR. CL CIP CONC. DLW 0/A fA DR. FG FS GR IE HP

toe. tP MAX. MIN. NIC

oc

OlW OHW PERF. PP&R R SPEC. JR TYP.

AGGREGATE APPROVED APPROXIMATE BASE OF RAMP CENTER UN£ CAST- IN-PLACE CONCRETE DF:SIGN LOW WATER DIAMETER EACH EXI$11NG RNISH£0 GRADE RNJSH£0 SURFACE GRADE INVERT EUVATlON HIGH POINT lOCATION LOW POINT MAXIMUM MINIMUM NOT IN CONTRACT ON CENTrn ORDiNARY LOW WATER ORDINARY HIGH WATER PtRFORATED F'OR1WifJ PARKS 4 RfCRfATIOH RADIUS SPECIFICATION BOOK TOP OF RAMP TYPICAL

NWP-2011-187

GENERAL NOTES I.

2.

J.

4. 5.

DO NOT OBTAIN DIME:NSIONS BY SCALING DRAWINGS. US£ WRITTEN DII.IENTSIONS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS.

AlMS£ THE OWNER'S R£PRESENTATM: OF ANY CONF!JCTS OR DISCRE:PANC/E$ F7VE (5) WORKING £lo\YS PRIOR TO STAR11NG WORK. STAGING AREAS ARE TO BE WITHIN THE DESIGNATED CONSTRUC710N UMITS. IF THE CONTRACTOR REOUIR[S ADOITIONAL AREA. HE SHAlL SUBM" A WRITTEN REQUEST TO THE OWNERS'S REPRESENTATIVE. VE:RIFY ALL SfT£ COND"IONS BY $"£ VIS" PRIOR TO BID OPENING. VERIFY LOCATION OF ALL UTIL/71£5 PRIOR TO COMMENCEMENT OF WORK. FOR LOCATION$ CONTACT PORTLAND PARKS &: RECREA710N. (50.3) 82.3- 1607 AND THE UTIL/71£5 N011RCATION CENTER (50J) 246-6699 NOT LESS THAN 48 HOURS PRIOR TO BEGINNING WORK.

DRAWING INDEX 6.

7.

8.

ALL CONSTRUC710N AND MATERIALS SHALL CONFORM TO THESE PLANS. TH£ CITY OF PORTlAND 2007 STANDARD SPECIFICATIONS, THE 2010 OR£GON STRUCTURAL SP£C/ALTY COD£. THE 2005 PORTlAND FIR£ CODE. THE 20 I 1 OREGON ELECTRICAL SPECIALTY CODE.. AND THE 2011 OREGON PLUMBING SPECIALTY CODE. CONTRACTOR SHAtL COMPLY WTTH ALL T£RMS AND CONDmONS OF FEDERAL. STAT£ AND C~ PERMITS.

SHEET TIIL£

SHffi fl

COVER SHEET [)(JSnNG CONDlOON$

2

EXISTING RAMP PROFlLE de TO£ SECTION

J

SfT£ PLAN

4

DREDGING de £XCAVATION SECTIONS

5

PROPOS(() S£C710NS

6

tROS/ON CONTROL PLAN

7

PROTECT ALL EXJSnNG IMPROVEM£NTS TO RDJAIN. THE CONTRACTOR SHAtL REPAIR OR REPLACE ALL DA/tiAG£0 £XIS71NG IMPROVEMENTS TO THE SATISF/JCTION OF THE C~.

1 of 9

Enclosure

SURVEY INFORMATION TBM-t

TBM-2

1/,N; NAil & WASHER

·osMB CONTROl·

518. IRON ROO WITH RED PlASTIC STAMP0 ·OEA CONTROL.

N: 666945.96 E: 7645859.40

N: 666738.57 E: 7645901.16

BENCHMARK CITY OF PORTlAND BENCH MARK :13174 BRASS DISK IN TOP OF CURB ON SW CORNER OF SW MACADAM AVE AND SW NEBRASKA ST

EL: 20.04 (COPD)

El.: 27.27 (COPD)

EL: 44.078 (COPD)

EL: 22.29 (NA\1088)

EL: 29.52 (NAVD68) EL: 26.03 (NGVD29) El.: 23.98 (CRO)

CAP

I \

w ~

L-v \__.

EXISTING PARKING

:;;

TO REMAIN

& 0

' '~ /

c::/~

("' ~

I II I

\

l

I

I

\

" ' \

\

\ ~\

I

\

I /\

EXISTING PILES TO REMAJN (T'tP. OF 15)

CONSTRUCTION UMIT

(

~

I &xeltec EXISTING PRECAST

EXISTI NG TRANSIENT

CONCRETE RJWP

TO REMAIN

l

\I

f

'i'

,.,

\

-(

1.

2. 3.

SCN.£ " '

PORTIONS Of TlfoSE NOTES AND THE BATHYMETRIC PORTIONS OF THIS ORAWU..~ PRESEifl"S THE RESUlTS Of A MULT18EMI BATHYMETRIC SUl

DATE OF SURVEY: JANUARY 5. 2011. HORIZONTAl.. DATUM: NORTH AMERlCNf DATUM OF 1983 (NAD83~ (CORS-96,EPOCH 2002) STATE PlANE COORDINATE S'tSTEM (SPeS), OREGON NOR"TH ZOI

<.

VERTICAl.. DA.TUM: CITY O F PORTlAND ( COPD)

5.

UNITS: INTERNATIO"'AL FEET.

6.

CONT(l(}q I IITERVAL: 1.0 FEET.

7.

HORIZOHTAL POSITIONS WERE ACOUfREO WITlt A POS/\IV CO!o'BINEI> I NER11AI.. AND REAl..·'liME KI>ISWATIC GL06AI.. POSilJONING SYSTEM (RTK

GPS).

8.

\

(

C~TORS.

9.

DEPTHS WERE ACOU1RED VIITH A RESON MtllTlBEAM BAlHYMETRIC SONA.!HNTEGRATEO Wl'rn A. POSIMVPOSmONINGAND MOTION REFERENCE SYSTEM.

10 . SPOT SOUNDV«>S.ARE POSITIONED AT THE DECIMAl POINT. 11. PlANlMETRIC UNEWORK Ale) A.ERlAI.. ARE PROVIDED FOR REFERENCE 01>1.Y.

12. HORIZOt USING THE OREGON REAI..-TIWE GPS NEn'IORK (ORGN~ 13. VERTlCAI.. CONTROl AT TBM-1 ANO TBM-2WAS ESTABLISHED USING OIFFERENTW.LEVELS BASED ·ON THE CITY Of ~1\.AN!l BENCH..IAARK#3174.

0

6

~ w

~it

(.)~

a:

~~ ~..,

(1) ::0

>-

a a: a: <(

I-

~

~(!)

1:) c~

0::::;::

~

(/)

Ill

~ ~

rcl? ~i=: Ill~

.xE

<

~8 "'0 ':2

--~ lLJ roo

n. z

::!;

:5 -.J ~

CN

ill~

-<

::: 1/)

~~

o

01

· "< co -

- ...

n. C§

a. a

.,..._..,.

R'E\IlSIONS 00'<

w -

IS FROM OS!iS SIJRVEY DA.TED 11J13312009.

2

(Jf'

Enclosure

l

OQ>

!!W :; <

oz

15. TOPOGRAPt!IC SURVEY DATA ABOVE FIVE FEET

2 of 9

w

·z ::!; <:::o- m -< m"' ~Q~~ J-"> _o<

9

NWP-2011-187

~b crUJ "'

0:::

oo- a..

1:)~

14. VERTICAl.. DATUM CONVERSI0-'15 FROM COPD WERE COPIPUTEI> FROM NIB-HOIJR STATlC GPS 08SERYATlON ON TBM-2. THE SEPARATION SETWEEJ< NAoe:J (CORS-96. EPOCH 2002) AN() COPD A T TBM-2 WAS OE'TERY.lii£ B.UPSOIO AND NAV068 WAS COh'PUTEI> USNG Ga>lll09. THE SEPARATION BETWEEN NAYOSe AND CRD WAS COI<'Y\JTED FROM A. tlJODEL DEVELOPED 6Y DAVID EVANS ANil A.SSOClATES. INC. THE SEPARATION BETWEEN NAVD88 AND NGV02!l'47 WAS COMPUTED IJSING VERTCOI<94. THE RESULTS ARE llCSPI.A.YEO IN THE VERTICAL DATUM CONVERSION TABlE AND SHOULD OM.Y BE USED FOR 1liiS SITE. THE SEPARATIONVAI..IJES VARY SPATIAUY.

,2

of 0::: c~

Q)

f

F'tE1

WATER SURFACE ELEVATtONS WERE OBTAINED FROM A RrKGPS.ARTKGPS BASE STATION WAS O::Pt.OYED TO~ REAI..·TIII.E GPS

~

I

\ NOTES:

"

REMAIN

\

l

~

1§ .

DOCK TO

..

.

[EXISTING PilE (TYP.) n II

::

"

,.

EXISTING RAMP PROFILE A

·· ·

li

c~

0 ....

·z -<

m"'

CD .._a:

0~ CD

a: . _ ·· _ ·· _

. _OHW:' 11!.:!!.

20

EXISTING TOE OF RAMP

~TlNG GRADE

10

;-\

=---:f""~---t---~~~ r";;;;_,._;;::a..-

[:~~~ =!--=-- - -

- - ..:

0

Yl

LEGEND

POSSJBl£ EXISTING ROCK

·10

j

i

[::::J

EXISTTNG ROCK

----

DC/STING GRADE ORIGINAL GRADE

5

u

·

-

----

-

EXISTING TO£ OF RAMP PROFILE B

..

OHW (18.0? ot.W ( 6.2') DtW ( .3.0'}

! NWP-2011-187

3 of 9

Enclosure

..

EXISTING CJP CONCRETE AA'

--·· -----

-~

----··- ·--

-- ·- - ··--·

PlACE RIP RAP, ClASS 100, OVER RIPAAP GEOTEXTILE, TYPE 2 {SEE SHEET 6 )

0

~

0

0::

~

l&.J

r:i 0::

c~ o ~

·z -<

m"' GJ 0~ Q)

a: . "0

c -

mj

U); _..:E

~ ...rooa l&.J

-z

- - - - ____ -·

Q.

-·

.........

LEGEND

20

-.3.5 " DRroG[ AR£A

100

20

:::E

::5 ....J ~

'--

--- ------

..

CUSS 100 RIPRAP

-

OHW (18.0') OLW ( 6.2')

4

DRroGING CUT LIN£

Cf'

9

NWP-2011-187

4 of 9

Enclosure

EXISTING P1LES, TYP

~ L~:n~~~~~~~~~TERLEVEL

=====*==============-=1.::.:===-=--------=-------=----- -

----~--~-JL-. ___ JLH-.--~L~=~~~-~=~~ :: -~~--~~Jf==~~== g==~~~=r It

lJ

I

--

.,

EXISnNG TOE OF RAMP

I

. __ ___ __ .. __ ; f~--

i

1

OHW· 18,0

20

1 I

:: I I

..i

~

EXISTING GRADE

10

··-- ORJGINALGAAOE ----- ----- - ---- -···- - _ _ _, :J_ j --·- - --·- ---·- - "'- ---·- -·-- - · - -· 1

_ _ ... _ _ .f?!-W=6:2, _ _ ,~

---- ---- ---- ~=_J,g __ --

_:::_=----:==:----- - - - - - -r-H~.~- I

o

::

"'

~

~z

·· ··

I I

... 9:VJ~~ "":2: ffi

0

·

I I

SECTION A s

u

0

-15 ,.

ci c~

__ z

_ _ OLW= 6.2 _ _

~

·

(/) .'!

t=~ ~ (.!)

'0 ~

I.

2.

ORE:OG£ AR£A W.Y CONTAIN E:X15TING ROCK mAT IJAY REQUIRE: E:XCAVAOON OE:PE:NDING ON DRE:OGE: E:OUIPME:NT USED. IHVE:STIGitTE: E:XJSTING MATERIALS WITHIN E:XCAVATION AREA NOnFY CITY OF' F'INDINGS AND Of!TA/N APPROVAL BE:F'ORE: PROCffDING WITH E:XCAVATION OF' E:XISTING ROCK BELOW DREDGE: DEPTH.

SCAU: "

nxr

DREDGE: AR£A ( SE:E: NOTE: 1.)

c:::J

E:X15TING ROCK OHW (18.0')

5 of 9

_.a:& · ~ c6~

....

-< ......

REY

OLW ( 6.2') OLW ( :J.O') E:XISTINGGRADE: ORIGINAL GRAD£

NWP-2011-187

::s8 c~ oc -

-0

oz

E:XCAVATION ARfA (SEE NOTE 2.)

- ------ ----

-.,

Enclosure

0

"' ....

lLJ~

a..~

~

- -· -

CN (Q~

~ ~ <

~~

a.. z

··

1£ ~ ~

.::t:, E

~li

L£G(ND I2ZJ

1-i=:f~

(§§ a:: 0;) <( l 0

-10

~ "'

:2fol z

o"' ~

Q)

ro~ ()

~

~<..,

(Q"'

c~

DREDGE OEPT1-t z -J.5

CI)

Q..(/) :f ,.

'0 ORIGINAL GRADE - - - -- - - - - - - - - - - - - - - - - - - -- - - - - - _ _ _ - - - - - - ___ _____ OLW =_3,P _ _ _ _

"

~i=:~f

o~

0~

10

B

0.: 0

-< ~

a> .._a:

...SECTION ·

,.,2

0 0

-10

I

II

exe llec

--

I

IJI

I

.

I

11

----------tr-

Ei .

I I

~

.. 0

'

·

EXISllNG PILES TYP

\ ' ----r-

:: I 1

EXISTING GRADE

--_-f~~TlNGT~e;,::::o~f_-_f-7'~~-~~ ---~_:::__-: U:..-_:-- -~~ _J

-

- - -:}- - - _

~- - - - · · -

-

r

- - - - - - - - - - - - - - - - - __

·

'I

- 10

SECTION A

-- r~NG7:~~L:PERNA~rPR~~~~EXIf~S=~~~~~=--

J_- -,....- -_;--- - --- --

ClASS tOO KEYED RIPRAP OllER RIPRAP GEOTEXTILE. TYPE 2 KEY GEOTEXTllE INTO ROCK ON AU. SIDES

t ee

I

S

I.S

0

=-_-_-: = ---------------- DLW=_J,P__-_ _ .. __ _ .. __ _ ··- - --- - . _

_J

0

exe

LPOSSIBLE EXISTING ROCK ClASS 100 KEYED RJPRAP OVER RlPRAP GEOTE.XTILE. TYPE 2 KEY GEOTEXTILE I NTO ROCK ON ALL SIDES

::

OREOGEDEPTH=-3.~

-=- --=-=- ~-~-~ OLw=_J~= OI..W = 62

~ ~=-~

_ , __ _ _, _ _ __ _ _ , __ _

- --·

~------

DREDGE DEPTH= -3.5

--------

--

. .... .

SECTION B

0~2

..

----

0

- 10

_,_ REVI

LEGEND EXISTING ROCK RIPRAP, CLASS 100

OHW (J B.O') OLW ( 6.2')

....

OLW ( J.O') DOS11NC CIW)f:

0

ORIGINAL GRADF:

NWP-2011-187

6 of 9

"9 Enclosure

MAINTAIN AND PROITCT STORACE AREA AS NEEDED. CONTRACTOR TO DETERMINE AR£A NEEDED. tOCArr A MINIMUM OF .300' FROM OH'W.

®

INSTAll AND MAINTAIN BIOFILTER ALONG DOWN SLOPE SIDES or STORACE ARfA. SEE RD 10.30.

LOCATr

E~

(

CONDITION AND MAINTAIN ADEQUAIT CONTAINMENT FOR POSSIBLE SPILLS.

00 NOT AttOW EOOIPMENT TO TRACK DIRT OR DEBRIS OUTSIOE STORAGE OR iSOLAOON AR£AS. PROVIDE WHffi WASH FACILITIES AS NEEDED. SEE RD 1060. CONTRACTOR TO PROVIDE \IISUAL OBSERVATION OF" TURBIOITY THROUGHOLIT CONSTRUCnON. IF TURBIDITY L£VELS ARE OBSERVE:D TO APPROACH THE PCRWTTF:D ALLOWABLE UMIT. DJSCOifTINUE OPERAnONS UNTIL TUR8101TY RETURNS TO ACCEPTABLE L£V£LS AND/OR ADJLiST CONSTRUCTTON METHODS TO MAINTAIN ALLOWABLE LllwiiT.

ON UP SLOPE SIDE OF

STORAGE AREA INSTAll TEMPORARY INLET PROITCTION. SEE RD 1015 .

IF" EOOIPMENT IS TO BE OPERATED N£AR OR OVER THE WATER. ENSURE THAT IT iS IN GOOD OPERATING

~I

:;j

EXISTING

"'~I PARKL~G I <;.

c~·

/

I

l

/ v-'"' \

1

/

// ,

I

;/

tl

)

I

I

\/1

I \

/''y / \

/

I

I

I exeltec

I( I

EXISTING TRAI>ISIENT DOCK

·.

)

I

I

1\_0REDGIKG UMIT

I

\

I

I

1

I

\

0-"; \

L~---

/

~

:;>

I

REYI t

cw.n

m-=-~a~

EROSION CONTROL PLAN 30

.,

7

NWP-2011-187

7 of 9

Enclosure

··

/.' I

, 0

~

C"J

0

z

..

-

~

-....... . -

~

."'

1t

z

.... .

...

!

C"J

;

,..,

-

0

~

2 ~·'?

ll '

}fl

·

~~

Po rt land Park s and Recreati on ll

1: NWP-2011-187

'

Of,N Sf,L TZMAN.

Commloslonor

·

ZARI

SANTNER.

Olroot or

WILLAMETTE PARK BOAT RAMP REPAIR DISPOSAL SIT[ Por llf nO. Or ogon DATE, 12 - 1g- 20 1J

SC ALE· AS SHOWN

PROJECT MANAGER, JON ADKINS DRAWN BYr JWB SECTION.

8 of 9

,. ,- (b .. I' n 1-

Enclosure

.. <.:

~

ElovoUoo

~11

.

~

f-t-

I~

~

..~) ......··~·

!J

&

-><

~~ -~

~~

"'"'

-N

~~~.. ~

&

I!

-~

<>r"'' W.+-r-h, . , --1

.§.

Portland Pa rk s and Rec r ea ti on DAN SALTZMAN,

Ccmmlutcnor

ZARI

SANTNER,

Olr ec lor

WILLAMETTE PARK BOAT RAMP REPAIR EXISTING & POST DISPOSAL CONDITIONS NWP-2011-187

Penland, Orooon DATE, 12- 19- 201J SCALE. AS SHOWN

PROJECT MANAGER, JON ADKINS DRAWN BY; JWB SECTION.

9 of 9

Enclosure

l·

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas