You can copy from here when filling out the rest of the page.
Danielle Erb is the Regulatory point-of-contact for this permit application from the Trust for Public Lands for work on the Columbia Slough and adjacent wetlands in Portland, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: January 10, 2014
Expiration Date: February 10, 2014
U.S. Army Corps of Engineers No: NWP-2013-396
30-Day Notice Oregon Department of State Lands No: APP0055224
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Danielle H. Erb Danielle.H.Erb@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Trust for Public Lands
808 SW Third St., Suite 570
Portland, OR 97204
Location: Former Colwood Golf Course located at NE Alderwood Rd at NE Cornfoot Rd, Section 17, Township 1 North, Range 2 East (45.5701, -122.5863).
Waterway: Columbia Slough and wetlands adjacent to the Columbia Slough.
Project Description: Permittee proposes to construct two large industrial buildings and associated infrastructure and utilities on approximately 48.4 acres of the former Colwood Golf Course. The purpose of the proposed project is to construct an industrial development to meet the City of Portland’s need for industrial sites that can accommodate large floor-plate industrial buildings. An additional 90 acres will be set aside for a future park.
Development of the site will include grading to accommodate the construction of two large buildings with approximately 409,105 square feet and 413,550 square feet of floor space each, as well as associated parking and infrastructure. The proposed stormwater management system will include vegetated swales, planters, and basins to treat stormwater runoff before being directed to a new stormwater outlet that will discharge into the Columbia Slough. Flood storage basins will be constructed along the perimeter of the site to offset proposed development within the mapped flood hazard area.
Construction of the proposed project will result in the permanent placement of fill within six wetlands (9,204 cubic yards / 1.934 acre) and the permanent placement of a riprap outfall below the OHWM of the Columbia Slough (37 cubic yards / 0.01 acre). Removal of materials will be necessary in two of the wetlands (137 cubic yards / 1.7 acre) and within the Columbia Slough (37 cubic yards / 0.01 acre) for associated activities.
An estimated 30,000 cubic yards of material will be excavated from non-wetland areas in the southern portion of the site for the creation of the wetland mitigation area. This material will be transported to the northern part of the site and used to fill wetlands and to create a level grade on which the industrial buildings and associated infrastructure will be constructed. Construction is anticipated to begin in early summer of 2014. Measures will be taken to ensure impacts to wetlands and waterways are minimized to the maximum extent practicable.
Permittee will restore and enhance approximately 26.08 acres of riparian area between the Whitaker and Columbia Sloughs to compensate for impacts to the City of Portland’s mapped environmental zones resulting from the proposed development of the northern portion of the site. A wetland mitigation area will be constructed in the southern portion of the site to compensate for the unavoidable impact to wetlands. Approximately 3.17 acres of scrub-shrub wetlands will be created onsite to compensate for the permanent loss of 1.94 acres of wetlands resulting from the development in the northern portion of the site. Material excavated from the wetland mitigation area will be used to fill the wetlands in the northern portion of the site for the proposed industrial development.
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for permanent loss of approximately 1.94 acres of wetlands.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To construct an industrial development that meets the City of Portland’s need for industrial sites that can accommodate large floor-plate industrial buildings.
Drawings: Five (5) drawings are attached and labeled Corp No. NWP-2013-396 enclosure.
Additional Information: Additional information may be obtained from Danielle H. Erb, Project Manager, U.S. Army Corps of Engineers at 503-808-4368 or email: Danielle.H.Erb@usace.army.mil
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not required for the described activity.
Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
-Our preliminary determination is that the project site does not support EFH and that there will therefore be no effect.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
'- U I
U At ;
- . . . ..__
I 1
Stoughton
Besch
t
...
~.
tic
. ,.,
4/24/12
4947
Location and general topography for the Colwood Industrial Park site in Portland,
Oregon (USGS Mt. Tabor, OR-WA quadrangle, 1990).
NWP-2013-396
ervices, Inc.
----------------------------...1
Enclosure 1
I
r
I
I'
r
_...JI_ _ ... __
I
High Water
line
(Typical)
-,
LEGEND
,:
----'1_ \
Delineated Wetlands
\.
§
Waters of the State I US
-
····
Study Area Boundary
----
Tax Lot Lines
-----
Existing Storm Pipe
(--
0
260
Direction of Flow
600
1000
SCALE IN FEET
Existing Conditions
Colwood Industrial Park Site - Portland, Oregon
IFI:rj
Pacific Habitat Services, Inc.
ti!O!W-Cii12-6-13
s.MtiOW-, ~11010
fa0t5S
NWP-2013-396
Enclosure 1
LEGEND
Delineated Wetland
Riparian Restoration I
Enhancement Area
Wetland Mitigation Area
Wetland Buffer Planting Area
line
0
200
400
800
SCALE IN FEET
Overall Development Plan and Mitigation Area
Colwood Industrial Park Site- Portland, Oregon
Pacific Habitat Services,Inc.
..I· IIOW.-~trOrO
l'hot1o. ll011570....,
'"'(11031170.0165
NWP-2013-396
V:\AUTOCA0\~900\~~7
Colwood Mltlgorlon Pl·nnlng\PIOI Owg.VPA figuro~aiiDoYPIItlllndMitig.llloft dW!J, l2/~0lll&l3.07 AM
12·6· 13
Enclosure 1
LEGEND
~
~
Wetland I Waters Impact
{84,513 sf /1 .94 ac)
Limit of Wor1<
Tax Lot Line
Existing Contours
-
u-
Proposed Contours
..
Pre-grading Surface Flow
¢
Post-grading Surface Flow
NOTE
For Cross Section A-A'
See Figure 6
0
150
300
SCA.LE IN FEET
WETLANDE
(2,944 sf I 0.07 ac)
Base Map Provided by VLMK Inc.
Development Plan, Wetland Impacts, Grading and Section Location
Co1wood Industrial Park Site - Portland, Oregon
Pacific Habitat Services,lnc.
I-
(....ISI<>NWP-2013-396
h>(SO\li .51I>OOSO
12-6-13
Enclosure 1
. Building 1
41~SQFT. ; _
·
~
r
, Approximate Location
of Connection to
36" Onsite Outfall
Building 2
LEGEND
409. IDS SQFT
Delineated Wetland
Property Boundary
-------
Proposed Storm Pipe
Proposed Storm Inlet
Overflow Structure
for Water Quality
SwaleA
Site Plan Provided by VLMK Inc.
SU!vey and LIDAR contours
Provided by CARDNO
Pacific Habitat Services,lnc.
tlt.OS'NDmtwceOidl.&.lt180 . . . . . .~ t1Dle
...._,(503)5]IO...(J!O)
F·(503t~
NWP-2013-396
800
0
SCALR IN FEET
Stormwater Plan
Colwood Industrial Park Site- Portland, Oregon
12-6-13
Enclosure 1