STR£IJIBANK 11/EATJIENT
TYPICAL BENCHING (OUTSIDE FLOOD WAY)
NJS
4231
4/22/13
p
Cross-sections of proposed streambank benching at the Wain
Creek and Battle Creek enhancement project in Salem, Oregon.
Provided by OTAK, In c ., 2011 .
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 5C bench, 5/6/2013 11:13:19 AM
1' THICK
RIPRAP
PROPOSED GRADE
Pacific Habitat Services, Inc.
EXISTING GRADE
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 6 bridge, 5/6/2013 11:14:12 AM
355
360
365
370
375
380
385
390
395
400
405
410
415
420
6" THICK
GRAVEL
WALN CREEK
OHW
(383.5')
p
WALN CREEK
B
B
RIP RAP
UNDER
BRIDGE
STUDY AREA BOUNDARY, TYP.
PROPOSED
BRIDGE
COLLECTOR ROAD
TYPICAL
ROOT
WAD
385
B
B
A
>
>
>
FILL
A
>
B
A
B
BACKWATER
REFUGIA
A
385
38
5
A
B
B
380
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 7 streambanks waln, 5/6/2013 11:14:56 AM
BANK TYPE A
BANK TYPE A ROOT WAD SECTION
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 7A streambank A, 5/6/2013 11:15:44 AM
BANK TYPE B
BANK TYPE B - ROOT WAD SECTION
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 7B streambank B, 5/6/2013 11:16:37 AM
't
I
STREAMBANK TYPE VARIES
(SEE FIGUF?ES 7A & 78)
CHANNEL
BOTTOM
WIDTH 8'
FLOO DPLM~
STREAMBANK TYPE VAHIES
(SEE SHEETS 7A & 78
BE ~~ CH
,....,
'
PROPOSED
GRADE
HEIGHT VARIES
STREAM BED GRAVEL/ 0.5' Ml~~. THIC K~~ESS
IF~UEI
Typical cross-section of streambed for Wain Creek at the Wain Creek and Battle Creek
enhancement project in Salem, Oregon. Provided by OTAK, Inc., 2011.
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 7c typical streambed, 5/6/2013 11:17:28 AM
4231
4/22/1 3
p
PROPOSED
BRIDGE
AL
ST
STUDY AREA BOUNDARY
SE
>
ERCI
>
MM
>
CO
STUDY AREA BOUNDARY
COLLECTOR ROAD
>
BERM
NOTES;
PLANT TREES AND SHRUBS IN
ALL DISTURBED AREAS ABOVE
CREEK TOP OF BANK
DISTRIBUTE TREE SPECIES
EVENLY THROUGHOUT BUFFER
IN THE RANDOM TRIANGULAR
SPACING PATTERN SHOWN ON
FIGURE 8A
OVERVIEW OF SITE SHOWING
BERM PLANTING AREAS
BACKWATER
REFUGIA
REALIGNED
WALN CREEK
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 8 PLANTING, 5/6/2013 11:18:28 AM
TREES
OUANnTY
· 1,511
1,209
.J02
.J02
·
605
*1,209
907
COMMON NAI.IE
I
Size and Description
Spacing
OREGON ASH
Fraxlnus /at/folia
Bare root
7.2' o.c.
WH/1E
Alnus rhombifo/ia
Bare root
7.2' o.c.
Bore root
7.2' o.c.
Bare root
7.2' o.c.
Bare root
7.2' o.c.
Bare root
7.2' o.c.
Bare root
7.2' o.c.
Size and description
Spacing
Bore root
4-.7' o.c.
I
ALDER I
Botanical name:
I Crataegus douglas//
WESTERN CRABAPPLE I 1./alus fusca
WESTERN RED CEDAR I Thujo plicoto
BLACK COTTONWOOD I Populus trichocarpa
BIG LEAF 1./APLE I Acer macrophjlum
DOUGLAS HA wrHORNE
· Plant Closer to stream
SHRUBS
QTY ABBREV. COI./I./ON NAI.IE
I
Botanical nome:
557 CORSEA RED-OSIER DOGWOOD
I
557 LON/NV
T'MNBfRY
.J71 SP/DOU
DOUGLAS SPIREA
I
Comus sericea
Lonicero in vo/ucrata
I
I
ELDERBERRY I
Spiraea douglasii
Bore root
4-.7' o.c.
Bore root
4-.t
o.c .
557 PHYCAP PAC/RC NINEBARK
Physocarpus capitatus
Bore root
4-.7' o.c.
.J71 SAI.ICER BLUE
Sambucus cerulea
Bore root
4-.7' o.c.
334 ROSNUT NOOTKA ROSE I Rasa nutkana
Bore root
4-.7' o.c.
334 ROSPIS SWAMP ROSE I Rosa pisocarpa
Bore root
4-.7' o.c.
Bore root
4-.7' o.c.
6.J1 SYMALB SNO'frfJERRY I Syrnphorlcarpos a/bus
\.___ OFFSET PLANTS TO
AVOID STRAIGHT ROWS
SEED MIX
SYMBOL
IF~;EI
..
.
QUANnTY COMMON NAI.IE
I
Botanical name:
5.69 Acres SPfl(f BiNmRASS I Agrostis llKtlfllfa
'"'6H
""t"'!J SF
2T,,
7Uf7fD HAIRGRASSf I ~sdrompsia cespitosa
S1.£NDfFI HAIRGRASS I Deschampsio elongota.
VESTfRN FESCUE I FMfuco occidenta/is
TA/.1 li.IJINAGRASS I G/yceria e/afa
lr/EAOOW BARLEY I Horrleum bradlyanfherum
S7Rfl.tBANK LUPINE I Luplnus rilfJiarls
LBS
I
ACRE
2.18/IJs I
2.18/IJs I
2.18/IJs I
8.71/IJs I
2.18/IJs I
4156 ltJs I
1J.0711Js I
acre
acre
acre
acre
acre
acre
acre
Plant list and planting grid at the Wain Creek and Battle Creek enhancement project in
Salem, Oregon.
Provided by OTAK, Inc., 2011. See Figure 7 for riparian and disturbance
planting limits and Figure 78 for shrub species distribution and notes.
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, FIG 8a PLANTING LIST TREE SHRUB, 5/6/2013 11:19:14 AM
423 1
4/ 22/1 3
p
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, FIG 8b PLANTING NOTES AND SHRUB DIST, 5/6/2013 11:19:53 AM
Pacific Habitat Services, Inc.
SHRUB SPECIES DISTRIBUTION
p
PROPOSED BERM
AR
EA
BOUN
DARY
A
A
A
A
STUDY AREA BOUNDARY
ST
UD
Y
38
5
CULVERT REMOVAL ON WEST
END OF BATTLE CREEK
CULVERT REMOVAL ON EAST
END OF BATTLE CREEK
385
MM
CO
IAL
ERC
390
E
ST S
GRAVEL FILL
IN CREEK
(7,080 SF/
0.16 AC)
REMOVAL
(9,055 SF/
0.21 AC)
REMOVE
FOOTBRIDGE
395
395
385
RIPRAP FILL UNDER BRIDGE;
SEE FIGURE 7 FOR LOCATION
(226 SF/0.005 AC)
390
390
COLLECTOR ROAD
EXISTING
GRADE,
TYP.
385
STUDY AREA BOUNDARY
PROPOSED
BRIDGE
LOCATION OF
CULVERT
REMOVAL
395
395
390
REMOVE
FOOTBRIDGE
WETLAND A
PROPOSED BERM
390
WALN CREEK
(GRADING
IMPROVEMENTS
/BENCHING)
385
LIMIT OF
GRADING,
TYP.
385
>
>
385
>
>
38
0
PROPOSED
STORMWATER
OUTFALL (COIR
FABRIC, LWD, &
STREAM GRAVEL)
BACKWATER
REFUGIA
385
39
0
REALIGNED
WALN CREEK
L CREEK
POWEL
LIMIT OF
GRADING,
TYP.
385
38
5
LIMIT OF
GRADING,
TYP.
380
WETLAND D
SCO
TCH
CREE
K
REMOVE
CULVERT
LOCATION OF
CULVERT
REMOVAL
REMOVAL
(651 SF/
0.01 AC)
38
5
39
0
395
395
PROPOSED BERM
385
LIMIT OF
GRADING,
TYP.
395
390
390
WETLAND E
(CONTINUES
OFFSITE)
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 9 CULVERT REMOVAL, 5/6/2013 11:20:42 AM
395
urc:;:·,\
~~TCH-811CUIIl
390
I
EJIIIIIIIQCIIIIllllll~
-GIWE
c:AEBCCEmRL
~~\
J85
--JSO
--
j
//
6·1.111
'\
EXI ST. 35 '
\
--CREBC~;BnEIIUI
_J- _, -
\~
---
A. CULVi:R T
J75
WESTERN CULVERT REMOVAL PROFILE:
Horiz. Scale: 1"=40'
Vert. Scale: 1"=10'
J95
J90
J85
Jll()
J75
WESIEBt:l QI.!LliEBI
~SEQ ~BQEIL.E·
Horiz. Scale: 1"= 40'
Vert. Scale: 1"=10'
lMl
Cross-section and profile for western culvert removal area on Battle Creek at the Wain Creek and
Battle Creek enhancement project in Salem, Oregon. Provided by OTAK, Inc., 2011. See location of
cross-section and profile on Figure 8.
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 9a western CULVERT REMOVAL, 5/6/2013 11:21:43 AM
4231
4/22/ 13
p
390
IIATQI EXI8f.
{Ml ~EIIST.
385
L
::160
r-
GROIIII
EIIIITIIGGRDUNilAT
CRaKCEifTEJUIE
./"'"" r-
~1
_____/
J'TS
I~IIWIEAT
CI&IC CIIITERLA:
~
.....
~
~
n
\
1'\. _j_
~
\_E XIST. 36
I---DI A. CUL'.!:RT
370
EASJ'ERN CULVERT REt.10VAL PROFlLE:
Horiz. Sccle: 1·=40'
Vert. Scale: 1"=10'
3110
,.;-
385
-
375
370
LQ~B
CUL.'lEBI KSEt::
~BQEILE·
Horlz. Scale: 1"= 40'
Vert. Scale: 1"=10'
~
Cross-section and profile for eastern culvert removal area on Battle Creek at the Wain Creek and
Battle Creek enhancement project in Salem, Oregon. Provided by OTAK, Inc., 2011.
See location of
cross-section and profile on Figure 8.
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\CADFigures.dwg, fig 9b eastern CULVERT REMOVAL, 5/6/2013 11:22:35 AM
4231
4/ 22/1 3
p
PROPOSED BERM
STUDY AREA BOUNDARY
ST
UD
Y
AR
EA
BOUN
DARY
38
5
CULVERT REMOVAL ON WEST
END OF BATTLE CREEK
DETAIL A
CULVERT REMOVAL ON EAST
END OF BATTLE CREEK
DETAIL B
385
MM
CO
IAL
ERC
390
E
ST S
GRAVEL FILL
IN CREEK
(7,080 SF/
0.16 AC)
REMOVAL
(9,055 SF/
0.21 AC)
REMOVE
FOOTBRIDGE
395
395
385
RIPRAP FILL UNDER BRIDGE;
SEE FIGURE 7 FOR LOCATION
(226 SF/0.005 AC)
390
395
395
390
390
COLLECTOR ROAD
EXISTING
GRADE,
TYP.
SEE DETAIL A
THIS SHEET
385
STUDY AREA BOUNDARY
PROPOSED
BRIDGE
REMOVE
FOOTBRIDGE
WETLAND A
PROPOSED BERM
390
WALN CREEK
(GRADING
IMPROVEMENTS
/BENCHING)
385
LIMIT OF
GRADING,
TYP.
>
>
385
>
>
PROPOSED
STORMWATER
OUTFALL (COIR
FABRIC, LWD, &
STREAM GRAVEL)
385
38
0
BACKWATER
REFUGIA
385
39
0
REALIGNED
WALN CREEK
L CREEK
POWEL
LEGEND
LIMIT OF
GRADING,
TYP.
38
385
5
Waln Creek Reach 1
LIMIT OF
GRADING,
TYP.
380
Waln Creek Reach 2
WETLAND D
CREE
K
REMOVE
CULVERT
Battle Creek Reach 1
Battle Creek Reach 3
p
Pacific Habitat Services, Inc.
Y:\AUTOCAD\4200\4231\AutoCAD\Fig8CulvertRemoval.dwg, 8/14/2013 3:39:30 PM
LIMIT OF
GRADING,
TYP.
395
395
SEE DETAIL B
THIS SHEET
REMOVAL
(651 SF/
0.01 AC)
38
5
39
0
PROPOSED BERM
385
Battle Creek Reach 2
SCO
TCH
Waln Creek Reach 3
395
390
390
WETLAND E
(CONTINUES
OFFSITE)
Appendix B
Credit Calculation Worksheets
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
1
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
0.80
80.80
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
25
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
0.34
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
0.34
Changing straightened channel to an appropriate conformation
H
1.34
Adding habitat structures (including large wood):
I
0.15
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
0.34
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
Replacing undersized culvert with fish-passable culvert or bridge:
L
Installing fish ladders
M
0.34
101
0.80
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
0.76*(BB/N)
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
0
Q
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
0
R
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
105
S
11.50
105.00
0.33*(DD/N)
0.15
15.94
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
105
T
12.50
105.00
0.33*(EE/N)
0.17
17.33
0.76*(CC/N)
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
282.00
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
282.00
0.37
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Reach #:
Battle Creek
Mitigation Stream Name:
1
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
Z1
Low
Low to High
0.54
Medium
Medium to
High
0.27
Z2
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Z3
Z4
Right Bank Tree
Canopy/Tall
Shrub
Right Bank
Herbaceous/
Low Shrub
Left Bank Tree
Canopy/Tall
Shrub
Weight
Plant CommunityNet Improvement Factors
Left Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
Improvement
Action
Right Bank
Herbaceous/
Low Shrub
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Left Bank Tree
Canopy/Tall
Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z5
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
116
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
0.1
Tertiary Waters are streams that are documented as non-game-fishbearing.
Secondary
Primary
0.4
0.8
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
Total Riparian Credits (EE) = CC+DD
EE
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Battle Creek
Mitigation Stream Name:
Salem, Oregon
Location:
Aug 2013
1
Reach #:
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
101
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
105
105
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
Adding habitat structures
Low
Left Herb/Low
Shrubs
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Medium
Left Herb/Low
Shrubs
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
Total Riparian Credits (from Table C-2B):
EE
Total Credits: Y+EE
DD
282
282
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
1
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
25
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
0.34
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
0.34
Changing straightened channel to an appropriate conformation
H
1.34
Adding habitat structures (including large wood):
I
0.15
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
0.34
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
0.34
Replacing undersized culvert with fish-passable culvert or bridge:
L
0.80
Installing fish ladders
M
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
0
Q
0.76*(BB/N)
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
0
R
0.76*(CC/N)
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
0
S
0.33*(DD/N)
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
0
T
0.33*(EE/N)
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
Reach #:
Battle Creek
Mitigation Stream Name:
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
Medium to
High
Medium
0.162
0.30
0.27
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Right Bank Tree
Canopy/Tall
Shrub
0.54
Right Bank
Herbaceous/
Low Shrub
24952
Weight
Left Bank Tree
Canopy/Tall
Shrub
24952
Right Bank Tree
Canopy/Tall
Shrub
Right Bank Tree
Canopy/Tall
Shrub
Low to High
24952
Plant CommunityNet Improvement Factors
Left Bank
Herbaceous/
Low Shrub
Low
Z2
Improvement
Action
Left Bank Tree
Canopy/Tall
Shrub
499
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Z1
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Right Bank
Herbaceous/
Low Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z3
0.162
Z4
0.30
Z5
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
135
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
368.27
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as non-game-fishbearing.
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
Total Riparian Credits (EE) = CC+DD
EE
368.27
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Battle Creek
Mitigation Stream Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
Low
Left Herb/Low
Shrubs
Medium
Left Herb/Low
Shrubs
24952
Adding habitat structures
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
Total Riparian Credits (from Table C-2B):
EE
368
Total Credits: Y+EE
DD
368
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
0.80
96.80
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
25
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
0.34
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
0.34
Changing straightened channel to an appropriate conformation
H
1.34
Adding habitat structures (including large wood):
I
0.15
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
0.34
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
0.34
121
0.80
Replacing undersized culvert with fish-passable culvert or bridge:
L
Installing fish ladders
M
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
0.76*(BB/N)
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
0
Q
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
0
R
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
0
S
5
121
0.33*(DD/N)
0.07
0.00
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
0
T
5
121
0.33*(EE/N)
0.07
0.00
0.76*(CC/N)
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
162.14
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
162.14
0.80
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
Reach #:
Battle Creek
Mitigation Stream Name:
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
Z1
Low
Low to High
0.54
Medium
Medium to
High
0.27
Z2
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Z3
Z4
Right Bank Tree
Canopy/Tall
Shrub
Right Bank
Herbaceous/
Low Shrub
Left Bank Tree
Canopy/Tall
Shrub
Weight
Plant CommunityNet Improvement Factors
Left Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
Improvement
Action
Right Bank
Herbaceous/
Low Shrub
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Left Bank Tree
Canopy/Tall
Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z5
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
121
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as non-game-fishbearing.
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
Total Riparian Credits (EE) = CC+DD
EE
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Battle Creek
Mitigation Stream Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
121
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
121
121
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
Adding habitat structures
Low
Left Herb/Low
Shrubs
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Medium
Left Herb/Low
Shrubs
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
Total Riparian Credits (from Table C-2B):
EE
Total Credits: Y+EE
DD
162
162
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Battle Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
1
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
30
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
0.34
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
Changing straightened channel to an appropriate conformation
H
805
1.34
1.34
1078.70
Adding habitat structures (including large wood):
I
124
0.15
0.15
18.60
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
0.34
Replacing undersized culvert with fish-passable culvert or bridge:
L
0.80
Installing fish ladders
M
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
0.34
0.34
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
805
Q
56
805
0.76*(BB/N)
1.42
1142.03
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
805
R
145
805
0.76*(CC/N)
3.67
2957.03
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
0
S
0.33*(DD/N)
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
0
T
0.33*(EE/N)
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
6567.42
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
6567.42
2.05
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
1
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
Reach #:
Waln Creek
Mitigation Stream Name:
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
40250
40250
40250
40250
0.54
Medium to
High
Medium
0.162
0.30
0.16
0.25
0.27
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Right Bank Tree
Canopy/Tall
Shrub
Low to High
Right Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
40250
Weight
Plant CommunityNet Improvement Factors
Left Bank Tree
Canopy/Tall
Shrub
40250
Right Bank Tree
Canopy/Tall
Shrub
Low
805
Right Bank
Herbaceous/
Low Shrub
Z2
Improvement
Action
Left Bank Tree
Canopy/Tall
Shrub
805
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Z1
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Left Bank
Herbaceous/
Low Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z3
0.162
Z4
0.30
Z5
0.16
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
166
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
594.09
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as non-game-fishbearing.
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
556.61
Total Riparian Credits (EE) = CC+DD
EE
1150.70
0.25
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Waln Creek
Mitigation Stream Name:
1
Reach #:
Salem, Oregon
Location:
Aug 2013
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
805
Low
Left Herb/Low
Shrubs
Medium
Left Herb/Low
Shrubs
40250
805
Adding habitat structures
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
40250
124
Right Tree/Tall
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
6567
Total Riparian Credits (from Table C-2B):
EE
1151
Total Credits: Y+EE
DD
7718
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
1
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
30
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
0.34
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
0.34
Changing straightened channel to an appropriate conformation
H
1.34
Adding habitat structures (including large wood):
I
0.15
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
0.34
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
0.34
Replacing undersized culvert with fish-passable culvert or bridge:
L
0.80
Installing fish ladders
M
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
345
Q
65
345
0.76*(BB/N)
1.65
568.10
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
345
R
43
345
0.76*(CC/N)
1.09
375.82
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
345
S
10
345
0.33*(DD/N)
0.11
37.95
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
345
T
10
345
0.33*(EE/N)
0.11
37.95
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
1765.02
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
1765.02
0.74
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
Reach #:
Waln Creek
Mitigation Stream Name:
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
17250
17250
14835
14835
0.54
Medium to
High
Medium
0.162
0.30
0.14
0.14
0.27
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Right Bank Tree
Canopy/Tall
Shrub
Low to High
Right Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
14835
Weight
Plant CommunityNet Improvement Factors
Left Bank Tree
Canopy/Tall
Shrub
17250
Right Bank Tree
Canopy/Tall
Shrub
Low
345
Right Bank
Herbaceous/
Low Shrub
Z2
Improvement
Action
Left Bank Tree
Canopy/Tall
Shrub
345
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Z1
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Left Bank
Herbaceous/
Low Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z3
0.162
Z4
0.30
Z5
0.14
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
0
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as non-game-fishbearing.
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
254.61
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
191.35
Total Riparian Credits (EE) = CC+DD
EE
445.96
0.14
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Waln Creek
Mitigation Stream Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
345
345
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
345
Low
Left Herb/Low
Shrubs
Medium
Left Herb/Low
Shrubs
17250
Adding habitat structures
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
14835
Right Tree/Tall
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
1765
Total Riparian Credits (from Table C-2B):
EE
446
Total Credits: Y+EE
DD
2211
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
2
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
CITY OF SALEM STREAM MITIGATION PROCESS - Page 1
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
The Salem, Oregon Stream Mitigation Process is a rapid assessment methodology that quantifies impacts to streams and riparian areas and determines an appropriate level
of mitigation. The process requires knowledge of stream and riparian conditions to complete four tables (2 for debit calculations and 2 for credit calculations). This
worksheet is protected - no password is required to unprotect.
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
This section calculates the amount of credit achieved as a result of proposed instream mitigation activities.
Table C -1A: Instream Credits
Factors
Stream Type
(A)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
A
0.7
B
0.4
Improvement
Value
Net Improvement
Factor
Ephemeral streams flow only in direct response to
Intermittent streams contain water for only part of the
precipitation. Water typically flows only during and
year, typically during the winter and spring when the Perennial streams contain water continuously during a year of normal
shortly after large precipitation events. Ephemeral
stream bed may be below the water table and/or
rainfall, often with the stream bed located below the water table for
streams may or may not have a well-defined channel,
when snowmelt from surrounding uplands provides
most of the year. Groundwater supplies the baseflow for perennial
the stream bed is always above the water table, and
sustained flow. The channels may or may not be wellstreams, but flow is also supplemented by stormwater runoff and
stormwater runoff is the primary source of water.
defined. The flows may vary greatly with stormwater snowmelt. Perennial stream exhibit the typical biological, hydrological,
Ephemeral streams typically lack the biological,
runoff. Intermittent streams may lack the biological and physical characteristics commonly associated with the continuous
hydrological, and physical characteristics commonly
and hydrological characteristics commonly associated
conveyance of water.
associated with the continuous or intermittent
with the continuous conveyance of water.
conveyance of water.
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as
non-game-fish-bearing.
Secondary Waters are game-fish-bearing streams
that do not meet the criteria for Primary Waters.
Primary Waters are streams designated as Essential Salmonid
Habitat; Critical Habitat; state or federal wild and scenic rivers;
streams supporting state-listed or federally listed threatened,
endangered or special concern species; and streams within federal or
state protected areas.
Stream Status
(B)
Table C-1B - Instream Net Improvement Factors
Improvement
width
Bankfull Width
C
Linear Feet of
Specific
Improvement
Improvement
Weight
29
Instream Net Improvement Factors - Above Bankfull Elevation
Laying back bank above bankfull elevation (Right Side):
[Improvement weight = 0.21*(O/N)]
0
D
0.21*(V/U)
Laying back bank above bankfull elevation (Left Side):
[Improvement weight =0.21*(P/N)]
0
E
0.21*(W/U)
Instream Net Improvement Factors - At or Below Bankfull Elevation
0.34
Bioengineering below bankfull elevation (Left Side) where not part of any other improvement:
F
Bioengineering below bankfull elevation (Right Side) where not part of any other improvement:
G
0.34
Changing straightened channel to an appropriate conformation
H
1.34
Adding habitat structures (including large wood):
I
0.15
Removal of bank armoring below bankfull elevation (Right Side) (must be stabilized with bioengineering)
J
0.34
Removal of bank armoring below bankfull elevation (Left Side) (must be stabilized with bioengineering)
K
0.34
Replacing undersized culvert with fish-passable culvert or bridge:
L
0.80
Installing fish ladders
M
0.80
Removing man-made structures that impound streams:
N
1.34
Removing man-made debris below the ordinary high water (If "yes", enter "Y", if "no" leave blank):
O
0.01
Increasing culvert size or adding culverts to increase floodplain connectivity (If "yes", enter "Y", if "no" leave
blank):
P
0.05
Bench creation at bankfull elevation (Left Side):
[Improvement weight =0.76*(BB/N)]
440
Q
48
440
0.76*(BB/N)
1.26
553.49
Bench creation at bankfull elevation (Right Side):
[Improvement weight =0.76*(CC/N)]
440
R
48
440
0.76*(CC/N)
1.26
553.49
Laying back bank below bankfull elevation (Left Side):
[Improvement weight =0.33*(DD/N)]
440
S
10
440
0.33*(DD/N)
0.11
50.07
Laying back bank below bankfull elevation (Right Side):
[Improvement weight =0.33*(EE/N)]
440
T
10
440
0.33*(EE/N)
0.11
50.07
Average above bankfull elevation: Net Improvement=Sum of above bankfull Net Improvement Factors/Sum of above bankfull linear feet of specific improvements
U
Average below bankfull elevation: Net Improvement=Sum of below bankfull Net Improvement Factors/Sum of below bankfull linear feet of specific improvements
V
Above Bankfull Elevation Credits=Average above bankfull Net Improvement*Sum of above bankfull linear feet of specific improvements
W
Below Bankfull Elevation Credits=Average below bankfull Net Improvement*Sum of below bankfull linear feet of specific improvements
X
2157.52
Total Instream Credits = Above bankfull elevation credits + Below bankfull elevation credits
Y
2157.52
0.69
Mitigation Site Assessment
Mitigation plans must be accompanied by data that supports the mitigation design. Table C-4A lists types of data necessary to support each potential instream
improvement
CITY OF SALEM STREAM MITIGATION PROCESS - Page 2
MITIGATION SITE - CREDIT CALCULATION WORKSHEET
Date:
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Evaluator(s):
Salem, Oregon
Location:
Aug 2013
Reach #:
Waln Creek
Mitigation Stream Name:
CET
This section determines how much credit is gained from enhancing a riparian area in low or medium value condition. There is no limit to the length of the
enhancement area, but credit given only within 50 feet of the stream (as measured perpendicular from the ordinary high water).
Table C-2A: Riparian Vegetation Net Improvement Factors within 50 feet of Edge of Stream
1. Provide the length of the riparian area that will be enhanced along each bank.
2. Estimate the area (in square feet) of each existing plant community type (i.e. low or medium) to be enhanced.
21120
21120
21120
21120
0.54
Medium to
High
Medium
0.156
0.30
0.16
0.23
0.27
Riparian Mitigation Net Improvement Factors (Z3, Z4, Z5, Z6)=sum o
Plant Community Net Improvement Factors
High
Right Bank Tree
Canopy/Tall
Shrub
Low to High
Right Bank
Herbaceous/
Low Shrub
Right Bank Tree
Canopy/Tall
Shrub
21120
Weight
Plant CommunityNet Improvement Factors
Left Bank Tree
Canopy/Tall
Shrub
21120
Right Bank Tree
Canopy/Tall
Shrub
Low
440
Right Bank
Herbaceous/
Low Shrub
Z2
Improvement
Action
Left Bank Tree
Canopy/Tall
Shrub
440
3. Area (in square feet) of each type of
enhancement
Left Bank
Herbaceous/
Low Shrub
Z1
Right
Right Bank
Herbaceous/
Low Shrub
Left
Left Bank Tree
Canopy/Tall
Shrub
Functional
Value
Left Bank
Herbaceous/
Low Shrub
2. Area (in square feet) of each type
of existing plant stratum
Left Bank
Herbaceous/
Low Shrub
1. Length of riparian area to be
enhanced (not more than a 50 feet
wide)
Z3
0.156
Z4
0.30
Z5
0.16
Z6
Average Stream Flow Direction across mitigation site in degrees east of north*
168
*Measured every 100 feet along riparian enhancement Area
Riparian Mitigation
Area Scores
Table C-2B: Additional Riparian Mitigation Factors
Stream
Type
(LL)
Ephemeral
Intermittent
Perennial
0.2
0.5
0.7
AA
0.70
BB
0.40
Perennial streams contain water continuously
during a year of normal rainfall, often with the
Ephemeral streams flow only in direct response to precipitation. Water
Intermittent streams contain water for only part of the year, typically during the winter stream bed located below the water table for
typically flows only during and shortly after large precipitation events.
and spring when the stream bed may be below the water table and/or when snowmelt most of the year. Groundwater supplies the
Ephemeral streams may or may not have a well-defined channel, the
from surrounding uplands provides sustained flow. The channels may or may not be baseflow for perennial streams, but flow is
stream bed is always above the water table, and stormwater runoff is
well-defined. The flows may vary greatly with stormwater runoff. Intermittent streams also supplemented by stormwater runoff and
the primary source of water. Ephemeral streams typically lack the the
may lack the biological and hydrological characteristics commonly associated with the snowmelt. Perennial stream exhibit the typical
biological, hydrological, and physical characteristics commonly
continuous conveyance of water.
biological, hydrological, and physical
associated with the continuous or intermittent conveyance of water.
characteristics commonly associated with the
continuous conveyance of water.
Stream
Status
(MM)
Tertiary
Secondary
Primary
0.1
0.4
0.8
Tertiary Waters are streams that are documented as non-game-fishbearing.
Primary Waters are streams designated as
Essential Salmonid Habitat; Critical Habitat;
state or federal wild and scenic rivers; streams
Secondary Waters are game-fish-bearing streams that do not meet the criteria for
supporting state-listed or federally listed
Primary Waters.
threatened, endangered or special concern
species; and streams within federal or state
protected areas.
Left Riparian Credit (CC) =Z1*(Z3+Z4+(0.2*AA)+(0.34*BB))
CC
321.87
Right Riparian Credit (OO) =Z2*(Z5+Z6+(0.2*AA)+(0.34*BB))
DD
291.49
Total Riparian Credits (EE) = CC+DD
EE
613.36
0.23
CITY OF SALEM STREAM MITIGATION PROCESS - Page 3
CREDIT CALCULATION PROJECT SUMMARY AND SCORES
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
Date:
Waln Creek
Mitigation Stream Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
CET
Evaluator(s):
Table C-3A: Project Summary
INSTREAM NET IMPROVEMENT FACTORS - ABOVE BANKFULL STAGE
Laying back bank:
Right
Side
Left
Side
Bioengineering:
Left
Side
Right
Side
Changing straightened channel to
an appropriate conformation:
Removal of bank armoring:
Right
Side
Left
Side
Replacing undersized culvert with
Removing dams or adding
fish-passable culver or bridge:
fish ladders
Increasing culvert size or adding culverts to increase floodplain
connectivity:
Left
Right
Laying back bank:
440
440
Side
Side
INSTREAM NET IMPROVEMENT FACTORS - AT OR BELOW BANKFULL STAGE
Removing man-made debris below ordinary high water:
Bench Creation:
Left
Side
Riparian area to be enhanced:
Right
Side
440
Low
Left Herb/Low
Shrubs
Medium
Left Herb/Low
Shrubs
21120
Adding habitat structures
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
Left Tree/Tall
Shrub
Right Herb/Low
Shrub
21120
Right Tree/Tall
Shrub
Right Tree/Tall
Shrub
Total Instream Credits (from Table C-1B):
Y
2158
Total Riparian Credits (from Table C-2B):
EE
613
Total Credits: Y+EE
DD
2771
CITY OF SALEM STREAM MITIGATION PROCESS - Page 4
Waln Creek Enhancement and Battle Creek Culvert Removal Project
Project Name:
3
Reach #:
Salem, Oregon
Location:
Aug 2013
Date:
Waln Creek
Mitigation Stream Name:
CET
Evaluator(s):
Table C-4: Mitigation Site Assessment (see chart below.)
Table 6 lists mitigation site evaluation criteria (1-18) that are to be assessed in the Mitigation Site Development Plan; they are not required for scoring
mitigation credits. Choose the appropriate criteria by matching the check marks in the Data Elements table with the Instream Improvements listed in Table 3B
that will be part of the mitigation. Note: No evaluation is required if "removing man-made debris below bankfull" is the project's only Instream Improvement.
Required for Mitigation Design
1.
Sinuosity (river length /valley length).
2.
Meander geometry including: belt width, radius of curvature (average and range), and amplitude.
3.
Representative cross-sections showing actual morphology for each habitat type (pools, glides, riffles, runs, step).
4.
Representative cross-sections that extend beyond the channel to the 100-year floodplain, including dikes and levees.
5.
Longitudinal profile of the channel bed including detailed slopes of specific habitat units such as pools, riffles, glides, runs, steps, and cascades.
6.
Discharge measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
7.
Roughness coefficients for low flow, channel forming flow (bankfull), top of bank, and floodplain flows.
8.
Velocity measurements and/or calculations for channel forming flow (bankfull) and other targeted discharges (typically at top of bank, and 5, 10, 25, 50, and 100-year events).
9.
Floodplain soil description and/or map.
10.
Bank material description (particle size distribution and information about stratification if present).
11.
Bed material particle size distribution (D50, D84, and D100) (Pebble counts, (Wolman 1954) and Bar sampling (Rosgen 2008).
12.
Sediment transport competence -- what caliber of particles can be transported at channel forming and higher flows (Andrews, 1984).
13.
Sediment transport capacity -- how much sediment can be moved at channel forming and higher flows
14.
Depth of maximum scour for channel forming flow, top of bank, 5, 10, 25, 50, and 100-year events.
15.
Depth to permanent groundwater.
16.
Fish habitat use and distribution, including resident and anadromous fish, in spawning and rearing areas and in migration corridors.
17.
Wildlife use and distribution including amphibians, reptiles and mammals.
18.
Invertebrate assemblages.
x
Data elements
Instream Improvement
1
2
3
4
5
6
laying back bank above bankfull
bioengineering below bankfull
changing straightened channel to
appropriate conformation
x
x
7
8
9
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
adding habitat structures
x
x
x
x
x
x
removal of bank armoring below bankfull
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
replacing under-sized culverts with fishpassable culverts
installing fish ladders
x
removing dams
11
12
13
14
15
bench creation at bankfull
x
laying back bank below bankfull
x
x
17
18
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
removing man-made debris below
bankfull
increasing culvert size or adding culverts
to increase floodplain connectivity
16
x
x
x
x
x
x
x
x
x
x
Appendix C
Adjacent Property Owners
083W14CD02100
LARRY L SCHNELL
PO BOX 51900
SPARKS NV 89435
083W14CD02200, 2201
MADRAS PROPERTIES INC
WALTER B WELLS,TRE
PO BOX 56
TURNER OR 97392
083W23A 01000, 01100, 083W23B 00100,
00101, 083W23BA00400
TERRY J KELLY
6448 DORAL DR SE
SALEM OR 97306
083W23A 00801
SPIRIT MASTER FUNDING II LLC
PO BOX 3125
SALEM OR 97302
083W23A 00802
DAV II INVESTMENT GROUP
PO BOX 3308
SALEM OR 97302
083W23A 01200, 01300, 01400, 01600
JONES LT
LESLIE J BRAME
2027 RIVERKNOLL CT
WEST LINN OR 97068
083W23A 01800
BATTLECREEK INVESTMENTS
OF OREGON
PO BOX 1159
WILSONVILLE OR 97070
083W23A 90000
US HOUSING & DEVELOPMENT CORP
1469 CAPITOL ST NE
SALEM OR 97303
083W23A 90001
NANCY R RAY
6371 FAIRWAY AV SE
SALEM OR 97306
083W23A 90002
ALAN J BEYER
6369 FAIRWAY AV SE
SALEM OR 97306
083W23A 90003
DAVID W WEINER
6367 FAIRWAY AV SE
SALEM OR 97306
083W23A 90004
BRENDA BROOKS POST
6487 VILLAGE PKWY
ANCHORAGE AK 99504
083W23A 90005
ANNA M GREVEN
6383 FAIRWAY AV SE
SALEM OR 97306
083W23A 90006
VIRGIL E ANDERSON
6361 FAIRWAY AV SE NO 6
SALEM OR 97306
083W23A 90007
TERRI L CHAPMAN
6359 FAIRWAY AV SE
SALEM OR 97306
083W23A 90008
LINDA BEMIS
6357 FAIRWAY AV SE
SALEM OR 97306
083W23A 90009
GAYLE L ALLEN-RUDDELL
6355 FAIRWAY AV SE
SALEM OR 97306
083W23A 90010
LISA E TAYLOR
6353 FAIRWAY AV SE
SALEM OR 97306
083W23A 90011
LAURIE J POST
6351 FAIRWAY AV SE
SALEM OR 97306
083W23A 90012
ASHLEY YOUNG
6349 FAIRWAY AV SE
SALEM OR 97306
083W23A 90013
ERIC MITCHELL ELROD LT
C/O DIANE GORDON
500 WEST HARBOR DR NO 512
SAN DIEGO CA 92101
083W23A 90014
JOHN J MISA
6345 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90015
CHRISTINE E PARTAIN
6343 FAIRWAY AV SE
SALEM OR 97306
083W23A 90016
SHARON K ELLIOTT
6341 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90017
LARRY H BOSELL
48 NORTH JOHN ST
BLOOMFIELD IN 47424
083W23A 90018
MICHAEL J TUEL
6337 FAIRWAY AV SE
SALEM OR 97306
083W23A 90019
DAVID B TULLIS
6335 FAIRWAY AV SE
SALEM OR 97306
083W23A 90020, 083W23CA 10800
JONG C YEE
1920 SPICETREE LN SE
SALEM OR 97306
083W23A 90021
SHAWN E BATY
6331 FAIRWAY AV SE
SALEM OR 97306
083W23A 90022
DAVID R WESTMARK
6329 FAIRWAY AV SE
SALEM OR 97306
083W23A 90023
ROGER S MINTEN
6327 FAIRWAY AV SE
SALEM OR 97306
083W23A 90024
WILLIAM R IMPEY
5511 SE SCENIC LN NO 203
VANCOUVER WA 98661
083W23A 90025
MATTHEW S CAUDILLO
6323 FAIRWAY AVE SE NO 25
SALEM OR 97302
083W23A 90026
FEDERAL NATIONAL
MORTGAGE ASSC
888 E WALNUT ST
PASADENA CA 91101
083W23A 90027
JAMES G LOVE
6319 FAIRWAY AV SE
SALEM OR 97306
083W23A 90028
MICHELLE C LETOUMEAU
6317 FAIRWAY AV SE
SALEM OR 97306
083W23A 90029
LINDA L OSKO
6315 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90030
WILLIAM R IMPEY
57395 COLONIAL
LA QUINTA CA 92253
083W23A 90031
PATRICIA C PEARSON REV TR
6311 FAIRWAY AV SE
SALEM OR 97306
083W23A 90032
ELLEN CORBELL
6309 FAIRWAY AV SE
SALEM OR 97306
083W23A 90033
BUCKNELL FAM TR
RICHARD G BUCKNELL
6307 FAIRWAY AV SE
SALEM OR 97306
083W23A 90034
LAURA J BERTELSON
6305 FAIRWAY AV SE
SALEM OR 97306
083W23A 90035
DORENE A KUTSCH
1078 KERRISDALE DR SE
ALBANY OR 97322
083W23A 90036
DALE L VAN LYDEGRAF LT
PO BOX 4369
SALEM OR 97302
083W23A 90037
CAROL A RUSSELL
6251 FAIRWAY AV NE
SALEM OR 97306
083W23A 90038
PATRICK J BRADLEY
1971 CHURCH ST NE
SALEM OR 97301
083W23A 90039
GRACETTA THOMPSON
6255 FAIRWAY AV SE
SALEM OR 97306
083W23A 90040
JENNIFER L OHTA
6257 FAIRWAY AV SE
SALEM OR 97306
083W23A 90041
CATHLEEN J BOWERSOX
6259 FAIRWAY AV SE
SALEM OR 97306
083W23A 90042
DAVID J JACKSON
6261 FAIRWAY AV SE
SALEM OR 97306
083W23A 90043
JAMES LEROY EVANS
18895 FROST RD
DALLAS OR 97338
083W23A 90044
SCOTT A LUDVIKSEN
6267 FAIRWAY AV SE
SALEM OR 97306
083W23A 90045
DAVID L MELSHA
3465 CONTINENTAL DR SE
TURNER OR 97392
083W23A 90046
RON HELMS
PO BOX 3456
SOLDOTNA AK 99669
083W23A 90047
LAURIE K BOYLE
6273 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90048
CHERYL L SIMPSON
PO BOX 13493
SALEM OR 97309
083W23A 90049
REBECCA J LEITHOLD
6277 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90050
FRANCES B BROWN TR
C/O MARY BROWN
1165 ACADEMY ST
MT ANGEL OR 97362
083W23A 90051
ETTA ARCHER GROSS
6281 FAIRWAY AV SE
SALEM OR 97306
083W23A 90052
CAROL R BAKER
6283 FAIRWAY AV SE
SALEM OR 97306
083W23A 90053
RAYMOND FISHER TR
083W23A 90054
KELLY B ALBRECHT
KEITH W NUTTER
21641 SE MAIN ST
GRESHAM OR 97030
083W23A 90055
ROBIN D MORTON
106 OLYMPIC AV SE
SALEM OR 97306
083W23A 90056
CHRISTINA L BASSO-LENZ
6291 FAIRWAY AV SE
SALEM OR 97306
083W23A 90057
JUSTIN BRETT HUTCHINSON
5678 SUGAR PLUM AV SE
SALEM OR 97306
083W23A 90058
S FRANK THOMPSON
6295 FAIRWAY AVE SE
SALEM OR 97306
083W23A 90059
CHARLOTTE L RYAN
6297 FAIRWAY AV SE
SALEM OR 97306
083W23A 90060
RONDA R COUCH-EBERZ
6299 FAIRWAY AV SE
SALEM OR 97306
083W23B 00300
SALEM-KEIZER SCHOOL DIST 24J
3630 STATE ST
SALEM OR 97301
083W23BA00500
VILLA FORTY LLC
PO BOX 2285
SALEM OR 97308
083W23BA00600, 00700, 00800, 00900,
1000, 01100
LOWELL A SMITH
4120 CROISAN CREEK RD S
SALEM OR 97302
083W23BA01300
DAVID A BOWMAN
7840 LIBERTY RD S
SALEM OR 97306
083W23BA01400
JAMES F SMITH
6754 RIPPLING BROOK DR SE
SALEM OR 97301
083W23BA03400
CRYSTAL L CORNEJO
1585 MADRAS ST SE
SALEM OR 97306
083W23BB03500, 03600,
WILLIAM H CHARNHOLM RT
BETTY J CHARNHOLM RT
1323 CHEMEKETA ST NE
SALEM OR 97301
083W23BB03700
RYAN WHITSON
6220 13TH AVE SE
SALEM OR 97306
083W23BB90001
GERRITT HOUDYSHELL
695 WINDING WAY SE
SALEM OR 97302
083W23BB90002
CHERYL L HOPKINS
1478 MADRAS ST SE
SALEM OR 97306
083W23BB90003
RONALD D ALLOWITZ
1480 MADRAS ST SE
SALEM OR 97306
083W23BB90004
MAUREEN SMITH
1482 MADRAS ST SE
SALEM OR 97306
083W23BB90005
DESMOND HARPSTER
1484 MADRAS ST SE
SALEM OR 97306
083W23BB90006
CAROLYNNE J PHILLIPS
1486 MADRAS ST SE
SALEM OR 97306
083W23BB90007
R DEAN MANWARING
1488 MADRAS ST SE
SALEM OR 97306
083W23BB90008
JOAN L FRYE TR
1490 MADRAS ST SE
SALEM OR 97306
083W23BB90009
NORMA J OSTRANDER
PO BOX 296
TURNER OR 97392
083W23BB90010
MARY E COULTER
1494 MADRAS SE
SALEM OR 97306
083W23BB90011
JOHN J SCHMITZ
1496 MADRAS SE
SALEM OR 97306
083W23BB90012
MARGOT L CROW
1498 MADRAS ST SE
SALEM OR 97306
083W23BB90013
MICHAEL J WAUGE
1500 MADRAS ST SE
SALEM OR 97306
083W23BB90014
BARBARA J LANGE
1502 MADRAS ST SE
SALEM OR 97306
083W23BB90015
KATHERINE L HANCOCK
1504 MADRAS ST SE
SALEM OR 97306
083W23BB90016
CONNIE R NESSL
1506 MADRAS ST SE
SALEM OR 97306
083W23BB90017
ALMA WAUGE
1508 MADRAS ST SE
SALEM OR 97306
083W23BB90018
NANCY A WEBER
1510 MADRAS ST SE
SALEM OR 97306
083W23BB90019
INEZ R HALVERSON
1512 MADRAS ST SE
SALEM OR 97306
083W23BB90020
S DAHLIA HAN
1514 MADRAS ST SE
SALEM OR 97306
083W23BB90021
THOMAS FAMILY TR
1516 MADRAS ST SE
SALEM OR 97306
083W23BB90022
GREGORY L GOYINS
4724 BRADFORD LP SE
SALEM OR 97302
083W23BB90023
NIOMA JEAN CUTLER
1520 MADRAS ST SE
SALEM OR 97306
083W23BB90024
HSBC MORTGAGE SERVICES INC
2929 WALDEN AV
DEPEW NY 14043
083W23BB90025
MICHAEL L MANNING
1754 CUMULUS CT NW
SALEM OR 97304
083W23BB90026
ELIZABETH L EKSTROM
1526 MADRAS ST SE
SALEM OR 97306
083W23BB90027
MARNI S WATTS
1528 MADRAS ST SE
SALEM OR 97306
083W23BB90028
SUSAN BERG
2427 CORAL AV NE APT D
SALEM OR 97305
083W23BB90029
JOHN R COCHENOUR
1532 MADRAS ST SE
SALEM OR 97306
083W23BB90030
SUNNY RONDA RAE
1534 MADRAS SE
SALEM OR 97306
083W23BB90031
MURPHY FAM TR
1536 MADRAS ST SE
SALEM OR 97306
083W23BB90032
PAUL D KRISSEL
1675 HIGH ST SE
SALEM OR 97302
083W23BB90033
FEDERAL HOME LOAN
C/O RECONTRUST COMPANY
400 COUNTRYWIDE WY SV 35
SIMI VALLEY CA 93065
083W23BB90034
SHIRLEY J HERRMANN, TRUSTEE
1560 MADRAS ST SE
SALEM OR 97306
083W23BB90035
KEVIN B WIENHOFF
1558 MADRAS ST SE
SALEM OR 97306
083W23BB90036
KENNETH M STEWART
1556 MADRAS ST SE
SALEM OR 97306
083W23BB90037
AMPARO SIMS TESTAMENTARY TR
1554 MADRAS ST SE
SALEM OR 97306
083W23BB90038
KATHRYN E KENEFICK
1552 MADRAS ST SE
SALEM OR 97306
083W23BB90039
G ELAINE SELBERG
1550 MADRAS ST SE
SALEM OR 97306
083W23BB90040
KENNETH B PITMAN
1548 MADRAS ST SE
SALEM OR 97306
083W23BB90041
DALY JRLT
ELISABETH, DALY TRE
1546 MADRAS ST SE
SALEM OR 97306
083W23BB90042
STEVEN W TUTTLE
1544 MADRAS ST SE
SALEM OR 97306
083W23BB90043
RICHARD L ODELL
5513 DEAN COURT SE
SALEM OR 97301
083W23BB90044
CYNTHIA FREEMAN
1540 MADRAS ST SE
SALEM OR 97306
083W23BC00500
DONALD R CAUSEY
PO BOX 12488
SALEM OR 97309
083W23BC00700
DIANA L LARONT
1475 PACWOOD CT SE
SALEM OR 97306
083W23BC00800
JOSEPH C DAVIDSON
1480 PACWOOD CT S
SALEM OR 97306
083W23BC01400
KAY PATRICIA RENTCHLER
6386 13TH AV SE
SALEM OR 97302
083W23BC01900
CITY OF SALEM
350 COMMERCIAL ST NE
SALEM OR 97301
083W23BC02000
EVA H SLINKER LT
6418 DORAL DR SE
SALEM OR 97306
083W23BC02100
RICHARD A & GLORIA J ROSENAU
6428 DORAL DR SE
SALEM OR 97306
083W23BC02200
MOLLY F WOOLARD
PO BOX 4132
SALEM OR 97302
083W23BC02300
MARY L RENTFRO
6448 DORAL DR SE
SALEM OR 97306
083W23BC02400
ETHEL V PATRICK TR
6458 DORAL DR SE
SALEM OR 97306
083W23BC02500
JAMES J BRIGGS
6468 DORAL DR SE
SALEM OR 97306
083W23BC02600
ROBERT & CLARISE WARREN,
TRUSTEE
6488 DORAL DRIVE SE
SALEM OR 97306
083W23CA00100
BATTLECREEK COMMONS
ASSOCIATION
6585 FAIRWAY AV SE
SALEM OR 97306
083W23CA00200
HOWARD E & CLETA L HEINKEL
1825 LEXINGTON CIRCLE SE
SALEM OR 97306
083W23CA00300
NANCY S GUTH
1827 LEXINGTON CR SE
SALEM OR 97306
083W23CA00400
MARY FORD
1829 LEXINGTON CR SE
SALEM OR 97306
083W23CA00500
THOMAS A TURNER
1831 LEXINGTON CR SE
SALEM OR 97306
083W23CA00600
ROBERT R & ROSALIND E HELBER
1833 LEXINGTON CIRCLE SE
SALEM OR 97306
083W23CA00700
LEA N SPENCER
1835 LEXINGTON CR SE
SALEM OR 97306
083W23CA00800
ALBERT JASSO
1795 FAIRMOUNT AV S
SALEM OR 97302
083W23CA00900
CORNELIUS C & MICKEY K PUCKETT
1839 LEXINGTON CIRCLE SE
SALEM OR 97306
083W23CA01000
DONALD H SMITH
1841 LEXINGTON CR SE
SALEM OR 97306
083W23CA01100
MARTHA A HOWELL
1843 LEXINGTON CR SE
SALEM OR 97306
083W23CA01200
DAVID D PALLETT, ET AL
11871 SE EOLA HILLS DR
AMITY OR 97101
083W23CA01300
BARBARA A TURNER
1847 LEXINGTON CR SE
SALEM OR 97306
083W23CA01400
KARIN E NILSSON
1849 LEXINGTON CIR SE
SALEM OR 97306
083W23CA01500
FRANCIS C & ANITA L FARNELL
1851 LEXINGTON CIRCLE SE
SALEM OR 97306
083W23CA01600
SHIRLEY A SOBIE
1853 LEXINGTON CR SE
SALEM OR 97306
083W23CA01700
YVONNE KELLEY
1855 LEXINGTON CR SE
SALEM OR 97306
083W23CA01800
KATHERINE ANDERSON
1857 LEXINGTON CR SE
SALEM OR 97306
083W23CA01900
JANICE E ROBERTS
1859 LEXINGTON CR SE
SALEM OR 97306
083W23CA02000
JOYCE A MURRAY
1861 LEXINGTON CR SE
SALEM OR 97306
083W23CA02100
ANNETTE HENRY
1863 LEXINGTON CIR SE
SALEM OR 97306
083W23CA02200
THOMAS C PAULUS
1865 LEXINGTON CIR SE
SALEM OR 97306
083W23CA02300
DIANE STOUT
1867 LEXINGTON CR SE
SALEM OR 97306
083W23CA02400
DONNA LOCKE
1869 LEXINGTON CR SE
SALEM OR 97306
083W23CA02500
PAUL MCCOUBREY
6635 CONTINENTAL CR SE
SALEM OR 97306
083W23CA02600
JAMES E EARHART
1873 LEXINGTON CR SE
SALEM OR 97306
083W23CA02700
EDWARD C HALL
1669 ANKENY HILL RD SE
JEFFERSON OR 97352
083W23CA02800
CUNNINGHAM LT
DONNA J CUNNINGHAM, TRE
1877 LEXINGTON CR SE
SALEM OR 97306
083W23CA02900
KEITH G EDDY
1879 LEXINGTON CR SE
SALEM OR 97306
083W23CA03000
ROBERT R JOHNSON
4050 12TH ST CUTOFF NO 132
SALEM OR 97302
083W23CA03100
RONALD W DEPUY
1883 LEXINGTON CR SE
SALEM OR 97306
083W23CA03200
ARTHUR A & MARY H BIRKBY
1885 LEXINGTON CR SE
SALEM OR 97306
083W23CA03300
GARY E UPHAM
PO BOX 245
RHODODENRON OR 97049
083W23CA03400
GLEN W KNICKERBOCKER
1889 LEXINGTON CR SE
SALEM OR 97306
083W23CA03500
ANDER RT
C/O HAGERMAN,GEORGETTE
3264 LIBERTY RD S
SALEM OR 97302
083W23CA03600
FL PATRICK RLT
1893 LEXINGTON CR SE
SALEM OR 97306
083W23CA03700
LAVERNA J SHEPHERD
1895 LEXINGTON CR SE
SALEM OR 97306
083W23CA03800
BATTLECREEK COMMONS
ASSOCIATION
1823 LEXINGTON CR SE
SALEM OR 97306
083W23CA03900
MAE CULVER
6587 FAIRWAY AV SE
SALEM OR 97306
083W23CA04000
JAMES J BURNETTE
6589 FAIRWAY AV SE
SALEM OR 97306
083W23CA04100
DOROTHY J OLSON RLT
6591 FAIRWAY AV SE
SALEM OR 97306
083W23CA04200
HOLLAND REVOCABLE LIVING
TRUST
6611 FAIRWAY AV SE
SALEM OR 97306
083W23CA04300
ARLENE D BENNETT
6615 FAIRWAY AV SE
SALEM OR 97306
083W23CA04400
LINDA H NORRIS
6700 CONTINENTAL CR SE
SALEM OR 97306
083W23CA04500
MARY S MACDONALD
6706 CONTINENTAL CR SE
SALEM OR 97306
083W23CA04600
WARREN W COOLEY BYPASS TR
ANNE S COOLEY, TRE
6710 CONTINENTAL CR SE
SALEM OR 97306
083W23CA04700
J W & MARY LOU BARTOSZ
6716 CONTINENTAL CR SE
SALEM OR 97306
083W23CA04800
MARY K SCHROEDER
6720 CONTINENTIAL CR SE
SALEM OR 97306
083W23CA04900
PHIL B FORD
6726 CONTINENTAL CR SE
SALEM OR 97306
083W23CA05000
SANDRA A SIEWERT
6756 CONTINENTAL CIR SE
SALEM OR 97306
083W23CA05100
RICHARD A & SHARRON M
SEIDEMAN
6750 CONTINENTAL CR SE
SALEM OR 97306
083W23CA05200
HILDEGARD REGINA SERRATT RLT
4616 GOLDENROD AV NE
SALEM OR 97305
083W23CA05300
BETTY-COE DEBROKERT
1931 YOLANDA AV
SPRINGFIELD OR 97477
083W23CA05400
WILLIAM PRITCHETT
6686 CONTINENTAL CR SE
SALEM OR 97306
083W23CA05500
GLADYS J HARTMAN RLT
6680 CONTINENTAL CR SE
SALEM OR 97302
083W23CA05600
JOSEPH LEO THIMM JR TR
6746 CONTINENTAL CR SE
SALEM OR 97306
083W23CA05700
MICHAEL A MCCAFFREY
6740 CONTINENTAL CIR SE
SALEM OR 97306
083W23CA05800
LEE A DAVIS
PO BOX 706
SALEM OR 97308
083W23CA05900
MARY E RUE TRUST
6730 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06000
JOSEPH C &EDITH W-TR
BENNINGHOFF
6676 CONTINENTAL CIR SE
SALEM OR 97306
083W23CA06100
PETER GARTLAN
6670 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06200
SANDRA R MELHORN
6666 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06300
WILLIAM ZIRBES
6660 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06400
RUTH A LONDBERG LT
6785 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06500
CATHY KOUGH
EVAN TYLOR YOUNG
6775 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06600
ANNE D JETER
6765 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06700
REX O DART
6755 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06800
LAVERNE G NELSON
6745 CONTINENTAL CR SE
SALEM OR 97306
083W23CA06900
ELEANOR THOMPSON FAM TR
JOHN S THOMPSON TR
6735 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07000
ROLAND & MARJORIE GORHAM
FAMILY TRUST
6725 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07100
MITTI D HINZ
6715 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07200
DAVID L WOOD
6705 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07300
ROBERT F MCNALLY, SR
6695 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07400
MARCIA F HERRING
6685 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07500
KATHRYN L STOPHER
5773 FLAIRSTONE DR SE
SALEM OR 97306
083W23CA07600
MICHAEL A CULBERTSON
6665 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07700
BOWERSOX FAM TR
JUNE A BOWERSOX, TRE
6655 CONTINENTAL CR SE
SALEM OR 97306
083W23CA07800
LLOYD S & JUDITH W SMITH, TRUST
6645 CONTINENTAL CIRCLE SE
SALEM OR 97306
083W23CA07900
PATRICIA L BOURSON
6635 CONTINENTAL CR SE
SALEM OR 97306
083W23CA08000
JEAN M RENNEBOHM TR
6625 CONTINENTAL CR S
SALEM OR 97306
083W23CA08100
AMARYLLIS LILLES POWELL
6615 CONTINENTAL CIR SE
SALEM OR 97306
083W23CA08200
NORMAN R MILLER
6620 CONTINENTAL CR SE
SALEM OR 97306
083W23CA08300
DENNIS D LEE
5014 S MOUNTAIN TERRACE WY
PORT ANGELES WA 98362
083W23CA08400
JO ANN RUNYON, TRUSTEE
6630 CONTINENTAL CR SE
SALEM OR 97306
083W23CA08500
JOHN W DAY RLT
6636 CONTINENTAL CR
SALEM OR 97306
083W23CA08600
RICHARD & ANGELYN BYLSMA,
TRUST
6640 CONTINENTAL CIRCLE SE
SALEM OR 97306
083W23CA08700
JUNE G MCCALLISTER, TRUST
6646 CONTINENTAL CIR SE
SALEM OR 97306
083W23CA08800
DORIS R REYNOLDS RLT
6650 CONTINENTAL CR SE
SALEM OR 97306
083W23CA08900
PAUL MCCOUBREY 2008 TR
6656 CONTINENTAL CR SE
SALEM OR 97306
083W23CA09100
RHODES S & JEAN L SKILLMAN,
TRUST
6520 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA09200
JILL READ
6524 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09300
ELIZABETH R COLLINS, TRUST
6530 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09400
SANDRA KAY HAYNES
7483 SW LAKESIDE LP
WILSONVILLE OR 97070
083W23CA09500
GREEN LT
KATHLEEN M GREEN, TRE
6540 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09600
CHARLOTTE R MARTIN, TRUSTEE
6544 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09700
PEG
6550 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09800
ARLYCE J BURKE TR
6554 HUNTINGTON CR SE
SALEM OR 97306
083W23CA09900
EDEN WEST LLC
6560 HUNTINGTON CR SE
SALEM OR 97306
083W23CA10000
STEVEN K STARKEY
6564 HUNTINGTON CR SE
SALEM OR 97306
083W23CA10100
HENRY E SHOUDY
1033 TWIN HILLS DR SE
JEFFERSON OR 97352
083W23CA10200
SALLY A HOLCOMB CREDIT SHELTER T
C/O GREG KUPILLAS
18487 S VALLEY VISTA RD
MULINO OR 97042
083W23CA10300
HOWARD R HANNAN
6580 HUNTINGTON CR SE
SALEM OR 97306
083W23CA10400
NANCY C CLARK
6584 HUNTINGTON CR SE
SALEM OR 97306
083W23CA10500
AGNES DIRKSEN
6590 HUNTINGTON CR SE
SALEM OR 97306
083W23CA10600
HELEN D WEST TR
6594 HUNTINGTON CR SE
SALEM OR 97306
083W23CB00900
JOHN C SHEPARD, JR
LYNANN L SHEPARD
6596 DORAL DRIVE SE
SALEM OR 97306
083W23CA10900
MELVIN J & B JEAN DOWNING
6599 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA11000
RAYMOND C NORVELL
6514 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11100
DONNA M POLIVKA
6510 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA11200
RUTH L JOHNSON RLT
6504 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11300
DONALD & BARBARA L EDWARDS
6500 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11400
PHYLLIS E NYGAARD
6674 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11500
DONALD LEE ANDERSON
6670 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11600
RICHARD & MARY T DALKE, TR/TRE
6664 HUNTINGTON CR
SALEM OR 97306
083W23CA11700
DARREL TOWERY
6660 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11800
SUSAN KRAGT
6654 HUNTINGTON CR SE
SALEM OR 97306
083W23CA11900
MARY LOU BECK
6650 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12000
EMMA L PFEIFFER TRUST
6644 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12100
PHILLIP R & VIRGINIA A COLGAN, TR
6640 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12200
WARREN J THOMPSON
6634 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12300
SHIRLEY J BITTNER
GARY V BITTNER
6630 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12400
JOHANNA B RUGGLES
6614 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA12500
DORIS M POWERS FAM TR
6610 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12600
MICHAEL P CAMPBELL
6604 HUNTINGTON CR SE
SALEM OR 97306
083W23CA12700
BAUER LT
CATHERINE E BAUER, TRE
74670 GAUCHO WAY
THOUSAND PALMS CA 92276
083W23CA12900
THOMAS H GREGSON
1805 B ST
HOOD RIVER OR 97031
083W23CA13000
DALTON LT
JEANNE R DALTON, TRE
6619 HUNTINGTON CR SE
SALEM OR 97306
083W23CA13100
PHYLLIS D TARTER, TRUSTEE
6625 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA13200
DONALD F & JANET L ELLIOTT
6629 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA13300
LOIS M TUTTLE
6675 HUNTINGTON CR SE
SALEM OR 97306
083W23CA13400
ROBERT F SASSEEN
6677 HUNTINGTON CR SE
SALEM OR 97306
083W23CA13500
JOHN KONOPASEK, JR
PO BOX 4194
SALEM OR 97302
083W23CA13600
CHARLES F WARREN
6681 HUNTINGTON CR SE
SALEM OR 97306
083W23CA13800
JULIE B GOSS TR
C/O JEFFREY CLARK
100 N BROADWAY MO2-100-07-18
ST LOUIS MO 63102
083W23CA13900
DANIEL P & F JUANITA HEIKEN
6684 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA14000
JAMES L & HOPE L TACCHINI LT
HOPE L TACCHINI, TRE
6690 HUNTINGTON CR SE
SALEM OR 97306
083W23CA14100
L DAVID SHERMAN
6694 HUNTINGTON CR SE
SALEM OR 97306
083W23CA14200
WILLIAM F MARQUARDT
6700 HUNTINGTON CR SE
SALEM OR 97306
083W23CA14300
WILLIAM H ROTH
6704 HUNTINGTON CR SE
SALEM OR 97306
083W23CA14400
RICK L SCOTT
3685 LACHS CT S
SALEM OR 97302
083W23CA14600
SHERRIE ANN KENER
6720 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA14700
BLANCHE E RATHE LE GURCHE RLT
6724 HUNTINGTON CR SE
SALEM OR 97306
083W23CA14800
ARTHUR J DURASKI
6734 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA14900
GIERING FAM TR
EVA M GIERING, TRE
PO BOX 261
LINCOLN CITY OR 97367
083W23CA15000
KIRBY FAM TR
6750 HUNTINGTON CR SE
SALEM OR 97306
083W23CA15100
ABNER O & MYRNA Y WALDRON
6754 HUNTINGTON CR SE
SALEM OR 97306
083W23CA15300
COSENTINO FAM TRUST OF 1994
JO ANN COSENTINO, TRE
774 SCENIC HEIGHTS DR SE
SALEM OR 97306
083W23CA15400
CINDY L CALLIGAN
6759 HUNTINGTON CR SE
SALEM OR 97306
083W23CA15500
BECKMAN FAM TR
JOAN E BECKMAN, TRE
6765 HUNTINGTON CR SE
SALEM OR 97306
083W23CA15600
V L BENDER
PO BOX 3551
SALEM OR 97302
083W23CA15700
GERALDINE M BOWER
6791 HUNTINGTON CR SE
SALEM OR 97306
083W23CA15800
SHELLEE A LOWERY
1623 LEEWOOD AV NE
KEIZER OR 97303
083W23CA15900
CHARLES E & MARCELLA G
REYNOLDS
6797 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA16000
JOANNA LYNN PEARL
6799 HUNTINGTON CIR SE
SALEM OR 97306
083W23CA16100
MARGARET DUNN HILL RLT
6770 HUNTINGTON CR SE
SALEM OR 97306
083W23CA16200
SHARON K BOLDT RLT
6774 HUNTINGTON CR SE
SALEM OR 97306
083W23CA16300
PHYLLIS G HANN RLT
6780 HUNTINGTON CR SE
SALEM OR 97306
083W23CA16400
BOBBI H KUREK
6784 HUNTINGTON CIRCLE SE
SALEM OR 97306
083W23CA16500
COLLEEN J MOHR
6790 HUNTINGTON CR SE
SALEM OR 97306
083W23CA16600
MARY M & CRAIG S SPILLMAN
6794 HUNTINGTON CIR SE
SALEM OR 97306
083W23CB00100
JON M & THERESA K PETERSON
6498 DORAL DR SE
SALEM OR 97306
083W23CB00200
WILLIAM C RAND
PO BOX 490
SILVERTON OR 97381
083W23CB00300
CITY OF SALEM
555 LIBERTY ST RM NO 230
SALEM OR 97301
083W23CB00400
JAMES SCOTT WOOLSEY
6546 DORAL DR SE
SALEM OR 97306
083W23CB00500
CARLOS N BROULLON RLT
522 BOULEVARD WY
PIEDMONT CA 94610
083W23CB00600
PATRICIA A DUNLAP
6566 DORAL DR SE
SALEM OR 97306
083W23CB00700
DONALD E BUCKENDORF
6576 DORAL DR SE
SALEM OR 97306
083W23CB00800
LYNN L BAXTER
6586 DORAL DR SE
SALEM OR 97306