Benny Dean Jr. is the Regulatory point-of-contact for this permit application from the Bonneville Power Administration for a corridor project which begins at the Bonneville Power Administration substation in Alvey, located south of Eugene, Ore., extends south to Reston, Ore., and west to Fairview, Ore.

PUBLIC NOTICE for Permit Application Issue Date: February 14, 2014 Expiration Date: March 15, 2014 US Army Corps of Engineers No: NWP-2013-240 30-Day Notice Oregon Department of State Lands No: 55017-RF Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil) Eugene Field Office 1600 Executive Pkwy., Ste. 210 Eugene, OR 97401-2156

Applicant: Bonneville Power Administration TEP-TPP-1 P.O. Box 61409 Vancouver, WA 98666-1409

Location: The project is a corridor project which begins at the Bonneville Power Administration substation in Alvey, located south of Eugene, Lane Co., extends south to Reston in Douglas Co., and west to Fairview, Coos Co., Ore. The site begins in Section 14, of Township 18 South, Range 3 West and continues through Section 24 of Township 27 South, Range 12 West.

Waterway: Through the project corridor there are over 680 identified wetlands and waterways.

Project Description: The project entails replacing aged wood pole structures and associated structural components on the existing 230-kV Alvey-Fairview transmission line and upgrading roads to facilitate construction and year-round access for maintenance. Project activities that may result in impacts to waters and wetlands include removal and replacement of wood pole transmission line structures, access road upgrades, including upgrading existing roads, developing new roads, maintenance or replacement of culverts, and installation of dip drains. Overall there will be a total of 5.61 acres of temporary impacts and 7.16 acres of permanent impacts combined in the Coast Fork Willamette River watershed, South Umpqua watershed, Umpqua watershed, and the Coquille River watershed.

Of the 709 transmission pole structures that would be replaced with this project, 87 are located within wetlands, including 18 three-pole structures and 69 two-pole structures. Permanent impacts to wetlands would consist of excavation of a 5-foot diameter hole at each pole location to a depth of 10 to 12 feet. A 4-foot diameter corrugated metal pipe footing (e.g., culvert) will be installed upright in the hole extending to the soil surface. The new pole will be placed within the vertical pipe and will be backfilled with gravel or crushed rock. The use of culverts surrounding the poles improves the stability of the pole in soft wetland soils and increases the longevity of the pole by due to backfill with aggregate (3/4-inch crushed rock).

Improving roads involves minor adjustments to existing roadways or driveways to correct light rutting, adjust cross slope for drainage, and apply additional surfacing material as needed to support construction and future maintenance. Road improvement would consist of light grading and application of 3 inch of 1 ½ inch minus gravel material and should result in an increase in road width of less than 2 feet. All Improve Road work would have less than a 20 percent increase in road width. About 34.7 miles of existing access roads or driveways would have road improvements associated with the project.

Reconstruction of roads involves rough grading to adjust existing roadway grades, increase roadway width, smooth out depressions, adjust the cross slope for drainage followed by application of base material and surfacing. For road reconstruction, grading may be done in the top 4 inches of the existing road surface and fill for road reconstruction would include addition of 5 inches of 1 1/2 inch minus gravel to the final graded surface. About 57.6 miles of existing access roads are proposed for reconstruction. Roadways for reconstruction may need to be widened by more than 2 feet, are partially covered with vegetation or debris, or require substantial work within the road prism to return the roadway to a usable condition. Subgrade stabilization, which would include slightly deeper excavation and fill of coarse rock, may be required if soft subgrade conditions exist or as determined by the contractor.

Road construction involves excavation of the existing ground surface and the import of rock to develop a solid subbase and road surface. The road bed would be constructed with excavation of approximately 0.5 to 1 foot of soil that would be considered removal of fill from wetlands where the alignment crosses wetlands. The road bed would be constructed with 5 inches of crushed 3 inch minus rock with a minimum of 3 inches of 1 1/2 inch minus gravel on the travel surface. Where soft soil conditions dictate the need for subgrade stabilization, 1 foot of native soil would be excavated from the road alignment, followed by the placement of 1 foot of quarry spalls wrapped in geotextile fabric, which is then overlain by 5 inches of compacted road surfacing material. About 6.5 miles of new permanent road would need to be constructed to allow complete access to the alignment for transmission structure replacement.

Temporary roadways built during construction to access the transmission facility in locations where permanent roadways will not be constructed. A temporary road may be necessary to address topography, soil conditions, seasonal site conditions, safety concerns, or other site conditions encountered during construction. These roads will be fully removed after project completion and the site will be restored after the road is no longer needed for construction. The temporary fill materials could include timbers, ground mats, or gravel over geotextile fabric. All fill would be removed after rebuild construction. Areas would be returned to pre-construction contours and seeded with a native seed mix or seed mix requested by the landowner. To minimize cost and site disturbance, temporary roads are installed to minimum machine access standards (as narrow as practicable). Approximately 1.28 miles of temporary access road are proposed along the 98-mile transmission line corridor.

A total of 84 culvert replacements are proposed which includes 14 upgrades to culverts designed for fish passage and 70 replacement culverts. Five new 18-inch diameter culverts would be installed. Seven bridges would be installed including three new bridges to replace the existing culverts. Four existing bridges in disrepair would be replaced within their existing footprints.

Temporary staging areas may be selected by the contractor for use during construction along or near the transmission line easement to stockpile structure materials and construction equipment.

Mitigation: The applicant has proposed purchasing credits from Coyote Prairie North Mitigation Bank, Cow Hollow Mitigation Bank, and/or Umpqua Interior Foothills in-lieu fee project as compensatory wetland mitigation for permanent impacts of the project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The project purpose is to maintain the existing utility lines and to maintain/upgrade access roads.

Drawings: Thirty (30) drawings are attached and labeled NWP-2013-240 enclosure.

Additional Information: Additional information may be obtained from Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers, at 541-465-6769 or email Benny.A.Dean@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been initiated by the Bonneville Power Administration. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: An initial evaluation of the proposed project area indicates the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The Bonneville Power Administration is completing a cultural Resources inventory and is coordinating the findings with the State Historic Preservation Office.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

NWP-2013-240

Page 1 of 30

ENCL

L:\Projects\75000\75200-75299\75207_BPAAlveyFairviewWetlands\GIS\Temp\MAPS\APRIL-FINAL DRAFT SET\BPA_Alvey_Fairview_FINAL_Vicinity.mxd

Source: Alvey-Fairview Transmission Line No 1, Transmission Line Towers- BPA; Oregon Counties - Oregon Geospatial Enterprise Office

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT VICINITY MAP ) "

Transmission Line Towers (line mile / structure number) Alvey-Fairview Transmission Line No. 1 Counties

Legend

0

6

[

FIGURE 1

Miles 12

PROJECT #

MAY 2013

DATE

75207.000

Page 2 of 30

" S

1

Reston

" S

" S

2

Green Valley

" S

[

3

INDEX PAGE

Legend

Martin Creek

2/1 " )

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Alvey

1/1

Fairview

" )

S "

Alvey

4

S "

" )

6 3/1

7

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

5 " )

S Index Page 1 "

9

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 1

0

8

4/1 " )

[

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

10 11 1

4/1 9

Page 3 of 30

" )

" S

11

Reston

" S

[

5/1

12

INDEX PAGE

Legend

" S

" S

13

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

10

" S

Green Valley

Martin Creek

" )

Fairview

Alvey

6/1

" )

S "

" )

15-3

15-2

15-1

15-4 15-5

16

15-6

7/1

17

" )

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

14

0

FIGURE 2: INDEX PAGE 2

18

ENCL

1,000

19

Feet 2,000

[

Index Page 2

PROJECT #

NOV 2013

DATE

75207.000

21

21-3

8/1

20 " )

NWP-2013-240

Page 4 of 30

19

" S

8/1

Reston

20

" S

" S

[

21-1

INDEX PAGE

Legend

21-2

21-3

Green Valley

" S

22

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Fairview

" )

Martin Creek

9/1 " )

Index Page 3

S "

" )

24

25

26

11/1

28-2

28-1

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 3

0

27

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

23

10/1 " )

" S

[

Alvey

" )

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

29

30

28-1

28-2

" S

Reston

30

" S

" S

[

31

12/1

INDEX PAGE

Legend

" S

" S

32

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

29

Fairview

Green Valley

Martin Creek

Index Page 4

Alvey

) "

11/1

) "

Page 5 of 30

S "

" )

) "

34-1

35

36

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

33 13/1

34-2 37 ) " 0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 4

14/1

[

NWP-2013-240 38

PROJECT #

NOV 2013

DATE

75207.000

39

15/1

) "

4

37

" S

" S

15/1

39

Reston

[

40-1

INDEX PAGE

Legend

40-2

" S

" S

41-1

41-2

41-3

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

38

Fairview

Index Page 5

S Martin Creek "

Green Valley

" )

Alvey

42

S "

" )

43-1

43-2

44

45 17/1

" )

46

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

16/1

" )

Page 6 of 30

0

ENCL

1,000

18/1

47-3

Feet 2,000

FIGURE 2: INDEX PAGE 5

47-2

47-1

[

" )

NWP-2013-240

49

NOV 2013

DATE

75207.000

PROJECT #

48

46

47-1

Page 7 of 30

47-3

" S

49

Reston

" S

Green Valley

" S

[

50

19/1

51-1

INDEX PAGE

6

" SIndex Page

Legend

Martin Creek

51-2

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

47-2

18/1

48

Fairview

" )

53-1

S "

" )

20/1

54

Martin Creek

55 57

0

FIGURE 2: INDEX PAGE 6

" )

21/1

56

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

52

53-2 " )

" S

" )

S "

Alvey

ENCL

1,000

Feet 2,000

[

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

58 59 22/1

" )

Page 8 of 30

58

" S

22/1

59

Reston

" S

[ INDEX PAGE

Legend

60

" S

" S

61 23/1

" )

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Fairview

Martin Creek

Index Page 7

Green Valley

" )

" S

S "

" )

63

64

67-2

67-1

0

FIGURE 2: INDEX PAGE 7

66-1

66-2

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

62

65

24/1 " )

Alvey

ENCL

1,000

Feet 2,000

[

25/1

NOV 2013

DATE

75207.000

PROJECT #

67-3

68-1

" )

NWP-2013-240

68-2

69

67-3

" S

68-2

68-1

25/1

Reston

69

" S

[

70

26/1

INDEX PAGE

Legend

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

72

71-3

S "

" )

27/1

71-4

73-1 73-2 73-3

74-1

74-2

75

28/1

76

" )

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

71-1

71-2

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

67-2

67-1

" S

Green Valley

Index Page 8

Martin Creek

" S

" )

Fairview

" )

Alvey

" )

Page 9 of 30

0

ENCL

1,000

78

Feet 2,000

FIGURE 2: INDEX PAGE 8

77

[

29/1

PROJECT #

NOV 2013

DATE

75207.000

79-2

79-1

" )

NWP-2013-240

8

77

Page 10 of 30

78

29/1

" S

79-1

" S

79-2

Reston

Green Valley

80

" S

" S

[

81

INDEX PAGE

Legend

Index Page 9

Martin Creek

" S

82-2

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

82-3

83

S "

" )

84 31/1

) "

85 86

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

82-1 30/1

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Fairview

) "

) "

Alvey

88

32/1

0

FIGURE 2: INDEX PAGE 9

87 ) "

ENCL

1,000

Feet 2,000

[

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

89

33

90

) "

" )

88

" S

33/1

" S

90

Reston

" S

91

92-4

92-5

INDEX PAGE

Legend

[

" S

92-1

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

89

Fairview

Green Valley

Index Page 10

" S

Alvey

S "

" )

94

95

97-4

97-3

35/1

96

" )

97-2

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

92-3

92-2

93

34/1 " )

Martin Creek

" )

32/1

Page 11 of 30

98

0

FIGURE 2: INDEX PAGE 10

97-1

ENCL

1,000

Feet 2,000

[

99-2

NOV 2013

DATE

75207.000

PROJECT #

36/1 99-1

" )

NWP-2013-240

100

" S

99-2

Fairview

" S

100

Reston

Green Valley

" S

Index Page 11

" S

[

101

37/1

INDEX PAGE

Legend

Martin Creek

" S

102

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

36/1 99-1

" )

Alvey

" )

S "

" )

38/1

104

105

106-2

106-1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

103-1

103-2

" )

39/1

0

FIGURE 2: INDEX PAGE 11

107

" )

98

Page 12 of 30

ENCL

1,000

108

Feet 2,000

[

NWP-2013-240

PROJECT #

NOV 2013

DATE

75207.000

109

7

39/1

Page 13 of 30

" )

" S

109

Reston

" S

40/1

INDEX PAGE

Legend

[

" S

110

111

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

108

Fairview

Green Valley " S

" S

" )

Index Page 12

Martin Creek

Alvey

" )

41/1

S "

" )

114 115 42/1

" )

117

0

FIGURE 2: INDEX PAGE 12

116

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

112

113

ENCL

1,000

Feet 2,000

[

NWP-2013-240

43/1

119

NOV 2013

DATE

75207.000

PROJECT #

118

" )

12

12

117

Page 14 of 30

Fairview

43/1

" S

44/1 121

120

INDEX PAGE

Legend

[

" S Index Page 13

" S

122

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

119

Reston

Green Valley

Martin Creek

) "

" S

118

) "

" S

S "

" )

) " ) "

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

123

124

45/1

125

126

0

FIGURE 2: INDEX PAGE 13

46/1

127

128

ENCL

1,000

Feet 2,000

[

Alvey

NOV 2013

DATE

75207.000

PROJECT #

129

47/1 ) "

NWP-2013-240

1

128

Page 15 of 30

" S

[

Green Valley

131

INDEX PAGE

Legend

Index Page 14

" S

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

130

" S

" S

Martin Creek

Green Valley

Reston

47/1

129

Fairview

" )

S "

48/1

133

S "

" )

134-1

134-2 49/1

135

136

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

132

" )

" )

Alvey

" ) 0

FIGURE 2: INDEX PAGE 14

137

ENCL

1,000

PROJECT #

139

NOV 2013

DATE

75207.000

138

50/1

Feet 2,000

[

NWP-2013-240

51/1

140 " )

7

" )

50/1

138

139

" S

Reston

" S

51/1

140

[

141

INDEX PAGE

Legend

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Fairview

" S

" S

Index Page 15

" )

Green Valley

Martin Creek

" S

143-1

S "

" )

144-1

144-2 145

53/1

147

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 15

146-1

146-2

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

142

52/1

143-2 " )

Page 16 of 30

[

" )

Alvey

NOV 2013

DATE

75207.000

PROJECT #

148

" )

NWP-2013-240

54/1

149

1

" S

" )

54/1

149

Reston

" S

[ INDEX PAGE

Legend

150-2

150-1

" S

" S

151 55/1

" )

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

148

Fairview

Index Page 16

Green Valley

Martin Creek

" S

S "

" )

153

154

56/1

155

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

152-1

152-2 " )

147

Page 17 of 30

157

57/1

0

FIGURE 2: INDEX PAGE 16

156-2

156-1

ENCL

1,000

Feet 2,000

[

Alvey

" )

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

158

159

Page 18 of 30

" )

57/1

157

" S

Reston

159

" S

Index Page 17

[

58/1

160

INDEX PAGE

Legend

161

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

158

Fairview

" S

" S

" )

Green Valley

Martin Creek

S "

" )

163 164-1

164-2

164-3

164-4

60/1

165-1

165-2

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

162

59/1 " )

" S

" )

Alvey

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 17

166

[

NWP-2013-240

PROJECT #

168

NOV 2013

DATE

75207.000

167

" )

166

Page 19 of 30

" S

168

61/1

Reston

" S

Index Page 18

[

169 170 62/1

INDEX PAGE

Legend

" S

" )

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

167

Fairview

" S

Martin Creek

Green Valley

" )

" S

172

S "

" )

63/1

" )

174

175

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

171

173

64/1

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 18

176

[

Alvey

" )

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

177-2

177-1 178

176

")

64/1

Page 20 of 30

" S

[

179

65/1

INDEX PAGE

Legend

180

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

178

S Reston "

Index Page 19

177-2

177-1

Fairview

" S

" S

")

Green Valley

Martin Creek

" S

S "

" )

182

66/1

183

184

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

181 ")

Alvey

185 ") 0

FIGURE 2: INDEX PAGE 19

67/1

ENCL

1,000

PROJECT #

NOV 2013

DATE

68/1

187

75207.000

186

Feet 2,000

[

NWP-2013-240

")

Page 21 of 30

186

187

68/1

" S Index Page 20 Reston " S

[

188 189-1

189-2

INDEX PAGE

Legend

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

S "

" )

191 70/1

192 193

71/1

194 " )

" )

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

190

Reston

69/1

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Fairview

" S

Martin Creek

Green Valley

" )

" S

S " " )

Alvey

196

ENCL

0

1,000

Feet 2,000

198-1

PROJECT #

197 " )

NOV 2013

DATE

75207.000

FIGURE 2: 72/1 INDEX PAGE 20

195

[

NWP-2013-240

19

192

" S

71/1

194

Index PageReston 21 " S

" S

[

195

INDEX PAGE

Legend

" S

" S

196

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

193

Fairview

Green Valley

Martin Creek

" )

Page 22 of 30

S "

" )

199

200

73/1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

72/1

197

198-1

198-2

202

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 21

201

[

" )

Alvey

203

74/1

NOV 2013

DATE

75207.000

PROJECT #

" )

" )

NWP-2013-240

204

" S

201

" S

" S

202

Index Page Reston 22

Green Valley

" S

[

74/1

203

INDEX PAGE

Legend

Martin Creek

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

73/1

200

Fairview

199

" )

Page 23 of 30

205 75/1

S "

" )

206 207

208-1

208-2

209-1

0

ENCL

1,000

210

209-3

Feet 2,000

FIGURE 2: INDEX PAGE 22

209-2

76/1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

204

[

Alvey

NOV 2013

DATE

75207.000

PROJECT #

211-1

77/1

" )

" )

" )

" )

NWP-2013-240

206

" S

208-1

[

209-2

209-1

76/1

INDEX PAGE

Legend

208-2

Index PageReston 23 " S

" S

" S

209-3

210

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

207

Fairview

Green Valley

Martin Creek

" S

211-1

77/1

S "

" )

213

214

78/1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

212-2

212-1

211-2

Index Legend

" )

Page 24 of 30

216

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 23

215

[

" )

Alvey

NOV 2013

DATE

75207.000

PROJECT #

217

79/1 " )

" )

NWP-2013-240

" S

214

215

Index PageReston 24 " S

Green Valley

" S

[

216

INDEX PAGE

Legend

Martin Creek

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

213

" S

78/1

Fairview

" )

Page 25 of 30 218

S "

" )

80/1

219 220

221

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

217

79/1

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 24

81/1

222

[

" )

Alvey

" )

" )

NWP-2013-240

224-1

NOV 2013

DATE

75207.000

PROJECT #

223

221

" S

223

S

Index Page Reston 25 "

Green Valley

" S

" S

[

224-1

224-2

INDEX PAGE

Legend

Martin Creek

" S

82/1

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

S "

" )

83/1

227 228 229

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

225-3

226-1 226-1

226-2

225-2

225-1

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

81/1

222

Fairview

" )

Page 26 of 30

84/1

231-1

231-2

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 25

230

[

" )

Alvey

" )

" )

NWP-2013-240

NOV 2013

DATE

75207.000

PROJECT #

232

233

85/

23

84/1

231-1

230

" S

[

234

INDEX PAGE

Legend

233 85/1

" S

" S

" S

235

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

232

" S

Index Page Reston 26

231-2

Fairview

Green Valley

Martin Creek

" )

" )

Page 27 of 30

236

S "

" )

237 87/1

238

239

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

86/1

0

ENCL

1,000

241

Feet 2,000

FIGURE 2: INDEX PAGE 26

240

[

" )

Alvey

NOV 2013

DATE

75207.000

243

242

88/1

PROJECT #

" )

" )

NWP-2013-240

" S

242

" S

Index Page Reston 27

[ INDEX PAGE

Legend

243

" S

" S

89/1

244

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

241

88/1

Fairview

Green Valley

Martin Creek

" S

" )

" )

Page 28 of 30

S "

" )

90/1

248-1 249 91/1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

245

246

247-1

247-2

248-2

0

ENCL

1,000

251

Feet 2,000

FIGURE 2: INDEX PAGE 27

250-2

250-1

[

" )

Alvey

PROJECT #

NOV 2013

DATE

75207.000

92/1

252

" )

" )

NWP-2013-240

0-2

1

" S

92/1

Reston

252

" S

[

253

254

INDEX PAGE

Legend

" S

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

251

Index Page 28

Fairview

" S

Martin Creek

Green Valley

" )

Page 29 of 30

256

S "

" )

257 258

94/1

259

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

255

93/1

ENCL

0

1,000

Feet 2,000

PROJECT #

NOV 2013

DATE

75207.000

261

95/1

FIGURE 2: INDEX PAGE 28

260

[

Alvey

" )

" )

" )

NWP-2013-240

262 2

261

95/1

" S

262

Reston

263-1

" S

" S

[

96/1

263-2 264

INDEX PAGE

Legend

" S

" S

Source: Transmission Line Structure, Substation Point, Transmission Line - BPA; Topo - National Geographic Society, i-cubed 2011

ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT WETLAND / WATER IMPACT MAP SHEET INDEX

Index Page 29

Fairview

Green Valley

Martin Creek

" )

Page 30 of 30

266

S "

" )

267-2

267-1 268

269

98/1

Transmission Line Structure (line mile / structure number) Substation Points Alvey-Fairview Transmission Line No. 1 Sheets with impacts Wetland Delineation Figure 4 Sheets (Reference)

Index Legend

265

97/1

0

ENCL

1,000

Feet 2,000

FIGURE 2: INDEX PAGE 29

270

[

" )

" )

Alvey

NOV 2013

DATE

75207.000

PROJECT #

Fairview

271

S "

NWP-2013-240

" )

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2013-240 Notice Issued: June 17, 2014 Oregon Department of State Lands No: 55017-RF Written Comments Due: July 1, 2014

WHO IS THE APPLICANT: Bonneville Power Administration LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: notice on the proposed project.

See attached U.S. Army Corps of Engineers public

WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.

PUBLIC PARTICIPATION: Corps No. NWP-2013-240

Page 1 of 3

Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No. NWP-2013-240

Page 2 of 3

PUBLIC NOTICE Oregon Ocean and Coastal Management Program Consistency Certification

Date: June 17, 2014 U.S. Army Corps of Engineers No: Corps No. NWP-2013-240 Oregon Department of State Lands No: 55017-RF

NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office. DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit Application. For further information, you may call DLCD at (503) 373-0050.

REVIEW CRITERIA: Comments should address consistency with the applicable elements of the Oregon Coastal management Program. These elements include the following: Acknowledged Local Comprehensive Plans & Implementing Ordinances Statewide Planning Goals Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as applicable.

INCONSISTENT? If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program.

Corps No. NWP-2013-240

Page 3 of 3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas