Benny Dean Jr. is the Regulatory point-of-contact for this permit application from the Bonneville Power Administration for a corridor project which begins at the Bonneville Power Administration substation in Alvey, located south of Eugene, Ore., extends south to Reston, Ore., and west to Fairview, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: February 14, 2014
Expiration Date: March 15, 2014
US Army Corps of Engineers No: NWP-2013-240
30-Day Notice Oregon Department of State Lands No: 55017-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil)
Eugene Field Office
1600 Executive Pkwy., Ste. 210
Eugene, OR 97401-2156
Applicant: Bonneville Power Administration
TEP-TPP-1
P.O. Box 61409
Vancouver, WA 98666-1409
Location: The project is a corridor project which begins at the Bonneville Power Administration substation in Alvey, located south of Eugene, Lane Co., extends south to Reston in Douglas Co., and west to Fairview, Coos Co., Ore. The site begins in Section 14, of Township 18 South, Range 3 West and continues through Section 24 of Township 27 South, Range 12 West.
Waterway: Through the project corridor there are over 680 identified wetlands and waterways.
Project Description: The project entails replacing aged wood pole structures and associated structural components on the existing 230-kV Alvey-Fairview transmission line and upgrading roads to facilitate construction and year-round access for maintenance. Project activities that may result in impacts to waters and wetlands include removal and replacement of wood pole transmission line structures, access road upgrades, including upgrading existing roads, developing new roads, maintenance or replacement of culverts, and installation of dip drains. Overall there will be a total of 5.61 acres of temporary impacts and 7.16 acres of permanent impacts combined in the Coast Fork Willamette River watershed, South Umpqua watershed, Umpqua watershed, and the Coquille River watershed.
Of the 709 transmission pole structures that would be replaced with this project, 87 are located within wetlands, including 18 three-pole structures and 69 two-pole structures. Permanent impacts to wetlands would consist of excavation of a 5-foot diameter hole at each pole location to a depth of 10 to 12 feet. A 4-foot diameter corrugated metal pipe footing (e.g., culvert) will be installed upright in the hole extending to the soil surface. The new pole will be placed within the vertical pipe and will be backfilled with gravel or crushed rock. The use of culverts surrounding the poles improves the stability of the pole in soft wetland soils and increases the longevity of the pole by due to backfill with aggregate (3/4-inch crushed rock).
Improving roads involves minor adjustments to existing roadways or driveways to correct light rutting, adjust cross slope for drainage, and apply additional surfacing material as needed to support construction and future maintenance. Road improvement would consist of light grading and application of 3 inch of 1 ½ inch minus gravel material and should result in an increase in road width of less than 2 feet. All Improve Road work would have less than a 20 percent increase in road width. About 34.7 miles of existing access roads or driveways would have road improvements associated with the project.
Reconstruction of roads involves rough grading to adjust existing roadway grades, increase roadway width, smooth out depressions, adjust the cross slope for drainage followed by application of base material and surfacing. For road reconstruction, grading may be done in the top 4 inches of the existing road surface and fill for road reconstruction would include addition of 5 inches of 1 1/2 inch minus gravel to the final graded surface. About 57.6 miles of existing access roads are proposed for reconstruction. Roadways for reconstruction may need to be widened by more than 2 feet, are partially covered with vegetation or debris, or require substantial work within the road prism to return the roadway to a usable condition. Subgrade stabilization, which would include slightly deeper excavation and fill of coarse rock, may be required if soft subgrade conditions exist or as determined by the contractor.
Road construction involves excavation of the existing ground surface and the import of rock to develop a solid subbase and road surface. The road bed would be constructed with excavation of approximately 0.5 to 1 foot of soil that would be considered removal of fill from wetlands where the alignment crosses wetlands. The road bed would be constructed with 5 inches of crushed 3 inch minus rock with a minimum of 3 inches of 1 1/2 inch minus gravel on the travel surface. Where soft soil conditions dictate the need for subgrade stabilization, 1 foot of native soil would be excavated from the road alignment, followed by the placement of 1 foot of quarry spalls wrapped in geotextile fabric, which is then overlain by 5 inches of compacted road surfacing material. About 6.5 miles of new permanent road would need to be constructed to allow complete access to the alignment for transmission structure replacement.
Temporary roadways built during construction to access the transmission facility in locations where permanent roadways will not be constructed. A temporary road may be necessary to address topography, soil conditions, seasonal site conditions, safety concerns, or other site conditions encountered during construction. These roads will be fully removed after project completion and the site will be restored after the road is no longer needed for construction. The temporary fill materials could include timbers, ground mats, or gravel over geotextile fabric. All fill would be removed after rebuild construction. Areas would be returned to pre-construction contours and seeded with a native seed mix or seed mix requested by the landowner. To minimize cost and site disturbance, temporary roads are installed to minimum machine access standards (as narrow as practicable). Approximately 1.28 miles of temporary access road are proposed along the 98-mile transmission line corridor.
A total of 84 culvert replacements are proposed which includes 14 upgrades to culverts designed for fish passage and 70 replacement culverts. Five new 18-inch diameter culverts would be installed. Seven bridges would be installed including three new bridges to replace the existing culverts. Four existing bridges in disrepair would be replaced within their existing footprints.
Temporary staging areas may be selected by the contractor for use during construction along or near the transmission line easement to stockpile structure materials and construction equipment.
Mitigation: The applicant has proposed purchasing credits from Coyote Prairie North Mitigation Bank, Cow Hollow Mitigation Bank, and/or Umpqua Interior Foothills in-lieu fee project as compensatory wetland mitigation for permanent impacts of the project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to maintain the existing utility lines and to maintain/upgrade access roads.
Drawings: Thirty (30) drawings are attached and labeled NWP-2013-240 enclosure.
Additional Information: Additional information may be obtained from Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers, at 541-465-6769 or email Benny.A.Dean@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been initiated by the Bonneville Power Administration. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The Bonneville Power Administration is completing a cultural Resources inventory and is coordinating the findings with the State Historic Preservation Office.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
NWP-2013-240
Page 1 of 30
ENCL
L:\Projects\75000\75200-75299\75207_BPAAlveyFairviewWetlands\GIS\Temp\MAPS\APRIL-FINAL DRAFT SET\BPA_Alvey_Fairview_FINAL_Vicinity.mxd
Source: Alvey-Fairview Transmission Line No 1,
Transmission Line Towers- BPA;
Oregon Counties - Oregon Geospatial Enterprise Office
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
VICINITY MAP
)
"
Transmission Line Towers (line mile / structure number)
Alvey-Fairview Transmission Line No. 1
Counties
Legend
0
6
[
FIGURE 1
Miles
12
PROJECT #
MAY 2013
DATE
75207.000
Page 2 of 30
"
S
1
Reston
"
S
"
S
2
Green Valley
"
S
[
3
INDEX PAGE
Legend
Martin Creek
2/1
"
)
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Alvey
1/1
Fairview
"
)
S
"
Alvey
4
S
"
"
)
6
3/1
7
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
5
"
)
S
Index Page 1 "
9
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 1
0
8
4/1
"
)
[
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
10
11
1
4/1 9
Page 3 of 30
"
)
"
S
11
Reston
"
S
[
5/1
12
INDEX PAGE
Legend
"
S
"
S
13
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
10
"
S
Green Valley
Martin Creek
"
)
Fairview
Alvey
6/1
"
)
S
"
"
)
15-3
15-2
15-1
15-4
15-5
16
15-6
7/1
17
"
)
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
14
0
FIGURE 2:
INDEX PAGE 2
18
ENCL
1,000
19
Feet
2,000
[
Index Page 2
PROJECT #
NOV 2013
DATE
75207.000
21
21-3
8/1
20
"
)
NWP-2013-240
Page 4 of 30
19
"
S
8/1
Reston
20
"
S
"
S
[
21-1
INDEX PAGE
Legend
21-2
21-3
Green Valley
"
S
22
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Fairview
"
)
Martin Creek
9/1
"
)
Index Page 3
S
"
"
)
24
25
26
11/1
28-2
28-1
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 3
0
27
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
23
10/1
"
)
"
S
[
Alvey
"
)
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
29
30
28-1
28-2
"
S
Reston
30
"
S
"
S
[
31
12/1
INDEX PAGE
Legend
"
S
"
S
32
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
29
Fairview
Green Valley
Martin Creek
Index Page 4
Alvey
)
"
11/1
)
"
Page 5 of 30
S
"
"
)
)
"
34-1
35
36
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
33 13/1
34-2
37
)
"
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 4
14/1
[
NWP-2013-240
38
PROJECT #
NOV 2013
DATE
75207.000
39
15/1
)
"
4
37
"
S
"
S
15/1
39
Reston
[
40-1
INDEX PAGE
Legend
40-2
"
S
"
S
41-1
41-2
41-3
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
38
Fairview
Index Page 5
S
Martin Creek "
Green Valley
"
)
Alvey
42
S
"
"
)
43-1
43-2
44
45
17/1
"
)
46
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
16/1
"
)
Page 6 of 30
0
ENCL
1,000
18/1
47-3
Feet
2,000
FIGURE 2:
INDEX PAGE 5
47-2
47-1
[
"
)
NWP-2013-240
49
NOV 2013
DATE
75207.000
PROJECT #
48
46
47-1
Page 7 of 30
47-3
"
S
49
Reston
"
S
Green Valley
"
S
[
50
19/1
51-1
INDEX PAGE
6
"
SIndex Page
Legend
Martin Creek
51-2
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
47-2
18/1
48
Fairview
"
)
53-1
S
"
"
)
20/1
54
Martin
Creek
55
57
0
FIGURE 2:
INDEX PAGE 6
"
)
21/1
56
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
52
53-2
"
)
"
S
"
)
S
"
Alvey
ENCL
1,000
Feet
2,000
[
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
58
59
22/1
"
)
Page 8 of 30
58
"
S
22/1
59
Reston
"
S
[
INDEX PAGE
Legend
60
"
S
"
S
61
23/1
"
)
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Fairview
Martin Creek
Index Page 7
Green Valley
"
)
"
S
S
"
"
)
63
64
67-2
67-1
0
FIGURE 2:
INDEX PAGE 7
66-1
66-2
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
62
65
24/1
"
)
Alvey
ENCL
1,000
Feet
2,000
[
25/1
NOV 2013
DATE
75207.000
PROJECT #
67-3
68-1
"
)
NWP-2013-240
68-2
69
67-3
"
S
68-2
68-1
25/1
Reston
69
"
S
[
70
26/1
INDEX PAGE
Legend
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
72
71-3
S
"
"
)
27/1
71-4
73-1
73-2
73-3
74-1
74-2
75
28/1
76
"
)
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
71-1
71-2
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
67-2
67-1
"
S
Green Valley
Index Page 8
Martin Creek
"
S
"
)
Fairview
"
)
Alvey
"
)
Page 9 of 30
0
ENCL
1,000
78
Feet
2,000
FIGURE 2:
INDEX PAGE 8
77
[
29/1
PROJECT #
NOV 2013
DATE
75207.000
79-2
79-1
"
)
NWP-2013-240
8
77
Page 10 of 30
78
29/1
"
S
79-1
"
S
79-2
Reston
Green Valley
80
"
S
"
S
[
81
INDEX PAGE
Legend
Index Page 9
Martin Creek
"
S
82-2
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
82-3
83
S
"
"
)
84
31/1
)
"
85
86
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
82-1 30/1
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Fairview
)
"
)
"
Alvey
88
32/1
0
FIGURE 2:
INDEX PAGE 9
87
)
"
ENCL
1,000
Feet
2,000
[
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
89
33
90
)
"
"
)
88
"
S
33/1
"
S
90
Reston
"
S
91
92-4
92-5
INDEX PAGE
Legend
[
"
S
92-1
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
89
Fairview
Green Valley
Index Page 10
"
S
Alvey
S
"
"
)
94
95
97-4
97-3
35/1
96
"
)
97-2
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
92-3
92-2
93
34/1
"
)
Martin Creek
"
)
32/1
Page 11 of 30
98
0
FIGURE 2:
INDEX PAGE 10
97-1
ENCL
1,000
Feet
2,000
[
99-2
NOV 2013
DATE
75207.000
PROJECT #
36/1 99-1
"
)
NWP-2013-240
100
"
S
99-2
Fairview
"
S
100
Reston
Green Valley
"
S
Index Page 11
"
S
[
101
37/1
INDEX PAGE
Legend
Martin Creek
"
S
102
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
36/1 99-1
"
)
Alvey
"
)
S
"
"
)
38/1
104
105
106-2
106-1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
103-1
103-2
"
)
39/1
0
FIGURE 2:
INDEX PAGE 11
107
"
)
98
Page 12 of 30
ENCL
1,000
108
Feet
2,000
[
NWP-2013-240
PROJECT #
NOV 2013
DATE
75207.000
109
7
39/1
Page 13 of 30
"
)
"
S
109
Reston
"
S
40/1
INDEX PAGE
Legend
[
"
S
110
111
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
108
Fairview
Green Valley "
S
"
S
"
)
Index Page 12
Martin Creek
Alvey
"
)
41/1
S
"
"
)
114
115
42/1
"
)
117
0
FIGURE 2:
INDEX PAGE 12
116
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
112
113
ENCL
1,000
Feet
2,000
[
NWP-2013-240
43/1
119
NOV 2013
DATE
75207.000
PROJECT #
118
"
)
12
12
117
Page 14 of 30
Fairview
43/1
"
S
44/1 121
120
INDEX PAGE
Legend
[
"
S Index Page 13
"
S
122
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
119
Reston
Green Valley
Martin Creek
)
"
"
S
118
)
"
"
S
S
"
"
)
)
"
)
"
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
123
124
45/1
125
126
0
FIGURE 2:
INDEX PAGE 13
46/1
127
128
ENCL
1,000
Feet
2,000
[
Alvey
NOV 2013
DATE
75207.000
PROJECT #
129
47/1
)
"
NWP-2013-240
1
128
Page 15 of 30
"
S
[
Green
Valley
131
INDEX PAGE
Legend
Index Page 14
"
S
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
130
"
S
"
S
Martin Creek
Green Valley
Reston
47/1
129
Fairview
"
)
S
"
48/1
133
S
"
"
)
134-1
134-2
49/1
135
136
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
132
"
)
"
)
Alvey
"
)
0
FIGURE 2:
INDEX PAGE 14
137
ENCL
1,000
PROJECT #
139
NOV 2013
DATE
75207.000
138
50/1
Feet
2,000
[
NWP-2013-240
51/1
140
"
)
7
"
)
50/1
138
139
"
S
Reston
"
S
51/1
140
[
141
INDEX PAGE
Legend
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Fairview
"
S
"
S
Index Page
15
"
)
Green Valley
Martin Creek
"
S
143-1
S
"
"
)
144-1
144-2
145
53/1
147
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 15
146-1
146-2
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
142
52/1
143-2
"
)
Page 16 of 30
[
"
)
Alvey
NOV 2013
DATE
75207.000
PROJECT #
148
"
)
NWP-2013-240
54/1
149
1
"
S
"
)
54/1
149
Reston
"
S
[
INDEX PAGE
Legend
150-2
150-1
"
S
"
S
151
55/1
"
)
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
148
Fairview
Index Page 16
Green Valley
Martin Creek
"
S
S
"
"
)
153
154
56/1
155
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
152-1
152-2
"
)
147
Page 17 of 30
157
57/1
0
FIGURE 2:
INDEX PAGE 16
156-2
156-1
ENCL
1,000
Feet
2,000
[
Alvey
"
)
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
158
159
Page 18 of 30
"
)
57/1
157
"
S
Reston
159
"
S
Index Page 17
[
58/1
160
INDEX PAGE
Legend
161
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
158
Fairview
"
S
"
S
"
)
Green Valley
Martin Creek
S
"
"
)
163
164-1
164-2
164-3
164-4
60/1
165-1
165-2
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
162
59/1
"
)
"
S
"
)
Alvey
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 17
166
[
NWP-2013-240
PROJECT #
168
NOV 2013
DATE
75207.000
167
"
)
166
Page 19 of 30
"
S
168
61/1
Reston
"
S
Index Page 18
[
169
170 62/1
INDEX PAGE
Legend
"
S
"
)
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
167
Fairview
"
S
Martin Creek
Green Valley
"
)
"
S
172
S
"
"
)
63/1
"
)
174
175
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
171
173
64/1
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 18
176
[
Alvey
"
)
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
177-2
177-1
178
176
")
64/1
Page 20 of 30
"
S
[
179
65/1
INDEX PAGE
Legend
180
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
178
S
Reston "
Index Page 19
177-2
177-1
Fairview
"
S
"
S
")
Green Valley
Martin Creek
"
S
S
"
"
)
182
66/1
183
184
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
181
")
Alvey
185
")
0
FIGURE 2:
INDEX PAGE 19
67/1
ENCL
1,000
PROJECT #
NOV 2013
DATE
68/1
187
75207.000
186
Feet
2,000
[
NWP-2013-240
")
Page 21 of 30
186
187
68/1
"
S Index Page 20 Reston
"
S
[
188
189-1
189-2
INDEX PAGE
Legend
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
S
"
"
)
191
70/1
192
193
71/1
194
"
)
"
)
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
190
Reston
69/1
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Fairview
"
S
Martin Creek
Green Valley
"
)
"
S
S
"
"
)
Alvey
196
ENCL
0
1,000
Feet
2,000
198-1
PROJECT #
197
"
)
NOV 2013
DATE
75207.000
FIGURE 2:
72/1
INDEX PAGE 20
195
[
NWP-2013-240
19
192
"
S
71/1
194
Index PageReston
21 "
S
"
S
[
195
INDEX PAGE
Legend
"
S
"
S
196
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
193
Fairview
Green Valley
Martin Creek
"
)
Page 22 of 30
S
"
"
)
199
200
73/1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
72/1
197
198-1
198-2
202
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 21
201
[
"
)
Alvey
203
74/1
NOV 2013
DATE
75207.000
PROJECT #
"
)
"
)
NWP-2013-240
204
"
S
201
"
S
"
S
202
Index Page
Reston
22
Green Valley
"
S
[
74/1
203
INDEX PAGE
Legend
Martin Creek
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
73/1
200
Fairview
199
"
)
Page 23 of 30
205 75/1
S
"
"
)
206
207
208-1
208-2
209-1
0
ENCL
1,000
210
209-3
Feet
2,000
FIGURE 2:
INDEX PAGE 22
209-2
76/1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
204
[
Alvey
NOV 2013
DATE
75207.000
PROJECT #
211-1
77/1
"
)
"
)
"
)
"
)
NWP-2013-240
206
"
S
208-1
[
209-2
209-1
76/1
INDEX PAGE
Legend
208-2
Index PageReston
23
"
S
"
S
"
S
209-3
210
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
207
Fairview
Green Valley
Martin Creek
"
S
211-1
77/1
S
"
"
)
213
214
78/1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
212-2
212-1
211-2
Index Legend
"
)
Page 24 of 30
216
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 23
215
[
"
)
Alvey
NOV 2013
DATE
75207.000
PROJECT #
217
79/1
"
)
"
)
NWP-2013-240
"
S
214
215
Index PageReston
24
"
S
Green Valley
"
S
[
216
INDEX PAGE
Legend
Martin Creek
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
213
"
S
78/1
Fairview
"
)
Page 25 of 30
218
S
"
"
)
80/1
219
220
221
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
217
79/1
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 24
81/1
222
[
"
)
Alvey
"
)
"
)
NWP-2013-240
224-1
NOV 2013
DATE
75207.000
PROJECT #
223
221
"
S
223
S
Index Page
Reston
25
"
Green Valley
"
S
"
S
[
224-1
224-2
INDEX PAGE
Legend
Martin Creek
"
S
82/1
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
S
"
"
)
83/1
227
228
229
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
225-3
226-1
226-1
226-2
225-2
225-1
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
81/1
222
Fairview
"
)
Page 26 of 30
84/1
231-1
231-2
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 25
230
[
"
)
Alvey
"
)
"
)
NWP-2013-240
NOV 2013
DATE
75207.000
PROJECT #
232
233
85/
23
84/1
231-1
230
"
S
[
234
INDEX PAGE
Legend
233 85/1
"
S
"
S
"
S
235
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
232
"
S
Index Page
Reston
26
231-2
Fairview
Green Valley
Martin Creek
"
)
"
)
Page 27 of 30
236
S
"
"
)
237
87/1
238
239
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
86/1
0
ENCL
1,000
241
Feet
2,000
FIGURE 2:
INDEX PAGE 26
240
[
"
)
Alvey
NOV 2013
DATE
75207.000
243
242
88/1
PROJECT #
"
)
"
)
NWP-2013-240
"
S
242
"
S
Index Page
Reston
27
[
INDEX PAGE
Legend
243
"
S
"
S
89/1
244
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
241
88/1
Fairview
Green Valley
Martin Creek
"
S
"
)
"
)
Page 28 of 30
S
"
"
)
90/1
248-1
249 91/1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
245
246
247-1
247-2
248-2
0
ENCL
1,000
251
Feet
2,000
FIGURE 2:
INDEX PAGE 27
250-2
250-1
[
"
)
Alvey
PROJECT #
NOV 2013
DATE
75207.000
92/1
252
"
)
"
)
NWP-2013-240
0-2
1
"
S
92/1
Reston
252
"
S
[
253
254
INDEX PAGE
Legend
"
S
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
251
Index Page 28
Fairview
"
S
Martin Creek
Green Valley
"
)
Page 29 of 30
256
S
"
"
)
257
258
94/1
259
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
255
93/1
ENCL
0
1,000
Feet
2,000
PROJECT #
NOV 2013
DATE
75207.000
261
95/1
FIGURE 2:
INDEX PAGE 28
260
[
Alvey
"
)
"
)
"
)
NWP-2013-240
262
2
261
95/1
"
S
262
Reston
263-1
"
S
"
S
[
96/1
263-2 264
INDEX PAGE
Legend
"
S
"
S
Source: Transmission Line Structure, Substation Point,
Transmission Line - BPA;
Topo - National Geographic Society, i-cubed 2011
ALVEY - FAIRVIEW REBUILD WOOD POLE REPLACEMENT PROJECT
WETLAND / WATER IMPACT MAP SHEET INDEX
Index Page
29
Fairview
Green Valley
Martin Creek
"
)
Page 30 of 30
266
S
"
"
)
267-2
267-1
268
269
98/1
Transmission Line Structure (line mile / structure number)
Substation Points
Alvey-Fairview Transmission Line No. 1
Sheets with impacts
Wetland Delineation Figure 4 Sheets (Reference)
Index Legend
265
97/1
0
ENCL
1,000
Feet
2,000
FIGURE 2:
INDEX PAGE 29
270
[
"
)
"
)
Alvey
NOV 2013
DATE
75207.000
PROJECT #
Fairview
271
S
"
NWP-2013-240
"
)
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2013-240
Notice Issued: June 17, 2014
Oregon Department of State Lands No: 55017-RF Written Comments Due: July 1, 2014
WHO IS THE APPLICANT: Bonneville Power Administration
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES:
notice on the proposed project.
See attached U.S. Army Corps of Engineers public
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
PUBLIC PARTICIPATION:
Corps No. NWP-2013-240
Page 1 of 3
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2013-240
Page 2 of 3
PUBLIC NOTICE
Oregon Ocean and Coastal Management Program
Consistency Certification
Date: June 17, 2014
U.S. Army Corps of Engineers No: Corps No. NWP-2013-240
Oregon Department of State Lands No: 55017-RF
NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being
reviewed by the Department of Land Conservation and Development (DLCD) as provided in
Section 307(c) of the Coastal Zone Management Act. The applicant believes that the
activities described in the attached materials would comply with and be conducted in a
manner consistent with the Oregon Ocean and Coastal Management Program. Project
information can be made available for inspection at DLCD's Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the
Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635
Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by
fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be
received by DLCD on or before the comment deadline listed in the accompanying Corps of
Engineers' Public Notice for Permit Application. For further information, you may call DLCD
at (503) 373-0050.
REVIEW CRITERIA:
Comments should address consistency with the applicable elements of the Oregon Coastal
management Program. These elements include the following:
Acknowledged Local Comprehensive Plans & Implementing Ordinances
Statewide Planning Goals
Applicable State Authorities incorporated into the Oregon Coastal Management
Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as
applicable.
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your
comments to DLCD should explain why you believe the project is inconsistent and should
identify the Oregon Coastal Management Program element(s) in question. You should also
describe how the project could be modified, if possible, to make it consistent with the Oregon
Coastal Management Program.
Corps No. NWP-2013-240
Page 3 of 3