You can copy from here when filling out the rest of the page.
Michael LaDouceur is the Regulatory point-of-contact for this permit application from the Port of St. Helens for work at Scappoose Bay near Warren, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: February 28, 2014
Expiration Date: March 30, 2014
US Army Corps of Engineers No: NWP-2011-95
30-Day NoticeOregon Department of State Lands No: 55388
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Michael LaDouceur Michael.A.Ladouceur@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Port of St. Helens
Craig Allison
P.O. Box 190
Columbia City, OR 97018
Location: The proposed project is located near Warren, Columbia Co., Ore., in Section 17 of Township 4 North, Range 1 West.
Waterway: Scappoose Bay
Project Description: The proposed project will remove approximately 79,000 cubic yards from 8.06 acres of the Scappoose Bay every 5 to 6 years to maintain adequate depths. Up to 3 dredge events will remove a total of 229,000 CY over the life of the 10 year permit. Dredging methods will involve bucket dredging and / or hydraulic dredging. The marina will be dredged to -12 feet National Geodetic Vertical Datum 29 and the access channel will be dredged to a depth of -4.5 feet NGVD 29. Only the marina and west part of the access channel will be dredged.
The dredged material has been approved for in-water placement and will be placed in the flow lane of the Columbia River near river mile 88. The sediment is primarily composed of silt and clay. All work will be completed between September 1 and October 31 to comply with the in-water work periods of the Columbia River and of Scappoose Bay.
Mitigation: If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to maintain adequate water depth for safe mooring and navigation.
Drawings: Six (6) drawings are attached and labeled NWP-2011-95 enclosure.
Additional Information may be obtained from Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers at 503-808-4337 or e-mail: Michael.A.Ladouceur@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.
Cultural Resources: An initial evaluation of the proposed project area indicates that to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2011-95
Oregon Department of State Lands No: 55388
Notice Issued: February 28, 2014
Written Comments Due: March 30, 2014
WHO IS THE APPLICANT: Port of St. Helens, Mr. Craig Allison
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.
Map 1. Vicinity Map
Project Site
Address: 57420 Old Portland Road
Lat/Long: 45°49'38.21"N 122°50'11.27"W
Section: 17 Township: 4W Range: 1N
Reference Number:
Applicant: Port or St. Helens
Adjacent Property Owners: Carl Larson,
Port of St. Helens, Oregon Parks and Rec.,
Proposed Project: Maintenance Dredging
In: Scappoose Bay
Near: Warren County: Columbia State: OR
Date:09/05/2013 Sheet 1 of 15
NWP-2011-95
1 of 11
Northern Resource Consulting, Inc.
ENVIRONMENTAL SERVICES
1339 Commerce Ave., Suite 309B
Longview, Washington 98632
Phone: (360)414-5239
Fax: (360)414-4021
Map 2. Satellite Image (Google Earth)
Project Site
Address: 57420 Old Portland Road
Lat/Long: 45°49'38.21"N 122°50'11.27"W
Section: 17 Township: 4W Range: 1N
Reference Number:
Applicant: Port or St. Helens
Adjacent Property Owners: Carl Larson,
Port of St. Helens, Oregon Parks and Rec.,
Proposed Project: Maintenance Dredging
In: Scappoose Bay
Near: Warren County: Columbia State: OR
Date:09/05/2013 Sheet 2 of 15
NWP-2011-95
2 of 11
Northern Resource Consulting, Inc.
ENVIRONMENTAL SERVICES
1339 Commerce Ave., Suite 309B
Longview, Washington 98632
Phone: (360)414-5239
Fax: (360)414-4021
Map 7. Dredging Area (Google Earth)
Project Site
Address: 57420 Old Portland Road
Lat/Long: 45°49'38.21"N 122°50'11.27"W
Section: 17 Township: 4W Range: 1N
Reference Number:
Applicant: Port or St. Helens
Adjacent Property Owners: Carl Larson,
Port of St. Helens, Oregon Parks and Rec.,
Proposed Project: Maintenance Dredging
In: Scappoose Bay
Near: Warren County: Columbia State: OR
Date:09/05/2013 Sheet 7 of 15
NWP-2011-95
3 of 11
Northern Resource Consulting, Inc.
ENVIRONMENTAL SERVICES
1339 Commerce Ave., Suite 309B
Longview, Washington 98632
Phone: (360)414-5239
Fax: (360)414-4021
SCAPPOOSE BAY MARINE PARK DREDGING
WARREN, OR
DECEMBER 2013
NWP-2011-95
4 of 11
·'·\1e.
·-
tl!.,..
1
t:
;
I
' .......
-..,
I
w
z
-
...J
5
NJCII!
i
-S ·I
I
11
w
z
-
...J
~+
~
SOUNDINGS LEGEND
-f
8
+
on
-
...
ELEVATION
RED
+0.1' AND ABOVE
BLUE
-2.0' TO -3.9'
.r
DK BLUE -4.0' TO -5.9'
BLACK -8.0' AND BELOW
- INDICATES ELEVATION FROt.l POLE SOUNDING
···
- INDICATES ELEVATION FROM ACOUSTIC SOUNDINGS
+.·
t·
NOTE: SEE SHEET 2 OF 2 FOR SURVEY NOTES.
50
0
50
100
150
IF SHEET IS SMALLER THAN 22"X34"
IT IS A REDUCED PRINT.
SCALE REDUCED ACCORDINGLY
0
SCALE: 1"= 50'
NWP-2011-95
·
8
2.4
COLOR
~===tz;;;;;;;:;;;;;::fi :til j d t~
,ORIGINAL SCALE
DRAWN------~~--------1
GAHAGAN & BRYANT ASSOCIATES, INC.
PO Box823
Camas, WA 98607
Phone(360)210-4292
..............
DESIGNED _ _ _ _ _ _
B_GC
_ _ _ _ _ _.........,
ENGINEERS
*
5 of 11
SURVEYORS
SCAPPOOSE BAY MARINA
CONDITION SURVEY
SURVEYS PERFORMED: FEBRUARY 14 & 15, 2012
DATE _
__!Q.,_,5"--./'-'Q,_.2~/-'1'-"2~---
1" = 50'
S~--~-=-~~-----
SHEET
1 OF 2
SHEETS
\\
\\f.\
I
SOUNDINGS LEGEND
COLOR
RED
ELEVATION
+0. 1 ' AND ABOVE
-2.0' TO -3.9'
BLUE
DK BLUE -4.0' TO -5.9'
BLACK -8.0' AND BELOW
ASSUMED DREDGE
BOUNDARY (TYP)
-
INDICATES ELEVATION F'ROU POLE SOUNDING
-
INDICATES ELEVATION F'ROU ACOUSTIC SOUNDINGS
GENERAL NOTES
1. POLE SOUNDINGS OBTAINED BY GAHAGAN & BRYANT ASSOCIATES, INC. ON
FEBRUARY 14 & 15, 2012. ACOUSTIC SOUNDINGS OBTAINED BY GAHAGAN &
BRYANT ASSOCIATES, INC. ON FEBRUARY 15, 2012.
2. SOUNDINGS ARE BASED ON NGVD29 DATUM.
3. SOUNDINGS WERE ACQUIRED BY FATHOMETER OR POLE SOUNDING AND ARE
SHOWN TO THE NEAREST TENTH OF A FOOT. WATER LEVEL MONITORING STATION
REFERENCED TO OSMB BM "0506-01 1996" LOCATED AT UPPER CORNER OF
SIDEWALK LEADING TO NORTHERN FLOAT AT BOAT RAMP: EL.
15.90' NGVD29.
ELEVATION OF "0506-01 1996" DETERMINED VIA SHORT-TERM STATIC GPS
OBSERVATIONS REFERENCED TO NOAA TIDAL 3 BM IN ST. HELENS, OR, PUBLISHED
EL. = 42.1 0' NGVD29.
g
=
!
4. HORIZONTAL POSITIONING SYSTEM USED IS NAVSTAR GPS WITH U.S. COAST GUARD
DIFFERENTIAL BEACON.
4J
5. ALL HORIZONTAL COORDINATES ARE BASED ON THE LAMBERT COORDINATE SYSTEM,
NAD 83, OREGON NORTH SYSTEM.
6. THE BATHYMETRIC INFORMATION SHOWN ON THIS DRAWING IS BASED ON
SURVEYS MADE ON THE DATE(S) INDICATED AND CAN ONLY BE CONSIDERED
AS INDICATING THE CONDITIONS EXISTING AT THAT TIME.
7. AERIAL PHOTOGRAPHY PROVIDED BY GOOGLE EARTH.
8. PLANIMETRICS ARE DRAWN (DOCKS, WALKWAYS) AS DELINEATED BASED ON VISUAL
OBSERVATIONS FROM THE FIELD.
30
0
30
60
90
IF SHEET IS SMALLER THAN 22"X34"
IT IS A REDUCED PRINT.
SCALE REDUCED ACCORDINGLY
0
SCALE: 1""= 30"
NWP-2011-95
,.
ORIGINAL SCALE
.-
DRAWN------------~B~GC~------------------
GAHAGAN & BRYANT ASSOCIATES, INC.
PO Box823
Camas, WA 98607
Phone (360) 21 0-4292
DESIGNED ___________B_G_C____________- ..
.~~M9~~
RAO/MRS
CHECKED--------------~----------,oo~RRd
. .nE~
ENGINEERS
*
6 of 11
SURVEYORS
SCAPPOOSE
BAY
MARINA
CONDITION SURVEY
SURVEYS PERFORMED: FEBRUARY 14 & 15, 2012
DATE
05/02/12
" = 30'
SCM£ ____1~--~~--------SHEET
2 OF 2
SHEETS
LEGEND
FLOATING DOCK
PROPERTY LINES
UNCOVERED l.lOORAGE LIMITS
APPROXII.IATE ORDINARY HIGH WATER
S.E. CORNER B.D. STEVENS DLC NO. 56
PORT OF ST. HELENS
TOP OF BANK
D.B. 126, PAGE 401
FOUND I.IONUMENT
r
I
APPROXII.IATE ORDINARY \
HIGH WATER LINE
/
!
'
EXISTING PILING
"
I'
\ /
·
;
I
NEW PILING
EXISTING ELECTRICAL TRANSFORI.IER
'I
\
I
/
(
SANITARY SEWER HOOK UP
''
!
FIRE STATION CABINET
[[]]
FIRE EXTINGUISHER
ELECTRICAL PANEL
TOP OF PILING ELEVATION
T/PI II1G
ELEVATION OF BOTTOM OF BAY
(E)
I
I
EXISTING
I
I
I
I
I
I
I
I
I"
I
I
I
I
I
I
I
I
I
'"
CONCRETE
SIDEWALK
STATE OF OREGON
DIVISION OF STATE LANDS
SUBI.IERGED & SUBMERSIBLE LAND LEASE BOUNDARY
I.IL-6266
DAlE:
EXPAND ED MARINA SITE PLAN
SCALE: 1" = 40'
PRELIMINARY
NOT
FOR CONSlRUCTION
_ _,
'""""""""'-""""'~"'~----q---#$###$#
- ' - " ' " " " " - " ' " " ' " ' - " ' " " ' " "_ _ _#$#####_#_ _ _
50' 40' 30' 20' 10' 0'
50'
100'
REV.
REVISION RECORD
DATE
Lower
Columbia
St Helens, Oregon
(503) 366-{)399
..
7 of 11
PROJ. NO.
DWG. BY
-='~ Engineering~.
NWP-2011-95
12/16/13
1936
NORTHERN RESOURCE CONSULTING, INC.
TCO
SCAPPOOSE BAY MARINE PARK DREDGING
APPR. BY
SCALE
NOTED
EXPANDED MARINA SITE PLAN
DATE
09
13
DWG. NO.
D 1936 1000 04
'\
r-\
\
\
/
,;
/'
r/
~
'\
'
(1
/"I
/
I
I
/
I
/
II
/
I
,I
I
//;I
I
II
I
//"
I\
I
'I
'\ I
I \ II
I
\
I
I
I
\
I
I
I I I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
\
--._
:
\
/ I jl /
\
\
//
I
1/
~
\
-------
I
\
//
I
I
I
I\
I
I
---~ /--._,
---------
/
I
!I
I
I
I
'
'\
\
\
\
\
I
PROJECT CONTROL
VERTICAL CONTROL
SURVEY DATA ELEVATIONS
ARE REFERENCED TO NATIONAL GEODETIC VERTICAL
DATUM OF 1929 (NGVD29). SEE GENERAL NOTES
ON GBA CONDITION SURVEY FOR ADDITIONAL
INFORMATION AND CONTROLS FOR SURVEY.
LEGEND
(E)
E9
EXISTING
EXISTING PILING
DREDGING BOUNDARY
EXISTING MINOR CONTOUR
EXISTING MAIOR CONTOUR
DAlE:
AREA OF DREDGING
REV.
EXPANDED MARINA DREDGING SITE PLAN
SCALE: 1" = 40'
100'
80'
60'
40'
20'
o'
100'
200'
REVISION RECORD
PREUMINARY
NOT
FOR CONSTRUCTION
DATE
Lower
Columbia
St. Helens, Oregon
(503) 366-{)399
8 of 11
PROJ. NO.
DWG. BY
Engineering~.
..
NWP-2011-95
12/16/13
1936
NORTHERN RESOURCE CONSULTING, INC.
TCO
SCAPPOOSE BAY MARINE PARK DREDGING
APPR. BY
SCALE
NOTED
EXPANDED MARINA DREDGING SITE PLAN & NOTES
DATE
09
13
DWG. NO.
D-1936-1 000-05
__..-\1
LOCATION OF NORTH CHANNEL
SECTION. SEE SHEET
D-1936-1000-11
/
/
/
LOCATION OF CHANNEL CENTER
SECTION. SEE SHEET
D-1936-1000-11
\
\
LOCATION OF SOUTH CHANNEL
SECTION. SEE SHEET
D-1936-1000-12
PROJECT CONTROL
VERTICAL CONTROL
SURVEY DATA ELEVATIONS
ARE REFERENCED TO NATIONAL GEODETIC VERTICAL
DATUM OF 1929 (NGVD29). SEE GENERAL NOTES
ON GBA CONDITION SURVEY FOR ADDITIONAL
INFORMATION AND CONTROLS FOR SURVEY.
NOTE:
LOCATION OF CHANNEL NAVIGATION
MARKERS WILL BE VERIFIED IN THE
PRE -DREDGE SURVEY.
~-
LEGEND
EXPANDED UPSTREAM CHANNEL DREDGING SITE PLAN
DREDGING BOUNDARY
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
SCALE: 1" = 40'
100'
80'
60'
40'
20'
AREA OF DREDGING
o'
100'
200'
I
REV.
DATE:
PREI.Jt.IINARY
NOT
FOR CONSTRUCTION
NWP-2011-95
9 of 11
REVISION RECORD
DATE
Lower
Columbia
St. Helens, Oregon
(503) 366-{)399
PROJ. NO.
DWG. BY
Engineering~0
0
1936
TCO
APPR. BY
SCALE
NOTED
RESOURCE CONSULTING, INC.
POOSE BAY MARINE PARK DREDGING
OED UPSTREAM CHANNEL DREDGING SITE
DATE 09
13
DWG. NO.
D-1936-1 000-06
\' ~
I
VICINITY MAP
~
SCALE: NTS
--r
\
\
S6
\
WARRIOR ROCK LIGHT \
r
WARRIOR ROCK
TURN LIGHTED (/
BOUY 4 -4i-
\
\\
WASHINGTON
OREGON
\
)
87
J
l
f
WASHINyTON
--
-
--
I
I
0
MARINA DREDGINGSITE
I
I
\
89
OREGON
A
H 11 2 Rt.l2
LEGEND
--
CHANNEL BOUNDARY
EXISTING CONTOUR
DISPOSAL
SIT~
SCALE: 1·
PLAN
I
A
I
1105-04
300
89
A~
A
1o5-o2
1105-03 1
DISPOSAL AREA
500'
REV.
REVISION RECORD
DATE
Lower
·.
Columbia . "
·· · '~Engineermg'
~rj[
PROJ. NO.
1936
DWG. BY
TCO
(503)366-{)399
D\TE:
12/16/13
PREI.Jt.IINARY
NOT
FOR CONSTRUCTION
NWP-2011-95
10 of 11
APPR. BY
SCALE
NOTED
RCE CONSULTING, INC.
NORTHERN RESOU
PARK DREDGING
SCAPPOOSE BAY MARINE
DISPOSAL
SITE PLAN
No
DWG.
D 1936
1000 13
0'--------------------------------------------------------------------------------------------------------------------------------------------------
-5'----------------------------------------------------------------------------------------
0'------------------------------------------------------------------------------------------------------
~·------------------------------------------------------------------------
------
-10'---------------------------------------------------------------------------------------------------------------------------+----------------------
-10'----------------------------------------------------------------------------------~r~----------------
-I,._------------------------------------------------------------------------------------
-·Is'----------------------------------------------------------
-w·----------------------------------------------------------------------------------------------------------------------+---------------------------
-w·--------------------------------------------------------------------------------~--------------------
-2''--- ~
-25' ___
~----------------------------------------------------------------------------
--------------------
Zl
-~·----~~----------~--------------------------------------------------------------------------------------~~------------------------------------1"--
--~t0
~I
__ ~wrn~~~~E~;~~~:~,~~Ji~[_L
____
·j __ ____ ______ __________ ______ ____ ______ ____ ___ ______________________________ _
I
I
~
-lc'- _
·-·
...-I--,
___________________________________________________ ______________ _
1
~;
ut.
-~
2:JO' SETBACK FR·
-cDERA_ ~;\\IIGATI(]'~AL_CHAI1'H____ ~ _ _ __ _ _ __ _ _ _ _ __ _ _ _ _ __ _ _ __ _ _ _ _
1
____
i§l
_ _______________ _
I
.,;I
-~·
I
-40'----::;;;
-~·
~
~j
I
----!----------:----------:-- "'---;i ----------1--------(l;.~';:~;;~;,;;c::;?~;·/·';- --1-----/---- 1----------1 ---50'~~~~==f====~~~~~~~-,~~==-----+---+------+---+-----+~I
-L'-
I
'
--~~- ---------1------- -(--t ~~-~.~~~//./;77/ /----1---I
/
----- ----------:------
t::' I
-50'
8+
',;-~<
8+
0
8
I
I
I
~
I
b
b
...
0
0
...,+
I
I
I
b
b
b
b
b
+
+
+
r--
+
00
+
0
+
I
I()
0
""
0
0
-
0
I
_I
8
8+
+
~
0
"'
---- -...: '
~ SECTION
I
/
-
\._14 ..I
/
''
'\
@
/
I
'-f--...-"
I
8+
'·""~;
I
I
' / /~// 1//~
···.c//X~r-"
8+
...,
N
I
I
8+
8+
""
I()
/
I
I
/
/
/
/
//"'
.>'
---- -, '
MILE 87 20+00'
I
"s""'...1
I
,/
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'
''
'
'- 14
-
SECTION ® MILE 87 30+ 00'
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'
\
0'---------------------------------------------------------------------------------------------------------------------------------------
0'-------------------------------------------------------------------------------------------------------------------
5'---------------------------------------------------------------------------------------------
5'--------------------------------------------------------------------------------
-
-10'----------------------------------------------------------------------------------------------------------------------------~~-------
-10'--------------------------------------------------------------------------------------------------------------~~
-1::'-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-1::,'--- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-w·----~----------------------------------------------------------------------------------------------------------------~---------------
-w·-----------------------------------------------------------------------------------------------------------,~-----
cd
:z
:zl
ul
-2::'--- -~t-----------------------------------------------------------------------------
:;;~· ·
-~·----:Z
LJO' :ili~All\ fklJM
-cDERAL
~MVIGATIO'IAL CHAI1~H
·
-.]' -- -
~I
-~-1-
~
- -- - - - - -- - - -- - - - - -- - --1-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I
:ZI
_,I
..
- - - - - -- - - - - - - - - -
-L''-
t::': _________________
'
_,.
~I
ur---------~>===~~~----------------------------------------------------------------------------+-----------
--'< I
i5
?:Jo' SFTR!IC-< FRDiil
-cDERAL NAVIGATimML CHAN~~EL
'
1 /
/
-50'----~--------------~----------~'~~~~~1----------~------------~--------------~1--------------~1 --------------~1 ---------------------T-/\
I
I
I
I
b
b
b
b
b
~
I
~
+
+
+
+
...,+
N
I
...
r-""
I
0
0
0
0
0
/
/
'
''
'\
I
_,n·
-.v
~
:zl
~~
-45'--
-50'
-~t----------
...-r-,
-1------- _//_ t--;- '-;------ _/_/_------ -1---------- -t--------- --------- -1-I '
I
/
8+
0
---------
I
I
I
/
8+
0
/
' '4-....
b
' '"
/
b
b
b
b
+
+
I()
+
...
0
0
...,+
+
N
I
~
I
/
0
I
I
I
I
1
-~,---.,;~--------------------~---------------------------------------------
I()
---- -...:
·
~1
L
-IO'~~==]ffi~~~~~~~~~~~~~~::
:r~-~~~~~~~~~~~~;;~~;;~::======~========~~~~-----------'--~--------------------f--, __
~~---'-------1----------+----------~r ______________ _
//////// / /// ////
I
0
-25'---~t---------------------------------------------------------------------~
I
I
ol
-------------
0
8+
0
r--
""
I
rc""' SECTION
-
\.14...;
@
MILE 88 5+00'
I
------l..
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'
I
ro""' SECTION ® MILE 88 10+00'
' '
-
'14_.~ HORIZONTAL SCALE: 1" = 50'
''
VERTICAL SCALE: 1" = 10'
\
LEGEND
2 FT. UFT
4 FT. UFT
REV.
MATERIAL PLACED IN 2 FT. UFTS
D\TE:
12/16/13
PREI.Jt.IINARY
NOT
FOR CONSTRUCTION
NWP-2011-95
11 of 11
REVISION RECORD
DATE
Lower
Columbia
St. Helens, Oregon
(503) 366-{)399
PROJ. NO.
DWG. BY
-='~ Engineering~.
'
'
1936
NORTHERN RESOURCE CONSULTING, INC.
TCO
SCAPPOOSE BAY MARINE PARK DREDGING
APPR. BY
SCALE
NOTED
DISPOSAL SITE
DATE 09
SECTIONS
13
DWG. NO.
D-1936-1 000-14