Omar Ortiz is the Regulatory point-of-contact for this permit application from Linn-Benton Community College for work impacting wetlands adjacent to Upper Oak Creek in Lebanon, Ore.

PUBLIC NOTICE for Permit Application Issue Date: March 13, 2014 Expiration Date: April 12, 2014 US Army Corps of Engineers No: NWP-2014-76 30-Day Notice Oregon Department of State Lands No: APP0055680

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Omar Ortiz, omar.m.ortiz@usace.army.mil Eugene Field Office 211 E. 7th Ave., Ste. 105 Eugene, OR 97401-2722

Applicant: Jim Huckerstein Linn-Benton Community College 6500 Pacific Blvd. Albany, OR 97321

Location: The project is located at 2000 West Oak St., west of Lebanon, Linn Co., Ore. The site is in Section 16, Township 12 South, Range 2 West.

Waterway: The proposed project area includes 1.63 acres of palustrine emergent/flats wetlands adjacent to Upper Oak Creek (HUC12: 170900030401).

Project description: The applicant proposes to discharge approximately 4,861 cubic yards of fill material into 1.63 acres of wetlands to construct an institutional development. Approximately 1,370 cubic yards of material would be excavated from wetlands. Excess materials not suitable for use as structural fill would be disposed of at an upland location at the Knife River Paetsch Quarry.

The overall project would be on an 11.03 acre tax lot. The applicant proposes to retrofit an existing building and construct a new building, associated pavement for parking, access, training, storage, a fuel station, and a compressed natural gasbiomass digester. The development would primarily be used to provide instruction on alternative fuel technology, delivery systems and research. The facility would also be open to the public for sale of alternative fuels, including compressed natural gas and propane.

The applicant’s proposed stormwater plan would use best management practices to detain and treat impervious surface runoff. Stormwater would be collected into sumped catch basins, and be conveyed via pipe into sumped manholes and oil/water separators prior to discharging into water quality and detention swales along the perimeter of the property. Stormwater will leave the site through the City of Lebanon’s municipal stormwater pipe at the north of the property.

Background: A Department of the Army permit was issued on February 16, 2007 authorizing the discharge of fill material into 5.025 acres of wetlands and 0.11 acre of ditch for the construction of an industrial/commercial complex. Approximately 8.69 acres of the 11.03-acre site was developed. The remaining 2.34 acre portion was not developed before the permit expired on January 31, 2012. The applicant did not fill 1.56 acres of wetland within the previously authorized impact area prior to the permit’s expiration. The applicant is requesting reauthorization to fill 1.56 acres of wetland and requests to fill an additional 0.07 acres of wetlands, which were identified in an updated delineation in 2012.

Mitigation: As compensatory mitigation for the loss of wetlands associated with this project, the applicant is proposing to purchase 1.63 credits from the One Horse Slough Mitigation Bank, which is in the service area of the project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To construct an alternative fuels education and training facility.

Drawings: Eighteen (18) drawings are attached and labeled NWP-2014-76 enclosure.

Additional information may be obtained from Omar Ortiz, Project Manager, U.S. Army Corps of Engineers at 541-465-6878 or email omar.m.ortiz@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2014-76 Oregon Department of State Lands No: APP0055680

Notice Issued: March 13, 2014 Written Comments Due: April 12, 2014

WHO IS THE APPLICANT: Linn-Benton Community College LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Linn Benton Community College Advanced Technology Training Center 2000 W.Oak Street Lebanon, OR 97355 1200

FIGURE 1A: LOCATION MAP 0

1200

2400

Scale: 1" = 1,200' Source: MapInfo StreetWorks Pro Drafted: 12/02/13

Feet Geo Resources

NWP-2014-76

Scale: 1:14,400

Page 1 of 18

ENCL

Linn Benton Community College Advanced Technology Training Center 2000 W.Oak Street Lebanon, OR 97355

Geo Resources

NWP-2014-76

FIGURE 1B: TOPOGRAPHIC MAP 800

0

800

1600

Scale: 1" = 800' Source: USFWS NWI Lebanon Quad Drafted: 12/02/13

Feet Scale: 1:9,600

Page 2 of 18

ENCL

~

I

SECTION 1_6 :f.12S. R.2W. W.M. Jri\ L1n~ County l'·-"r~?t~r~.-(~~\:A\... ,

NO. 10 I

10

o

16 AC.

g

"'

501

.7'

.r-"\\

A(\{\'

-1 .. 270.00

--

12.95CH

\

;r';t

n 1~ \

.-)I).~)~r·"'

'·-~- .~-

I

350.00

5.83 A~.

~301 401

~t-~ ~

44.72AC.

29.41 AC.

303

~70 ,{)0

11 .03AC.

A:O>.OO

i AC.

.

470.29

3100

S 89"47'W

C.S.243

SO.OOCH GI.O

~~-----~ . 5~ ~~ - 17------~ ~~

C.S.24368

PARCEL 1

~~

I

155. 10

~

470.38

fL.

t- ~ 3200 ~ 1 i 470 A1 530:41

6.84C/-I

k

9-5

SW COR. E 1/2 DLC 51

12.9SCH

94J.78

2811

~

9.54AC.

"'2810

,Jeti~-H

22.0SCH

2802

~ 13.38AC.

2804

25.67 AC.

30.67 AC. 225.00

"' ~

;;

8! ;;

."' 0

. 8

71 8.74

2812 5.66AC.

9-2

g

696.64

:r u

~

~

2807

).<-10.00

2806

5.11 AC.

2805

5.11 AC.

1

5.11 AC.

691!.64

12809 3.13AC.

2800 5.11 AC.

2808 5.11 AC.

LBCC Training Center

I

I

~ ll h

Linn Benton Community College Advanced Technology Training Center 2000 W.Oak Street Lebanon , OR 97355

Geo Resources

NWP-2014-76

FIGURE 2: TAX LOT MAP

300

300

Feet calc: I :4,800

Page 3 of 18

600

Sca le: 1" = 400' Source: Linn County Assessor Map 16 12 02 Drafted: 12102/13

.............. NORTH ENCL

LBCC Training Center Linn Benton Community College Advanced Technology Training Center 2000 W.Oak Street Lebanon, OR 97355

Geo Resources

NWP-2014-76

FIGURE 3: 2012 AERIAL 100

0

100

200

Scale: 1" = 120' Source: Lebanon 3" resolution orthophoto Flown: March 7, 2012 Drafted: 12/02/13

Feet Scale: 1:1,440

Page 4 of 18

ENCL

swale

Stormwater catch basin

detention

Gravel Parking Area sp2u

Stormwater

sp1w

Chainlink fence on elevated berm around perimeter of unfilled area sp3w sp4u

8" ditch drains into stornwater detention swale flowing north to street.

sp5u sp6w

Wetland in unfilled area based on 3/07/12 updated delineation: 1.63 acres Wetland in unfilled area based on WD #06-0177: 1.56 acres Base map including tax lot boundary based on Udell Engineering survey. Wetland/upland boundary and unfilled area mapped using a resource grade GPS with sub-meter accuracy.

Expired wetland boundary (DSL WD #06-0177) Unfilled area: 2.34 acres

FIGURE 4: WETLAND MAP Linn Benton Community College Advanced Technology Training Center 2000 W. Oak Street Lebanon, OR 97355 Geo Resources NWP-2014-76

80

0

80

160

Scale: 1" = 80' Source: Modified from Udell Engineering Survey, Base Map from Udell Engineering, Wetland Mapped by Geo Resources Drafted: 3/09/12

Feet Scale: 1:960

Page 5 of 18

ENCL

EX. WATER QUALIT'( VEGETATED BIOSWALE

LEGEND

EXISTING WETLAND DEUNEATED BY ALLEN MARTIN: 1.63 AC±

u

A

A' CROSS SECTION

TM - TAX MAP n - TAX LOT PROJEcr

- - - - UMITS

EXIsriNG

GRAVELED AREA

EX. FENCE

.."' Cll

0

~

II=

~

""" &; 0

t!l

~

u ~

EXISTING WETLAND

§

IJ-4

.. ... ...

............

i

·······

TM: 12S02lf16 TL: #302

BARSCALE 0

I

I

75

150

225

EXISTING WETLANDS -OVERALL PfOI&t

::,:,'CfN'1'f~ ~ .. ..._ c.:r _ AIJT _ o_

"1'::tnwn!

3 30

{~:

UDELL ENGINEERING "

WETLAND FILL/REMOVE PERMIT 1 LBCC AUTO CENTER LEBANON 1 0REGON

NWP-2014-76

AND

LAND SURVEYING/ LLC 63 EAST ASH ST. LEBANON, OREGON, 97355

5'11-451-5125

Page 6 of 18

.)

ENCL

LEGEND .. ... . ... .. . .. .. .. . ... ...

TM: 12S02W16 TL: #30:1

EXISTING WETlAND DELINEATED BY ALLEN MARTIN: 1.63 AC±

u

A

A' CROSS SECTION

TM · TAX MAP TL - TAX LOT

PROJECT

.... - - .... UMITS EX. FENCE

5

EXISTING GRAVELED

AREA

-----~

I

I

I .. C\1

0

(I')

..

... .. ... . .. . . . . . . ' .. ...

""

...

A

TM: 12S021H6

EXISTING

TL: #302

WETlAND

EXISTING WETlAND

BARSCALE

0

"'

I 0

40

h,,. , ., .13 PfO.JQCC

ll Ol01.8CCAI.IIO

conn

I 80

120

EXISTING WETLANDS -SOUTH

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

UDELL ENGINEERING "\ AND LAND SURVEYING, LLC 63 EAST ASH ST. LEBANON, OREGON, 97355

541-451·5125

Page 7 of 18

./

ENCL

EX. WATER QUALITY VEGETATED BIOSWALE

LEGEND

EXISTING WETlAND DEUNEATED BY ALLEN MARTIN: 1.63 AC±

A

u

A' CROSS SECTION - TAX MAP - TAX LOT

TM

n

PROJECT UMITS

EXISTING SURFACE DRAINAGE PATIERN

I I

EX. STORM DETENTION SWALE

EXI STING

-340'- CONTOUR ELEVATION -

- - - - EXISTING FENCE

EXISTING WETLAND

EXISTING BERM

BARSCALE 0

I

I

75

150

ho··n·u·oJ Wl

-,.;::::~ n.a"" ;..:.::"',_ .urc_cNJT0 __ r;;·

.,.!

,~~

NAVD 88 225

UDELL ENGINEERING "\

EXISTING CONTOUR ELEVATIONS

WETLAND FILL/ REMOVE PERMIT 1 LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

VERTICAL DATUM

AND

LAND SURVEYING, LLC 63 EAST ASH ST. lEBANON, OREGON, 97355 S4HS1·512S

Page 8 of 18

./

ENCL

EX. WATER QUALITY VEGETATED BIOSWALE

LEGEND

EXlSTING WETlAND DEU NEATED BY ALLEN MARTIN: 1.63 AC±

PROPOSED WETLAND DisnJRBANCE: 1.63 AC±

u A

A' CROSS SECTION

TM

·TAXMAP · TAXLOT

n

ROPOSED WATER QUALITY VEGETATED

EX. STORM DETENTION SWALE

EX. FENCE

PROPOSED WATER QUALITY VEGETATED BIOSWALE EXISTING WETlAND 1.63 AC± DlsnJRBED WETLAND 1.63 AC±

PROPOSED WATER QUALITY VEGETATED B!OSWALE

TM: 12S02W16 TL: 1 302

BARSCALE

I

so

0

r-

1HH1

PU~ilit

-.=:~;;e. ~ :!:.UICt NJI_ o_

""·~~

I 100

150

PROPOSED DEVELOPMENT PLAN ·OVERALL

WETLAND FILL/REMOVE PERMIT 1 LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

UDELL ENGINEERING ' AND

LAND SURVEYING, LLC 63 EAST ASH ST. LEBANON, OREGON, 97355 S'IHSl-5125

Page 9 of 18

_/

ENCL

LEGEND

D

u

A

-.

-.

.

A' CROSS SECTION

TM

EXISTING WETLAND DEliNEATED BY ALLEN MARTIN: 1.63 AC±

n.

TM: 12S02lr16

· TAX MAP - TAX LOT

TL: #303

EX. FENCE PROPOSED ACCESS AND MANEUVERING AREA

PROPOSED WETLAND DlS11JRBANCE: 1.63 AC±

PROPOSED WATER

QUAUTY VEGETATED BIOSWALE

PROPOSED PROJECT EQUIPMENT S TORAGE

I I

I I

I

!

I I

I PROPOSED WATER

QUALITY VEGETATED BIOSWALE

PROPOSED CNG DIGESTER

TM: 12S021t'16 TL: 1302

PROPOSED CNG STORAGE TANK

EXISTING WETLAND 1.63 AC± WETLAND DISTURBANCE 1.63 AC±

BARSCALE

I 40

0

Foo·

11, 11, 13

PROPOSED TRANSFORMERS PROPOSED COMPRESSOR

I 80

120 PROPOSED DEVELOPMENT PLAN -SOUTH

,._..:J~:IOI.ICXAIJI'O WETLAND FILL/REMOVE PERMIT Ct!mR 6 .,.., ...,=""'~-LBCC AUTO CENTER EOl

\. m"' '

PROPOSED WATER QUALITY VEGETATED BIOSWALE

IISV

NWP-2014-76

LEBANON, OREGON

UDELL ENGINEERING AND

LAND SURVEYING, LLC 63 EAST' ASH ST. LEBANON, OREGON, 97355 541-'151 ·5125

Page 10 of 18

ENCL

POSSIBLE TRUCK VEHICULAR CIRCULATION FOR REPAIR/TRAINING

~~~===~~~~--

PROPDSECJ - B UILDING

~t.._:w~w. - --

__

PROPOSED ACCESS AND MANEUVERING AREA

--.!'£31!----

CANOPY-

~~~ mruMNS:

=====

~0'0' 0' ~~~~~~ v

I

1\ \

v

I

1\

v

\

I

"

v

\

I

v

\1

I\

\

I

1\

\

I

1\ \

PROPOSED PROJECT EQUIPMENT STORAGE

~0'0' ~~ ~'0'0' v

v

v

v

\1

\1

I " '\

I ,., \

I" \

I" \

I 1\\

I 1\\

I

'

I POSSIBLE TRUCK VEHICULAR CIRCULATION FOR FUEUNG

POSSIBLE EQUIPMENT VEHICULAR ORCULATION FOR TRAINING

TM: 12S02W16 TL: #302

POSSIBLE DEUVERY TRUCK VEHICULAR ORCULATION FOR CNG DIGESTER

BARSCALE

I 0

40

/.:,. u-u-11

I BO

120

VEHICULAR O RCULATION PLAN

UDELL ENGINEERING "'\

WETLAND FILL/REMOVE PERMIT -..::'""""'"~i:;='---l LBCC AUTO CENTER o;;a;a&; LEBANON, OREGON '··l&iu..,oLBCC,

'

ISV

NWP-2014-76

AND

LAND SURVEYING, LLC 63 EAST ASH ST. LEBANON, OREGON, 97355 541-451·5125

Page 11 of 18

_/

ENCL

LEGEND SURFACE DRAINAGE . . . . DIREcriON, POST DEVELOPMENT

·

-

CATCH BASIN EXISTING STORM PIPE

·o -

PIPE CONNECTION FOR STORM WATER SYSTEM TO SURGE INTO DETENTION SWALE AND DETENTION SWALE TO DRAIN.

DISCHARGE FROM BfOSWALETO DETENTION SWALE

PROPOSED ACCESS AND MANEUVERING AREA

ROPOSED WATER QUALITY VEGETATED

EX. STORM DETENTION SWALE

EX. FENCE PROPOSED WATER QUALm' VEGETATED BIOSWALE DISCHARGE FROM BIOSWALETO DETENTION SWALE

dj '

.

DEVELOPMENT CNG DIGESTER

BARSCALE 0

I

I

75

150

TM: 12S02W16 TL: #302

= 1370 C.Y.

TOTAL EXCAVATION IN WETLAND TOTAL FILL IN WETLAND

= 4861 C.Y.

TOTAL EXCAVATION IN DEVELOPMENT TOTAL FILL IN DEVELOPMENT

=7660 C.Y.

; 1781 C.Y.

225

/a;",..- - - - -P-R-0-PO-S-ED - GR_A_D_lN_ G_A_N_D_D_ RAI _N_A_G_E-PLA--N--:-U-:-::D:-::E::-l-:-l-::E::N":":G::l::-N:::E:: E::R::IN~G;::--.,' 11 11 ' '"

"'".d""'~ :l-olO g.!!!l~JICCAA_o_ 1 WETLAND FILL/REMOVE PERMIT

.... 151

-!

NWP-2014-76

LBCC AUTO CENTER LEBANON, OREGON

AND LAND SURVEYING, LLC 63 EAST ASHST. 97355

LEBAN~~l·~~;~~~

Page 12 of 18

ENCL

EL=339.55

EL=340.81

344

344

340 336

336 0

0

0

1..1')

0

+

+

0

0

1..1')

M

M

+

+

N

EDGE Of WETLAND STA:O+lO.OO

0

EDGE OF WETLAND

"'"··;

EDGE OF WETLAND STA:3+31.10

STA:2+70.16

EL:339.37

EL:339.26

PROPOSED DEVELOPMENT FINISH ELEVATION EXISTING GROUND

SECTION A-A' r-

FILL ONLY

10'

1- 5'

BARSCALE

r-------.----r-

0

40

80

---1.--i 0'

120

LEGEND - PROPOSED FILL IN WETLANDS - EXISTING WETlAND - PROPOSED EXCAVATION IN WETLAND

CROSS SECTION P~i

UOJOllta:IIUIO

CltiTM L(;ll

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

UDELL ENGINEERING "'\ AND lAND SURVEYING, LLC 63 EAST ASH Sf. LEBANON, OREGON, 97355 541·451·5125

Page 13 of 18

..)

ENCL

PROPOSED DEVELOPMENT FINISH ELEVATION

EDGE OF WETLAND

STA:0+05.96 EL:338.83

0

00

IJHO

0

+

++ ..............

..-4

-

L

~

~

.

._ '

t:

PROPOSED DEVELOPMENT FINISH ELEVATION EXlSTING GROUND

\

FILL

[

ONLY

EDGE OF WETLAND STA: 1+50.00 EL:338.26

SECTION B-8' r - 10'

EXCAVATION AND FILL 6":1: TYPICAL

I - 5'

BARSCALE

....r ---.--- -,....--- ......., o· 0

40

80

120

LEGEND - PROPOSED FILL IN WETLANDS - EXISTING WETLAND - PROPOSED EXCAVATION IN WETLAND

~~ U ·ll-U l'iiii«},_.lO l8CC AUTO =?f:! CEJmR ~--1

·lli..,nfOj iil'

' BW

&ioa liY

CROSSSECTION

UDELL ENGINEERING """

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

AND

LAND SURVEYING, LLC 63 EAST ASH ST. LEBANON, OREGON, 9735S 541-451· S12S

Page 14 of 18

.,/

ENCL

DEQ EROSION CONTROL (EPSC) NOTES

EROSION CONTROL NOTES

l, ACTIV£ F(RIOD

INSTALL SEDIMENT FENCE OR COIR LOG PER Dfl"AIL 092, AOJUST LOCAnON AS GRADING AND CONSTRUCnON ONSITE llEOVIRES TO PilE\!£NT SEDIMENT fROM LEAVING siTE INS TALL INLET PROTECl10N FOR CATCH 8ASIN$hi.REA (":;'\ ORA IN PER DETAIL 09!. UsE BIO·BAG$ AND INSTALL :!~~~'Z~~TER MATERIAL OR S/LTSACJ< UNDER THE

(j)

'\::._) f"":'\

'\:!_}

f':"'\

IN~81\JTY',

'M)R"lrlOQAI)(Jl - HAJ~JNCf AIO ...AIA MUSI.IOII)C l'f

INSTALL BIO.BAGS FOREROSIONPREVENnONAT

DITCH INLET PER DETAIL GI S. USE BID-BAGS

ONC!. 'rO~T'HAT awostct; Wl SCXMINT COHiliOl MnA5UU5 Mf IH

1. PAlOftT01HEml!!li££0MI~ INJ\(TM¢R. INNmC:IPAnOH0Ftilt:

""'Of

lP I'AAC!lc.<. lr.s.t:CtJOtNLV AT'Allli.f'IN

· · PllUOOO CLIUHG T>f!Strf J$ lti·COSSiel.t DUeTO INO..NI'If WAT>

D.tSOtMQI'IIOJfi'T'ORDCI.\f~

lOO.TlOH.

INSTALL 8/0.SAGS FOR EROSION PREVENTION AT PER OETA/L »I~ SIMII.AR

~ PIPE 1Nl$T

INSTA~L 2.0CYOFC/,50RIPRAPOV~GI!O.TEXTILE

0

AS FIELD DIR£CTEO BY ENGINEER FOR EROSION PROTECTION SEE DR)JNA GE PLAN.

INSTALL Lllvt;D CONCRI[TI! TRUCK WASil DO"""Af/.f/1 CDNTRAC:TOR SHALL BE CAUTIDIJS TO NOT OVER PILL CONTAINrEF!.

0

0

·NSTA(t. CHECK CAMS AT SWALES. PER DETAIL

6~

L HOlD A~Or< H~NGOP~ai/<11'11\.CTJOII-~Il 'TI"'T llldl.I>IS'M lllmCTt>Jt T'ODI£CU$Sli!OSIOII~tal1Mttlfcoomct. MEASIJOa...0 fXriSTIIUCTlOfl U>11lS IIOtl>.lJ! MJ.C.J(IJI l. AU. l'~'fC11CI<$M~OeMAOe IN ~WJ·IH~ I:ICIK,._!T~ j,

I N!if'!CTitH LOCi'! Mi.lS'r8!! I«FY 1N ~DNO.. wrTH DUlS !200-CPER.t~.rr eQUR!H!W'S.

·· ·etii··Ol"'Cio "fliee>O'AMliiiJ.-O.~ITtAHO~trrAV>~AAQO nlle'Tll< ~SIMN Q)I«.fA1UJ04TO~Ittl

or'!H~o:Jtli'U lollloS\I\I5 Q!llottACf1<:5 OfSCO!HI> IH~ aa> 1$ ·I'IOVnOHQI'1>1f

llf""'" (SO<:IlU.fAil.A)

&. flil!r:IO' KA'iutr$ SH0wH 0 Hll11S PLANAR MINlHUM ~tAEMOITSRM. NrntiPATD>SrrtQ)Nci'1'10Ns. CUOI'fa T!-tE!:O:IfG'OU.CTlDNmuQo, l1PGIUOE111!5E

MW....n. AoS N!!J)(D ro ,.,.,.._. wrno ALL ......,CAIJ.tl.Oetol, ST·l!. ...,_,....IJoOsroo ...,m>I>1Uif«M!!OO. O

1. W;MI$151~ ~.IU-tsO U 'I1SIQIISr5NOT ~Hf!D. ~ITT~~ f)tpd('Jl itiMS~I$1SO:t1 T l~SWC1,1Ccot.tJrTKrNS. St.IMTrNI NtO!..\-.Al K.lVI)IOttlO

e

OHl 011 Mriltr. ~1£ AJI.I:JJO

I. l'11ol:ii!Q.ENilloiG AJOl!llU~ < I.C.II,(l )(bJl

NOTVSED

n"'"""'

eJDfHT!I"', triOI®l'TATIo.'OOAI!DtoemlJJG IO.JJS. NtHtJrt ~·ll~l..rtR :IO'tt:S lelvotv< t>ill! It A'ill A«U&it.O. v.rti.N>1>5) 1\HO emIt'll ~~a; TO

ij''"!$t111110oOI>'fQAIJ.' '~·t'ltll*'ml"""A$ ~"'"r'-I.C.J!IlJCI))

EROSION CONTROL LEGEND

10. ffeeSfkVE ['dSONG VEGCTATI"" 'illifN PRACTlC.Il. #IN() R£ ~ElATE OPef IIAEAS. P.&\I£Gfl:'A1"f CJillN ~M-Er~ t"ff.AC"TlCA8L Watf ANO~ QIIW,)Jrtl Oil OONmtuCTlOW.lCEHTlFY ll\t TVfi! OF\ii!GlTA.ll\'ESB!D MJX USeD. (SOfmW A...7Jl,ltlf11 ANOA.7Blll(3lJ

II tliCISICIN IIIORQIMWTCCJTRtiWHII<

..,..,.,.,.,...l'U

ll\.Aa ATIO~t,...OOAJNID,Il!J'AIJieD. 4'0 ~\' J......_OO_OodNQ -I$Uii.IOICD rOo< ""-011\follON Of~ION, l/ICLIA>OO P!lOTI!CTIOH""' Aen'«mo>< cru.iN II·""' M QCA'!Oi IA!Im AA6 .....,.>IAlt I'CIO i VI)orl COOT1!

0 a

a

... t==f>

-

BIOf llTffl. BA.G INI.fT BARRIER TYPICAl ~ROUNO ALl CATCH BASINS

-

CONSTRUCT SEDIMENT FENCE OR COIR lOG OR WAmES ALONG PROJECT' BOUNOARY UNES PS PER OfTAIL

~

El!JSTJNG RUNOFF FI.OW CIRtCTION

ll,

C$T.,._,St!Cllf«JJl!Tl:11100<-0T>OOI!T1!1!10UT,oREA$-I!IlGINrniiG~ l""''J<

ISOII;IJlU'IIJ.C.IIJ)l

11. - ' r IVII'OIWIH 11!. esTAB:JSti ~rBUN. UO

W~~

.flf.\S. MDOlltfA "fDNSrOI..MWAlUlt'O'ITRCU..(S01ffU.fMCJ (7))

I~ I'R!W11f 11UCKING OFsrtXMlWT ONTO PUIU~OR PRJVJI'T'[fiOf~llmKi IMPS SlOt M : G~ (01\ P.-VID) EXIT'S MD PNWNG MF.Ni. ~ALL L.frAVf'DJIC»D5

UlUTijJ ort;JTt,ORI.I!r4' flaT not Wl\l.. Tl"'-"' D...S MV$T De IN P\ACl PRIOR TO JNC>OISl\JIIOJ,.. ICTllmd, (I;O<

1&. 'A'Hlrt n.ucJONa SA"'Y\..Ml'I!O scm.!.rflle»tl)« t:nt, l'lniM Le~t"WAl't,.nC'Ht'l"ftt.O:J 01rt CR.Air· to.u:r..04 «1l t

lllettbl.it~ r..U).n~t)JJ

11. I.UDMI>S fOJliUMIIT OOMINliST~Ol'CII OUoHJNIO .....D M.\1111!HNIC! loCTI'miS; NU~ I'UAO, ANO 0!1181 OilS H.cr.. liEHW5"-'

"""""l'So

-

PROPOSI-0 RUNOff' Flt:NI DIRI:CTJON

Ea

-

lEHPOIIARY N

~

-

10.

l'IIUf"OO~fi'OlLOWIIIG~\'H~NINCAIJii:WIU1 1\'11J#IllM'WfHllllttU.JIRM/ITIONioHO

DrsiiOSM. fiR~ 5PJU. 101'5lfi Ml ~la.e5, flfG\AAR WilrffB'tMO: 50EOU.! ~ 'V&i,IQ.£5 AND MAOttNEI.'f, MAlWAL DW~V AND S"ffOIIG!: O)fiJR~ !"fWt"" ANO SlGNI!Gf.,JIIo CO"tml.D STORAGE AAW FOR WAS'T! AND9JIPUES.. (SOi. '.E..lll.)

1, V)P WA'frl, $011.-lJI NI) I~4

~rN'I OII.QlHrw PI.4TC'Oftlf~l

Tt'OtMQIJP'

~ I4!'U"D t'OA'1'010wtNI)otlc;MI'~ $QL ~IA1tUU

serotrK;

2Q. TitD Mft.IC(I'lDN IViT~C~ RRTlt.mRS V)m 1V PmTABUStl 'miCT"TI~ rt\6T FCUOW N~UF~a:'5 Pm:JMtol&fo.\nCNS "TT Ml~tMilE !'AA'RJENT R.fi.fiQ!5 TO Uf.Jp! WATf.JlS, ~ OlliTlOH Yltii!N l6tNCi TlMC~ FGlTl1..1Z.l1\S v.fni!H AJff WATEXWitY ltJPAfllltH ~ (SOtEDli.!.I\9Aitt)

CflfCKOAM

~IT·!J=~~=:"~=e~~~~~~·~,...~~~=~=~...::,".:o=':v."' OCI\;r<,ANOoiSAMPl.tr.:OJVN ANDt-CT) It/'CIIIt~nr.c;1·10c ......THOif_Ofi.,NPUtl_lll_OI'tAATINGI>Oo11!ilrol1>:!Wr....,... """"""""' MAINTiolll M'!lltA1l'lfNTSmiM .o:QitOINQ 10 IWM""""IA~$1'CCIICAnCI'I$. (IOfi:MtA.tDI

C.,.

l2. TIOOP'!H!SHIFf WOIU! HOI.IDA\'SWJ\'o<>JS, lfhtflXD. THI!Affi/$11WfTIS P-IUfOI<~TIIAUOI~/OI

GD -

~

~iRAW

llAlE

0\JU~ IUJH ~ATN.J. TlMCll

..W. (SOfiD.U A 7.1)

U. liT 1\COOCIP"!.\01~1 SOJI.srool'ltsl"\..nll $1'AU!Ulre0RJXMM), I)IIQ'nlllllll'l'tt'U1f lit IMI'\Z'

CO!fl/lrfi N(( $V$Tf

-

EXISTING AND P!IOPOSED CONCRlilt:

,N.

C0t6"00.CT10N 'Olvrn!SM..ST A.\IOIDO'l MlNJMU!etCAVA'l10N ANDOt!AnON Of 8AAe GftOI.tJO ~NCW!T W!ATI!ER. (50-c:tlt.UO..U)

H. llt.Dli"[NT~(HQ; IUJol!tM..1'RAPPtl)$t.DIMtHT'WOII! t1' PCJOUDr·I!THDIDOFTHt!A!O~~Df.tltQ ltlGMT AM>Itt

11.----------------------' lr-----------------------.DESIGN

A9.tJII

V . CATCI11>SIIOfltE!I!ffl()Oj CJWCN H/161lffNAfC!.oal)rrtl1ml'fiiSIIlii*M'~ "'-T>.IPP!!D$U>I.......

ESCP

sm INFO

aM

t_

1&. WITitiN:H""""'$JG>iii1C'm lfiiiMI!HT!l

lt-·SOI -tl'I ""'"P-E IU·N·I~-CO A·~ --IO -RII:l9) --)-------------I ~~J~~~~..;..~'!'~:~~!~r..".... "!IW!lAOCOMiit~'101i 0, 1,.

2\ OLAClifAASVARli

2~ ThIItJGOfSEDf!ol!JoiT JH10ST0""'5"'15alJMO.AEU,&.IQ

IL.----------------------' ~I~~~~'";'DA":sr;..~""=:':,'f::~vt:t;I!TionO!o116-~w.corm"==IN 111 PROVIDI: lD"ffflMYSTMIIU.tA110ft Fat TH.IIT POimCW Of'T)IE'SITE ~~CIJ.j\iTlU.CTlOf'~ ACTI~ CEASE R::M 14 P!'YSORf'P(wrrtiA CXMJUN{jQF II.,DM4 ~~ 'NO 4 TAOOn"'- lOO".ol! snr>W. 00 IN OMIGNG Of CO~ M\Uii IM!IL l'ltJIIJ< MISU

-'It

l~ l'ROV·ofl'()iiWIOIT"""Kl "a>Nll'Oli'EAIUO'I$01oJ AI.L f!XI'OSQ)Mt~I/O fCTl\tM01': rfi

COII'OJO.UCING!ielW#li'Refloll 8'1 'Tt>f'OIWI' llJolll$. A.1..8J II~1

Fo.tr

1Hl-1j

Fto:;ci

U

'"'!!!I

Di'a"fJlO,O

ECII

emGY '

1~\1

EROSION AND SEDIMENT CONTROL PLAN

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

($Ol('.II

Nl01\,!£.m)

UDELL ENGINEERING "\ AND LAND SURVEY!NG, LLC 63 EAST ASH ST. lEBANON, OREGON, 97355 541-451·5125

Page 15 of 18

Dlcar?

I'

~~ '

!itCl fll

FIG 11

-

'

5CIII£: AS N01l!l

~

~

ENCL

EX. WATER QUAUlY VEGETATED BIOSWALE

PROPOSED WATER QUAUlY VEGETATED BIOSWALE

-TYP.

-TYP.

PROPOSED WATER QUAUlY VEGETATED BIOSWALE

BARSCALE 0

I

I

75

ISO

JO.., 11·11.u

EROSION CONTROL PLAN

UDELL ENGINEERING '

-..:::::::r:~~~~:~.:... UICC _M/10 __ WETLAND FILL/ REMOVE PERMIT

bi"":~

,~"'

NWP-2014-76

TY: 12S02W16 TL: #302

225

lliOji(i

1

CNG DIGESTER

PROPOSED WATER QUAUll' VEGETATED BIOSWALE

LBCC AUTO CENTER LEBANON, OREGON

AND

LAND SURVEYING, LLC 63 EAST ASH sr. LEBANON, OREGON, 97355 541·451-5125

Page 16 of 18

./

ENCL

~

1

AODI?IOtW t.l(..t$JMS I.4V$t t)t OEP£HOitfQ ON 1011.. nm.

~Rm

2..

at

Boi)..,..f(. 8.t.C!

$T.t.lt[V 'illlol("f;

~UUl ~ltAIIIl[ U$loiG

~1~~~NI:D CA .....cH

IJ$liiiC

PltQf[Cl A

.3G"

~JCH

~0-tw:S

10 8MIH YOU IM1

Holl'4' -\ ON;S AAQ lttrr Qlll'[llll),P1IO BY t",

St~

IC.

CHECK DAM 910- riLT[R I:IAG

INLE'T PROTECTION TYPE 4

lftiiii.D1J...Qt

Nt)ll\·

rfOf!Sl t ""lftWioll 12"

Of .«ll ~CAliS N:OUI..W. 2.. iWW10 lf[C\Itii(.D 0 10( 01 fTOOC PU. J . C'M.ll!!'loG ~~f'I(D llQfn..'l' IH fol\AC[ 1W U'Sif~ llr.NODo\OS Oft nMJ O...IIOP(IWIIH;, WUIWUI.I 10' 0":0 $NoCNO N .4!1..L Dlllll:l'lOM. ()II(~

I. RI:OUI,t'\lt H.OWONI.Y DO NOf USI! IIICUI I'I.OW ~SI'Iff l.IMQ 2 AV011liJ"WOOIOUAOSALI008llllolt IO I'klHI!CT I~LI" I AFIIlA Till fiRliTIJIVI M

Ul ..AYM}:Nrtsr~rALU.O

\ lwt< !TAU ti~F WOVEN fAilltiC JN3l!RT (lJLTPIC SOCK!. ·ltf.OUI.AK 11 OW Wffil NO CIYJ! RrLIJW

Ci\TCIII3ASTN INSERT BAG

D!:TAIL i091

PLASTIC SHEUING 10

EROS£0N AND SEDIMENT CONTROL DTLS

ct;dl;;i b¥ \..

8511

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

UDELL ENGINEERING AND

LAND SURVEYING, LLC 63 EASi ASH Si. LEBANON, OREGON, 97355 541-'151-5125

Page 17 of 18

ENCL

'FRONT VIFW

A~OLE

SID!! Vl bW DO'l'fl ENDS Of SEDIMENT F~C"C TO

~ ~-------~~SJS~lJ-RE_S_O_Il_I_S~~Cp~L-----~------JJ INTERI.OCK~Ill~ TOP

, 2' 'OST'S ~NO

VIEW

ATTACII t'tllr.1 I

ftUl't'U!fiiUI-IO! InTJIR tAliRtt·a·

"4~

Yftt'r!CAIJVf'lJ·lW

OMIlL

1

r .. rrnc..l'INt.OJt·i1.tLH:Ktf'OS'Ia: J mrorwtJII()hlOilL

INSfAIHJ) UAIILL llOlOI !!Wrl, I CVMt'~I~TIVlrHI

n-IAIJ A·IAtllr

CONSTRUCTION EN1 RANCE

rllnktr~;_

1tti:NC11

Sediment Fence Hll

OETAILIO'J2

6WAU!8 SEED MI~TURE:·l

~0'4 Torf"IYJ)O Tail fescue 30"4 Perellnilll Ry(lng 11«1 ~'*"" 10% COiotiU>I Iler~QIM.<

~131mlx ror~w8ies, ~

r(IN1tl0nponds,etr:.

·5e<:tlh1Q om: 220 lbo ,._.,10'1! (4-Sil.rs WlOOOtq.l\.)

'I OR ENGINEER AWIIO'ILO EQIJAL

SECTION A-A' WATER QUALITY VEGETATED BIOSWALE SECTION

EROSION AND SEDIMENT CONTROL DTI.S

WETLAND FILL/REMOVE PERMIT LBCC AUTO CENTER LEBANON, OREGON

NWP-2014-76

UDELL ENGINEERING """' AND

LAND SURVEYING, LLC 63 EAST ASH ST. l.fBANON, OREGON, 97355 5~1-451 ·5125

Page 18 of 18

~

ENCL

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas