You can copy from here when filling out the rest of the page.
Omar Ortiz is the Regulatory point-of-contact for this permit application from Linn-Benton Community College for work impacting wetlands adjacent to Upper Oak Creek in Lebanon, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: March 13, 2014
Expiration Date: April 12, 2014
US Army Corps of Engineers No: NWP-2014-76
30-Day Notice Oregon Department of State Lands No: APP0055680
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Omar Ortiz, omar.m.ortiz@usace.army.mil
Eugene Field Office
211 E. 7th Ave., Ste. 105
Eugene, OR 97401-2722
Applicant: Jim Huckerstein
Linn-Benton Community College
6500 Pacific Blvd.
Albany, OR 97321
Location: The project is located at 2000 West Oak St., west of Lebanon, Linn Co., Ore. The site is in Section 16, Township 12 South, Range 2 West.
Waterway: The proposed project area includes 1.63 acres of palustrine emergent/flats wetlands adjacent to Upper Oak Creek (HUC12: 170900030401).
Project description: The applicant proposes to discharge approximately 4,861 cubic yards of fill material into 1.63 acres of wetlands to construct an institutional development. Approximately 1,370 cubic yards of material would be excavated from wetlands. Excess materials not suitable for use as structural fill would be disposed of at an upland location at the Knife River Paetsch Quarry.
The overall project would be on an 11.03 acre tax lot. The applicant proposes to retrofit an existing building and construct a new building, associated pavement for parking, access, training, storage, a fuel station, and a compressed natural gasbiomass digester. The development would primarily be used to provide instruction on alternative fuel technology, delivery systems and research. The facility would also be open to the public for sale of alternative fuels, including compressed natural gas and propane.
The applicant’s proposed stormwater plan would use best management practices to detain and treat impervious surface runoff. Stormwater would be collected into sumped catch basins, and be conveyed via pipe into sumped manholes and oil/water separators prior to discharging into water quality and detention swales along the perimeter of the property. Stormwater will leave the site through the City of Lebanon’s municipal stormwater pipe at the north of the property.
Background: A Department of the Army permit was issued on February 16, 2007 authorizing the discharge of fill material into 5.025 acres of wetlands and 0.11 acre of ditch for the construction of an industrial/commercial complex. Approximately 8.69 acres of the 11.03-acre site was developed. The remaining 2.34 acre portion was not developed before the permit expired on January 31, 2012. The applicant did not fill 1.56 acres of wetland within the previously authorized impact area prior to the permit’s expiration. The applicant is requesting reauthorization to fill 1.56 acres of wetland and requests to fill an additional 0.07 acres of wetlands, which were identified in an updated delineation in 2012.
Mitigation: As compensatory mitigation for the loss of wetlands associated with this project, the applicant is proposing to purchase 1.63 credits from the One Horse Slough Mitigation Bank, which is in the service area of the project. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To construct an alternative fuels education and training facility.
Drawings: Eighteen (18) drawings are attached and labeled NWP-2014-76 enclosure.
Additional information may be obtained from Omar Ortiz, Project Manager, U.S. Army Corps of Engineers at 541-465-6878 or email omar.m.ortiz@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2014-76
Oregon Department of State Lands No: APP0055680
Notice Issued: March 13, 2014
Written Comments Due: April 12, 2014
WHO IS THE APPLICANT: Linn-Benton Community College
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.
Linn Benton Community College
Advanced Technology Training Center
2000 W.Oak Street
Lebanon, OR 97355
1200
FIGURE 1A: LOCATION MAP
0
1200
2400
Scale: 1" = 1,200'
Source: MapInfo StreetWorks Pro
Drafted: 12/02/13
Feet
Geo Resources
NWP-2014-76
Scale: 1:14,400
Page 1 of 18
ENCL
Linn Benton Community College
Advanced Technology Training Center
2000 W.Oak Street
Lebanon, OR 97355
Geo Resources
NWP-2014-76
FIGURE 1B: TOPOGRAPHIC MAP
800
0
800
1600
Scale: 1" = 800'
Source: USFWS NWI Lebanon Quad
Drafted: 12/02/13
Feet
Scale: 1:9,600
Page 2 of 18
ENCL
~
I
SECTION 1_6 :f.12S. R.2W. W.M. Jri\
L1n~ County
l'·-"r~?t~r~.-(~~\:A\... ,
NO. 10
I
10
o
16 AC.
g
"'
501
.7'
.r-"\\
A(\{\'
-1 ..
270.00
--
12.95CH
\
;r';t
n 1~ \
.-)I).~)~r·"'
'·-~- .~-
I
350.00
5.83 A~.
~301
401
~t-~
~
44.72AC.
29.41 AC.
303
~70 ,{)0
11 .03AC.
A:O>.OO
i AC.
.
470.29
3100
S 89"47'W
C.S.243
SO.OOCH GI.O
~~-----~
.
5~
~~
- 17------~
~~
C.S.24368
PARCEL 1
~~
I
155. 10
~
470.38
fL.
t- ~ 3200
~ 1
i
470 A1
530:41
6.84C/-I
k
9-5
SW COR. E 1/2
DLC 51
12.9SCH
94J.78
2811
~
9.54AC.
"'2810
,Jeti~-H
22.0SCH
2802
~ 13.38AC.
2804
25.67 AC.
30.67 AC.
225.00
"'
~
;;
8!
;;
."'
0
.
8
71 8.74
2812
5.66AC.
9-2
g
696.64
:r
u
~
~
2807
).<-10.00
2806
5.11 AC.
2805
5.11 AC.
1
5.11 AC.
691!.64
12809
3.13AC.
2800
5.11 AC.
2808
5.11 AC.
LBCC Training Center
I
I
~ ll h
Linn Benton Community College
Advanced Technology Training Center
2000 W.Oak Street
Lebanon , OR 97355
Geo Resources
NWP-2014-76
FIGURE 2: TAX LOT MAP
300
300
Feet
calc: I :4,800
Page 3 of 18
600
Sca le: 1" = 400'
Source: Linn County Assessor Map 16 12 02
Drafted: 12102/13
..............
NORTH
ENCL
LBCC Training Center
Linn Benton Community College
Advanced Technology Training Center
2000 W.Oak Street
Lebanon, OR 97355
Geo Resources
NWP-2014-76
FIGURE 3: 2012 AERIAL
100
0
100
200
Scale: 1" = 120'
Source: Lebanon 3" resolution orthophoto
Flown: March 7, 2012
Drafted: 12/02/13
Feet
Scale: 1:1,440
Page 4 of 18
ENCL
swale
Stormwater
catch
basin
detention
Gravel Parking Area
sp2u
Stormwater
sp1w
Chainlink fence
on elevated berm
around perimeter
of unfilled area
sp3w
sp4u
8" ditch drains into
stornwater detention
swale flowing north
to street.
sp5u
sp6w
Wetland in unfilled area based on 3/07/12 updated delineation: 1.63 acres
Wetland in unfilled area based on WD #06-0177: 1.56 acres
Base map including tax lot boundary based on Udell Engineering survey.
Wetland/upland boundary and unfilled area mapped using a resource
grade GPS with sub-meter accuracy.
Expired wetland boundary (DSL WD #06-0177)
Unfilled area: 2.34 acres
FIGURE 4: WETLAND MAP
Linn Benton Community College
Advanced Technology Training Center
2000 W. Oak Street
Lebanon, OR 97355
Geo Resources
NWP-2014-76
80
0
80
160
Scale: 1" = 80'
Source: Modified from Udell Engineering Survey,
Base Map from Udell Engineering,
Wetland Mapped by Geo Resources
Drafted: 3/09/12
Feet
Scale: 1:960
Page 5 of 18
ENCL
EX. WATER QUALIT'(
VEGETATED BIOSWALE
LEGEND
EXISTING WETLAND
DEUNEATED BY
ALLEN MARTIN: 1.63 AC±
u
A
A'
CROSS SECTION
TM - TAX MAP
n - TAX LOT
PROJEcr
- - - - UMITS
EXIsriNG
GRAVELED
AREA
EX.
FENCE
.."'
Cll
0
~
II=
~
"""
&;
0
t!l
~
u
~
EXISTING WETLAND
§
IJ-4
.. ... ...
............
i
·······
TM: 12S02lf16
TL: #302
BARSCALE
0
I
I
75
150
225
EXISTING WETLANDS -OVERALL
PfOI&t
::,:,'CfN'1'f~
~
.. ..._
c.:r
_ AIJT
_ o_
"1'::tnwn!
3 30
{~:
UDELL ENGINEERING "
WETLAND FILL/REMOVE PERMIT
1
LBCC AUTO CENTER
LEBANON 1 0REGON
NWP-2014-76
AND
LAND SURVEYING/ LLC
63 EAST ASH ST.
LEBANON, OREGON, 97355
5'11-451-5125
Page 6 of 18
.)
ENCL
LEGEND
.. ... . ... .. . .. .. .. . ... ...
TM: 12S02W16
TL: #30:1
EXISTING WETlAND
DELINEATED BY
ALLEN MARTIN: 1.63 AC±
u
A
A'
CROSS SECTION
TM · TAX MAP
TL - TAX LOT
PROJECT
.... - - .... UMITS
EX.
FENCE
5
EXISTING
GRAVELED
AREA
-----~
I
I
I
..
C\1
0
(I')
..
... .. ... . .. . . . . . . ' ..
...
""
...
A
TM: 12S021H6
EXISTING
TL: #302
WETlAND
EXISTING WETlAND
BARSCALE
0
"'
I
0
40
h,,. , ., .13
PfO.JQCC
ll Ol01.8CCAI.IIO
conn
I
80
120
EXISTING WETLANDS -SOUTH
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
UDELL ENGINEERING "\
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
LEBANON, OREGON, 97355
541-451·5125
Page 7 of 18
./
ENCL
EX. WATER QUALITY
VEGETATED BIOSWALE
LEGEND
EXISTING WETlAND
DEUNEATED BY
ALLEN MARTIN: 1.63 AC±
A
u
A'
CROSS SECTION
- TAX MAP
- TAX LOT
TM
n
PROJECT
UMITS
EXISTING
SURFACE
DRAINAGE
PATIERN
I I
EX. STORM
DETENTION
SWALE
EXI STING
-340'- CONTOUR
ELEVATION
-
- - - - EXISTING
FENCE
EXISTING WETLAND
EXISTING
BERM
BARSCALE
0
I
I
75
150
ho··n·u·oJ
Wl
-,.;::::~
n.a""
;..:.::"',_
.urc_cNJT0
__
r;;·
.,.!
,~~
NAVD 88
225
UDELL ENGINEERING "\
EXISTING CONTOUR ELEVATIONS
WETLAND FILL/ REMOVE PERMIT
1
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
VERTICAL
DATUM
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
lEBANON, OREGON, 97355
S4HS1·512S
Page 8 of 18
./
ENCL
EX. WATER QUALITY
VEGETATED BIOSWALE
LEGEND
EXlSTING WETlAND
DEU NEATED BY
ALLEN MARTIN: 1.63 AC±
PROPOSED WETLAND DisnJRBANCE:
1.63 AC±
u
A
A'
CROSS SECTION
TM
·TAXMAP
· TAXLOT
n
ROPOSED
WATER
QUALITY
VEGETATED
EX. STORM
DETENTION
SWALE
EX.
FENCE
PROPOSED
WATER QUALITY
VEGETATED
BIOSWALE
EXISTING WETlAND 1.63 AC±
DlsnJRBED WETLAND 1.63 AC±
PROPOSED WATER
QUALITY VEGETATED
B!OSWALE
TM: 12S02W16
TL: 1 302
BARSCALE
I
so
0
r-
1HH1
PU~ilit
-.=:~;;e.
~
:!:.UICt NJI_
o_
""·~~
I
100
150
PROPOSED DEVELOPMENT PLAN ·OVERALL
WETLAND FILL/REMOVE PERMIT
1
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
UDELL ENGINEERING '
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
LEBANON, OREGON, 97355
S'IHSl-5125
Page 9 of 18
_/
ENCL
LEGEND
D
u
A
-.
-.
.
A'
CROSS SECTION
TM
EXISTING WETLAND
DEliNEATED BY
ALLEN MARTIN: 1.63 AC±
n.
TM: 12S02lr16
· TAX MAP
- TAX LOT
TL: #303
EX.
FENCE
PROPOSED
ACCESS AND
MANEUVERING
AREA
PROPOSED WETLAND DlS11JRBANCE:
1.63 AC±
PROPOSED WATER
QUAUTY
VEGETATED
BIOSWALE
PROPOSED
PROJECT
EQUIPMENT
S TORAGE
I
I
I
I
I
!
I
I
I
PROPOSED
WATER
QUALITY
VEGETATED
BIOSWALE
PROPOSED CNG
DIGESTER
TM: 12S021t'16
TL: 1302
PROPOSED CNG
STORAGE TANK
EXISTING WETLAND 1.63 AC±
WETLAND DISTURBANCE 1.63 AC±
BARSCALE
I
40
0
Foo·
11, 11, 13
PROPOSED
TRANSFORMERS
PROPOSED
COMPRESSOR
I
80
120
PROPOSED DEVELOPMENT PLAN -SOUTH
,._..:J~:IOI.ICXAIJI'O
WETLAND FILL/REMOVE PERMIT
Ct!mR
6
.,..,
...,=""'~-LBCC AUTO CENTER
EOl
\. m"'
'
PROPOSED
WATER
QUALITY
VEGETATED
BIOSWALE
IISV
NWP-2014-76
LEBANON, OREGON
UDELL ENGINEERING
AND
LAND SURVEYING, LLC
63 EAST' ASH ST.
LEBANON, OREGON, 97355
541-'151 ·5125
Page 10 of 18
ENCL
POSSIBLE TRUCK VEHICULAR
CIRCULATION FOR
REPAIR/TRAINING
~~~===~~~~--
PROPDSECJ - B UILDING
~t.._:w~w. - --
__
PROPOSED
ACCESS AND
MANEUVERING
AREA
--.!'£31!----
CANOPY-
~~~ mruMNS:
=====
~0'0' 0' ~~~~~~
v
I
1\
\
v
I
1\
v
\
I
"
v
\
I
v
\1
I\
\
I
1\
\
I
1\
\
PROPOSED
PROJECT
EQUIPMENT
STORAGE
~0'0' ~~ ~'0'0'
v
v
v
v
\1
\1
I " '\
I ,., \
I" \
I" \
I 1\\
I 1\\
I
'
I
POSSIBLE TRUCK VEHICULAR
CIRCULATION FOR FUEUNG
POSSIBLE EQUIPMENT
VEHICULAR ORCULATION FOR
TRAINING
TM: 12S02W16
TL: #302
POSSIBLE DEUVERY TRUCK
VEHICULAR ORCULATION FOR
CNG DIGESTER
BARSCALE
I
0
40
/.:,. u-u-11
I
BO
120
VEHICULAR O RCULATION PLAN
UDELL ENGINEERING "'\
WETLAND FILL/REMOVE PERMIT
-..::'""""'"~i:;='---l
LBCC AUTO CENTER
o;;a;a&;
LEBANON, OREGON
'··l&iu..,oLBCC,'
ISV
NWP-2014-76
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
LEBANON, OREGON, 97355
541-451·5125
Page 11 of 18
_/
ENCL
LEGEND
SURFACE DRAINAGE
. . . . DIREcriON, POST
DEVELOPMENT
·
-
CATCH BASIN
EXISTING
STORM PIPE
·o -
PIPE CONNECTION FOR STORM
WATER SYSTEM TO SURGE INTO
DETENTION SWALE AND DETENTION
SWALE TO DRAIN.
DISCHARGE FROM
BfOSWALETO
DETENTION SWALE
PROPOSED
ACCESS AND
MANEUVERING
AREA
ROPOSED
WATER
QUALITY
VEGETATED
EX. STORM
DETENTION
SWALE
EX.
FENCE
PROPOSED WATER
QUALm' VEGETATED
BIOSWALE
DISCHARGE FROM
BIOSWALETO
DETENTION SWALE
dj
'
.
DEVELOPMENT
CNG DIGESTER
BARSCALE
0
I
I
75
150
TM: 12S02W16
TL: #302
= 1370 C.Y.
TOTAL EXCAVATION IN WETLAND
TOTAL FILL IN WETLAND
= 4861 C.Y.
TOTAL EXCAVATION IN DEVELOPMENT
TOTAL FILL IN DEVELOPMENT
=7660 C.Y.
; 1781 C.Y.
225
/a;",..- - - - -P-R-0-PO-S-ED
- GR_A_D_lN_
G_A_N_D_D_
RAI
_N_A_G_E-PLA--N--:-U-:-::D:-::E::-l-:-l-::E::N":":G::l::-N:::E::
E::R::IN~G;::--.,'
11 11
' '"
"'".d""'~
:l-olO
g.!!!l~JICCAA_o_ 1 WETLAND FILL/REMOVE PERMIT
....
151
-!
NWP-2014-76
LBCC AUTO CENTER
LEBANON, OREGON
AND
LAND SURVEYING, LLC
63 EAST ASHST.
97355
LEBAN~~l·~~;~~~
Page 12 of 18
ENCL
EL=339.55
EL=340.81
344
344
340
336
336
0
0
0
1..1')
0
+
+
0
0
1..1')
M
M
+
+
N
EDGE Of WETLAND
STA:O+lO.OO
0
EDGE OF WETLAND
"'"··;
EDGE OF WETLAND
STA:3+31.10
STA:2+70.16
EL:339.37
EL:339.26
PROPOSED
DEVELOPMENT
FINISH ELEVATION
EXISTING GROUND
SECTION A-A'
r-
FILL
ONLY
10'
1- 5'
BARSCALE
r-------.----r-
0
40
80
---1.--i 0'
120
LEGEND
- PROPOSED FILL IN WETLANDS
- EXISTING WETlAND
- PROPOSED EXCAVATION IN WETLAND
CROSS SECTION
P~i
UOJOllta:IIUIO
CltiTM
L(;ll
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
UDELL ENGINEERING "'\
AND
lAND SURVEYING, LLC
63 EAST ASH Sf.
LEBANON, OREGON, 97355
541·451·5125
Page 13 of 18
..)
ENCL
PROPOSED
DEVELOPMENT
FINISH ELEVATION
EDGE OF WETLAND
STA:0+05.96
EL:338.83
0
00
IJHO
0
+
++
..............
..-4
-
L
~
~
.
._ '
t:
PROPOSED
DEVELOPMENT
FINISH ELEVATION
EXlSTING GROUND
\
FILL
[
ONLY
EDGE OF WETLAND
STA: 1+50.00
EL:338.26
SECTION B-8'
r - 10'
EXCAVATION
AND FILL 6":1: TYPICAL
I - 5'
BARSCALE
....r ---.--- -,....--- ......., o·
0
40
80
120
LEGEND
- PROPOSED FILL IN WETLANDS
- EXISTING WETLAND
- PROPOSED EXCAVATION IN WETLAND
~~ U ·ll-U
l'iiii«},_.lO l8CC AUTO
=?f:!
CEJmR
~--1
·lli..,nfOj
iil'
' BW
&ioa liY
CROSSSECTION
UDELL ENGINEERING """
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
LEBANON, OREGON, 9735S
541-451· S12S
Page 14 of 18
.,/
ENCL
DEQ EROSION CONTROL (EPSC) NOTES
EROSION CONTROL NOTES
l, ACTIV£ F(RIOD
INSTALL SEDIMENT FENCE OR COIR LOG PER Dfl"AIL 092,
AOJUST LOCAnON AS GRADING AND CONSTRUCnON
ONSITE llEOVIRES TO PilE\!£NT SEDIMENT fROM
LEAVING siTE
INS TALL INLET PROTECl10N FOR CATCH 8ASIN$hi.REA
(":;'\ ORA IN PER DETAIL 09!. UsE BIO·BAG$ AND INSTALL
:!~~~'Z~~TER MATERIAL OR S/LTSACJ< UNDER THE
(j)
'\::._)
f"":'\
'\:!_}
f':"'\
IN~81\JTY',
'M)R"lrlOQAI)(Jl - HAJ~JNCf AIO ...AIA MUSI.IOII)C
l'fINSTALL BIO.BAGS FOREROSIONPREVENnONAT
DITCH INLET PER DETAIL GI S. USE BID-BAGS
ONC!. 'rO~T'HAT awostct; Wl
SCXMINT COHiliOl MnA5UU5 Mf IH
1. PAlOftT01HEml!!li££0MI~
INJ\(TM¢R. INNmC:IPAnOH0Ftilt:
""'Of
lP I'AAC!lc.<. lr.s.t:CtJOtNLV AT'Allli.f'IN· · PllUOOO CLIUHG
T>f!Strf J$
lti·COSSiel.t DUeTO INO..NI'If
WAT>D.tSOtMQI'IIOJfi'T'ORDCI.\f~
lOO.TlOH.
INSTALL 8/0.SAGS FOR EROSION PREVENTION AT
PER OETA/L »I~ SIMII.AR
~ PIPE 1Nl$T
INSTA~L 2.0CYOFC/,50RIPRAPOV~GI!O.TEXTILE
0
AS FIELD DIR£CTEO BY ENGINEER FOR EROSION
PROTECTION SEE DR)JNA GE PLAN.
INSTALL Lllvt;D CONCRI[TI! TRUCK WASil DO"""Af/.f/1
CDNTRAC:TOR SHALL BE CAUTIDIJS TO NOT OVER PILL
CONTAINrEF!.
0
0
·NSTA(t. CHECK CAMS AT SWALES. PER DETAIL
6~
L HOlD A~Or< H~NGOP~ai/<11'11\.CTJOII-~Il 'TI"'T llldl.I>IS'M lllmCTt>Jt T'ODI£CU$Sli!OSIOII~tal1Mttlfcoomct. MEASIJOa...0
fXriSTIIUCTlOfl U>11lS IIOtl>.lJ! MJ.C.J(IJI
l. AU. l'~'fC11CI<$M~OeMAOe IN ~WJ·IH~ I:ICIK,._!T~
j,
I N!if'!CTitH LOCi'! Mi.lS'r8!! I«FY 1N ~DNO.. wrTH DUlS !200-CPER.t~.rr eQUR!H!W'S.
·· ·etii··Ol"'Cio "fliee>O'AMliiiJ.-O.~ITtAHO~trrAV>~AAQO
nlle'Tll< ~SIMN Q)I«.fA1UJ04TO~Ittl
or'!H~o:Jtli'U lollloS\I\I5 Q!llottACf1<:5 OfSCO!HI> IH~ aa> 1$ ·I'IOVnOHQI'1>1f
llf""'" (SO<:IlU.fAil.A)
&. flil!r:IO' KA'iutr$ SH0wH 0 Hll11S PLANAR MINlHUM ~tAEMOITSRM. NrntiPATD>SrrtQ)Nci'1'10Ns. CUOI'fa T!-tE!:O:IfG'OU.CTlDNmuQo, l1PGIUOE111!5E
MW....n. AoS N!!J)(D ro ,.,.,.._. wrno ALL ......,CAIJ.tl.Oetol, ST·l!. ...,_,....IJoOsroo ...,m>I>1Uif«M!!OO. O1. W;MI$151~ ~.IU-tsO U 'I1SIQIISr5NOT ~Hf!D. ~ITT~~ f)tpd('Jl itiMS~I$1SO:t1 T l~SWC1,1Ccot.tJrTKrNS. St.IMTrNI NtO!..\-.Al K.lVI)IOttlO
e
OHl 011 Mriltr. ~1£ AJI.I:JJO
I. l'11ol:ii!Q.ENilloiG AJOl!llU~ <
I.C.II,(l )(bJl
NOTVSED
n"'"""'
eJDfHT!I"', triOI®l'TATIo.'OOAI!DtoemlJJG
IO.JJS. NtHtJrt ~·ll~l..rtR :IO'tt:S lelvotv< t>ill! It A'ill
A«U&it.O. v.rti.N>1>5) 1\HO emIt'll ~~a; TO
ij''"!$t111110oOI>'fQAIJ.' '~·t'ltll*'ml"""A$ ~"'"r'-I.C.J!IlJCI))
EROSION CONTROL LEGEND
10. ffeeSfkVE ['dSONG VEGCTATI"" 'illifN PRACTlC.Il. #IN() R£ ~ElATE OPef IIAEAS. P.&\I£Gfl:'A1"f CJillN ~M-Er~ t"ff.AC"TlCA8L Watf ANO~ QIIW,)Jrtl Oil
OONmtuCTlOW.lCEHTlFY ll\t TVfi! OF\ii!GlTA.ll\'ESB!D MJX USeD. (SOfmW A...7Jl,ltlf11 ANOA.7Blll(3lJ
II tliCISICIN IIIORQIMWTCCJTRtiWHII<
..,..,.,.,.,...l'U
ll\.Aa ATIO~t,...OOAJNID,Il!J'AIJieD. 4'0 ~\' J......_OO_OodNQ -I$Uii.IOICD rOo< ""-011\follON Of~ION, l/ICLIA>OO
P!lOTI!CTIOH""' Aen'«mo>< cru.iN II·""' M QCA'!Oi IA!Im AA6 .....,.>IAlt
I'CIO i VI)orl COOT1!
0
a
a
...
t==f>
-
BIOf llTffl. BA.G INI.fT BARRIER
TYPICAl ~ROUNO ALl CATCH BASINS
-
CONSTRUCT SEDIMENT FENCE OR
COIR lOG OR WAmES ALONG
PROJECT' BOUNOARY UNES PS PER
OfTAIL
~
El!JSTJNG RUNOFF FI.OW CIRtCTION
ll,
C$T.,._,St!Cllf«JJl!Tl:11100<-0T>OOI!T1!1!10UT,oREA$-I!IlGINrniiG~ l""''J<
ISOII;IJlU'IIJ.C.IIJ)l
11. - ' r IVII'OIWIH
11!. esTAB:JSti ~rBUN. UO
W~~
.flf.\S. MDOlltfA "fDNSrOI..MWAlUlt'O'ITRCU..(S01ffU.fMCJ (7))
I~ I'R!W11f 11UCKING OFsrtXMlWT ONTO PUIU~OR PRJVJI'T'[fiOf~llmKi IMPS SlOt M : G~ (01\ P.-VID) EXIT'S MD PNWNG MF.Ni. ~ALL L.frAVf'DJIC»D5
UlUTijJ ort;JTt,ORI.I!r4' flaT not Wl\l.. Tl"'-"' D...S MV$T De IN P\ACl PRIOR TO JNC>OISl\JIIOJ,.. ICTllmd, (I;O<
1&. 'A'Hlrt n.ucJONa SA"'Y\..Ml'I!O scm.!.rflle»tl)« t:nt, l'lniM Le~t"WAl't,.nC'Ht'l"ftt.O:J 01rt CR.Air· to.u:r..04 «1l t
lllettbl.it~ r..U).n~t)JJ
11. I.UDMI>S fOJliUMIIT OOMINliST~Ol'CII
OUoHJNIO .....D M.\1111!HNIC! loCTI'miS; NU~ I'UAO, ANO 0!1181 OilS H.cr.. liEHW5"-'"""""l'So
-
PROPOSI-0 RUNOff' Flt:NI
DIRI:CTJON
Ea
-
lEHPOIIARY N~
-
10.
l'IIUf"OO~fi'OlLOWIIIG~\'H~NINCAIJii:WIU1 1\'11J#IllM'WfHllllttU.JIRM/ITIONioHO
DrsiiOSM. fiR~ 5PJU. 101'5lfi Ml ~la.e5, flfG\AAR WilrffB'tMO: 50EOU.! ~ 'V&i,IQ.£5 AND MAOttNEI.'f, MAlWAL DW~V AND S"ffOIIG!: O)fiJR~ !"fWt""
ANO SlGNI!Gf.,JIIo CO"tml.D STORAGE AAW FOR WAS'T! AND9JIPUES.. (SOi. '.E..lll.)
1, V)P WA'frl, $011.-lJI NI) I~4
~rN'I OII.QlHrw PI.4TC'Oftlf~l
Tt'OtMQIJP'
~ I4!'U"D t'OA'1'010wtNI)otlc;MI'~ $QL ~IA1tUU
serotrK;
2Q. TitD Mft.IC(I'lDN IViT~C~ RRTlt.mRS V)m 1V PmTABUStl 'miCT"TI~ rt\6T FCUOW N~UF~a:'5 Pm:JMtol&fo.\nCNS "TT Ml~tMilE !'AA'RJENT R.fi.fiQ!5 TO Uf.Jp!
WATf.JlS, ~ OlliTlOH Yltii!N l6tNCi TlMC~ FGlTl1..1Z.l1\S v.fni!H AJff WATEXWitY ltJPAfllltH ~ (SOtEDli.!.I\9Aitt)
CflfCKOAM
~IT·!J=~~=:"~=e~~~~~~·~,...~~~=~=~...::,".:o=':v."'
OCI\;r<,ANOoiSAMPl.tr.:OJVN ANDt-CT) It/'CIIIt~nr.c;1·10c ......THOif_Ofi.,NPUtl_lll_OI'tAATINGI>Oo11!ilrol1>:!Wr....,... """"""""'
MAINTiolll M'!lltA1l'lfNTSmiM .o:QitOINQ 10 IWM""""IA~$1'CCIICAnCI'I$. (IOfi:MtA.tDI
C.,.
l2. TIOOP'!H!SHIFf WOIU! HOI.IDA\'SWJ\'o<>JS, lfhtflXD. THI!Affi/$11WfTIS P-IUfOI<~TIIAUOI~/OIGD -
~
~iRAW
llAlE
0\JU~ IUJH ~ATN.J. TlMCll
..W. (SOfiD.U A 7.1)
U. liT 1\COOCIP"!.\01~1 SOJI.srool'ltsl"\..nll $1'AU!Ulre0RJXMM), I)IIQ'nlllllll'l'tt'U1f lit IMI'\Z'
CO!fl/lrfi N(( $V$Tf-
EXISTING AND P!IOPOSED
CONCRlilt:
,N.
C0t6"00.CT10N 'Olvrn!SM..ST A.\IOIDO'l MlNJMU!etCAVA'l10N ANDOt!AnON Of 8AAe GftOI.tJO ~NCW!T W!ATI!ER. (50-c:tlt.UO..U)
H. llt.Dli"[NT~(HQ; IUJol!tM..1'RAPPtl)$t.DIMtHT'WOII! t1' PCJOUDr·I!THDIDOFTHt!A!O~~Df.tltQ ltlGMT AM>Itt11.----------------------'
lr-----------------------.DESIGN
A9.tJII
V . CATCI11>SIIOfltE!I!ffl()Oj CJWCN H/161lffNAfC!.oal)rrtl1ml'fiiSIIlii*M'~ "'-T>.IPP!!D$U>I.......
ESCP
sm INFO
aM
t_
1&. WITitiN:H""""'$JG>iii1C'm lfiiiMI!HT!llt-·SOI
-tl'I
""'"P-E IU·N·I~-CO A·~
--IO
-RII:l9)
--)-------------I ~~J~~~~..;..~'!'~:~~!~r.."....
"!IW!lAOCOMiit~'101i 0, 1,.
2\ OLAClifAASVARli2~ ThIItJGOfSEDf!ol!JoiT JH10ST0""'5"'15alJMO.AEU,&.IQ
IL.----------------------' ~I~~~~'";'DA":sr;..~""=:':,'f::~vt:t;I!TionO!o116-~w.corm"==IN
111 PROVIDI: lD"ffflMYSTMIIU.tA110ft Fat TH.IIT POimCW Of'T)IE'SITE ~~CIJ.j\iTlU.CTlOf'~ ACTI~ CEASE R::M 14 P!'YSORf'P(wrrtiA CXMJUN{jQF II.,DM4 ~~
'NO 4 TAOOn"'- lOO".ol! snr>W. 00 IN
OMIGNG Of CO~ M\Uii IM!IL l'ltJIIJ< MISU-'It
l~ l'ROV·ofl'()iiWIOIT"""Kl "a>Nll'Oli'EAIUO'I$01oJ AI.L f!XI'OSQ)Mt~I/O fCTl\tM01': rfiCOII'OJO.UCING!ielW#li'Refloll 8'1 'Tt>f'OIWI' llJolll$.
A.1..8J II~1
Fo.tr
1Hl-1j
Fto:;ci
U'"'!!!I
Di'a"fJlO,O
ECII
emGY
'
1~\1
EROSION AND SEDIMENT CONTROL PLAN
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
($Ol('.II
Nl01\,!£.m)
UDELL ENGINEERING "\
AND
LAND SURVEY!NG, LLC
63 EAST ASH ST.
lEBANON, OREGON, 97355
541-451·5125
Page 15 of 18
Dlcar?
I'
~~ '
!itCl
fll
FIG 11
-
'
5CIII£: AS N01l!l
~
~
ENCL
EX. WATER QUAUlY
VEGETATED BIOSWALE
PROPOSED WATER
QUAUlY VEGETATED
BIOSWALE
-TYP.
-TYP.
PROPOSED
WATER
QUAUlY
VEGETATED
BIOSWALE
BARSCALE
0
I
I
75
ISO
JO.., 11·11.u
EROSION CONTROL PLAN
UDELL ENGINEERING '
-..:::::::r:~~~~:~.:...
UICC
_M/10
__ WETLAND FILL/ REMOVE PERMIT
bi"":~
,~"'
NWP-2014-76
TY: 12S02W16
TL: #302
225
lliOji(i
1
CNG DIGESTER
PROPOSED
WATER
QUAUll'
VEGETATED
BIOSWALE
LBCC AUTO CENTER
LEBANON, OREGON
AND
LAND SURVEYING, LLC
63 EAST ASH sr.
LEBANON, OREGON, 97355
541·451-5125
Page 16 of 18
./
ENCL
~
1
AODI?IOtW t.l(..t$JMS I.4V$t t)t
OEP£HOitfQ ON 1011.. nm.
~Rm
2..
at
Boi)..,..f(. 8.t.C!
$T.t.lt[V 'illlol("f;
~UUl
~ltAIIIl[ U$loiG
~1~~~NI:D CA
.....cH
IJ$liiiC
PltQf[Cl A
.3G"
~JCH
~0-tw:S
10
8MIH YOU IM1
Holl'4' -\ ON;S AAQ lttrr
Qlll'[llll),P1IO BY t",
St~
IC.
CHECK DAM
910- riLT[R I:IAG
INLE'T PROTECTION
TYPE 4
lftiiii.D1J...Qt
Nt)ll\·
rfOf!Sl
t ""lftWioll 12"
Of .«ll ~CAliS N:OUI..W.
2.. iWW10 lf[C\Itii(.D 0 10( 01 fTOOC PU.
J . C'M.ll!!'loG ~~f'I(D llQfn..'l' IH fol\AC[
1W U'Sif~ llr.NODo\OS Oft nMJ O...IIOP(IWIIH;,
WUIWUI.I 10' 0":0 $NoCNO N .4!1..L Dlllll:l'lOM.
()II(~
I. RI:OUI,t'\lt H.OWONI.Y DO NOf USI! IIICUI I'I.OW ~SI'Iff l.IMQ
2 AV011liJ"WOOIOUAOSALI008llllolt IO I'klHI!CT I~LI" I AFIIlA Till fiRliTIJIVI M
Ul ..AYM}:Nrtsr~rALU.O
\ lwt< !TAU ti~F WOVEN fAilltiC JN3l!RT (lJLTPIC SOCK!. ·ltf.OUI.AK 11 OW Wffil NO
CIYJ! RrLIJW
Ci\TCIII3ASTN INSERT BAG
D!:TAIL i091
PLASTIC SHEUING
10
EROS£0N AND SEDIMENT CONTROL DTLS
ct;dl;;i b¥
\..
8511
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
UDELL ENGINEERING
AND
LAND SURVEYING, LLC
63 EASi ASH Si.
LEBANON, OREGON, 97355
541-'151-5125
Page 17 of 18
ENCL
'FRONT VIFW
A~OLE
SID!! Vl bW
DO'l'fl ENDS Of SEDIMENT F~C"C TO
~
~-------~~SJS~lJ-RE_S_O_Il_I_S~~Cp~L-----~------JJ
INTERI.OCK~Ill~
TOP
, 2' 'OST'S ~NO
VIEW
ATTACII
t'tllr.1
I
ftUl't'U!fiiUI-IO! InTJIR tAliRtt·a·
"4~
Yftt'r!CAIJVf'lJ·lW
OMIlL
1
r .. rrnc..l'INt.OJt·i1.tLH:Ktf'OS'Ia: J mrorwtJII()hlOilL
INSfAIHJ) UAIILL llOlOI !!Wrl,
I CVMt'~I~TIVlrHI
n-IAIJ A·IAtllr
CONSTRUCTION EN1 RANCE
rllnktr~;_
1tti:NC11
Sediment
Fence
Hll
OETAILIO'J2
6WAU!8 SEED MI~TURE:·l
~0'4 Torf"IYJ)O Tail fescue
30"4 Perellnilll Ry(lng 11«1 ~'*""
10% COiotiU>I Iler~QIM.<
~131mlx ror~w8ies, ~
r(IN1tl0nponds,etr:.
·5e<:tlh1Q om: 220 lbo ,._.,10'1! (4-Sil.rs
WlOOOtq.l\.)
'I OR ENGINEER AWIIO'ILO EQIJAL
SECTION A-A'
WATER QUALITY VEGETATED BIOSWALE SECTION
EROSION AND SEDIMENT CONTROL DTI.S
WETLAND FILL/REMOVE PERMIT
LBCC AUTO CENTER
LEBANON, OREGON
NWP-2014-76
UDELL ENGINEERING """'
AND
LAND SURVEYING, LLC
63 EAST ASH ST.
l.fBANON, OREGON, 97355
5~1-451 ·5125
Page 18 of 18
~
ENCL