Debra Henry is the Regulatory point-of-contact for this permit application from the Oregon Parks and Recreation Dept. for work at the North Fork Silver Creek, near Stayton, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: April 7, 2014
Expiration Date: May 7, 2014
US Army Corps of Engineers No: NWP-2013-382
30-Day Notice Oregon Department of State Lands No: Unknown
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Debra.J.Henry@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Oregon Parks and Recreation Dept.
Katrina Kam
725 Summer St. NE, Ste. C
Salem, OR 97301
Location: The project is located in South Fork Silver Creek, at the South Fork Silver Creek Campground Bridge (Latitude 44.8682, Longitude -122.6482), near Stayton, Marion Co., Ore. (Section 14 and 23, Township 8 South, Range 1 East).
Waterway: South Fork Silver Creek
Project description: OPRD wants to realign a segment of stream and stabilize the stream bank. Applicant proposes to re-grade banks with a two-foot horizontal and one-foot vertical slope. Applicant wants to add three stream barbs, vegetated riprap, and wood (logs) habitat structures with live fascines in between the barbs. Approximately 77 cubic yards of cobble, riprap and soil would be excavated to create a new thalweg low flow channel. The proposed project involves placement of 89 cubic yards of cobble, riprap, and logs to stabilize the stream bank and stream channel of South Fork Silver Creek, and return the creek to its original path at the bridge crossing accessing the Silver Falls State Park campground. All work, below the OHW, would be performed within the preferred Oregon Department of Fish and Wildlife in-water work window (July 15 - September 30)”.
Dewatering devices shall discharge into a sediment trap or sediment pond. No discharge shall be made to a paved street or stormwater collection system without first removing sediment. Straw wattles will be installed down slope from the staging areas to prevent sediment laden runoff from entering wetlands. All disturbed areas will be replanted with native seed and riparian vegetation.
Mitigation: A compensatory wetland mitigation plan for bank stabilization and stream channelization was not proposed. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: There is only one access to the Silver Falls State Park campground and it crosses South Fork Silver Creek via a bridge built in the late 1960’s. Over the years, the Creek has shifted causing scour to the upstream side of the bridge and bank erosion. The purpose of the project is to stabilize the streambank and stream channel in the Creek back to where if flowed when the bridge was built.
Drawings: Fourteen (14) drawings are attached and labeled NWP-2013-382 enclosure.
Additional information may be obtained from Debra Henry, Project Manager, U.S. Army Corps of Engineers at 503-808-4391 or email debra.j.henry@usace.army.mil
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity is upstream from an existing dam and will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not likely required for the described activity.
Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. Our preliminary determination is that the project site does not support EFH and that there will therefore be no effect.
Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. Applicant would have an archaeologist on-site to monitor initial ground disturbance.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
Silver Falls State' Park Property Boundaries
Oregon Parl.."S & R~tt~ation Dept
20024 Silver Falls Hwy, Sublimity, OR
725 SummerSt ~E. Suite C
Salem OR, 9 7301
in Marion County
b r · b ·rnt.;·ll Pl. rpost-t and ll"ay m t /Ia '.t OH ~
'o t 01 1:-t S· IJ l:.'t t-r >t-; 1 . er; f l1 1' ; . or Sllfvey,-"9
c . r::.: ses UJtr' oftr 1 t~bl'l"'oJ to ., I~J 4 rt'' i! A' Q;( oon~o.'t tl'~
1
~ · J'".,J")' :).) IJ JJ" : "10'T"'Jle" ·10-f :::..J !~ ~~~"t~ r t/'tt JYC lyJ
lflis
I
~·.;.-j ; d 5
;:·tt>~·t~
l:"a r')"l'~t ~·
0
1,650
3,3CO Fee!
:;
.:-:: :: :
~
. ..
Oregon Parks & Recreation Dept
725 Swnm erSt NE, Suite C
Project Vicinity Map - Campground
Silver Falls State Park, Oregon
Salem OR, 9 730 l
I
*"
Tl'it p~~;~.;t s t· ·b '1l'JtlQrJ f p..rpcu:s.a'Y.lm·y~"~' '..
P''tp,Jttd ~·. or be 1. oc'4 b r ~-1 . t<'~ M rir ; O"< s.r~-e~i-1;
~t-r~s~ . Userso!trJ bti'I".J ~'~ ~~~ ·a r t'l-tn· o r oo~s.'t l~t
~r.rr.J'"'/:3 3 l "d ·!a·rnto"> sc.rcH 1~ u:ern · t,-~ .S.Jb 1)'~1
t"t ·':;m-JI!O"
,
-
~
0
ICO
200 Feet
\
;,
·~ :~:2:
:
Project Area -Bank Stabilization
Otegon Parks & Recreation Dept
Silver Falls State Park, Oregon
Salem OR, 9 730 1
Tt, I
p~a l l i:H 'I'I WI""JtO"...I I IKI.,OU.i: Nd' rr-Jy r~t ~..l \t
tetr
~uJ·td ·e·. Qr 1>e s·. tJ~:t t·~eg:~.. tl'9-"llrl" ; e( s~ "'~':r9
P-!FIU
s.rt efv! ~b~.~ ~~ 1!'0o.: ~ rt';'t?, er <:»!'$. t
ll'' rr"'-y<:J " ,.~ · 'l)rrr.J t~~ s~t¢t' ~~ ~1U v~ ~ s:sn r;o'
trt
rt
~ tr.,~tOI-
"2.5 SUJl\mtrSt XE, SuiteC
0
25
SD Feet
-
'!"'t
;
: :
~.::
!
EXISTING SITE PHOTOS
looking Downstream
looking Upstream
SEC.14 TSS R1E WM, MARION COUNTY
LEGEND
\
\
.
\
\
LINE TYPES
~
0
I
'
\
10
,
I
11
SEEIIAPaetE11
I
1
I
1
I
I
:- -- --" - -- - - --- ~3~1:----- - ---------.!..------- -:. - - - - - - -J;."_c':,·- - ------- - -- - ~ - -- - --------- ~~
r
t
I
IOCl.l
SJJmrYl3lal mc:JCioln
,,,,,,,
...
----- ... --... ---
cREEl<.
SILVER -·--~
P.t..ll'n'nCI' I"'..AT' lin'
,,,,,,,
0Jii . . . . .. . ".,1Z.O.
f
r_.J
SYJIBOL TYPES
II
~
--~-- ~- -- -
I
#......... ·!.
.
..J l -
I
+ -- ---- -- -- -- -t
· ..,.(;
NUJ/BCRS
ru amm
000 00 00 0
ACit£AGS - w. ~ CIQ..UDI:
AWY I"'ftDt ~1 WAY Ill
nniiX NC Cl*&l'Ut PV.X
tuc:HT,
··n
nck ll.t.JI.Q-'W}{Di a TDw..t.UIS
OOIICA.tm c.e« nfi IX1'1liSaOilC flit
" l.U'C. nlDf lllC -~ ~
1'0 TKE liCK Mdlt c:tXIJtlU..Y 1IU5
IS ..aD -xDI ttif~ c:a urtD
P\.-.ut
JDr;HT,. ··n.
-- - -- - -...1 __ _ _ _ _ _
NOTICE: This I'T1q:l was
created for Assessor's
Office uw ON..Y.
'
' !I
'
I
i
I
\
'1
~Assessor
~ -m.c.....·
,;_.,
15
.-;~:;:~._.....;.~~ :."~ ---- - ----- - - -,;..----- - - ------ -'~-w-'-3------------.J.J
... ......
·+·
SCALE 1"- 400'
Qfi"1.'8CO
Plot file created : November 03, 2009
.__.,.,.,,..u · ...,...,
1
...,
"
23
S£F.
24
I
w.v' 0. 1E 23
"
81E14
SEC.23 T8S R1E WM, MARION COUNTY
LECF:ND
:._l i
I
~ ~ j.~~ ~ ~ ~
22
~
IDCMT-4#-·AT
·
..__.-.w..-
'::
j
J
, .,·.,..,.~,..c
f
23
\
;
- : \.
Cancelled
100
:
14
23 I 24
I
\
'\ \. \ \
\
\
I
I I
I I
I
'
..-~
'
'
: 13
-- - - --- -------- - --- - --i$jr----·------- -.-1
I
t
,T-t
'--.r'l'
81E 23
1 ;
l
1
1 ""~.·~....,
t--- - -- -- -- - -- -'-5--4,14
i
1
:
----- -~-------- - +~-'-. . . - ~ \ ,____~-jloW'OitEI<
..( ·"~~ -- - -- - - -
LINE TTPES
al~
SLifER
I
f'ITI . ~Wf'Tlo4 1 AA LDJ
* O"IrMJI· ·i-t·
....._.
I
S'fJIJl()l. TYPES
t~ Sl~~£~
I·
" "' oa:
l!!
1-- - - - - -- - -....;;!..._..m..c-,..co·
NUJIBERS
fB
000 00 00 0
A~
- A.U. ACUAC£5 IXQ..l.llC
4.1fT i"DffnCHf
Wlnt[Jf
·
1ltl
.,. Of
ntAT :IUT Ul
~'1"1])
1'\::a.JC
"'
.,
·
I·
.._..
- - - - -,.-;.-- - - - - - - .,/
j
1MDIC4TED GM
11
·~~?;- - - - - - - - -- -- ~
~
=
"'
........,I
004 00 00 8
:
~
I
G
1c:r~ ·tc
t
t
--if!-- - - - - - - - - - - - -- - 0
i~
- - - - - _ _ __ _ __ _ _ _
I
I
I
I
_k.. cc·
i-- - -- - -- - - - --- 1
I
~
·_,
~~
~
J
"'
'
·.tn.
'JXI: VAUS - tltE!C
'Cil
~
I'I
I
004 00 18 ~ ((" ..... ~
::;
:0
~
..~
I
not WAIX K
ntr IXT'CXSlD' ar
.AW.-:E,.'f'1{1JQ~~NCO£$
10 t'S£ TICX .ltL'U. COIDtAUT 'n':JS
JS U6ID YKDI CD.PSXIIS CO OCTO
PUILX R3QIT fW ll.ll'S
I
I
~ - - ---- - -- -- - - - -+---- - --~-- -- -- - ~
I
..'.·
NOTICE: 'llill nq:l WOll
creoled for A-llOr's
Office use CK.Y.
'\
·+·
SCALE 1" = 400'
ar 1·.4800
Plot me created: September 13, 2005
·....._..,·..-,,.u· . . .,·
-------------------f
I
SEEIMPoe l £1!1
+--------------:
_:o: - - - - - - - - - - - - -
- - - - - - - - - - - - - - 2~
~
26 1 25
81E 23
CONTACTS
PROJ£CT
LOCATION
PROJECT MANAGER:
KATRINA KAM
725 SUMMER ST. NE, ST£ C
SALEM, OR 97301-1271
OFFICE: (503) 986-0776
FAX. (503) 986-0792
PARK MANAGER:
KEVIN STRANDBERG
SILVER FALLS STAT£ PARK
20024 SILVER FALLS HWY S£
SUBLIMITY, OR 97385
OFFICE: (503) 873-4395 EXT. 26
FAX: (503) 873-4395
OWNE.R/APPUCANT:
OREGON PARKS & R£CR£A TION DEPT.
725 SUMMER ST. N[, ST£ C
SALEM, OR 97301-1271
OFFICE: (503) 986-0707
FAX: (503) 986-0792
Coos Bay (
VIGIL,~_AGRIMIS
ENGINEER:
VIGIL -AGRIMIS, INC
HUNTER WHIT[, P£
KEN VIGIL, P£
STAT£ MAP
PROJECT LOCATION;
VICINITY MAP
819 SE Morrison Street
Suite310
Portland, Oregon 97214
Gt
Ct
C2
C3
C4
ECJ
EC2
EC3
SILVER FALLS STAT£ PARK
~!
c·
t:n;
.,.,._
e:
~::)
8\
It;
~;
C!
~!
PROJECT COORDINA T£5:
LAT.
LONG.
COVER
EXISTING CONDITIONS, SIT£ ACCESS, & DEMO
SIT£ PLAN & OVERVIEW
BANK TREATMENT SECTIONS &- DETAILS
HABITAT DETAILS
EROSION & SEDIMENT CONTROL PLAN
EROSION & SEDIMENT CONTROL DETAILS
EROSION &- SEDIMENT CONTROL DETAILS
I.
2.
3.
4.
5.
6.
CAMPGROUND BRIDGE BANK STABILIZATION
MARION COUNT~ OREGON
~
"
~
§
·~
~
I
w
0.58 ACRES
AREA OF DISTURBANCE:
0.20 ACRES - TOTAL SIT[ DISTURBANCE
THE CONTRACTOR :OHALL &t SOLELY RESPONSIBLE FOR HAVING UTILITIES LOCATED P.RIOR TO CONSTRUCTION ACTIVITIES.
THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DAMAGED UTILITIES TO THE AFFECTED UTILITY SERVICE.
ALL UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE LOCATIONS ONLY AND MUST B£ VERIFIED IN THE FIELD PRIO.R TO
CONSTRUCTION.
THE BAS£ SURVEY FOR THIS PROJECT WAS COMPLETED BY OREGON PARKS AND RECREATION. ALL ELEVATIONS ARE BASED ON
SURVEY CONTROL POINTS INDICATED IN PLAN DRAWINGS, HORIZONTAL COORDINATES ARE .REFERENCED TO U.S. STAT£ PLAN[,
OREGON NORTH, INTERNATIONAL FEET. ELEVATION DATUM: NAVDBB (G£0 ID 03).
THE CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE US£ OF AN APPROVED WORK
AREA ISOLATION AND STREAM DIVERSION PLAN. THE WORK AREA ISOLATION AND STREAM DIVERSION PLAN SHALL B£ SUBMITTED
TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.
ALL WORK SHALL 8£ DON£ DURING THE IN-WATER WORK PERIOD JULY 15 - SEPTEMBER 30.
~
(f)
'-
C5
::::::
a
ABBREVIATIONS
h:::
AVG
CY
DIA
DTL
--...;
nwr;
[
[L
rr
LF
MAX
MIN
N
OHW
SHT
TYP
WHS
~
Q:
N
AVERAGE
CUBIC YARD
DIAMETER
DETAIL
nRAWING
£A STING
ELEVATION
FOOT, FEET
LINEAR FEET
MAXIMUM
MINIMUM
NORTHING
ORDINARY HIGH WATER
SHEET
TYPICAL
WOOD HABITAT STRUCTURE
;;::
~
~
~
t::::J
~
<
CJ
~
l5
V)
i:::::
~
~
~
Cl:l
Q:
~
::::J
a
~
~
5/L VER FALLS STATE PARK
,._
"'
"< ~
44.876667 N
-122.64805
SIZE:
GENERAL NOTES
>-
~ et:
0
~ f-·
20024 SILVER FALLS HWY S£
SUBLIMITY, OR 97385
S£ 1/4 T. 8S, R. 1[, S. 14 (TAX LOT 00100)
N£ 1/4 T. 8S, R. 1[, S. 23 (TAX LOT 00100)
DRAWING INDEX
NOT TO SCALE
~:
~=
503-274-2010
503-274-2024
www.vigll-agrimis.com
LEGAL DESCRIPTION:
NOT TO SCALE
LOCATION MAP
::i
""'
professionals
PROJECT DATA
NOT TO SCALE
PROJECT
LOCATION
design
~
C5
LOCATES (48 HOURS N01lCE REQUIRED PRIOR TO EXCAVATION)
PINK
PURPLE
-
ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES
GAS, OIL, STEAM, PETROLEUM, OR OTl-IER HAZARDOUS LIQUID DR GASEOUS MATERIALS.
COMMUNICATIONS. CABLE TV, ALARM OR SIGNAL LINES. CABLES OR CONDUITS.
WATER. IRRIGATION, AND SLURRY LINES.
SEWERS. DRAINAGE FACILITIES OR OTHER DRAIN LINES.
PRE-MARKING OF THE OUTER LiMITS OF THE PROPOSED EXCAVATION OR MARKING THE
CENTERLINE AND WIDTH OF PROPOSED LINEAL INSTALLATIONS OF BURIED FACILITIES.
TEMPORARY SURVEY MARKINGS
SLURRY AND RECLAIMED
~
Q:
~
V)
THE CONTRACTOR MUST COMPLY WITH THE REGULATIONS OF O.R.S. 757.541 TO 757.571
IN LOCATION AND PROTECTION OF UNDERGROUND UTILITIES. OREGON LAW REQUIRES YOU
TO FOLLOW RULES ADOPTED BY Tl-IE OREGON UTILITY NOTiFICATION CENTER. Tl-IOSE
RULES ARE SET FORTl-1 IN OAR 952-001-0010 Tl-IROUGH OAR 952-001-0090. YOU MAY
OBTAIN COPIES OF THE RULES BY CALUNG THE CENTER.
COLOR CODES:
RED
YELLOW
ORANGE BLUE
GREEN
WHITE
""(
-..J
-..J
L:::
~
::::,;:
-..J
V)
<:
e5
::::,;:
a<'-..)
CJ
~
Q:
CJ
SHUT:
G1
-----·- --------·-------------- -·
I RENEWAL.
DATE
06-30-141
HV8 j:
NOTES:
1.
COORDINATE STAGING AND STOCKPILING LOCATIONS
WITrl PARK MANAGER.
2.
PROTECT EXISTING VEGETATION TO THE MAXIMUM
EXTENT POSSIBLE.
3.
ALL ACCESS AND STAGING AREAS SHALL BE RESTORED TO
PRECONSTRUCT! ON CONDITIONS AS DESCRIBED IN SPECS.
4.
UTILITY LOCATIONS ARE SHOWN FOR REFERENCE ONLY.
CONTRACTOR RESPONSIBLE FOR LOCATING AND
PROTECTING ALL UTlllllES WITHIN THE WORK AREA.
5.
EXISTING 10' PVC DRAIN PIPE
SEE NOTES
STAGING AREA
! ;:::
<::>
'S-
REMOVE EXISTING RIPRAP AND STOCKPILE ROCK FOR USE
IN VEGETATED RIPRAP OR STREAM BARBS.
6.
POSSIBLE LOCATION OF EXISTING 10" PVC DRAIN PIPE. IF
ENCOUNTERED DURING CONSTRUCTION, PROTECT PIPE
OR RECONNECT AS NECESSARY.
7.
REMOVE ALL TREES IDENTIFIED FOR REMOVAL, IF
NECESSARY TO COMPLETE WORK. DISPOSE OF TREES OFF
SITE.
:s._
.,.
~-
ii
~
~
TEL
EXISTING TRAIL
~: --J
~: ~
>- (:>
Ct::
0
f---
IJJ
I
~
;..
<::1
.~
~
SPOT ELEVATION (TYP)
EXISTING ALDER TREE
EXISTING LARGE BOULDER TO REMAIN
TREE TO BE REMOVED, TYP
EXiSTING DOUGLAS-FIR TREE
EXISTING GRAVEL BAR
I--
~
<:
TREE REMOVAL
~
C)
h::
~
SITE ACCESS
CI::l
EXISTING CRUSHED GRAVEL
t~w\
\
TREE#
1.¥1;
\ \ \ II
\
EXISTING GRAVEL RIDGELINE
TREE REMOVAL
I lli(
\\ .· '
EXISTING DOUGLAS FIR TREES. TYP
EXISTING GRAVEL RIDGELINE
\
UNDERCUT STREAM BAINK
2
3
SPECIES
SIZE(DBH)
RED ALDER
24"
RED ALDER
18'
RED ALDER
8"
REDAILDER
10"
RED ALDER
16"
6
RED ALDER
12"
7
RED ALDER
16"
8
REO ALDER
10"
RED ALDER
10"
10
DOUGLAS FIR
18"
~
·mE
9:
~
-.;
::::2
~
EXISTING TRAIL
Q:::
~
IN PLACE RIP-RAP
~
STAGING AREA
SITE ACCESS
'
SiTE ACCESS I CCNSTRUCTION ENTRANCE
C)
~
c:::::.
<::
C)
Q§
~
h:
t3
V)
L:5
Q:
~
12
~
:::::5
~
C)
(/)
~
V)
~
- - OHW --ORDINARY HIGH WATER LINE
C5
trJ
---.J
---.J
~
~
::::;;::
----.J
EXISTING CONDITIONS, SITE ACCESS, AND DEMO
~
V)
~
V}
(..)
(..)
'""(
~
--32
h::
C)
c.J
(.!:)
~
I-:
(/)
~
l,j
C,_)
LJ..J
Q:::
~
<::
~
~
Q:::
~
<::
C)
<:..:>
~
C)
SCALE: 1"=20'
0
10
20
40
Sl-IE£T:
IREI·JEWAL
..GJ ____ _
DATE
06-30-141
~
~
~
Q
COMMUNICATION RISER BOX
[]
REMOVE EXISTING RIPRAP
SEE NOTES
e>-~
i:5i
~
X1350.0
~
....~i
PROTECT EXISTING BRIDGE AND WINGWALLS DURING
CONSTRUCTION. CONTRACTOR TO BE RESPONSIBLE FOR
ANY DAMAGE TO BRIDGE. NOTIFY OWNER IMMEDIATELY IF
DAMAGE OCCURS.
SURVEY CONTROL POINT
. .
~.,.
,(
8.
co :e
<::>
;;;
==
:i
NOTES:
- - - - - - - CONTROL POINT #2 {OFF SHEET)
------APPROX 320 FT FROM CONTROL POINT #1
N: 44540B.64
E: 7644705.56
1.
CONSTRUCT VEGETATED RIP RAP BANK TREATMENT
ACCORDING TO DETAIL 1 ON SHT C3 AND SPECIFICATIONS.
2.
CONSTRUCT STREAM BARB #1 ALONG WITH VEGETATED RIP RAP
SUCH THAT BARB ROCK SEAMLESSLY TRANSITIONS INTO
RIP RAP.
3.
GRADE BANK TO REDUCE SLOPE TO 1.5H:1V ACCORDING TO
CROSS SECTION DTL 2 ON SHT C3. PROPOSED CONTOURS ARE
NOT SHOWN HERE.
4.
EXCAVATE STREAM GRAVEUCDBBLES TO CREATE A NEW
THALWEG/LOW FLOW CHANNEL CONNECTING THE ENDS OF THE
STREAM BARBS, TO THE GRADES SHOWN. CONNECT NEW
THALWEG TO THE EXISTING DEEP POOL DOWNSTREAM OF
STREAM BARB #1. PLACE EXCAVATED GRAVEUCOBBLES
ALONG THE TOE OF THE BANK, BETWEEN STREAM BARBS, AS
DIRECTED.
~i - -
EL: 1346.30
--\
--- ----~--
_..--
..-----I -··--- ~-
------ ·r .---------
CONTROL POINT#1
N: 445452.52
E: 7645022.33
EL: 1344.74
VEGETATED RIPRAP BANK TREATMENT
SEE NOTE 1
PLACE THREE TOE
PROTECTION ROCKS AT EDGE
OF BRIDGE WINGWALL, AS
APPROVED BY ENGINEER
0'
C\
""'
'l'!
= 1343.4
-
1337.3
5.
PROTECT EXISiNG BRIDGE WINGWALLS
0
X/337.2
INSTALL TWO BANK PROTECTION WOOD HABITAT STRUCTURES
(WHS) BETWEEN THE STREAM BARBS AS SHOWN, ACCORDII':G
TO DTL 1 ON SHT C4.
~·
[ollo ~
~
~.
.,."' --,
~·
Q:
~!
'"
.......~~
~:
~i
~'
~:
"·
O:Oi
>-
.:::
\
i
I
".
I
'~:.llr.,
PROPOSED BANK GRADING
SEE NOTE3
/---;
.?.....,____· ..
. ·. ·. /
't s~u ~TURE~~);{vp
WOOD HABIT'/..
'-
SE~.OTD1 SHT C4
\ \ . 'u/
.·
__I
SURVEY CONTROL POINT
'/
-----~8/ .
_./""\/
~~sJ--/ ,/''*-/.'
/
/j
I
I.
j
ttl~)--}'~-----.._
/
::~~:;;:~ c~~
I
1J.I6.0
(
I
X 733~._7/
//
XI~.}_,_~
_....~·\..;/
BANK PROTECTION WHS
SEE NOTES
BARB IF2 END
X
~
X1350.0
TEL
IDJ
PLACE TOE PROTECTION ROCKS ALONG TOE
OF VEGETATED RIPRAP BANK TREATMENT
;:..
~
f--
~
Ill ·..:
~
I
SPOT ELEVATION (1YP)
COMMUNICATION RISER BOX
EXISTING ALDER TREE TO REMAIN
GRADE TO CONNECT NEW THALWEG
TO EXISTING POOL AREA, SEE NOTE 4
EXISTING DOUGLAS-FiR TREE TO REMAIN
STREAW1 BARB #1
SEE DTL 4 ON SHT C3
BARB TJP
N: 445372.49
E: 7644951.78
'-
C5
<=:
~
a
EXISTING CRUSHED GRAVEL
h:
PLACE THREE ADDITIONAL 2' DIA ROCKS AT
END OF BARB #1 AS DIRECTED BY ENGINEER
0::::
N
0::
"-'
PROPOSED RIPRAP
::::::!
L,_J
Q:)
NEW THALWEG EL: 1336.0'
~
- - aHW -
PROPOSED BANK GRADING
lr)
ORDINARY HIGH WATER LINE
~
t:::::::l
<:
CJ
h::
i::-5
Q§
lu
(.,:)
BARB#3 END
N: 445339.96
E: 7644917.25
""'
~
~ 0cr::
BARB #1 MEETS BANK
N: 445404.66
E: 7644950.23
-..J
0::::
8
~
BARB #3 MEETS BANK
N: 445335.72
E: 7644931.39
(._)
~
t::::l
sa
~
~
C3
STREAM BARB #3
SEE DTL 6 ON SHT C3
BARB TIP
N: 445315.64
0)
-...J
-...J
E: 7644941.22
~
~
~
-...J
(/:)
SITE PLAN & OVERVIEW
~
~
~
10
20
S2
0::::
~
0::
a
<=:
IRENEWAL
CJ
~
lw
0)
C2
0.1\ TE
06-30-141
<:.
3Q._
40
Hl../8 j;
~
~
:s:
SCALE: 1"=20'
0
~
(..:)
0::::
CJ
.
~
~
<1:
"'
1350
1350
1345
1345
1340
.. -- ····---- -······-····. ---- -·
-- -~---'-------- -----
~------------ -- ---·
1335
···· EXGAVATENFWTFIALWEG'
.
..... ---,---
. -- --::A_F'~F(l?:~:s:_>,y!DJ"~-=·::-------L.
'
---------- ---,.-----·--·-·---
TO GRADESSfiOWN
1330
8
1+30
1+20
1+00
h10
o+eo
0+90
1320
0+-60
0+70
SECTION - BARB #1
HORIZONTAL SCALE: 1"=10'
VERTICAL SCALE: 1"=1 0'
1350
1350
1345
1345
1340
1340
1335
1335
10
1.
2.
LIVE STAKES AND POLE CUTTINGS SHOWN IN THIS SECTiON SHALL BE REPEATED,
INSTALLED AT APPROXIMATELY 2. FT ON CENTER ALONG THE LENGTH OF THE BANK
"TREATMENT.
BRUSH LAYERING SHALL BE A CONTINUOUS LAYER OF BRUSH ALONG THE LENGTH
OF THE BANK TREATMENT, AS DESCRIBED IN THE SPECS.
--
\---·
----
- -~---·· -----------
1330
SECTION- VEGETATED RIPRAP BANK TREATMENT
HORIZONTAL SCALE: 1"~10'
VERTICAL SCALE: 1"~10'
1330
0+00
o+ao
0+70
0+60
0+50
0+40
I-...
~~S~E~C~T~IO~N_-~B~A~R~B~#~2~---------------------------
V
HORIZONTAL SCAUE: 1"~10'
VERTICAL SCALE: 1';10'
1350
1355,.----------,-------------------~1355
--
.
'
1345
-· ~-~te?~:.I~Kt0:~~_f[Qt:JJB.~Qti-~-~~~-]_...... - --~~,~~=-=~=~~~
1345
i:::
::::::!
Q:)
~
~
C)
~
1340
1340
Q§
l...J
<:.::>
1335
1335
... - -~-· -~---··------~-----·
1330
1330
0+70
V
0+50
0-+50
0+40
D-t30
0+10
0+20
SECTION - BANK GRADING
HORIZONTAL SCALE: 1"·10'
VERTICAL SCALE: 1"·10'
~
l..J
i::::::
L5
Q::
c::.
~
~
CJ
~
~
""":(
~
Q::
~
es
USE SMALLER ROCKS
TO FILL IN GAPS
::::::!
~
-..J
-..J
TOP ROCK SHALL BE 24" MIN
CJ
l.r)
Cl::.l
~
0)
10
<::
c::.
~
G
HORIZONTAL SCALE: 1"=10'
VERTICAL SCALE: 1"~10'
1330 -'-----r---~----+-----'----:----'------+n3o
2
L....i
c::.
CJ
~rS~E~C~T~I=O~N_-~B~A~R=B~#~3~---------------------------
-10
Q::
-
N
l.r)
1350
-20
~
CJ
1350
....... ..:SEE-COTFfFABRfC-lYfC fSHt--Ec2· !'
~
<::
:::::,:
::::::!
Vi
i:::
b!
....._
~
1:5
~
~
Q§
~
C)
<::
SQ
~
<::
CJ
8Q::
CJ
SHl£T:
0~~-~-sP_l~C~A~L~B~A~R~B~S~E~C~T~IO~N~---------------------------
IREI,JEWAL
DATE
06-30-14\
HUB
J:
C3
-- -·--·- ----
I
,
/
/
/
~
/----
I
I
/
I
I
I
, I
I . I
PROPOSED BANK CONTOURS ~~ I I
/-------···
(
I
--
I
-----)
I
' iI{I
:? ~
/
I
I
oow"'~"t"'
/
1
I
ROCK I SOIL SCHEDULE
I
I
\
l_.....---4->4CY' _____ /./
i
ROCK/ SOIL
SPEC SECTION
RIP RAP
02215
STREAM BARB ROCK
02204
FILTER BLANKET ROCK
02215
TOE PROTECTION ROCKS
02215
TOPSOIL
02300
NATIVE BACKFILL
02321
. ~-
L--~--J- -~-------i. .
\
\
I
\
I
PLACE TWO TOE PROTECTION
~OCKS
CLASS 700 RIPRAP
WEIGHT OF ROCK (LBS)
PERCENT (BY WEIGHT)
1
700-500
I
20.0
500-200
30.0
\
I
200-20
40.0
··-·20-0
UPSTREAM
\
\
\
PLAN
SCALE:
RB
\
\
10.0
\
~
STREAM BARB ROCK
\
APPROXIMATE ROCK
DIAMETER (INCHES)
WEIGHT OF ROCK (LBS)
PERCENT (BY WEIGHT)
30.0
i
30"- 20"
1800-700
20" -15"
700-200
30.0
15"-8"
200- 20
20.0
8" -6"
20-15
20.0
1"~10'
20
COIRFABRIC
LiVE FASCINES, TYP
LOG ANGLE TO VARY SO
11-IATMINIMUM BURIAL DEPTHS
ARE MET AND ROOTWAD RESTS
FIRMLY ON FOOTER LOG
STAKE DOWN BUNDLES
Will-I A MIN OF 4 LIVE
STAKES. SEE NOTE 1
LIVE FASCINE NOTES:
NATiVE SOIL
1.
LIVE STAKES TO BEA MINIMUM 5' LONG AND
1 ):t" IN DIA. LIVE STAKES SHALL BE ONE OR
MORE OF THE FOLLOWING PACIFIC
NORTHWEST NATIVE WILLOW SPECIES:
HOOKERS WILLOW- SALIX HOOKER lANA
PACIFIC WILLOW- SALIX LUCIDA
SITKA WILLOW- SALIX SITCHENSIS
COLUMBIA WILLOW- SALIX FLUVIATILIS
\
'7
-
....-
SECTION A-A'
::;:.t£if ~~~~:~:~EAMBED
TIGHTLY WRAPPED
WILLOW BUNDLES
FOOTER LOG
BURIED MIN 213 LOG LENGTH
~~~
EMBED HALF OF FOOTER LOG INTO
NATIVE STREAMBED MATERIAL
A
SECTION A- A'
8
BANK PROTECTION WHS
TIE BUNDLES TIGHTLY TOGETHER
WITH BIODEGRADABLE MANILA ROPE
OR APPROVED EQUAL
STAKE DOWN
BUNDLES WITH A MIN
OF 4 LIVE STAKES
f;\~L~I~V~E~F~A~S~C~IN~E~------------------------------
VNTs
$H[£r:
I
RENEWAL DATE
......_Jd_____ _
06-30-141
HUB f:
,
-----
__
- - - - - - 1; - - - - -
STRAW WATTLE@
EC3
~
<:>
EXiSTING ROAD EDGE
:~
EROSION CONTROL NOTES:
1.
CONTRACTOR TO PREPARE WORK AREA ISOLATION AND STREAM DIVERSION PLAN FOR ENGINEER APPROVAL
PER SPECIFICATIONS.
2.
CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE USE OF AN
APPROPRIATE WORK AREA ISOLATION STRUCTURE. SEE DTL 2 SHT EC2.
3.
THE CONTRACTOR SHALL INSTALL AND MAINTAIN BMP'S AS SHOWN AND PERFORM ALL ACTIONS NECESSARY TO
PREVENT EROSION AND SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. CONTRACTOR SHALL COMPLY
WITH ALL PERMIT CONDITIONS.
:S
~.
4.
lOGE WINGWALLS
RESTORE ALL SURFACES TO
PRE-cONSTRUCTION CONDITIONS
(._
....
... _......
.
..
....
·:
6.
NO EXPOSED, BARE SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS DURING THE PERIOD
OCTOBER 1 THRU APRIL 30 OR FOR MORE THAN SEVEN DAYS DURING THE PERIOD OF MAY 1 THRU SEPTEMBER
30. ALL DISTURBED SOIL SURFACES SHALL BE STABILIZED BY A SUITABLE APPLICATION OF "BEST MANAGEMENT
PRACTICES".
7.
DEWATERING DEVICES SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. NO DISCHARGE SHALL BE
MADE TO A PAVED STREET OR STORMWATER COLLECTION SYSTEM WiTHOUT FIRST REMOVING SEDIMENT.
8.
CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. EROSION SHALL BE
CONTROLLED AND PREVENTED BY SUCH MEASURES AS ROUGHENING THE SURFACE, INSTALLATION OF
INTERCEPTOR DITCHES, TERRACING, COVERING WITH MATTING, MULCH OR PLASTIC SHEETING. RUNOFF SHALL
BE PREVENTED FROM ENTERING A SLOPE AND FROM UNDERCUTTING TIHE BASE OF SLOPES.
9.
STREAM DIVERSION PIPE,
SEE NOTE 1
L~,< ··-_.·-·-·····;\ .
ANY SOIL OR DEBRIS TRANSPORTED ONTO ROADWAYS AND SIDEWALKS SHALL BE REMOVED. DEPOSITS SHALL
BE COMPLETELY REMOVED BY SHOVELING AND/OR SWEEPING.
1D. IF BMP'S SHOWN ARE UTILIZED BUT ARE INSUFFICIENT TO PREVENT SEDIMENT FROM REACHING WATER BODIES,
ADJACENT PROPERTIES. OR PUBLIC RIGHTS-OF-WAY; ADDITIONAL BMP'S SHALL BE IMPLEMENTED IMMEDIATELY
TO PREVENT FURTHER ENCROACHMENT OF SEDIMENT.
'-'\.. ("'J")' I f
\·
SEDIMENT LADEN RUNOFF SHALL BE PREVENTED FROM ENTERING ALL EXISTING STORMWATER CATCH BASINS
AND INLETS AFFECTED BY CONSTRUCTION. PROTECT ANY INLETS AND DRAINS NOT SHOWN ON PLANS.
11. ALL TEMPORARY BMP'S SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED.
TRAPPED SEDIMENT SHALL BE DEPOSITED AND STABILIZED ON SiTE. AREAS DISTURBED RESULTING FROM BMP
REMOVAL SHALL BE PERMANENTLY STABILIZED.
..
12. CONSTRUCTION SHALL NOT BE CONSIDERED COMPLETE AND ACCEPTABLE UNTIL ALL DISTURBED SOIL SURFACES
HAVE BEEN PROTECTED FROM EROSION WITH PERMANENT LANDSCAPING, COVERED WITH IMPERVIOUS
SURFACES, RESTORED TO ORIGINAL UNDISTURBED CONDITION, OR PERMANENTILY STABILIZED.
13. CONTRACTOR SHALL SEED ALL DISTURBED AREAS WITH AN OWNER PROVIDED SEED MIX. ADDITIONAL
REVEGETATION WILL BE COMPLETED BY OWNER.
14. INSTALL STRAW WATTLES DOWNSLOPE FROM STAGING AREAS. IN ADDI1lON TO TIHE WATTLES SHOWN HERE,
INSTALL WATILES AS NECESSARY TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING WETLANDS.
"'·
c'
..,--.,
"'
~:-..I
<>·
:;:
·
>--
LIVE FASCINE
- - - OHW
EROSION & SEDIMENT CONTROL PLAN
.~
0
({J
~
~
I
'-
~
=<:
~
CJ
i:::::
a::
~
ltj
~
'--'
~
~
C)
f.J)
~
Cii
t5
~
&3
c:::.
<:
C)
=<:
~
~
--.1
10
20
~
~
1---.
""'l::
~
~
a::
~
f.J)
l.t)
~
=<:
~
::::,.::
CJ
:::::::!
B5
Vi
CJ
40
SHUJ:
I RENEWAL
DATE
06-30-141
. . .#:_ E:G1
HUliJ
~
CJ
SCALE: 1"=20'
0
L:5
a::
a::
e:=<:
Ej
f.J)
h:::
CJ
u
~
---ORDINARY HIGH WATER
s
...
f---
~
--.1
--.1
COIRFABRIC
tri ""l:
~ o-:-:
-1:
~
----o----o----- TREE PROTECllON FENCING
~
~;
~;
~
STRAW VVATTLE
0.·
g: ~
~
· . . . . . . . . , . , .......... 1··
~:
~
e!
CJ
LEGEND:
~
~-
ALL EROSION AND SEDIMENT CONTROL BMP'S SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ENSURE
CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. NEEDED REPAIRS SHALL BE MADE AS SOON AS
PRACTICABLE. THEY ARE TO REMAIN IN PLACE AND OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.
CONSTRUCTION ACTIVITIES SHALL NOT CONTINUE OR RESUME UNTIL REPAIRS TO EROSION CONTROL FACILITIES
ARE MADE AND THE FACILITIES ARE FUNCTIONAL. ANY SEDIMENT LEAVING THE SITE OR DISCHARGING TO A
SENSITIVE AREA SHALL 13E STOPPED AND CONTROLLED IMMEDIATELY. CONTAMINATED AREAS SHALL BE
CLEANED AND RESTORED.
5.
~
~:
o:
;;,
i'i
""'
""s::
~
<:
C)
i:3
ct::
C)
"~
SAND BAGS __/
""s:::
>-
NOTES:
e·~
'<· -J
....~\
~:
c:
"''
"-·
~:
~~
~:
.
>-
to!
~·
o)
1. THE CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE USE OF AN
APPROVED WORK AREA ISOLATION AND STREAM DIVERSION PLAN.
"""'{
~
OVERTOPPING AND ALLOW ENOUGH FREEBOARD FOR INCLEMENT WATER CONDinONS. DAM HEIGHTS AND
MATERIALS SHALL BE INCLUDED IN THE CONTRACTORS WORK AREA ISOLATION AND STREAM DIVERSION PLAN.
>--
~ 0:::
0
~ 1----
ISOLATION AND STEAM DIVERSION PLAN TO BE DEVELOPED BY THE CONTRACTOR AND APPROVED BY
ENGINEER/OWNER'S REPRESENTATIVE.
~
4. DEWATERING PUMPS SHALL HAVE FISH SCREENS.
DEAD STOUT STAKE, TYP
SEE DETAIL BELOW AND
NOTEB
Ul
~
::>.
~
-~
~
I
(2\~W~O~R~K~A~R~EA~IS~O~L~A~T~IO=N~S~T~R=U=C~TU=R~E=------------------
~ NTS
COIR FABRIC NOTES:
1.
PREPARE SOIL BEFORE INSTALLING FABRIC. PLACE SEED ON SOIL BEFORE INSTALLING FABRIC.
2,
FLOODPLAIN COIR FABRIC SHALL BE WOVEN ROLANKA BIOD-MAT 90 OR APPROVED EQUAL
3.
BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE FABRIC IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF FABRIC EXTENDED
BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE FABRIC WITH A ROW OF DEAD STOUT STAKES APPROXIMATELY 12" APART IN
THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAKING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING
12" PORTION OF FABRIC BACK OVER SEED AND COMPACTED SOIL. SECURE FABRIC OVER COMPACTED SOIL WITH A ROW OF STAKES SPACED
APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE FABRIC.
4.
ROLL THE FABRIC DOWN THE SLOPE. FABRIC WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL FABRIC MUST BE
SECURELY FASTENED TO SOIL SURIFACE BY PLACING STAKES A MINIMUM OF 3' ON CENTER IN A GRID PATTERN AS SHOWN.
5.
THE EDGES OF PARALLEL FABRIC PIECES MUST BE STAKED WITH MINIMUM 1' OVERLAP. STAKE THROUGH OVERLAPPED AREA. APPROXIMATELY
12"' APART ACROSS ENTIRE FABRIC LENGTH.
6.
CONSECUTIVE FABRIC PIECES SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH MINIMUM 1' OVERLAP.
STAKE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE FABRIC WIDTH.
7.
AT THE BOTTOM OF THE SLOPE ANCHOR THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF FABRIC EXTENDED
BEYOND THE DOWN-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF DEAD STOUT STAKES APPROXIMATELY 12"
APART IN THE BOTTOM OF THE TRENCH. AFTER PLACING STAKES, BACKFILL AND COMPACT THE TRENCH. SECURE FABRIC OVER COMPACTED
SOIL WI I"H A ROW OF STAKES SPACED APPROXIMATELY 12"' APART ACROSS THE WIDTH OF THE FABRIC.
B.
ALL STAKES TO BE MINIMUM 16" LONG 2X4 CUT DIAGONALLY. SEE DEAD STOUT STAKE DETAIL
9.
SHINGLE FABRIC WITH THE UPSTREAM PIECE OVER THE DOWNSTREAM PIECE.
...._
1~·
1B"MIN
SE
NOTE
_ L1E
Ill
I
\I I
\I
N
......,
Ct:
Cl:l
t.....i
~
~
(/)
DRIPLINE OF TREE OR
AS SHOWN ON PLAN
lr)
~
i::::::
l....J
(..:)
L...J
l5
S!
~
a
DEAD STOUT STAKE NOTES:
~
C)
'-.:>
Cl::::
~
h..
~
C5
~
FINISHED GRADE
(..:)
1. LONGER STAKES MAY BE REQUIRED DUE TO SOIL TYPES
AND MOISTURE LEVELS. STAKE LENGTHS TO BE
APPROVED BY ENGINEER PRIOR TO PLACEMENT.
u
5'-0"----..J
D.C.TYP.
2. ALL STAKES SHALL BE CONSTRUCTED FROM 2X4 LUMBER
RIPPED DIAGONALLY.
(/)
-.J
-.J
NOTES:
IJ)
v
1.
2.
3.
~
2"x 2''x 6' STEEL FENCE POSTS. INSTALL AROUND TREE DRIP UNE WHERE APPLICABLE.
FASTEN FABRIC TO FENCE PER MANUFACTURERS RECOMMENDATION.
INSURE ALL POST ARE SET FIRM AND STABLE INTO GROUND MIN. 2'-0" DEPTH.
~
:::::.::
~
~~T~R~E~E~P~R~O~T~E~C~T~IV~E~F~E=N~C=l~N~G~----------------
\.J
NTS
~
c::.'.l
-.J
~
RENEWAL DATE
06-30-141
HUfi
J:
~
~
~
d(:s
~
=<::
(:)
~
lr)
<:
a
(/)
a
Ct:
~
~
e:; (:)
SH["IT:
I
CJ
~
:::::i
FINISH GRADE
<:
~
~
TREE
ORANGE POLYETHYLENE (HOPE)
MESH FENCING FABRIC
48" WIDE ROLLS
f1\~C~O~IR~FA~B=R~I~C___________________________________
~ NTS
~
~
~ ,~,,~,"'~'
~
~
;:::::
ZIP TIES
--.
---m
/
~~IHll~~--~-
cs
<:
C)
-~G2.
;::
"'
2. THE HEIGHT OF THE PRIMARY AND SECONDARY DIVERSION DAMS SHALL BE HIGH ENOUGH TO PREVENT
3. THE LAYOUT DEPICTS A POTENTIAL APPROACH FOR STREAM DIVERSION AND DEWATERING. FINAL WORK AREA
>-
"'~
(.U
0
m
OREGON PARKS AND RECREATION DEPARTMENT
EROSION & SEDIMENT CONTROL DETAILS
SIL V£R FALLS CAMPGROUND BRIDGE BANK STABILIZATION
en
-i
z
m
(}
z~
-i
z
m
z
0
-i
0
c
::0
-i
en
z
0
0
I
~
m
G)
0
6
z
()
__,
en
m
Nature
HISTOF~Y
Discovery
:i
\J
m
-u
-l
z
;,;~
~m
oo
C7J
"':z
m-n
;="'
mm
8ii1
-j~
gjll5
GJC
[/)
[/)
[/)
"'~
~
)>
c
Oj
-";
0
ALJ
ORAWN BY
'
HLW
·,
J>"
1"t..
.o()
RE:VISION ~
··-·····-· ·i·····
"t;,.
9,
.o()
'fp1:.>.
~'o%
~II:\
0
~
~~
0~
""'%
Y..:.
0
08/JI/2012
~
\
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP-2013-382
Oregon Department of State Lands No: N/A
Notice Issued: April 7, 2014
Written Comments Due: May 7, 2014
WHO IS THE APPLICANT: Oregon Parks and Recreation, 725 Summer St. NE, Ste. C, Salem, OR
97301.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps
provides public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.