Home

Portland District

Run scraper

the Oregon Parks and Recreation Dept.

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Debra Henry is the Regulatory point-of-contact for this permit application from the Oregon Parks and Recreation Dept. for work at the North Fork Silver Creek, near Stayton, Ore.

PUBLIC NOTICE for Permit Application Issue Date: April 7, 2014 Expiration Date: May 7, 2014 US Army Corps of Engineers No: NWP-2013-382 30-Day Notice Oregon Department of State Lands No: Unknown

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Debra.J.Henry@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: Oregon Parks and Recreation Dept. Katrina Kam 725 Summer St. NE, Ste. C Salem, OR 97301

Location: The project is located in South Fork Silver Creek, at the South Fork Silver Creek Campground Bridge (Latitude 44.8682, Longitude -122.6482), near Stayton, Marion Co., Ore. (Section 14 and 23, Township 8 South, Range 1 East).

Waterway: South Fork Silver Creek

Project description: OPRD wants to realign a segment of stream and stabilize the stream bank. Applicant proposes to re-grade banks with a two-foot horizontal and one-foot vertical slope. Applicant wants to add three stream barbs, vegetated riprap, and wood (logs) habitat structures with live fascines in between the barbs. Approximately 77 cubic yards of cobble, riprap and soil would be excavated to create a new thalweg low flow channel. The proposed project involves placement of 89 cubic yards of cobble, riprap, and logs to stabilize the stream bank and stream channel of South Fork Silver Creek, and return the creek to its original path at the bridge crossing accessing the Silver Falls State Park campground. All work, below the OHW, would be performed within the preferred Oregon Department of Fish and Wildlife in-water work window (July 15 - September 30)”.

Dewatering devices shall discharge into a sediment trap or sediment pond. No discharge shall be made to a paved street or stormwater collection system without first removing sediment. Straw wattles will be installed down slope from the staging areas to prevent sediment laden runoff from entering wetlands. All disturbed areas will be replanted with native seed and riparian vegetation.

Mitigation: A compensatory wetland mitigation plan for bank stabilization and stream channelization was not proposed. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: There is only one access to the Silver Falls State Park campground and it crosses South Fork Silver Creek via a bridge built in the late 1960’s. Over the years, the Creek has shifted causing scour to the upstream side of the bridge and bank erosion. The purpose of the project is to stabilize the streambank and stream channel in the Creek back to where if flowed when the bridge was built.

Drawings: Fourteen (14) drawings are attached and labeled NWP-2013-382 enclosure.

Additional information may be obtained from Debra Henry, Project Manager, U.S. Army Corps of Engineers at 503-808-4391 or email debra.j.henry@usace.army.mil

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity is upstream from an existing dam and will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not likely required for the described activity.

Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. Our preliminary determination is that the project site does not support EFH and that there will therefore be no effect.

Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. Applicant would have an archaeologist on-site to monitor initial ground disturbance.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Silver Falls State' Park Property Boundaries

Oregon Parl.."S & R~tt~ation Dept

20024 Silver Falls Hwy, Sublimity, OR

725 SummerSt ~E. Suite C Salem OR, 9 7301

in Marion County

b r · b ·rnt.;·ll Pl. rpost-t and ll"ay m t /Ia '.t OH ~ 'o t 01 1:-t S· IJ l:.'t t-r >t-; 1 . er; f l1 1' ; . or Sllfvey,-"9 c . r::.: ses UJtr' oftr 1 t~bl'l"'oJ to ., I~J 4 rt'' i! A' Q;( oon~o.'t tl'~ 1 ~ · J'".,J")' :).) IJ JJ" : "10'T"'Jle" ·10-f :::..J !~ ~~~"t~ r t/'tt JYC lyJ

lflis

I

~·.;.-j ; d 5

;:·tt>~·t~

l:"a r')"l'~t ~·

0

1,650

3,3CO Fee!

:;

.:-:: :: : ~

. ..

Oregon Parks & Recreation Dept 725 Swnm erSt NE, Suite C

Project Vicinity Map - Campground Silver Falls State Park, Oregon

Salem OR, 9 730 l

I

*"

Tl'it p~~;~.;t s t· ·b '1l'JtlQrJ f p..rpcu:s.a'Y.lm·y~"~' '.. P''tp,Jttd ~·. or be 1. oc'4 b r ~-1 . t<'~ M rir ; O"< s.r~-e~i-1;

~t-r~s~ . Userso!trJ bti'I".J ~'~ ~~~ ·a r t'l-tn· o r oo~s.'t l~t ~r.rr.J'"'/:3 3 l "d ·!a·rnto"> sc.rcH 1~ u:ern · t,-~ .S.Jb 1)'~1

t"t ·':;m-JI!O"

,

-

~

0

ICO

200 Feet

\

;,

·~ :~:2:

:

Project Area -Bank Stabilization

Otegon Parks & Recreation Dept

Silver Falls State Park, Oregon

Salem OR, 9 730 1

Tt, I

p~a l l i:H 'I'I WI""JtO"...I I IKI.,OU.i: Nd' rr-Jy r~t ~..l \t

tetr

~uJ·td ·e·. Qr 1>e s·. tJ~:t t·~eg:~.. tl'9-"llrl" ; e( s~ "'~':r9 P-!FIU s.rt efv! ~b~.~ ~~ 1!'0o.: ~ rt';'t?, er <:»!'$. t ll'' rr"'-y<:J " ,.~ · 'l)rrr.J t~~ s~t¢t' ~~ ~1U v~ ~ s:sn r;o'

trt

rt

~ tr.,~tOI-

"2.5 SUJl\mtrSt XE, SuiteC

0

25

SD Feet

-

'!"'t

;

: :

~.::

!

EXISTING SITE PHOTOS

looking Downstream

looking Upstream

SEC.14 TSS R1E WM, MARION COUNTY

LEGEND

\

\

.

\

\

LINE TYPES

~

0

I

'

\

10

,

I

11

SEEIIAPaetE11

I

1

I

1

I

I

:- -- --" - -- - - --- ~3~1:----- - ---------.!..------- -:. - - - - - - -J;."_c':,·- - ------- - -- - ~ - -- - --------- ~~ r t

I

IOCl.l SJJmrYl3lal mc:JCioln

,,,,,,,

...

----- ... --... ---

cREEl<.

SILVER -·--~

P.t..ll'n'nCI' I"'..AT' lin'

,,,,,,,

0Jii . . . . .. . ".,1Z.O.

f r_.J

SYJIBOL TYPES

II

~

--~-- ~- -- -

I

#......... ·!.

.

..J l -

I

+ -- ---- -- -- -- -t

· ..,.(;

NUJ/BCRS ru amm

000 00 00 0 ACit£AGS - w. ~ CIQ..UDI: AWY I"'ftDt ~1 WAY Ill nniiX NC Cl*&l'Ut PV.X tuc:HT,

··n

nck ll.t.JI.Q-'W}{Di a TDw..t.UIS OOIICA.tm c.e« nfi IX1'1liSaOilC flit

" l.U'C. nlDf lllC -~ ~ 1'0 TKE liCK Mdlt c:tXIJtlU..Y 1IU5 IS ..aD -xDI ttif~ c:a urtD P\.-.ut

JDr;HT,. ··n.

-- - -- - -...1 __ _ _ _ _ _

NOTICE: This I'T1q:l was created for Assessor's Office uw ON..Y.

'

' !I ' I

i

I

\

'1

~Assessor ~ -m.c.....· ,;_.,

15

.-;~:;:~._.....;.~~ :."~ ---- - ----- - - -,;..----- - - ------ -'~-w-'-3------------.J.J

... ......

·+·

SCALE 1"- 400' Qfi"1.'8CO

Plot file created : November 03, 2009

.__.,.,.,,..u · ...,...,

1 ..., "

23 S£F.

24

I

w.v' 0. 1E 23

"

81E14

SEC.23 T8S R1E WM, MARION COUNTY

LECF:ND

:._l i

I

~ ~ j.~~ ~ ~ ~

22

~

IDCMT-4#-·AT

·

..__.-.w..-

'::

j

J

, .,·.,..,.~,..c

f

23

\

;

- : \.

Cancelled 100

: 14

23 I 24 I

\

'\ \. \ \

\

\

I

I I

I I

I

'

..-~

' '

: 13

-- - - --- -------- - --- - --i$jr----·------- -.-1

I t

,T-t

'--.r'l'

81E 23

1 ;

l 1 1 ""~.·~...., t--- - -- -- -- - -- -'-5--4,14 i 1 : ----- -~-------- - +~-'-. . . - ~ \ ,____~-jloW'OitEI< ..( ·"~~ -- - -- - - -

LINE TTPES

al~

SLifER

I

f'ITI . ~Wf'Tlo4 1 AA LDJ

* O"IrMJI· ·i-t·

....._.

I

S'fJIJl()l. TYPES

t~ Sl~~£~ I·

" "' oa:

l!! 1-- - - - - -- - -....;;!..._..m..c-,..co·

NUJIBERS

fB

000 00 00 0 A~

- A.U. ACUAC£5 IXQ..l.llC

4.1fT i"DffnCHf Wlnt[Jf

·

1ltl

.,. Of

ntAT :IUT Ul

~'1"1])

1'\::a.JC

"'

.,

· I·

.._..

- - - - -,.-;.-- - - - - - - .,/

j

1MDIC4TED GM

11

·~~?;- - - - - - - - -- -- ~

~

=

"'

........,I

004 00 00 8

:

~

I

G

1c:r~ ·tc

t

t

--if!-- - - - - - - - - - - - -- - 0

i~

- - - - - _ _ __ _ __ _ _ _

I

I

I

I

_k.. cc·

i-- - -- - -- - - - --- 1 I

~

·_,

~~

~

J

"'

'

·.tn.

'JXI: VAUS - tltE!C

'Cil

~

I'I

I

004 00 18 ~ ((" ..... ~

::; :0

~

..~

I

not WAIX K

ntr IXT'CXSlD' ar

.AW.-:E,.'f'1{1JQ~~NCO£$

10 t'S£ TICX .ltL'U. COIDtAUT 'n':JS JS U6ID YKDI CD.PSXIIS CO OCTO PUILX R3QIT fW ll.ll'S

I

I

~ - - ---- - -- -- - - - -+---- - --~-- -- -- - ~ I

..'.·

NOTICE: 'llill nq:l WOll creoled for A-llOr's Office use CK.Y.

'\

·+·

SCALE 1" = 400' ar 1·.4800 Plot me created: September 13, 2005

·....._..,·..-,,.u· . . .,·

-------------------f I

SEEIMPoe l £1!1

+--------------:

_:o: - - - - - - - - - - - - -

- - - - - - - - - - - - - - 2~

~

26 1 25

81E 23

CONTACTS

PROJ£CT LOCATION

PROJECT MANAGER: KATRINA KAM 725 SUMMER ST. NE, ST£ C SALEM, OR 97301-1271 OFFICE: (503) 986-0776 FAX. (503) 986-0792

PARK MANAGER: KEVIN STRANDBERG SILVER FALLS STAT£ PARK 20024 SILVER FALLS HWY S£ SUBLIMITY, OR 97385 OFFICE: (503) 873-4395 EXT. 26 FAX: (503) 873-4395

OWNE.R/APPUCANT: OREGON PARKS & R£CR£A TION DEPT. 725 SUMMER ST. N[, ST£ C SALEM, OR 97301-1271 OFFICE: (503) 986-0707 FAX: (503) 986-0792

Coos Bay (

VIGIL,~_AGRIMIS

ENGINEER: VIGIL -AGRIMIS, INC HUNTER WHIT[, P£ KEN VIGIL, P£

STAT£ MAP

PROJECT LOCATION;

VICINITY MAP

819 SE Morrison Street Suite310 Portland, Oregon 97214

Gt

Ct C2

C3 C4

ECJ EC2

EC3

SILVER FALLS STAT£ PARK

~!

c·

t:n;

.,.,._

e:

~::)

8\

It;

~;

C!

~!

PROJECT COORDINA T£5:

LAT. LONG.

COVER EXISTING CONDITIONS, SIT£ ACCESS, & DEMO SIT£ PLAN & OVERVIEW BANK TREATMENT SECTIONS &- DETAILS HABITAT DETAILS EROSION & SEDIMENT CONTROL PLAN EROSION & SEDIMENT CONTROL DETAILS EROSION &- SEDIMENT CONTROL DETAILS

I. 2. 3. 4.

5.

6.

CAMPGROUND BRIDGE BANK STABILIZATION MARION COUNT~ OREGON

~

"

~

§

·~

~

I

w

0.58 ACRES

AREA OF DISTURBANCE:

0.20 ACRES - TOTAL SIT[ DISTURBANCE

THE CONTRACTOR :OHALL &t SOLELY RESPONSIBLE FOR HAVING UTILITIES LOCATED P.RIOR TO CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DAMAGED UTILITIES TO THE AFFECTED UTILITY SERVICE. ALL UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE LOCATIONS ONLY AND MUST B£ VERIFIED IN THE FIELD PRIO.R TO CONSTRUCTION. THE BAS£ SURVEY FOR THIS PROJECT WAS COMPLETED BY OREGON PARKS AND RECREATION. ALL ELEVATIONS ARE BASED ON SURVEY CONTROL POINTS INDICATED IN PLAN DRAWINGS, HORIZONTAL COORDINATES ARE .REFERENCED TO U.S. STAT£ PLAN[, OREGON NORTH, INTERNATIONAL FEET. ELEVATION DATUM: NAVDBB (G£0 ID 03). THE CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE US£ OF AN APPROVED WORK AREA ISOLATION AND STREAM DIVERSION PLAN. THE WORK AREA ISOLATION AND STREAM DIVERSION PLAN SHALL B£ SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. ALL WORK SHALL 8£ DON£ DURING THE IN-WATER WORK PERIOD JULY 15 - SEPTEMBER 30.

~

(f)

'-

C5

::::::

a

ABBREVIATIONS

h:::

AVG CY DIA DTL

--...;

nwr; [ [L

rr LF MAX MIN N OHW SHT TYP WHS

~

Q:

N

AVERAGE CUBIC YARD DIAMETER DETAIL nRAWING £A STING ELEVATION FOOT, FEET LINEAR FEET MAXIMUM MINIMUM NORTHING ORDINARY HIGH WATER SHEET TYPICAL WOOD HABITAT STRUCTURE

;;::

~

~

~

t::::J

~

< CJ

~

l5

V)

i:::::

~

~

~ Cl:l

Q:

~ ::::J a

~

~

5/L VER FALLS STATE PARK

,._

"'

"< ~

44.876667 N -122.64805

SIZE:

GENERAL NOTES

>-

~ et: 0 ~ f-·

20024 SILVER FALLS HWY S£ SUBLIMITY, OR 97385

S£ 1/4 T. 8S, R. 1[, S. 14 (TAX LOT 00100) N£ 1/4 T. 8S, R. 1[, S. 23 (TAX LOT 00100)

DRAWING INDEX

NOT TO SCALE

~: ~=

503-274-2010 503-274-2024 www.vigll-agrimis.com

LEGAL DESCRIPTION:

NOT TO SCALE

LOCATION MAP

::i ""'

professionals

PROJECT DATA

NOT TO SCALE

PROJECT LOCATION

design

~ C5

LOCATES (48 HOURS N01lCE REQUIRED PRIOR TO EXCAVATION)

PINK PURPLE

-

ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES GAS, OIL, STEAM, PETROLEUM, OR OTl-IER HAZARDOUS LIQUID DR GASEOUS MATERIALS. COMMUNICATIONS. CABLE TV, ALARM OR SIGNAL LINES. CABLES OR CONDUITS. WATER. IRRIGATION, AND SLURRY LINES. SEWERS. DRAINAGE FACILITIES OR OTHER DRAIN LINES. PRE-MARKING OF THE OUTER LiMITS OF THE PROPOSED EXCAVATION OR MARKING THE CENTERLINE AND WIDTH OF PROPOSED LINEAL INSTALLATIONS OF BURIED FACILITIES. TEMPORARY SURVEY MARKINGS SLURRY AND RECLAIMED

~

Q:

~

V)

THE CONTRACTOR MUST COMPLY WITH THE REGULATIONS OF O.R.S. 757.541 TO 757.571 IN LOCATION AND PROTECTION OF UNDERGROUND UTILITIES. OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY Tl-IE OREGON UTILITY NOTiFICATION CENTER. Tl-IOSE RULES ARE SET FORTl-1 IN OAR 952-001-0010 Tl-IROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALUNG THE CENTER. COLOR CODES: RED YELLOW ORANGE BLUE GREEN WHITE

""(

-..J -..J

L::: ~ ::::,;:

-..J

V)

<:

e5

::::,;:

a<'-..)

CJ

~

Q:

CJ

SHUT:

G1

-----·- --------·-------------- -·

I RENEWAL.

DATE

06-30-141

HV8 j:

NOTES: 1.

COORDINATE STAGING AND STOCKPILING LOCATIONS WITrl PARK MANAGER.

2.

PROTECT EXISTING VEGETATION TO THE MAXIMUM EXTENT POSSIBLE.

3.

ALL ACCESS AND STAGING AREAS SHALL BE RESTORED TO PRECONSTRUCT! ON CONDITIONS AS DESCRIBED IN SPECS.

4.

UTILITY LOCATIONS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTlllllES WITHIN THE WORK AREA.

5.

EXISTING 10' PVC DRAIN PIPE SEE NOTES STAGING AREA

! ;::: <::>

'S-

REMOVE EXISTING RIPRAP AND STOCKPILE ROCK FOR USE IN VEGETATED RIPRAP OR STREAM BARBS.

6.

POSSIBLE LOCATION OF EXISTING 10" PVC DRAIN PIPE. IF ENCOUNTERED DURING CONSTRUCTION, PROTECT PIPE OR RECONNECT AS NECESSARY.

7.

REMOVE ALL TREES IDENTIFIED FOR REMOVAL, IF NECESSARY TO COMPLETE WORK. DISPOSE OF TREES OFF SITE.

:s._

.,. ~-

ii ~ ~

TEL EXISTING TRAIL

~: --J

~: ~

>- (:> Ct:: 0

f---

IJJ I

~

;.. <::1

.~

~

SPOT ELEVATION (TYP)

EXISTING ALDER TREE EXISTING LARGE BOULDER TO REMAIN

TREE TO BE REMOVED, TYP

EXiSTING DOUGLAS-FIR TREE

EXISTING GRAVEL BAR

I--

~

<:

TREE REMOVAL

~

C)

h::

~

SITE ACCESS

CI::l

EXISTING CRUSHED GRAVEL

t~w\

\

TREE#

1.¥1;

\ \ \ II \

EXISTING GRAVEL RIDGELINE

TREE REMOVAL

I lli( \\ .· '

EXISTING DOUGLAS FIR TREES. TYP

EXISTING GRAVEL RIDGELINE

\

UNDERCUT STREAM BAINK

2 3

SPECIES

SIZE(DBH)

RED ALDER

24"

RED ALDER

18'

RED ALDER

8"

REDAILDER

10"

RED ALDER

16"

6

RED ALDER

12"

7

RED ALDER

16"

8

REO ALDER

10"

RED ALDER

10"

10

DOUGLAS FIR

18"

~

·mE

9: ~

-.;

::::2 ~

EXISTING TRAIL

Q:::

~

IN PLACE RIP-RAP

~

STAGING AREA

SITE ACCESS

'

SiTE ACCESS I CCNSTRUCTION ENTRANCE

C)

~

c:::::.

<:: C)

Q§

~

h:

t3

V)

L:5 Q:

~

12

~ :::::5

~

C)

(/)

~

V)

~

- - OHW --ORDINARY HIGH WATER LINE

C5

trJ

---.J ---.J

~

~ ::::;;::

----.J

EXISTING CONDITIONS, SITE ACCESS, AND DEMO

~

V)

~

V}

(..) (..)

'""(

~

--32

h::

C)

c.J (.!:)

~

I-: (/)

~ l,j

C,_)

LJ..J

Q::: ~

<:: ~

~

Q:::

~ <:: C) <:..:>

~ C)

SCALE: 1"=20' 0

10

20

40 Sl-IE£T:

IREI·JEWAL

..GJ ____ _ DATE

06-30-141

~

~ ~ Q

COMMUNICATION RISER BOX

[]

REMOVE EXISTING RIPRAP SEE NOTES

e>-~

i:5i

~

X1350.0

~

....~i

PROTECT EXISTING BRIDGE AND WINGWALLS DURING CONSTRUCTION. CONTRACTOR TO BE RESPONSIBLE FOR ANY DAMAGE TO BRIDGE. NOTIFY OWNER IMMEDIATELY IF DAMAGE OCCURS.

SURVEY CONTROL POINT

. .

~.,.

,(

8.

co :e <::> ;;;

== :i

NOTES:

- - - - - - - CONTROL POINT #2 {OFF SHEET) ------APPROX 320 FT FROM CONTROL POINT #1

N: 44540B.64 E: 7644705.56

1.

CONSTRUCT VEGETATED RIP RAP BANK TREATMENT ACCORDING TO DETAIL 1 ON SHT C3 AND SPECIFICATIONS.

2.

CONSTRUCT STREAM BARB #1 ALONG WITH VEGETATED RIP RAP SUCH THAT BARB ROCK SEAMLESSLY TRANSITIONS INTO RIP RAP.

3.

GRADE BANK TO REDUCE SLOPE TO 1.5H:1V ACCORDING TO CROSS SECTION DTL 2 ON SHT C3. PROPOSED CONTOURS ARE NOT SHOWN HERE.

4.

EXCAVATE STREAM GRAVEUCDBBLES TO CREATE A NEW THALWEG/LOW FLOW CHANNEL CONNECTING THE ENDS OF THE STREAM BARBS, TO THE GRADES SHOWN. CONNECT NEW THALWEG TO THE EXISTING DEEP POOL DOWNSTREAM OF STREAM BARB #1. PLACE EXCAVATED GRAVEUCOBBLES ALONG THE TOE OF THE BANK, BETWEEN STREAM BARBS, AS DIRECTED.

~i - -

EL: 1346.30

--\

--- ----~--

_..--

..-----I -··--- ~-

------ ·r .---------

CONTROL POINT#1 N: 445452.52

E: 7645022.33 EL: 1344.74

VEGETATED RIPRAP BANK TREATMENT SEE NOTE 1

PLACE THREE TOE PROTECTION ROCKS AT EDGE OF BRIDGE WINGWALL, AS APPROVED BY ENGINEER

0'

C\

""' 'l'!

= 1343.4 -

1337.3

5.

PROTECT EXISiNG BRIDGE WINGWALLS 0

X/337.2

INSTALL TWO BANK PROTECTION WOOD HABITAT STRUCTURES (WHS) BETWEEN THE STREAM BARBS AS SHOWN, ACCORDII':G TO DTL 1 ON SHT C4.

~·

[ollo ~

~

~.

.,."' --,

~· Q:

~! '" .......~~

~:

~i ~'

~:

"·

O:Oi

>-

.:::

\

i

I

".

I

'~:.llr.,

PROPOSED BANK GRADING SEE NOTE3

/---;

.?.....,____· ..

. ·. ·. /

't s~u ~TURE~~);{vp

WOOD HABIT'/..

'-

SE~.OTD1 SHT C4

\ \ . 'u/ .·

__I

SURVEY CONTROL POINT

'/

-----~8/ .

_./""\/

~~sJ--/ ,/''*-/.'

/ /j I I. j ttl~)--}'~-----.._ /

::~~:;;:~ c~~

I 1J.I6.0 (

I X 733~._7/ // XI~.}_,_~ _....~·\..;/

BANK PROTECTION WHS SEE NOTES

BARB IF2 END

X

~ X1350.0 TEL

IDJ

PLACE TOE PROTECTION ROCKS ALONG TOE OF VEGETATED RIPRAP BANK TREATMENT

;:.. ~

f--

~ Ill ·..:

~

I

SPOT ELEVATION (1YP) COMMUNICATION RISER BOX

EXISTING ALDER TREE TO REMAIN GRADE TO CONNECT NEW THALWEG TO EXISTING POOL AREA, SEE NOTE 4 EXISTING DOUGLAS-FiR TREE TO REMAIN

STREAW1 BARB #1 SEE DTL 4 ON SHT C3 BARB TJP N: 445372.49 E: 7644951.78

'-

C5

<=:

~

a

EXISTING CRUSHED GRAVEL

h:

PLACE THREE ADDITIONAL 2' DIA ROCKS AT END OF BARB #1 AS DIRECTED BY ENGINEER

0::::

N

0::

"-'

PROPOSED RIPRAP

::::::!

L,_J

Q:)

NEW THALWEG EL: 1336.0'

~

- - aHW -

PROPOSED BANK GRADING

lr)

ORDINARY HIGH WATER LINE

~

t:::::::l

<:

CJ

h:: i::-5

Q§

lu (.,:)

BARB#3 END N: 445339.96 E: 7644917.25

""'

~

~ 0cr::

BARB #1 MEETS BANK N: 445404.66 E: 7644950.23

-..J

0::::

8 ~

BARB #3 MEETS BANK N: 445335.72 E: 7644931.39

(._)

~

t::::l

sa ~

~ C3

STREAM BARB #3 SEE DTL 6 ON SHT C3 BARB TIP N: 445315.64

0) -...J -...J

E: 7644941.22

~

~ ~ -...J

(/:)

SITE PLAN & OVERVIEW

~

~ ~

10

20

S2 0::::

~

0::

a

<=:

IRENEWAL

CJ

~

lw

0)

C2 0.1\ TE

06-30-141

<:.

3Q._

40

Hl../8 j;

~

~ :s:

SCALE: 1"=20' 0

~

(..:)

0:::: CJ

. ~

~

<1:

"'

1350

1350

1345

1345

1340

.. -- ····---- -······-····. ---- -· -- -~---'-------- -----

~------------ -- ---·

1335

···· EXGAVATENFWTFIALWEG'

. ..... ---,---

. -- --::A_F'~F(l?:~:s:_>,y!DJ"~-=·::-------L.

' ---------- ---,.-----·--·-·---

TO GRADESSfiOWN

1330

8

1+30

1+20

1+00

h10

o+eo

0+90

1320 0+-60

0+70

SECTION - BARB #1 HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=1 0'

1350

1350

1345

1345

1340

1340

1335

1335

10

1.

2.

LIVE STAKES AND POLE CUTTINGS SHOWN IN THIS SECTiON SHALL BE REPEATED, INSTALLED AT APPROXIMATELY 2. FT ON CENTER ALONG THE LENGTH OF THE BANK "TREATMENT. BRUSH LAYERING SHALL BE A CONTINUOUS LAYER OF BRUSH ALONG THE LENGTH OF THE BANK TREATMENT, AS DESCRIBED IN THE SPECS.

--

\---·

----

- -~---·· -----------

1330

SECTION- VEGETATED RIPRAP BANK TREATMENT HORIZONTAL SCALE: 1"~10' VERTICAL SCALE: 1"~10'

1330 0+00

o+ao

0+70

0+60

0+50

0+40

I-...

~~S~E~C~T~IO~N_-~B~A~R~B~#~2~---------------------------

V

HORIZONTAL SCAUE: 1"~10' VERTICAL SCALE: 1';10'

1350

1355,.----------,-------------------~1355

--

.

'

1345

-· ~-~te?~:.I~Kt0:~~_f[Qt:JJB.~Qti-~-~~~-]_...... - --~~,~~=-=~=~~~

1345

i:::

::::::!

Q:)

~

~

C)

~ 1340

1340

Q§

l...J <:.::>

1335

1335

... - -~-· -~---··------~-----· 1330

1330

0+70

V

0+50

0-+50

0+40

D-t30

0+10

0+20

SECTION - BANK GRADING HORIZONTAL SCALE: 1"·10' VERTICAL SCALE: 1"·10'

~ l..J

i::::::

L5 Q::

c::. ~

~ CJ

~

~

""":(

~

Q::

~

es

USE SMALLER ROCKS TO FILL IN GAPS

::::::!

~

-..J -..J

TOP ROCK SHALL BE 24" MIN

CJ

l.r)

Cl::.l

~

0)

10

<::

c::.

~ G

HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"~10'

1330 -'-----r---~----+-----'----:----'------+n3o

2

L....i

c::.

CJ

~rS~E~C~T~I=O~N_-~B~A~R=B~#~3~---------------------------

-10

Q::

-

N l.r)

1350

-20

~

CJ

1350

....... ..:SEE-COTFfFABRfC-lYfC fSHt--Ec2· !'

~

<::

:::::,:

::::::!

Vi

i:::

b! ....._ ~

1:5 ~

~ Q§

~

C)

<::

SQ ~ <:: CJ

8Q:: CJ

SHl£T:

0~~-~-sP_l~C~A~L~B~A~R~B~S~E~C~T~IO~N~---------------------------

IREI,JEWAL

DATE

06-30-14\

HUB

J:

C3 -- -·--·- ----

I

,

/

/

/

~

/----

I I

/

I

I

I

, I I . I PROPOSED BANK CONTOURS ~~ I I

/-------··· (

I

--

I

-----)

I

' iI{I

:? ~

/

I

I

oow"'~"t"'

/

1

I

ROCK I SOIL SCHEDULE

I

I

\

l_.....---4->4CY' _____ /./

i

ROCK/ SOIL

SPEC SECTION

RIP RAP

02215

STREAM BARB ROCK

02204

FILTER BLANKET ROCK

02215

TOE PROTECTION ROCKS

02215

TOPSOIL

02300

NATIVE BACKFILL

02321

. ~-

L--~--J- -~-------i. .

\

\ I \

I

PLACE TWO TOE PROTECTION

~OCKS

CLASS 700 RIPRAP WEIGHT OF ROCK (LBS)

PERCENT (BY WEIGHT)

1

700-500

I

20.0

500-200

30.0

\

I

200-20

40.0

··-·20-0

UPSTREAM

\

\

\

PLAN SCALE:

RB

\

\

10.0

\

~

STREAM BARB ROCK

\

APPROXIMATE ROCK DIAMETER (INCHES)

WEIGHT OF ROCK (LBS)

PERCENT (BY WEIGHT) 30.0

i

30"- 20"

1800-700

20" -15"

700-200

30.0

15"-8"

200- 20

20.0

8" -6"

20-15

20.0

1"~10'

20

COIRFABRIC LiVE FASCINES, TYP

LOG ANGLE TO VARY SO 11-IATMINIMUM BURIAL DEPTHS ARE MET AND ROOTWAD RESTS FIRMLY ON FOOTER LOG

STAKE DOWN BUNDLES Will-I A MIN OF 4 LIVE STAKES. SEE NOTE 1

LIVE FASCINE NOTES:

NATiVE SOIL

1.

LIVE STAKES TO BEA MINIMUM 5' LONG AND 1 ):t" IN DIA. LIVE STAKES SHALL BE ONE OR MORE OF THE FOLLOWING PACIFIC NORTHWEST NATIVE WILLOW SPECIES: HOOKERS WILLOW- SALIX HOOKER lANA PACIFIC WILLOW- SALIX LUCIDA SITKA WILLOW- SALIX SITCHENSIS COLUMBIA WILLOW- SALIX FLUVIATILIS

\

'7

-

....-

SECTION A-A'

::;:.t£if ~~~~:~:~EAMBED

TIGHTLY WRAPPED WILLOW BUNDLES

FOOTER LOG BURIED MIN 213 LOG LENGTH

~~~

EMBED HALF OF FOOTER LOG INTO NATIVE STREAMBED MATERIAL

A

SECTION A- A'

8

BANK PROTECTION WHS

TIE BUNDLES TIGHTLY TOGETHER WITH BIODEGRADABLE MANILA ROPE OR APPROVED EQUAL

STAKE DOWN BUNDLES WITH A MIN OF 4 LIVE STAKES

f;\~L~I~V~E~F~A~S~C~IN~E~------------------------------

VNTs

$H[£r:

I

RENEWAL DATE

......_Jd_____ _ 06-30-141

HUB f:

,

-----

__

- - - - - - 1; - - - - -

STRAW WATTLE@ EC3

~ <:>

EXiSTING ROAD EDGE

:~

EROSION CONTROL NOTES: 1.

CONTRACTOR TO PREPARE WORK AREA ISOLATION AND STREAM DIVERSION PLAN FOR ENGINEER APPROVAL PER SPECIFICATIONS.

2.

CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE USE OF AN APPROPRIATE WORK AREA ISOLATION STRUCTURE. SEE DTL 2 SHT EC2.

3.

THE CONTRACTOR SHALL INSTALL AND MAINTAIN BMP'S AS SHOWN AND PERFORM ALL ACTIONS NECESSARY TO PREVENT EROSION AND SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. CONTRACTOR SHALL COMPLY WITH ALL PERMIT CONDITIONS.

:S ~.

4.

lOGE WINGWALLS

RESTORE ALL SURFACES TO PRE-cONSTRUCTION CONDITIONS

(._

....

... _......

.

.. ....

·:

6.

NO EXPOSED, BARE SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS DURING THE PERIOD OCTOBER 1 THRU APRIL 30 OR FOR MORE THAN SEVEN DAYS DURING THE PERIOD OF MAY 1 THRU SEPTEMBER 30. ALL DISTURBED SOIL SURFACES SHALL BE STABILIZED BY A SUITABLE APPLICATION OF "BEST MANAGEMENT PRACTICES".

7.

DEWATERING DEVICES SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. NO DISCHARGE SHALL BE MADE TO A PAVED STREET OR STORMWATER COLLECTION SYSTEM WiTHOUT FIRST REMOVING SEDIMENT.

8.

CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. EROSION SHALL BE CONTROLLED AND PREVENTED BY SUCH MEASURES AS ROUGHENING THE SURFACE, INSTALLATION OF INTERCEPTOR DITCHES, TERRACING, COVERING WITH MATTING, MULCH OR PLASTIC SHEETING. RUNOFF SHALL BE PREVENTED FROM ENTERING A SLOPE AND FROM UNDERCUTTING TIHE BASE OF SLOPES.

9.

STREAM DIVERSION PIPE, SEE NOTE 1

L~,< ··-_.·-·-·····;\ .

ANY SOIL OR DEBRIS TRANSPORTED ONTO ROADWAYS AND SIDEWALKS SHALL BE REMOVED. DEPOSITS SHALL BE COMPLETELY REMOVED BY SHOVELING AND/OR SWEEPING.

1D. IF BMP'S SHOWN ARE UTILIZED BUT ARE INSUFFICIENT TO PREVENT SEDIMENT FROM REACHING WATER BODIES, ADJACENT PROPERTIES. OR PUBLIC RIGHTS-OF-WAY; ADDITIONAL BMP'S SHALL BE IMPLEMENTED IMMEDIATELY TO PREVENT FURTHER ENCROACHMENT OF SEDIMENT.

'-'\.. ("'J")' I f

\·

SEDIMENT LADEN RUNOFF SHALL BE PREVENTED FROM ENTERING ALL EXISTING STORMWATER CATCH BASINS AND INLETS AFFECTED BY CONSTRUCTION. PROTECT ANY INLETS AND DRAINS NOT SHOWN ON PLANS.

11. ALL TEMPORARY BMP'S SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED. TRAPPED SEDIMENT SHALL BE DEPOSITED AND STABILIZED ON SiTE. AREAS DISTURBED RESULTING FROM BMP REMOVAL SHALL BE PERMANENTLY STABILIZED.

..

12. CONSTRUCTION SHALL NOT BE CONSIDERED COMPLETE AND ACCEPTABLE UNTIL ALL DISTURBED SOIL SURFACES HAVE BEEN PROTECTED FROM EROSION WITH PERMANENT LANDSCAPING, COVERED WITH IMPERVIOUS SURFACES, RESTORED TO ORIGINAL UNDISTURBED CONDITION, OR PERMANENTILY STABILIZED. 13. CONTRACTOR SHALL SEED ALL DISTURBED AREAS WITH AN OWNER PROVIDED SEED MIX. ADDITIONAL REVEGETATION WILL BE COMPLETED BY OWNER. 14. INSTALL STRAW WATTLES DOWNSLOPE FROM STAGING AREAS. IN ADDI1lON TO TIHE WATTLES SHOWN HERE, INSTALL WATILES AS NECESSARY TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING WETLANDS.

"'· c' ..,--., "' ~:-..I

<>·

:;:

·

>--

LIVE FASCINE

- - - OHW

EROSION & SEDIMENT CONTROL PLAN

.~

0

({J

~

~

I

'-

~

=<:

~

CJ

i:::::

a:: ~ ltj

~ '--'

~

~

C)

f.J)

~ Cii

t5 ~

&3 c:::.

<: C) =<: ~

~ --.1

10

20

~

~

1---.

""'l::

~

~ a::

~

f.J)

l.t)

~

=<:

~ ::::,.::

CJ

:::::::!

B5

Vi

CJ

40 SHUJ:

I RENEWAL

DATE

06-30-141

. . .#:_ E:G1

HUliJ

~

CJ

SCALE: 1"=20' 0

L:5 a:: a::

e:=<: Ej

f.J)

h:::

CJ

u ~

---ORDINARY HIGH WATER

s

...

f---

~

--.1 --.1

COIRFABRIC

tri ""l:

~ o-:-:

-1:

~

----o----o----- TREE PROTECllON FENCING

~

~;

~;

~

STRAW VVATTLE

0.·

g: ~

~

· . . . . . . . . , . , .......... 1··

~:

~

e!

CJ LEGEND:

~

~-

ALL EROSION AND SEDIMENT CONTROL BMP'S SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. NEEDED REPAIRS SHALL BE MADE AS SOON AS PRACTICABLE. THEY ARE TO REMAIN IN PLACE AND OPERATIONAL DURING ALL PHASES OF CONSTRUCTION. CONSTRUCTION ACTIVITIES SHALL NOT CONTINUE OR RESUME UNTIL REPAIRS TO EROSION CONTROL FACILITIES ARE MADE AND THE FACILITIES ARE FUNCTIONAL. ANY SEDIMENT LEAVING THE SITE OR DISCHARGING TO A SENSITIVE AREA SHALL 13E STOPPED AND CONTROLLED IMMEDIATELY. CONTAMINATED AREAS SHALL BE CLEANED AND RESTORED.

5.

~

~:

o:

;;,

i'i

""'

""s::

~ <: C)

i:3 ct:: C)

"~

SAND BAGS __/

""s::: >-

NOTES:

e·~ '<· -J

....~\

~:

c:

"'' "-·

~:

~~

~:

. >-

to!

~·

o)

1. THE CONTRACTOR SHALL NOT WORK DIRECTLY WITHIN SOUTH FORK SILVER CREEK WITHOUT THE USE OF AN APPROVED WORK AREA ISOLATION AND STREAM DIVERSION PLAN.

"""'{

~

OVERTOPPING AND ALLOW ENOUGH FREEBOARD FOR INCLEMENT WATER CONDinONS. DAM HEIGHTS AND MATERIALS SHALL BE INCLUDED IN THE CONTRACTORS WORK AREA ISOLATION AND STREAM DIVERSION PLAN.

>--

~ 0::: 0 ~ 1----

ISOLATION AND STEAM DIVERSION PLAN TO BE DEVELOPED BY THE CONTRACTOR AND APPROVED BY ENGINEER/OWNER'S REPRESENTATIVE.

~

4. DEWATERING PUMPS SHALL HAVE FISH SCREENS. DEAD STOUT STAKE, TYP SEE DETAIL BELOW AND NOTEB

Ul

~

::>. ~

-~ ~

I

(2\~W~O~R~K~A~R~EA~IS~O~L~A~T~IO=N~S~T~R=U=C~TU=R~E=------------------

~ NTS

COIR FABRIC NOTES: 1.

PREPARE SOIL BEFORE INSTALLING FABRIC. PLACE SEED ON SOIL BEFORE INSTALLING FABRIC.

2,

FLOODPLAIN COIR FABRIC SHALL BE WOVEN ROLANKA BIOD-MAT 90 OR APPROVED EQUAL

3.

BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE FABRIC IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF FABRIC EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE FABRIC WITH A ROW OF DEAD STOUT STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAKING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF FABRIC BACK OVER SEED AND COMPACTED SOIL. SECURE FABRIC OVER COMPACTED SOIL WITH A ROW OF STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE FABRIC.

4.

ROLL THE FABRIC DOWN THE SLOPE. FABRIC WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL FABRIC MUST BE SECURELY FASTENED TO SOIL SURIFACE BY PLACING STAKES A MINIMUM OF 3' ON CENTER IN A GRID PATTERN AS SHOWN.

5.

THE EDGES OF PARALLEL FABRIC PIECES MUST BE STAKED WITH MINIMUM 1' OVERLAP. STAKE THROUGH OVERLAPPED AREA. APPROXIMATELY 12"' APART ACROSS ENTIRE FABRIC LENGTH.

6.

CONSECUTIVE FABRIC PIECES SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH MINIMUM 1' OVERLAP. STAKE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE FABRIC WIDTH.

7.

AT THE BOTTOM OF THE SLOPE ANCHOR THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF FABRIC EXTENDED BEYOND THE DOWN-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF DEAD STOUT STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. AFTER PLACING STAKES, BACKFILL AND COMPACT THE TRENCH. SECURE FABRIC OVER COMPACTED SOIL WI I"H A ROW OF STAKES SPACED APPROXIMATELY 12"' APART ACROSS THE WIDTH OF THE FABRIC.

B.

ALL STAKES TO BE MINIMUM 16" LONG 2X4 CUT DIAGONALLY. SEE DEAD STOUT STAKE DETAIL

9.

SHINGLE FABRIC WITH THE UPSTREAM PIECE OVER THE DOWNSTREAM PIECE.

...._

1~·

1B"MIN SE NOTE _ L1E

Ill

I

\I I

\I

N ......,

Ct:

Cl:l

t.....i

~

~

(/)

DRIPLINE OF TREE OR AS SHOWN ON PLAN

lr)

~

i::::::

l....J (..:)

L...J

l5

S! ~

a

DEAD STOUT STAKE NOTES:

~

C)

'-.:>

Cl::::

~

h..

~

C5

~

FINISHED GRADE

(..:)

1. LONGER STAKES MAY BE REQUIRED DUE TO SOIL TYPES AND MOISTURE LEVELS. STAKE LENGTHS TO BE APPROVED BY ENGINEER PRIOR TO PLACEMENT.

u

5'-0"----..J D.C.TYP.

2. ALL STAKES SHALL BE CONSTRUCTED FROM 2X4 LUMBER RIPPED DIAGONALLY.

(/) -.J

-.J

NOTES:

IJ)

v

1. 2. 3.

~

2"x 2''x 6' STEEL FENCE POSTS. INSTALL AROUND TREE DRIP UNE WHERE APPLICABLE. FASTEN FABRIC TO FENCE PER MANUFACTURERS RECOMMENDATION. INSURE ALL POST ARE SET FIRM AND STABLE INTO GROUND MIN. 2'-0" DEPTH.

~

:::::.::

~

~~T~R~E~E~P~R~O~T~E~C~T~IV~E~F~E=N~C=l~N~G~----------------

\.J

NTS

~

c::.'.l

-.J

~

RENEWAL DATE

06-30-141

HUfi

J:

~

~

~

d(:s

~ =<:: (:)

~ lr)

<:

a (/) a

Ct:

~

~ e:; (:)

SH["IT:

I

CJ

~

:::::i

FINISH GRADE

<:

~ ~

TREE

ORANGE POLYETHYLENE (HOPE) MESH FENCING FABRIC 48" WIDE ROLLS

f1\~C~O~IR~FA~B=R~I~C___________________________________ ~ NTS

~

~

~ ,~,,~,"'~'

~

~

;:::::

ZIP TIES

--. ---m / ~~IHll~~--~-

cs

<: C)

-~G2.

;::

"'

2. THE HEIGHT OF THE PRIMARY AND SECONDARY DIVERSION DAMS SHALL BE HIGH ENOUGH TO PREVENT

3. THE LAYOUT DEPICTS A POTENTIAL APPROACH FOR STREAM DIVERSION AND DEWATERING. FINAL WORK AREA

>-

"'~

(.U

0

m

OREGON PARKS AND RECREATION DEPARTMENT

EROSION & SEDIMENT CONTROL DETAILS

SIL V£R FALLS CAMPGROUND BRIDGE BANK STABILIZATION

en

-i

z

m

(}

z~

-i

z

m

z

0

-i

0

c

::0

-i

en

z

0 0

I

~ m

G)

0

6 z

() __,

en m

Nature HISTOF~Y

Discovery

:i

\J m -u

-l

z

;,;~ ~m

oo C7J

"':z m-n

;="' mm

8ii1

-j~

gjll5

GJC

[/)

[/)

[/)

"'~ ~

)>

c

Oj

-"; 0

ALJ ORAWN BY

'

HLW

·,

J>"

1"t..

.o()

RE:VISION ~

··-·····-· ·i·····

"t;,.

9,

.o()

'fp1:.>.

~'o% ~II:\

0

~

~~ 0~

""'% Y..:.

0

08/JI/2012

~

\

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification

Corps of Engineers No: NWP-2013-382 Oregon Department of State Lands No: N/A

Notice Issued: April 7, 2014 Written Comments Due: May 7, 2014

WHO IS THE APPLICANT: Oregon Parks and Recreation, 725 Summer St. NE, Ste. C, Salem, OR 97301. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Written comments:

Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas