Kristen Hafer is the Regulatory point-of-contact for this after-the-fact permit application from the J.C. Compton Company for work impacting Turner Lake, two of its unnamed tributaries and adjacent wetlands in Turner, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: April 8, 2014
Expiration Date: May 8, 2014
US Army Corps of Engineers No: NWP-1995-847-0
30-Day Notice Oregon Department of State Lands No: ENF-7395
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Kristen Hafer, Kristen.A.Hafer@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: J.C. Compton Company
Attn: Jay Compton, President
3825 Shropshire Way
Salem, OR 97302
Location: The project is located in waters of the U.S. near the Turner, in Section 20, Township 8 South, Range 2 West, in Marion Co., Ore.
Waterway: The project is located in wetlands adjacent to Turner Lake, two unnamed tributaries to Turner Lake, and Turner Lake.
Project description: The permittee is seeking an after-the-fact permit modificaiton for work that occurred during authorized aggregate mining activities. In 1996 the Corps issued a Department of Army permit authorizing mining activities for a period of 10-years and culminating the creation of the 82-acre Turner Lake. The project included the removal of 150,000 cubic yards of gravel annually, for a total of 2,250,000 cubic yards. The DA permit authorized the discharge of fill into 1.8 acres of wetlands, and conversion of 12.9 acres of wetlands into open water habitat. The permit authorized a total of 14.7 acres of wetland loss. To mitigate for the impacts to the wetlands, the DA permit required 16.2 acres of wetland creation and enhancement. The permit authorized the diversion of a ditched intermittent creek around the mining area until the final reclamation phase of the project was completed.
The permittee is seeking after-the-fact authorization for an additional 0.7 acre of wetland fill that occurred during gravel mining operations. The wetlands were originally planned to be impacted through removal activities and converted to deep water habitat. Construction access and staging resulted in project changes and the wetlands were subsequently filled.
Mitigation: If the DA permit is modified, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: Aggregate mining; after-the-fact authorization for changes made during authorized mining activities.
Drawings: Six (6) drawings are attached and labeled NWP-1995-847-0 enclosure.
Additional information may be obtained from Kristen Hafer, Project Manager, U.S. Army Corps of Engineers at 503-808-4387 or e-mail: Kristen.A.Hafer@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95-217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described changes to the original DA permit will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not required for the described activity.
Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
Our preliminary determination is that the project site does not support EFH and that there will therefore be no effect.
Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the
latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
LEGEND
DSL 10293-RF
Authorized Impact
Corps NWP 1995-847
Authorized Impact
~
North Center Depressions
0.85-acre
Not Spec:lflcotty Ouontifted
~
Southeast Swale
Not SpecUicoMy OuonfiUed
Mot Spec:lflcolly OuontU'-d
~ Southwest Swale
Not Sp.clflcoly Ouontif'-d
Hot SptdfJcoN' OuontU'-d
~
llol
Ditched Center Depressions
TOTAL
'-"lc..,
0
Proposed Avoided Wetland
dJ
Proposed Excavation Footprint
llol Spedflcolly O..onflflocl
Ouonmlocl
14.7 acres
1.8 acre
Road
North Center
Depressions
SAl 1996 Site
130:t Acres
Area
Boundary
Source: Adapted from digitized DSL WD# 1996-0024 4: 10293-RF files and Marton County GIS linework .
Terra Science, Inc.
Soil , Water, & Wetland Consultants
.....
~
·
0
PERMIT MODIFICATION REQUEST FOR
CORPS .PERMIT NWP 1997-847
City of Turner, Marion County, Oregon
NOTE: Corps did not regulate
removal Impacts.
PREVIOUSLY
AUTHORIZED
IMPACTS
GRAPHIC SCALE
ZZ$
·so
I
.
( IN FEET )
1 lnc.h ·
·~o
NWP-1995-847
ft .
April 2014
1
Enclosure 1
LEGEND
Realized Mining Impacts
Fill
Removal
~ North Center Depressions
0.8-ocre
0 . 1-ocre
~
0.2-ocre
3.7 acres
~ Southwest Swole
1.1 acre
3.8 acres
~ Ditched Center Depressions
0.<4-ocre
<4.8 acres
2.5 acres
12.<4 acres
Southeast Swole
TOTAL
f
TSI 2013 Study Area
171.S8:1: Acres
Source: Adopted from digitized DSL WDf 1996-002<4 .!c 10293-RF flies and Marion County GIS linework.
Terra Science, Inc.
Soil, Water, & Wetland Consultants
PERMIT MODIFICATION REQUEST FOR
CORPS PERMIT NWP 1997-847
City of Turner, Marion County, Oregon
REALIZED IMPACTS
22S
I
( IN FEET )
NWP-1995-847
-G)
c:
:::0
m
GRAPHIC SCALE
1 Inch · 450 U .
.,
1\l
April 2014
2
Enclosure 1
NOTE : Applicant anticipates drainage construction Ia occur between July and September 2014. Construction
methodology would adhere Ia previous OSL and Carps permit conditions and authorized SAl mitigation plans.
Existing culverts
Ia lioliligatian Annex
TSI 20 13 Study Area
r171.58± Acres
Ahrens Road
I
I
.---~------------·--
~ Approximate
>
- - -·As-Buill - - - - - - - - - - - - - - - - - -
Exlrocl ion Footpri nt
1996 Project Boundary
130± Acres
\_As-Buill Open
Water (263 msl)
As outlined in the authorized April 1996 SAl plan text, mitigation indicated " the
re-aligned channel would be somewhat sinuous and graded to have a highand law-flaw channel profile."
Project engineers determined that an eighteen-inch culvert be installed to allow
same drainage flows to enter into Turner Lake Ia maintain the integrity of
Turner Lake. As discussed, lake levels must remain at approximately 263 mean
sea level (msl) to satisfy Oregon Deportment of Geological and liollnerol Industries
(DOGAiiotl) reclamation slope standards. Allowing lake levels to fall below current
levels would decrease 3:1 slope distances and compromise OOGAiioll safely
standards. To molnloln safe levels, Applicant would install a culvert at
approximately 274 feel msl to capture approximately len cubic feel / second
bose flow (Cross-Section F-F). Figure 48 provides addlllonol speclflcollons for
the proposed culvert.
Wetland 0
Source: Adopted from digitized OSL Permit 10293-RF files, Marlon County GIS linework and Westech civil files.
Terra Science, Inc.
Soil, Water, & Wetland Consultants
PERMIT MODIFICATION REQUEST FOR
CORPS PERMIT NWP 1997-847
City of Turner, Marion County, Oregon
PROPOSED DRAINAGE
CONSTRUCTION
SPECIFICATIONS
GRAPHIC SCALE
0
· .....
~
.
7S
1 Inch · 150 11.
NWP-1995-847
-c:
G)
::0
.
m
ISO
( IN rEET )
.,
(,.)
April 2014
3
Enclosure 1
('
280
"'"
""""'· ADol4
I.
·"
009
w
280
280
278
278
278
z
276
6
3
276
276
274
"'"'
274
274
272
272
270
270
268
268
266
266
I
272
'
/
270
268
'L:
266
.........
1
I
1
.I\
.< I
'"
·o
·u
1-,..,
284
PR
282
z
\
,
I
I
I
~
280
-...
1
.. '
PRC OLE - ____/
0.
~';!:'·. 2
"'"
-
282
;;,, ~
280
~
1\J
276
272
284
tli.OR
~
278
......
'! /'...
.. !,,., ,
OL[
276
\
274
,J'
,..
O i LE
r-o~ PR
T
I
278
"'
I
282
280
0
0
60
SECTION
eo
too
20
4()
110
SECTION
262
262
20
""'
w
264
<;.An",.;:·
0
.ILGI' ~0
~'
N
1\
0:
~
~
...
274
270
......
272
276
274
.!..,
u
TP
270
ll
\
266
272
1
v
268
278
.
"
270
268
268
'ROf
264
ORIQ~
282
ot_D_
eo
too
t20
8-B
266
1'"'·20' H.
1'"'·2' VERT.
t20
\
\
264
262
A-A
0
·o
20
eo
60
SECTION
1'"'·20' H.
t··2' VERT.
290
290
II
~
284
288
288
286
286
/
284
7
280
"'
I
282
OAI~ ~ CR
I
""
~
~
ill
276 I
\'f.
284
282
278
274
272
0
20
·o
110
eo
100
120
SECTION E-E
272
1"·2o' H,
1"·2' 'o{RT
270
I\
270
270
274
,11\.
266
t20
276
272
270
268
tOO
c-c
276
'0\
272
260
278
u
274
"'
w
274
-~
\
I ll
280
~
278
I
-........
276
262
280
I
rT
u
278
'*
CR
1!:
284
282
7
~
280
,roo· ;.AD"I """'
,;;;;;,.. ;w;;;: UliD
)RIGI
~
·u
282
264
I
1\ \
260
1'"'·20' H.
1'"'· 2' VERT,
266
.\
268
266
T \
264
264
262
262
\
\
260
0
20
·o
60
SECTION
eo
260
tOO
120
0 -D
· · - ~· w
Source: Adapted from Westech civil flie s.
Terra Sc ience , In c .
PERMIT MODIFICATION REQUE ST F'OR
CORPS PERMIT NWP 1997-847
City of Turner, Marion County, Ore g on
PROPOSED DRAINAGE
CROSS-SECTIONS
.,
-
G)
c:
::0
m
Soil, Water, &: Wetla nd Consultants
~
)>
April 20 14
NWP-1995-847
4
Enclosure 1
()
()
292
288
284
92
co
r OG Tp BE
r--
r>
~
r--
I
,!!,
Ul
:s
l:i
280
~
'
I
FOR
I
I
~
; \, I
~~1
/
I
1-- TYPE
:::,t.t.
a· V
2
r~
272
\..
2'./
I
3 ST RM IN ET
I ru:::, ::.r .t. l
84
~ fl.
-vi
I
v-MITE R PIP END TO
MA CH CL T SLO E
r RIPRA
72
"~
68
v "'-.,
~
~
Q
1'--../
~
260
76
./
~
264
80
S= 2.0.
~
·2.0!1
4
268
88
r 18" 01 lA.. PIP
lj \ rl -2:1 v
276
F EMOV D
HANN L CUI 1:::,1KU TION
_,-OR GINAL
GR f)UND
64
""' ~
k
~
60
~
256
~
252
56
~
"'!'-.
248
52
~
48
~
........
244
240
WSE= 41.4
10 / 2 l/ 08
~
I
0
I
20
I
40
I
60
.........
I
80
I
100
I
120
I
140
I
160
I
180
SE C TIQ~
1"=20' H.
1"=4' VERT.
PlACE FILTtR FAeRie
1~ FROIIT OF CRATt
I
220
I
240
~
·-·~,Y
260
I
280
I
300
rI
320
~
I
340
I
-.......
~
IOFIJQN~ CROU~D
"<._
~
~
18' STORI,I PIPE 5·2.a.
_ /.:=;_
"""
~
...
PIP!I'!_G OET AIL
Source: Adapted from Wntech civil flies.
Terra Science, Inc.
f240
360
F-F (LAKE FILL PIPE)
I~LET
TYPE J I~ET
I
(SECTION TAKEN LOOKING UPSTREAM)
PlACE RIPRAP
OVER FILTER FAeRie
TYPE J
I
200
44
PERMIT MODIFICATION REQUEST FOR
CORPS PERMIT NWP 1997-847
City of Turner, Marion County, Oregon
PROPOSED DRAINAGE
CROSS-SECTIONS
,-
G')
c
:;o
m
Soil, Water, & Wetland Consultants
~
NWP-1995-847
April 2014
5
Enclosure 1
m
LEGEND
Wetland Boundary (9. 15 acres)
15-Foot t.llllgotlon Buffer (0.96-ocre)
t.litigotion Area
± 10.85 Acres
L
rr
Source:
from
Intermittent
Creek
Adopted from City of Solem georeferenced civil files ond TSI GPS survey file.
PERMIT MODIFICATION REQUEST FOR
CORPS PERMIT NWP 1997-847
City of Turner, Marion County, Oregon
Terra Science, Inc .
Soil, Woler, &. Wetland Consultants
FINAL MITIGATION
ACREAGES
C)
:::0
GRAPHIC SCALE
.
12S
( IN rtET )
I Inch = 12S fl .
NWP-1995-847
-c-n
250
I
NOTE : Corps concurred with f i nal mitigation ac reages
within their August 26, 2008 closure letter.
April 2014
6
Enclosure 1
m
CJ'I
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-1995-847
Oregon Department of State Lands No: ENF-7395
Notice Issued: April 8, 2014
Written Comments Due: May 8, 2014
WHO IS THE APPLICANT: J.C. Compton Company
Attn: Jay Compton, President
3825 Shropshire Way
Salem, OR 97302
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll-free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.