Shelly Lynch is the Regulatory point-of-contact for this permit application from the city of Wilsonville for work impacting Wetland A and the south tributary of Coffee Lake Creek.

PUBLIC NOTICE for Permit Application Issue Date: April 23, 2014 Expiration Date: May 23, 2014 US Army Corps of Engineers No:NWP-2014-134 30-Day Notice Oregon Department of State Lands No: APP0056093

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Shelly Lynch Michelle.R.Lynch@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: City of Wilsonville 29799 SW Town Center Loop E. Wilsonville, OR 97070

Location: The project is located near Wilsonville, Clackamas County, Oregon in Section 14, Township 3 South, Range 1 West, at the current Kinsman Road terminus at Barber Street to Boeckman Road.

Waterway: The project will have impacts on one wetland area (Wetland A) and the south tributary of Coffee Lake Creek.

Project description: The Kinsman Road Extension project will begin at the intersection of Barber Street and Kinsman Road and extend north to Boeckman Road. The road extension will include two 12-foot travel lanes, with two 6-foot bike lanes, two 6-foot water quality swales, one 5 to 6-foot sidewalk (east side) and one 10-foot wide sidewalk (west side), and curbs and gutters. There will also be a 150-foot long 14-foot wide left turn lane for southbound Kinsman Road traffic to eastbound Barber Street turning, and another 150-foot long 14-foot wide left turn lane from southbound Kinsman Road to the Commuter Rail park-and-ride lot. The fill slopes behind the sidewalks will be 1 vertical to 2 horizontal (IV:2H). Approximately 1000 feet of an existing 24-inch to 28-inch sanitary sewer line lies within the proposed road alignment and will be upgraded to a 30-inch line in the existing line location.

Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for a 1.35 acres temporal mitigation site to mitigate for tree removal. Aprpoximately 325 trees and 650 shrubs will be planted in the temporal mitigation site. In addition, the applicant is proposing to purchase 4.5 acres of Palustrine Forested to Palustrine Emergent HGM Slope-Flats wetland through the Mud Slough Mitigation Bank, LLC.

Purpose: The proposed project will provide a safe and efficient freight route through western Wilsonville, reducing current freight traffic through residential areas and school zones. This project was identified in the City of Wilsonville Transportation System Plan (TSP) in 2003 and in the updated 2013 plan.

Drawings: Seven (7) drawings are attached and labeled NWP-2014-134 enclosure.

Additional information may be obtained from Shelly Lynch, Project Manager, U.S. Army Corps of Engineers at 541-962-0401 or email Michelle.R.Lynch@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity will not affect endangered species. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) is not required for the described activity.

Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. Our preliminary determination is that the project site does not support EFH and that there will therefore be no effect.

Cultural resources: An historic properties investigation has been conducted within the permit area. The project area includes a segment of Seely Ditch which was determined eligible for listing in the National Register of Historic Places by the Federal Highway Administration in 2005. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

KinsmanRd 1 Extensionlllo.l (Project) I

I

11/18/13

5100 Location and general topography for the proposed Kinsman Road Extension project corridor in Wilsonville, Oregon (USGS Sherwood, OR quadrangle 1961 photo revised 1985). -Pacific Habitat Services. Inc.

------------------------------...1

Table4.

Prop<»oo Pl~mtillg listfor Temporal EntumcementjPEM to PFO) Site

Proposed Temporal Mitigation Area (58,975 sf I 1.35 ac)

\

Existing Temporal Mitigation Area

'~··(DSL#49456-RF) ·~ (COE

--\

# 2012-68)

'

LEGEND

CJ Wetland Existing Contour Tax Lot Line

0

Note: Survey provided by OBEC

175

350

700

SCALE IN FEET

Proposed Temporal Mitigation Area Kinsman Road Extension - Wilsonville, Oregon Pacific Habitat Services, Inc. !l45DSWConmwlmCiltlo, SUlle11l0-. Omgoo91070 Phone {503) 57l).OSOO

Fax (503)

570~

X:\Project Dwectones\5100\5100 Kmsman Road Extenslon\AutoCAD\P!ot Dwgs\JPA F!gures\FJg13PropM!tSJte,dwg, 12/19/2013 3:14:18 PM

12-6-13

XXV-XXX·

CUrt

fJIJffor

f

I 6 mil black plc6fic

Design Provided By OBEC - Not to Scale

Water Quality Swale Details Kinsman Road Extension - Wilsonville, OR 03-19-14

:\Pro;ect Dwectones\5100\5100 Kinsman Road fxtenston\AutaCAD\P1ot DwgsVPA Figures\F!gll_Swn!eDetaJ!s,dwg, 3/19/2014

PM

TOTAL AREA IMP AREA PERV AREA TOG BASIN lA SEE SHEET 4 FOR DETAILS

BASIN 2A TOTAL AREA 43665 SF IMP AREA 43665 SF TOC 5 MIN

BASIN 38 7433 SF 6166 SF 1267 SF 14 MIN

BASIN 28 TOTAL AREA 54594 SF IMP AREA 44569 SF PfRV AREA 10025 SF ' TOC 61 MIN

TREA TM£NT SWALE LENGTH 13 FT BOTTOM WIDTH 4 FT MIN SLOPE 0.50%

BASIN 18 TOTAL AREA 30206 SF IMP AREA = 27537 SF PERV AREA 2669 SF 5 MIN

Not to Scale

Design Provided By HHPR Inc.

Stormwater Design and Basins Kinsman Road Extension - Wilsonville, OR 12-6-13

PM

ground

ISlA

To

uKn 2

ISCAI E:

Ys"

ground

5" WETLAND

·STA. "K

II

"K

II

**

13+6 · 1 20+46 "'KII 22+59.2 "K 32+50 II

10

To STA. "K 1/'K To 1/K, To "K To II

II

II

20+L16 22+59.2 25+50 37+25 "K"

Taper section) NOT£:

Overexcwote Dy

2 4" aurlng

WETLAND

Design Provided By OBEC

FIGURE Typical Road Sections Kinsman Road Extension - Wilsonville, OR

7

Pacific Habitat Services, Inc. 945

Fa.x (503) 570-0055

03-07-14

LEGEND

Permanent Wetland Impact { 193,627 sf I 4.45 ac) Permanent Waters Impact {766 sf I 0.02 ac) Existing Contour Tax Lot Line

Waters Impact For Detailed View See Figure 58

"-D.:.rn-·<>n.<>nt

0

175

350

700

Note: Survey provided by OBEC

Proposed Alignment Impacts Overall view Kinsman Road Extension - Wilsonville, Oregon

FIGURE

6 03-07-14

Directories:\5100\5100 Kinsman Road Extension\AutoCAD\P!ot Dwgs\JPA Figures\Fig6.AHgnJmpactOV.dwg, 3/18/2014 3:49:05 PM

LEGEND ·· · ·

Study Area Boundary

D

WetlandA Existing Contour

Tax Lot Line

Temporal Mitigation Area (Existing)

0

Note: Survey provided by OBEC

200

400

800

SCALE IN FEET

Existing conditions Kinsman Road Extension - Wilsonville, Oregon 03-07-14

Diredories\5100\5100 Kinsman Road fxtension\AutoCAD\P!at Dwgs:\JPA Figures\Fig4~b:istCond~dwg, 3/18/2014 3:1035 PM

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2014-134 Oregon Department of State Lands No: APP0056093

Notice Issued: April 23, 2014 Written Comments Due: May 23, 2014

WHO IS THE APPLICANT: City of Wilsonville 29799 SW Town Center Loop E. Wilsonville, Oregon 97070

LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas