Benny Dean Jr. is the Regulatory point-of-contact for this permit application from Kenneth Sierra for work on the Siuslaw River at River Mile 4.6, near Florence, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: May 15, 2014 Expiration Date: June 13, 2014 US Army Corps of Engineers No: NWP-2014-112 30-Day Notice Oregon Department of State Lands No: 56122-FP

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil) 211 E. 7th Ave., Ste. 105 Eugene, OR 97401-2722

Applicant: Kenneth Sierra P.O. Box 2808 1236 Bay St. Florence, OR 97439

Location: The project is located along the Siuslaw River, River Mile 4.6, near Florence, Lane County, Oregon. The site is in Section 34 of Township 18 South, Range 12 West.

Waterway: Siuslaw River

Project description: The project would install 31 - 4 inch diameter, 5 foot long galvanized steel pipe piles in two separate walls. Each pipe pile will be filled with concrete. Each wall would also include 2 stacked rows of untreated wood lagging covered with erosion control fabric behind the pipe pile to retain soil. The total square footage for the wood lagging is 264 square feet with a total fill volume of 3.2 cubic yards. A row of coir logs would also be installed on the surface to control the short term erosion. And approximately 96 cubic yards of silty sand type fill from a local source would be placed behind and in front of each wall. The material would be discharged and graded to match existing native material.

Mitigation: The applicant has not proposed any mitigation for the project as proposed. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To stabilize a bank.

Drawings: Four (4) drawings are attached and labeled NWP-2014-112 enclosure.

Additional information may be obtained from Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers at 541-465-6769 or email Benny.A.Dean@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2014-112 Oregon Department of State Lands No: 56122-FP

Notice Issued: May 15, 2014 Written Comments Due: June 13, 2014

WHO IS THE APPLICANT: Kenneth Sierra LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Ave., Ste. 400, Portland, OR 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900. PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Corps No. NWP-2014-112

Page 1 of 3

Email: 401publiccomments@deq.state.or.us Mail: Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax: 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Corps No. NWP-2014-112

Page 2 of 3

PUBLIC NOTICE OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION Date: May 15, 2014 U.S. Army Corps of Engineers No: Corps No. NWP-2014-112 Oregon Department of State Lands No: 56122-FP

NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office. DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit Application. For further information, you may call DLCD at (503) 373-0050.

REVIEW CRITERIA: Comments should address consistency with the applicable elements of the Oregon Coastal management Program. These elements include the following: Acknowledged Local Comprehensive Plans & Implementing Ordinances Statewide Planning Goals Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as applicable.

INCONSISTENT? If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program.

Corps No. NWP-2014-112

Page 3 of 3

NWP-2014-112

SIER

FOUNDATION REPAIR

PBS

1236 BAY STREET FLORENCE, O .R EGON 97439

Engineering + Environmental 486 E Street Suite B Coos Bay, OR 97420 541 .266.·8200 Main 866.727.0140 Fax www.pbsenv.com

GENERAL NOTES 1.

THE CONTRACTOR SHALL HAVE AT ALL TIMES ON-SITE, THE .APPROVED CONSTRUCTION PLANS, PERMITS, STANDARD PLANS, AND ALL OTHER APPLICABLE SPECIFICATIONS BOOKS AND MANUALS.

2.

ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS AND THE APPLICABLE REQUIREMENTS OF THE CURRENT EDITION OF THE OREGON DEPARTMENT OF TRANSPORTATION (ODOT) STANDARD CONSTRUCTION SPECIFICATIONS AND ALL REVISIONS AND SPECIAL SPECIFICA liONS, EXCEPT WHERE. SPECIFICALLY STATED OTHERWISE.

3.

ATTENTION EXCAVATORS: OREGON LAW .REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES FROM THE CENTER BY CAWNG 1.800.332.2344. IF YOU HAVE ANY QUESTIONS ABOUT THE RULES, YOU MAY CONTACT THE CALL CENTER. YOU MUST NOTIFY THE CENTER AT LEAST 2 BUSINESS DAYS, BUT NOT MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVAllON. CALL 1.8.0 0.332.2344.

4.

DRAWING SCALES ARE SHOWN BY THE .BARSCALE AND TEXT. TEXT SCALE APPLIES TO FULL SCALE DRAWING 22" X 34" SIZE.

Bay Street

- '·'-,

~~· ~,-·,--.._ '"' ~/ \.

·-' - -

-

7.

ALL DISCREPANCIES IN THESE CONSTRUCTION DRAWINGS, .REFERENCED SPECIFICATIONS, NOTES AND SITE CON_DITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD. HE WILL DETERMINE CORRECTIONS OR REVISIONS AND SHALL ISSUE SUCH IN WRITING.

Page 1 of 4

8.

ALL FIELD CHANGES TO THESE APPROVED DRAWINGS SHALL BE PERMITTED AFTER AUTHORIZAllON BY THE ENGINEER OF RECORD. INCLUDING CITY APPROVALS WHERE NECESSARY.

9.

WORK IN PROXIMITY TO ADJACENT PROPERTY OWNERS. SHALL BE COORDINATED IN .ADVANCE.

10. CONTRACTOR SHALL PROTECT ALL FACILITIES, EXISllNG OR NEW, FROM DAMAGE AND RESTORE TO O.RIGINAL CONDITION WHERE REQUIRED.

1-' ........ " t \

""

t

"" / I~

Pt::'J

?

9V""

'- " "

"

"

"

'-

~

r -.. . . .

>

, ] ...........

'

I

-6- ,

...........

-........

..............

/

11. NO VEHICLES WILL BE PERMITTED TO OCCUPY THE AREA BELOW OHW. ONLY HAND TOOLS WILL BE. ACCEPTED IN THIS ZONE. EXCAVAllON AND MATERIAL PLACEMENT SHALL BE ACCOMPLISHED BY SUITABLE EQUIPMENT LOCATED ABOVE OHW. 12. THE CONTRACTOR IS REQUIRED TO NOTIFY ALL UTILITIES 48 HOURS PRIOR TO COMMENCEMENT OF WORK.

- -

14. THE CONTRACTOR MAY BE REQUIRED TO PROVIDE FLAGGING, SIGNS, AND OTHER TRAFFIC CONTROL DEVICES

FOR SAFE TRUCK ACCESS ONTO PUBLIC STREETS. ALL SUCH DEVICES SHALL CONFORM TO THE STANDARDS ESTABLISHED IN THE LATEST ADOPTED EDITION OF' THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) PUBLISHED BY THE U.S. DEPARTMENT OF TRANSPORTATION AND THE MODIFICATIONS TO THE MUTCD FOR STREETS AND HIGHWAYS FOR THE STATE OF WASHINGTON.

\

\ l.

~

-

---

I\ I \ (I I

'\

\

i

____

i'l

:g ~

I

J

I

-

~

· §

ENCL

I II l

SITE VICINITY MAP SCALE: NONE

'

-- - - - - - - o-

-

/

/

//

/I.

/

'\

\. . . _

-,_

-- --

-

---- '-

---

-

'0

-

_

-s- _

-

-

-

-

·

01Jdy

'

-

-

"

...........

~--------

(J--Q_

@

-........ \

\

\

" ...........

-... -... -...

--- --

0

0

0

0

SITE PLAN

----SCALE:

1"=1U'

- --0

0

'

0

" \.

.,

-...........

...........

' 1:7--

0

- -----0

0

0

z

<(1-0

O::WC)

0

o::ww w~:t:o::

GENERAL INFORMATION:

-1-o

en en

OWNE:R:

...........

-

I

FINISH FLOOR FINISH GRADE HIGHEST MEASURED TIDE ORDINARY HIGH WATER TOP OF WALL

,.

"-,

\

"'._"-

-.._ '- -

I

\. "- '-

\ \

.........__ Matrl· of Old Pier Supports 1Pt.~or Condition-Some ure Missing) -

- - -o-

~"-- -~~~ /

-

- ~--.\ ----..._

-........ -

FF FG HMT OHW TW

/

- - - - -------

0

0

0

0

-

\

_

'\,

-----

_/

-,

&eoc;.,

......................

·

PROJECT ABBREVIATIONS

·

......................

-:::>~ :::: -

0

~

-........

.................................

"

"~

::c>w 1-<(0

GARSON OIL lNG. PRIMARY: KENNETH SIERRA 1236 BAY STREET FLORENCE, OR 97439 PH: -(OFFICE) (CELL) E-MAIL:-

zWmz w zCDo::

. w~o ~""""...J

u.

SITE CIVIL ENGINEER: PBS ENGINEERING+ ENVIRONMENTAL INC. GEORGE DRAKE, P.E. 1500 D STREET VANCOUVER, WA 98663 PH: 360.690.4331 E-MAIL: george.drake@pbsenv.com

"' r

tJ

!<"'c ~

0 ·~

a;

~

0

ci z PROJECT:

0

'

0

- -

~

·

\.

I I li'l.'.:,......._ a ........._" '........... , · ~" .. ._, ..::;.-.._ : -... I / "'\"- \-

-

COVER EXISTING CONDITIONS SITE IMPROVEMENT PLAN CROSS SECTIONS & DETAILS

+

'-

_ _ -4- -

Grassy Area

'

\.

-=-~-- -. . . '· ~:--- '> I

"- - - s - -

-

C1 C2 C3 C4

'

..........

~

w

~

\.

-6 -

·

INDEX TO DRAWINGS

\.

- ,

-

I

I

v

---.e- -

I

'b

1

,

~

I

.·

T

~ "-.::::..--

""

:<

~

'

/

----........

& s

l._

/

/

-

'- '--.._ - -

\

j

,.,.._. ' -4-_ -

\

''' .,

\ ,.,

I

I

\;'I'\ ........... -........

'\

f

"" -

dl

\ '

"-

\'\

I

"'/

'

.

'\

15. SHOULD ANY ITEM OF ARCHAEOLOGICAL INTEREST BE FOUND DURING DEVELOPMENT. YOU ARE REQUIRED TO STOP WORK AND NOTIFY THE CITY/STATE. FAILURE TO DO SO COULD RESULT IN A FELONY CONVICTION. THE ENGINEER AND CITY INSPECTOR SHALL ALSO BE NOTIFIED.

,

/

~ ~\ ~"

.....

-

"

/

r~

_..- ...-

I

r / / /L

/1 .-,l. .: :c "-{/.. '7///// /' { · / / -. . . . \ I . x-,.,;b..,.:. £.._ . ~~ / I ',. . - \ '""'"""' iii ·. - .·4, r I I \ . .' ··- / / / / / 7 / kI d>\ \ "" . ':--.... \ \. . --.._ ,\ ·1f, "'\ . . . I\,> · ..· , ·

-

13. CONTRACTOR A9CESS FROM BAY STREET TO NORTH. PROVII;IE FOR THE SAFETY OF PUBLIC USERS IN THIS AREA.

,

' - - -.s.....

-........

/ / // / / / 11 · / / / / · " / , -.""!" u,< !!>6·· / /

-s- '

L_

I

/ / /

..___ -......,

/

1/Fo, ~tlng

I

>......_

I

/ / / / / / // /

0

I

!EXPIRES:

/ ///Existing / / / //Structure/ ' ' , 4 9/1/ / / FiC. Flr.=1 · / /

'_.--

\))

5. CONTRACTOR WILL HAVE USE OF AUTOCAD FILES TO PROVIDE. DETAILED LOCATIONS, ELEVATIONS AND DIMENSIONS OF ALL CONSTRUCTION IMPROVEMENTS. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMANCE WITH LOCAL, STATE AND FEDERAL CODES GOVERNING THE WORK.

~ 'I,-/ :~e9et I ot,."e '-'-"...-'i "ire ' I ,- .., \ \_-::...~ I

. ' /////// ·' / / / / / / / / / /// / / ////

90036.001

-

-----0 0 0

JK

DRAWN: CHECKED:

DATE: DWGNO.

Know what's below.

Call before you dig.

C1

GD,PS .MARCH 2014 SHEET NO.

1 OF

4

~----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~------._--~

NWP-2014-112

Topographic Survey Located in : T 18 S, R 12 W, SE1/4, NE1/4 Section 34 , W.M. Lane County, Oregon

Bay Street

· &.8116 · g.4!'>\

,j~,01A

.,.

.1.986

~

,, ,69~ ,.Yo!>

\lege\.o\.i'<~e .,.e·l-

, 1 .!'>1'-

.v~l-

· f>.994

,,,e79 , 1 ,o;llf>

.e.~'e

Grassy Area · 7 .7~1

.1.1141

~

Page 2 of 4

So,.., 0

· l).llll'l.

:.v 8eocn

~(lin."' Ktnf

'm :] ~ ,

.z.z64

~

· \.'!l~'

0

u

0

0

0

.-o.!'>o'

~1~

o·-0 ·

o

p9~

0

E

0

0

0

Matrfx af Old ~er Support· '\"""- 'Poor Condltio(\-Sorne are WftlinQ)

-------

~

0

~ 0

0'\

.O·'·'

0

0

0

0

· \.~~'2.

'\

" 0

· 'J,.:s76

"

0

0

0

-

0

0

0

o

' 0o ---o-----'~.,...g~~!.._--~ o-. · -:IC~o·~%~1"'-o 9 . oo·'l.O o_

of Water

0

0

. o.lOII

~-··~

Survey By: Pariani Land Surveying 136 W. Main Street Eagle Point, OR 97524

Survev For: PBS Engineering + Environmental 486 E Street, Suite B Coos Bay, OR 97420

Basis of Bearing: Assumed by Compass

>-.

0

3: .s:::.

Siuslaw River ~

(J)

I

Survey Data Elevations ore reference to the NGS published elevation of survey nnonunnent "FLORENCE", with o NAVD88 elevation of 34.43 feet.

N

Edge of water was tied In at approximate low tide between 10: OOann and 10: 30om on July 26, .2013. Contour interval is

1 foot.

Existing Conditions Topo Survey

·0

REGISTERED

PROFESSIONAL Lhl!ND SURVEYOR

0 Q_

Pariani Land Surveying

W--f-E

ENCL

..-0 ..--

136 West Main Street Eagle Point, Oregon 541-890-1131

s 0

10

20

40

Date:

2014

1

July 31, 2013

Scale: 1" = 20'

Jab No.:

2013- 145

Sheet: 1 of 1

NWP-2014-112

\\ --

\

11

'-..'-

/j

'-,

I

-J ...........

\

\

...........

I

\

...........

\\

...........

I

"' "'

' 1

Page 3 of 4

/

'/

/"' .....__ "' '- '-"' '- ''-, "', "' .....__ "' ' -

I I I I

..... ~~

'- '- ' '-

/

\\

----

I I

\

\ \ \ \

\

Iii

\ --

~

ivoi

iii 15 ~

f

I

- "'

·J-

\

I '

ENCL

I

\ \ \

.,

/

/

/ /

/

/

/_

/

,.,;

21 \

_._..

/ "'

.

/

r

HIGHEST MEASURED TIDE (HMT)

L_,_

_

/

/

/.

/

"'

--

-

/

/

/

,..

/

/

~

/

/I

\

~'-..

.....__

'-

PaiW

'-, .....__

...._

_

i

- --- --- -

---

-

- -

-_

.

-

_

\

-1-

....,

:'\

"'

--..' -

_!Oil.!.._

*I

i

PaiW

?

.Jt$~

TW 6.20--......)J.

, . . ._ '-

i

I

'-. ......_

/

/' / /'0

__,

/

-+

.....__

-

-

-5- -

-

'-,

-

-

-

-

\

...........

-- --

"-

.....__

--

"-

. . ._ _

3 - :;:::::: ..=- " -

---

"-

"-

So/Jet :Y &"ac;,

...........

"-

ft

::Z:>W

1-<(0

Wmz

zcow z("')o::: WNO :::.:::-...J

\

~,......._,_ .........._ ~-...,._

\...---

-~

LL

\\

-

-

-- - -- '.

\\

- -'- --- - -- --'-

............

\\(

\ .....__ .....__

---

-1-o U)U)

...........

'-

'- .....__

----------4---

~we,

o:::ww wo:::o:::

\

'- ' -

..............

<(1-0

......_,_

\

'- \

-

z

-

\

-w

-

\t:- . . _ . . ._ . ._,

\

' - '- .....__

..._

...._

\\

Oc!)

- -

.....

:E

UJ

~~"D>fw- ~ ~ II \'---_~.. . . ._

)

So/Jciy &.,

--..._ -

'-

..... -""'·' ~' --,

~:5 D.. D..

w

I I I I II

~

'- .,

z w :E w >z

t /)

\

':::;f '-.."-

t-

t~ 0::

\

4.5

~w- _

~ '-

-

'

2

4 5 . 0 - - - - - - - - - - - = - - = ; ; - 6-=--==-==-:~-:::':;;:: -.~-

~,

'-

+""'

LL

\

-1-

l I

-

0

\

\

-

:::l

\

TW 6.70

~

I

z

\

..............

-

c

\

-----

-

1<(

\

D

'._:s

-

-

\ ,-CRADE BEllM 2

----

D

~

--- --------- -

w

0

/

+""'

25.8

'-..

D..

r----7

"'+

D

'-..

= 10.4'

z

/

Concrete Grade

D

\

-<(

0::

/

'.

·5-

0::

(

/

I I ...........

FILL SHALL BE A SILTY SAND WITH A MAX PARTICLE SIZE OF 2".

/~'

/

/

/

~ "'\

Et.IBED WOOD LAGGING INTO EXISTING BANK, t.IINIMUM 8". PLACE FILL AROUND END OF WALL.

PROPOSED ORDINARY HIGH WATER ELEVAllON (POHW) = 6.3'

A

---

0

www.pbsenv.com

EXISTING ORDINARY HIGH WATER ELEVATION (EOHW) = 6.3'

~

\

15

WOOD LAGGING/ STEEL PILE CONNECllON, SEE C4 FOR DETAIL

486 E Street Suite B Coos Bay, OR 97420 541.266.8200 Main 866.727.0140 Fax

LEGEND

/1

/

@

Engineering + Environmental

TAMP SOIL IN 8" LIFTS WITH HAND OPERATED EQUIPt.IENT. ENGINEER TO APPROVE FILL MATERIAL PRIOR TO PLACEMENT·

//I/

_

WOOD LAGGING. SEE C4 FOR SIZE, SPACING AND MATERIAL REQUIREt.IENTS.

PBS

j/

/

/

@

I

/

/

4" HOLLOW STEEL CIRCULAR PILE FILLED WITH 3000 PSI CONCRETE. SEE C4 FOR EMBEDMENT, SPACING AND MATERIAL REQUIREMENTS.

{

/

/

/

/

'

"'

'-.....

8"''

/

PaiW

\

\

'-

"' '-..

_

/

'

0\\:JI ~ -

Ch

'

/

~--··························

\

'-..

/

@

@APPROXIMATE LIMITS OF FILL

WALL B

.\

...........

"'

/

/

/

/center Line Beam

/

/

-- -

\ \

-- ,

/

/

/ //

/ · Y-_ 1/FG 6.70/ --:;c_;~> --/ / ~/ ---v'-- .:::_~

"- ~

\

' ) -'\

/

-------

~ \ \

\

/ / / I

/

/

/

~- __,® /

b

\

/1

REt.IOVE AND DISPOSE OFFSITE EXISllNG DEBRIS IN WORK AREA

/ / / / / / /1/ / / / / / / /

\"' . . . . . ~ \ '- . . .__ \

I I

/

/

D

\

\\ \ \

I...

/

0

\

\\ ~\ \

s,

0

--

--,

/

/

/

'- . . . .~

So".Y &"o

/

/

/'IS.. -

\ \

/

/

/

/

/

_

/

1---/- -

\

I I I

/

/

.....__

I

..(

,[QHW ~

I_ \- --- - - - -1 \ ---I \

\'- -

(

"'\

'- >

/

/

/

/

/

_

\

\

\\ \\ \\

/

/-~/:.___ /

\

I ... . . .__ "' "'

\\

/

/

/

/

/

/

/

/

I"'

J

0+10

'~1--\.- '-

/

\\

.....__

/

\

/

pfter Line ie'am

/7

/

0

/

//

I 1

o+oo '--

f

/

/

"-~"

\ / ,/1'-I "', \ / I '1 \

/

Footing

/

/I ,

/

/

/

/_

/

'-

/

/

/

.....__

--s,

/

/

/

0

/

."-

...........

/

/

/

/

-----7 /

' -.

COIR LOGS ABOVE OHW (6.3'). INSTALL WOOD STAKES ON ENDS OF LOG AND EVERY 3' OF LENGTH (18" LONG STAKE MINIMUt.l). LOGS TO REMAIN AFTER CONSTRUCTION . ADJUST GRADES AS NEEDED DURING CONSTRUCTION AND REPLACE IF NEEDED PRIOR TO COMPLEllON OF PROJECT.

/

/

INSTALL TEMPORARY HIGH VISIBILITY CONSTRUCTION FENCING TO PROTECT PUBLIC FROM WORK SITE HAZARDS AND PREVENT ENTRY.

® INSTALL EROSION CONTROLS PRIOR TO COMMENCING GROUND DISTURBING ACTIVITIES. MAINTAIN FULLY FUNCTIONAL THROUGHOUT CONSTRUCTION PERIOD. MINIMUM CONTROL IS SINGLE ROW OF

/

/

/

/

Exi{ting Stru~re / F1n. Flr./.1-4.91

/

/

X - --l

/

/ /

/

/

0

// /

-B-

.....__

--

"

-

/ /

~"----

/

/

/

/

/

/

/

-

/

/

/

/

~

.........

--

"'

/

/

~--

.....

/

/

/

/

/

/

i;l

"' "'

/

/

/

L -

...........

/

/ /

I I I

'-->

...........

"'-.

~1

'---',,

...........

.........

·-

'------,~~

\

/

G)

/

/

/

\ _ - ...........

...........

.........

-

I

/

/

/

/

CONSTRUCTION NOTES

/

/

/

/ /

/

/

/

/

/

/

/

/

/

1

/

/

/

II - - ~g.,lolr., I ./ I " ..,,..,0 II _..~~- I I ( ./ ./ I ---

/

/

_./---- 1..._-

\\1

\ \ '-- '\ L 1 - -

----

----

...............

.....__

'-

'- '-

'- .....__

PROJECT:

'-

'-

'-

'-

'-

- --

@

--- -

o·

2·

4'

90036.001

JK

DRAWN:

GO, PS

CHECKED: DATE:

s·

DWG NO.

MARCH 2014 SHEET NO.

3

C3 ~ ~------------------------------------------~----~~ ~

I

'

\

l

\

J'

...........

?

SCALE: 1" = 4'

OF

4

NWP-2014-112

12

12 ~HMT~LEV.

10, £ _

________ -1- ___ -- -:- -

12

I

~_-I-

8I

EX.

-1- -

- -

-- -

-

I

~HMT~LEV.

--

10.£ _ _

~-I--· _

I

I

e!.i

I8

I

8 7.0

.:,=:-=-=-~u~~'L

I

I

- - --- --I- -- ---- -- -lj- -- f - --- ~ _,

I I I I

ctRADEE~gM

PBS

12

I

- j 2 ·0

1-

I I

I I

I I

I

I

I

I I

I I

I I

I I ·

I 1

1

Z/JZL

~_/..('~ '/-'" "'

486 E Street Suite B Coos Bay, OR 97420 541 .266.8200 Main 866.727.0140 Fax

t

18

www.pbsenv.com

EX. GRADE~I BEAM #2 I ELEV. 6.7 ·.~-·

EX. GRADE BEAM #1 ELEV. 6.0'

5 4d'-'1 .

4.3'

Engineering + Environmental

4 8'

50 ·

· 4 DIAM. STEEL PILE

I

EXISTING GRADE

4

14

(2 TA4L) 4 X 12" WOOD ~AGGING

5.0 I

"

4 DIA · STEEL PIL[

I

J / 11.7'

SILTY SAI'IID FILL 1.7'

0 + 10

0+2 0

· '

8HW = ORDINARY HIGH WATER I .MT = HIGHEST MEASURED TIDE

0

0+ 30

0

ot oo

0+ 40

SECTION A ::;<.;ALl=:

~

Jr1.2'

NOT~S:

1. 2.

1.2 '

0+ 00

I

EXISTING GRADE

SILTY SAND FILL

0

14

(2 TALL) 4 X 12" WOOD LAGGING

NOl S: 1. HW = ORDINARY HIGH WATER 2. I MT = HIGHEST MEASURED TIDE

Ot1 0

0+ 20

0 +3 0

I0

0+ 40

SCALE:

~

·

SECTION B

1"=4' HORIZONTAL 1"=2' VERTICAL

tJ) ...J

I

1"=4' HORIZONTAL 1"=2' VERTICAL

w

c

~

~

·

tJ)

z

-1-

0

Page 4 of 4

·

0

..

w

tJ)

I

oo

0.25" GAP BETWEEN LAGGING

o:::-' C!JC/)

9' LONG WOOD LAGGING

6.0

jog

::::>0...

13"'

4"X12" (3.5" WIDE NOMINAL) WOOD LAGGING\

u 4" DIAM. STEEL PILE

§! w

LOCKING NUT-, 2" SQUARE WASHER-,

0 zW ::::>0...

u

6.0

-1

(_

l

(

3.5"

~18"

4" DIAM . STEEL PILE 1/2" U BOLT

PILE SPACING

I

I

y

18"-1

PLAN

SCALE: 1" = 2'

j

I

0.25" GAP BETWEEN LAGGING

T~----3-'.7'-5.

GROUND SLOPE

TOP OF WALL/ FINISH GRADE 2" SQUARE WASHER LOCKING NUT

z

SIERRA FOUNDATION REMOVAL/FILL QUANTITIES FILL CONCRETE PIPE PILE FILL (CY) 0.26

<(1-0

ELEVATION

REMOVAL (CY)

SILTY SAND (CY)

BELOW OHW ABOVE OHW, BELOW HMT

0

69

STEEL PIPE PILES (EA.) 17

0

27

14

0.22

58

ABOVE OHW

0

0

0

0.00

0

TOTAL

0

96

31

0,48

132

~WC!)

o:::ww wO:::o:::

WOOD LAGGING (LF) 74

-t-o

"'"' 1-<(0

~

::Z:)-W

Wmz

zcow ZMO::: WNQ

11.25"

~"r""...J

u..

1/2" U BOLT 0.25" GAP BETWEEN LAGGING 4" DIAM . STEEL PILE

f

4"X12" (3.5" X 11.25" NOMINAL) WOOD LAGGING

l

~

~

~

8 ~

~.

I

SCALE: 2"=1 · z

0

'~"

~

j ~I

~

ENCL

I! I.

],

~

NON-WOVEN FILTER FABRIC STAPLED TO UPHILL SIDE OF LAGGING ENTIRE LENGTH OF WALL (MIRAFI 140N, OR APPROVED EQUAL)

PILE/ LAGGING CONNECTION

§

j

~

-SECTION

r

~ !

"'

:c

(.)

"'

ci z

PREFERRED MATERIALS ITEM WOOD LAGGING

MATERIAL CEDAR

HARDWARE TO MOUNT LAGGING TO PILE

STAINLESS STEEL

4" STEEL PILE

0.43" THICK WALL GALVAN IZED STEEL BACKFILLED WITH CONCRETE

FILTER FABRIC

MIRAFI 140N

PROJECT:

90036.001 JK

DRAWN :

GO, PS

CHECKED: DATE: DWG NO.

C4

MARCH 2014 SHEET NO.

4 OF

4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas