Shelly Lynch is the Regulatory point-of-contact for this amendment to the original Public Notice issued Sept. 10, 2013, for a Regulatory permit application from Vigor Industrial, LLC, for work at River Mile 8.2 on the Willamette River in Portland, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: June 2, 2014
Expiration Date: June 17, 2014
US Army Corps of Engineers No: NWP-2007-195-7
15-Day Notice Oregon Department of State Lands No: 52080-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Shelly Lynch Michelle.R.Lynch@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Vigor Industrial, LLC
5555 North Channel Ave.
Portland, OR 97217
Location: The proposed project is located on the Willamette River, at RM 8.2 in Portland, Multnomah County, Ore., in Section 17, Township 1 North, Range 1 East.
Waterway: The project is located in the Willamette River, at River Mile 8.2.
Project description: The original project Public Notice was issued on September 10, 2013. This Public Notice is an amendment to the original notice and includes the proposed mitigation plan. Vigor will improve salmonid habitat within the Swan Island Basin on the north side of their facility to mitigate for the additional affected habitat beneath the new larger dry dock. The proposed mitigation will include removing 220 piles and large timber tie beams over 0.5 acre to improve shallow water habitat. The piles will be removed using a barge-mounted crane to extract the piles with a cable loop and a vibratory pile extractor if needed. Removed piles will be disposed of in an approved upland landfill. This mitigation plan was developed in partnership with the National Marine Fisheries Services and the Corps of Engineers and based on the Habitat Equivalency Analysis.
The original proposed project includes the installation of a new dry dock, replacing the existing one. The new dry dock will be 950 feet long by 227 feet wide and will be permanently moored to an existing pier. Ten 14-inch pilings will be installed using a vibratory hammer for dry dock operation. Four of the pilings will be H-beam piles to support a pedestrian ramps extending from the mooring pier to the drydock floor, and three batter pile structures will be installed to support a vehicle bridge extending from and existing trestle to the drydock floor. The mooring system, trestle and utilities serving the previous drydocks are already in place and will be reused.
Mitigation: Vigor will improve salmonid habitat within the Swan Island Basin on the north side of their facility to mitigate for the additional affected habitat beneath the new larger dry dock. The proposed mitigation will include removing 220 piles and large timber tie beams over 0.5 acre to improve shallow water habitat. The piles will be removed using a barge-mounted crane to extract the piles with a cable loop and a vibratory pile extractor if needed. Removed piles will be disposed of in an approved upland landfill. This mitigation plan was developed in partnership with the National Marine Fisheries Services and the Corps of Engineers and based on the Habitat Equivalency Analysis (HEA).
Purpose: The new drydock will provide the necessary lifting capacity to drydock and service large vessels operating on the West Coast of the United States. Currently, these large vessels can’t be drydocked in Portland, Oregon. The new drydock would provide that service. The proposed mitigation will improve shallow water habitat in the lower Willamette River.
Drawings: Eight (8) pages are attached and labeled Corp No. NWP-2007-195-7.
Additional information may be obtained from Shelly Lynch, Project Manager, U.S. Army Corps of Engineers at 541-962-0401 or email Michelle.R.Lynch@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
The project area is within the known range of the Lower Columbia River Steelhead (Oncorhynchus mykiss), Lower Columbia River Chinook Salmon (Oncorhynchus tshawytscha), Upper Willamette River Steelhead Trout (Oncorhynchus mykiss), Upper Willamette River Chinook Salmon (Oncorhynchus tshawytscha), and Lower Columbia River Coho Salmon (Oncorhynchus kisutch).
We will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning EFH will be considered in our final assessment of the described work.
Cultural Resources: A historic properties investigation has been conducted within the permit area. No sites determined eligible for or listed on the National Register of Historic Places were found to exist within the permit area.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
NWP-2007-195-7
HABITAT TYPE MAPPING APRIL 11, 2014
Habitat Type Inputs for National Marine
Fisheries Service Habitat Equivalency Analysis
P R E P A R E D
F O R
P R E P A R E D
Vigor Industrial
5555 Channel Avenue
Portland, OR 97217
F O R
S U B M I T T A L
B Y
Stillwater Sciences
108 NW Ninth Ave., Suite 202
Portland, OR 97209
T O
National Marine Fisheries Service
Stillwater Sciences
NWP-2007-195-7
1
Habitat Type Mapping for HEA
INTRODUCTION
Vigor Industrial (Vigor) is proposing to operate a new drydock, identified as drydock 6 (DD6) in
the current location of drydock 3 (DD3) at their facility at the western end of Swan Island,
Portland, Multnomah County, Oregon (Figure 1). DD6 is a 950-ft long by 227-ft wide floating
steel drydock and is replacing the 750-ft long by 139-ft wide DD3. The larger size of DD6
results an additional 111,400 square feet (2.56 acres) of floating area. National Marine Fisheries
Service (NMFS) has reviewed a biological assessment (BA) of the proposed drydock moorage
and has requested conservation measures in the form of habitat upgrades equivalent to the 2.56
acres of floating area as determined by a Habitat Equivalency Analysis (HEA).
Vigor is proposing to improve salmonid habitat in the Swan Island Basin on the north side of
their facility (Figure 1 "mitigation area") to mitigate for the additional affected habitat beneath
the new drydock. The proposed mitigation method is piling removal and removal of large timber
tie beams to improve shallow water salmonid habitat.
2
METHODS
NMFS provided Vigor Industrial and Stillwater Sciences with the HEA calculation spreadsheet
they (NMFS) will be using to calculate the discounted service acre years (DSAYs) of the
additional shaded habitat at DD6 vs the DSAYs in the mitigation area before and after the habitat
improvement actions (pile removal and removal of large timbers). Calculating DSAYs involves
identifying and measuring (in acres) habitat units at the impact and mitigation locations before
and after the proposed action (drydock moorage and habitat improvement respectively), and
entering those acreages in the HEA spreadsheet.
Habitat types are predefined in the spreadsheet and are included in Appendix A. Stillwater
Sciences visited the proposed mitigation site on March 7 and 14, 2014 and identified the habitat
types present. Acreages were determined based on field measurements and GIS mapping. GIS
mapping was initially used to block out various habitat types and these distances were then fieldverified and adjusted as needed.
Map files delineating the ordinary high water (OHW) line and bathymetric contours were
obtained from the City of Portland (City of Portland 2014). OHW has been defined by the U.S.
Army Corps of Engineers for Willamette River Mile 8 as 16.6 feet NGVD (USACE 2004), which
translates to 13 feet NAVD88. For the Portland Harbor Superfund Site cleanup, Ordinary Low
Water (OLW) has been defined as 5.1 feet NAVD88 (Anchor QEA 2012), 7.9 feet below OHW.
The area between OHW and OLW is defined as the Active Channel Margin (ACM). The active
channel margin was delineated based solely on the City of Portland OHW mapping and
bathymetric surveys using ArcView. Because the available contours were in two foot increments,
OLW was set at -8 feet elevation below OHW, very near the -7.9 feet used for the Portland
Harbor Superfund cleanup. Because of high water conditions during the site visit, the physical
condition of the ACM was determined based on previous photographs (see Appendix B).
Sediment types were obtained from sampling done for the Portland Harbor Superfund site
(Integral 2007). All samples collected for that effort in and around the mitigation area were
gravel and finer sediments.
Stillwater Sciences
April 2014
2
NWP-2007-195-7
Habitat Type Mapping for HEA
Map Location
Imagery :
L
Project feature
so
200
100
400
800 Fei!t
Stillwater Scicnce.s
www . s t i llw~ t er sci. co m
Figure 1. Project location
Stillwater Sciences
April 2014
3
NWP-2007-195-7
3
Habitat Type Mapping for HEA
RESULTS
Habitat types present at the drydock moorage and mitigation area pre and post project
implementation are provided on Table 1, and illustrated on Figures 2-4. The habitat values
were provided by NMFS, and differ from those previously provided (Appendix A).
Table 1. Habitat types, their current acreages, and their projected acreages post-project.
Location
Moorage
Mitigation
area
Habitat
Main Channel
Characteristics
Habitat
value
Acres preproject
Deepwater Natural Substrates
0.05
2.56
Covered-Floating
0.0
Acres postproject
2.56
Active
Channel
Margin
Sloped, >11º, unarmored,
unvegetated (tie beams present)
0.025
0.13
0.00
Sloped, >11º, unarmored,
unvegetated (tie beams removed)
0.05
0.00
0.13
Main Channel
Shallow water, gravel and finer
substrates (pilings removed)
0.5
0.0
0.50
The following are brief narrative descriptions of the habitat types currently present, and their
proposed post-project conditions. Photographs of all habitat types are included in Attachment 2.
1. Active Channel Margin. The active channel margin is currently steeply sloped and
unvegetated. Some derelict piles (approximately 30, based on a review of site and aerial
photographs taken during low water, and observations during the site visits) are currently
located within the active channel margin. In addition, 98 wood tie beams consisting of
two 4-inch by12-inch timbers, 12-feet in length, which connect to the pilings and run
perpendicular to the bank, extend onto the ACM (see the detail photo in Appendix B).
These tie beams are functionally similar to pilings in that they provide refuge to
predators, obstruct near shore habitat, and interfere with water circulation.
Approximately half the length of the tie beams extend over the ACM. However, the tie
beams affect the entire ACM by harboring ambush predators that can easily traverse the
spaces between them. Thus the entire 0.39 acres of the ACM is available for mitigation,
and the ACM with pilings will be converted to ACM, sloped >11º, unarmored,
unvegetated. In order to achieve mitigation equal to the effect, 0.13 acres of active
channel margin will have the pilings and tie-beams removed, along with piling removal
from 0.5 acres of shallow water (see below). A total of 32 tie beam pairs will be removed
from the 0.13 acres of ACM to be mitigated.
Stillwater Sciences
April 2014
4
NWP-2007-195-7
Habitat Type Mapping for HEA
Figure 2. Habitat units in the mitigation area
Map Sou rces: Map Location
OHW & river depth : Cit y of Portland
I magery: ESRI World Mapping Service -9:
Roads, cities : ESRI ~~ ~-
Habitat Units
[?)
Active Channel Margin - slope > 11°, unarmored and vegetated
~
Active Channel Margin- suspended structures
~ Water 10 to 20 feet deep
Main Channel, Shallow Water with Pilings
~ Water 10 t o 20 feet deep - suspended structures
Main Channel, Shallow Water, Gravel and Finer Substrates
Proposed mitigation area
LJ
LJ
Vancouver
'J..f.'
-~
)~
Dock
Dolphin
River depth contours
0
0
5
10
20Meters ~~
~-::¢=::¢==;:::::=;='=;::::::;::::::;::::::::,--'
0
15
30
60 Feet
Stillwater Sciences
www .stillwatersci .com
'~-r·
1tJ.,
~~ 0
P.ortland
1
z;
Stillwater Sciences
March 2014
5
NWP-2007-195-7
Habitat Type Mapping for HEA
2. Main Channel. The main channel habitat type is found in both the Moorage and
Mitigation areas. In the Moorage area, it includes water approximately 65 feet deep
(following dredging and depending on river and tidal stage), with fine substrates; 2.56
additional acres of which will be covered by the drydock. In the mitigation area, there is
1.4 acres of shallow water containing 853 pilings available for mitigation. The area of
effect from a piling extends 10 feet around the piling, thus, the mitigation area extends
from the OLW line out into the channel ten feet beyond the deepest pilings. This area
was calculated using ArcView based on georeferenced aerial photos and channel
contours obtained from the City of Portland (2014). A total of 0.5 acres of piling
removal will be required to achieve a net of 4.4 DSAYs; the amount of DSAYs
"converted" beneath Drydock 6. Three separate Google Earth aerial photos as well as
site photographs taken during low water conditions were reviewed to determine the
number of pilings to be removed. Each photograph (dated 7/2008, 7/2009 and 9/2009)
showed a slightly different angle and shadow pattern. Based on this evidence, the area of
piling removal contains approximately 220 piles. As part of the mitigation Vigor
Industrial will remove a minimum of 220 piles from a 0.5 acre footprint of shallow water.
Following mitigation the 0.5 acres of "shallow water with pilings" will be converted to
"shallow water, less than 20 feet deep, with gravel and finer substrates."
The pilings will be removed using a barge-mounted crane. A cable loop will be slipped over
the pilings and lowered as close to the mudline as possible. The crane will then extract the
pilings with a smooth lifting action. Care will be taken to not break the piles. A vibratory
pile driver/extractor will also be available on-site should the pilings prove difficult to extract
by pulling alone. The pilings will be stockpiled either at the top of bank or on one of the
piers and disposed of in an approved upland landfill (the Hillsboro Landfill). No water or
sediment clinging to the piles will be allowed to discharge back to the Swan Island Lagoon
from the stockpile area.
4
REFERENCES
Anchor QEA. 2012. Portland Harbor RI/FS. Attachment 1. Draft Mitigation Framework
Development. Draft Feasibility Study.
City of Portland. 2013. Bathymetric and OHW shapefiles obtained from Kevin Martin, Tech
Services Manager. Meta data available
at http://www.portlandmaps.com/metadata/viewer/display.cfm?Meta_layer_id=53397&Db_type=
sde&City_Only=True
and http://www.portlandmaps.com/metadata/viewer/display.cfm?Meta_layer_id=53396&Db_typ
e=sde&City_Only=True#dist
Integral Consulting. 2007. Portland Harbor RI/FS Comprehensive Round 2 Report
Maps. http://yosemite.epa.gov/R10/CLEANUP.NSF/6d62f9a16e249d7888256db4005fa293/894
c51781ac7d494882572950077bfe6/$FILE/2007-02-21_CompR2Rep_Sec11-3-16_Maps.pdf
accessed 04/12/2014
USACE (U.S. Army Corps of Engineers). 2004. Portland-Vancouver Harbor Information
Package Second Edition. Reservoir Regulation and Water Quality Section. November 2004.
Stillwater Sciences
March 2014
6
NWP-2007-195-7
Habitat Type Mapping for HEA
Figure B-2. Pilings and tie-beams to be removed. Note the gravel substrate in the exposed
ACM (photo courtesy of Gene Caudill, Vigor Industrial, photo taken January 18,
2014).
NWP-2007-195-7
Habitat Type Mapping for HEA
Figure B-1. A portion of the mitigation area shown in an aerial photograph taken 06/22/2006 showing pilings to be removed from shallow
water, and tie beams to be removed from the ACM (from Google Earth).