You can copy from here when filling out the rest of the page.
Carol Franson is the Regulatory point-of-contact for this permit application from the Bend Park and Recreation District for work at River Mile 167.5 of the Deschutes River in Bend, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: June 4, 2014
Expiration Date: July 3, 2014
US Army Corps of Engineers No: NWP-2013-83
30-Day Notice Oregon Department of state Lands No: 56095-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United states, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Carol Franson (carol.s.franson@usace.army.mil)
Eugene Field Office
211 E. 7th Ave., Ste. 105
Eugene, OR 97401-2722
Applicant: Bend Park and Recreation District
799 SW Columbia St.
Bend, OR 97702-3218
Location: The project is located in the Deschutes River at the Colorado Street Dam, in the city of Bend, Deschutes County, Oregon. The site is in Section 5 of Township 18 South, Range 12 East. (44.049979/-121.3200605)
Waterway: Deschutes River – River Mile 167.5
Project description: The applicant proposes to discharge 17,215 cubic yards of material and remove 9,340 cubic yards of material from the Deschutes River. Approximately 26 cubic yards of material would be discharged into Wetland B. The project consists of the following: Safe-Passage/Fish Passage Channel; Floating Boom; Whitewater Channel; a Habitat Channel; Pedestrian Bridge Replacement; and McKay Park Improvements. All in-water work areas would be isolated from the flowing river channel and staged so as to allow a portion of the river channel to remain free flowing throughout construction. Project site access and staging would occur along existing roadways, parking areas, and previously disturbed upland areas. In-water work below the dam would likely require the installation of two temporary work bridges and would be constructed using wooden platforms spanned over steel pilings, each with three clear-spans of 48 feet. Working directly with earth moving equipment could occur in the isolated and dewatered section of the river. Geotechnical exploration conducted on the site in March 2014, indicated the riverbed is capable of supporting an excavator. The existing dam structure would be modified throughout each phase of the project.
a. Safe passage channel / fish passage restoration: The safe passage channel would be located along McKay Park (river left) immediately below the existing dam and comprised of 10 step pools varying in width and length based on their location. The upstream-most step would include a concrete pad for anchoring pneumatic bladders, steel gates, and a floating boom. Three bladders would be installed at the upstream invert of the safe passage channel to manage upstream water levels and flow distribution. Three bladders would be installed upstream invert of the safe passage channel to manage upstream water levels and flow distribution. The bladders would receive air supply from a conduit network fed by a compressor located in a new concrete vault structure at McKay Park. The safe passage channel would be separated from the adjacent proposed whitewater channel by a man-made island comprised of natural boulders and alluvium.
b. Floating boom: Upstream of the Colorado Street Dam, a floating boom would be installed to guide less skilled boaters and less maneuverable watercraft toward the safe passage channel. The boom would be removed outside of the boating season to allow for debris and ice management during the winter months. The boom would be approximately 260 feet in length and consist of 10-foot modular units linked together. A steel channel would run along the bottom of each modular unit for tensile strength and used to bolt the units together. The boom would be assembled onshore and floated out to the anchor points. The anchor would consist of a precast, concrete box with attachment points. The boom would attach to these anchor points via cables and rods. The anchor box would be transported out to the installation point in the river. The box would be placed on an aggregate base for structural support and then filled with boulders/riprap to provide the necessary anchor weight.
c. Whitewater channel: The whitewater channel would be installed in the center of the river immediately below the existing dam. The channel would consist of three drop pools formed with boulders and coarse alluvium substrate. The grade control structures into each of the three pools would range in height from 12 to 30 inches and constructed of large boulders, cobbles, and wave enhancement features such as grouted boulders and concrete wave blocks. Cast-in-place concrete cutoff walls would be incorporated into grade control structures below Pools 1 and 3. A total of 24 bladders would be installed along the grade control structure within the whitewater channel to manage upstream water levels and flow distribution for altering wave heights. The whitewater channel would be separated from the adjacent safe passage channel (river left) and habitat channel (river right) by man-made islands comprised of natural boulders and alluvium. A portion of the island separating the habitat channel (river right) would also be supported by approximately 300 linear feet of sheet pile wall.
d. Habitat channel: The habitat channel would be constructed along Miller’s Landing side of the river (river right). The channel would consist of small peninsulas, alcoves, large woody debris, habitat boulders, and a small island to increase sinuosity and habitat complexity in the channel and along the shoreline. The newly created peninsula and island located along the river right shoreline would also contain small pools recharged by hyporheic flow. [The hyporheic zone is a region beneath and alongside a stream bed, where there is mixing of shallow groundwater and surface water.] A rock weir would be constructed at the upstream end of the habitat channel to prevent boaters and recreationists from floating through the habitat channel. The habitat channel would be separated from the adjacent whitewater channel by a man-made island comprised of natural boulders and alluvium supported by approximately 300 linear feet of sheet pile wall.
Two existing osprey nests poles located in the grassed area along the right bank would be moved approximately 40 feet closer to the river centerline. The poles would have concrete footings and installed when this portion of the channel would be isolated.
e. Pedestrian bridge: The existing pedestrian bridge would be removed and replaced with a 230-foot long, three-span, steel truss bridge, placed slightly upstream of the existing bridge. The new bridge would be constructed of pre-cast concrete slabs supported by two mid-span concrete piers and two concrete bridge abutments. The new bridge would be 16 feet wide at the center span and 12 feet wide at each of the end spans. The concrete bridge piers would be installed through the core island separating the channels. The piers would not come in contact with flowing water and would be faced with rock above the islands. The bridge pier and abutment would be comprised of driven H-piles and concrete pile caps.
f. McKay Park improvements: The existing designated beach area along the shoreline of McKay Park (river left) would be relocated approximately 100 feet downstream of its current location. Three rock groins would be positioned perpendicular to the beach to reduce velocities in and around the beach area during flood events. A six-foot wide concrete pathway would run from the sidewalk on Shelvin Hixon Drive down through the new beach area into the water. A ribbon of riparian vegetation would be planted in a 40-foot wide swath between the safe passage channel and McKay Park to restore the riparian corridor along the river bank and to restrict pedestrians in the park from accessing the safe passage channel.
Mitigation: Approximately 26 cubic yards would be discharged into 0.007 acre of Wetland B located at McKay Park. Temporary impacts include 10 cubic yards discharged into Wetland H and one cubic yard would be discharged into 0.08 acre of Wetlands C, F, & G located north side of the river near Millers Landing Park.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To provide safety, recreation, fish passage, improve fish and wildlife habitat, and access improvements to the Colorado Street dam.
Drawings: Twenty-four (24) drawings are attached and labeled NWP-2013-83 enclosure.
Additional information may be obtained from Carol Franson, Project Manager, U.S. Army Corps of Engineers at 541-465-6894, or email carol.s.franson@usace.army.mil
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United states.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural resources: An initial evaluation of the proposed project area indicates that n historic properties investigation has been conducted within the permit area. No sites determined eligible for or listing on the National Register of Historic Places were found to exist within the permit area. The Corps has requested the applicant to provide documentation to avoid ground disturbance where a positive shovel test exists. If the applicant cannot avoid this area, an archaeological monitor would be required.
This notice has been provided to the state Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: state law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2013-83
Notice Issued: June 4, 2014
Oregon Department of State Lands No: 56095-RF Written Comments Due: July 3, 2014
WHO IS THE APPLICANT: Bend Park & Recreation District
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the state of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public
notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Corps No. NWP-2013-83
Page 1 of 2
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2013-83
Page 2 of 2
NWP-2013-83
Page 1 of 24
ENCL
NWP-2013-83
L
~
~'..-r.---I
')
. Ctn
Pit--f"
-v"'·
---~ - ~ --1
~:~-:;
-)~ -=~
-II I
..
. ~=..-_ ::..: ' 111-.-;'l- '- .
.- - · ~·\. ·=
. ~~
,_~.o~
·ir- L_J
.____.L_;
'-;;_,~
I ' -:F ~.--. ~
I :.~ .....,,~
., ~ ..~~ .-~ !
,;.- -
_L..::;L
' ·· ·r ·
"""' ( "! . :·":':~
..
<:U'
·\
¢> '·_.\1
\
·. ~'.~~-.
' .... "~. .'~.\~.· "
a
. --,""'
'\\
" -~~'-
,,
'
T~nks ' -
.."I'·
-~
- · ~L-=::~
·~-·t
~r
\.
ertt:Jrf
·
' 'r~L-1,
- "L
90~ s· ~tt. L
~ \L - h
CO·'iMe:;f.Lll
..~ci
· ,--.,...--,....-
~- -~i'
.l'iL..}Xi.· ..:::.::.·,.
.
'\
.
I · ·
~:
.,
=·_:. . · , · .
~
Page 2 of 24
....- ~
- :.::;:;' [ -:. -~
- ./"'/
~
.,..
· ~C t n er P1t · · · :
\
·'
)_ -
I -,..,
~/;..~
I
I
I
I
I
/ If
'---.W(.~
.
i ..,
"' "'~~"'·
c:
)
Q'
'·'
; ::.-"' ~- ~ -::.~ ~ -,~~~erndrit-~;~-~ .
~~ ~
{..,/
\
I
~:
I
~
!=-"':. -:::-::--=--=
·· · :r. . '.. . :··...
,I
· ··s~fr"-:····.
.-; . ·Y . -
r ·· · ·
.·l. ...· 3_
... , ..~
·
T f3tl~ l
Par·k
1 ~.·- .~~-'
w
5202
4/11/13
~
ENCL
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
FIGrE
Location and General Topography for Riverbend Park Pump Station in Bend, OR
(USGS Bend, OR Quadrangle, 1962)
1
1
4709
1/2/14
~
Recent aerial photo- Colorado Dam Paddle Trail project area in Bend, Oregon I FIG URE I
(Google Earth, 8/12/2012)
3
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2013-83
Page 3 of 24
ENCL
4709
1/2/14
~
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2013-83
Location and general topography (USGS Map)
Colorado Dam Paddle Trail project area in Bend, Oregon
(www.usgs.gov, 2013)
Page 4 of 24
I FIG URE I
1
ENCL
18 12 05BA
& INDEX
NE1/4 NW1/4 SEC. 05 T.18S. R.12E. W.M.
DESCHUTES COUNTY
REYISED.\1/10/2008
SEEt.IAP171232CO
c __ _ _ _ _ __j
"'
~I;;
'-----___]
Caf\celledNos
199
SEE MAP
18 12 05BA
SUPPLEMENTAL
MAP NO. 2
200
101
2200
1!16COR~
,...-1J16COO
-!'
SEEUAP\812058
18 12 05BA
& INDEX
4709
112/14
~
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2013-83
Tax Lot Map- T18 R12 S05BA, Portions of tax lots 300 and 400
Colorado Dam Paddle Trail project area in Bend, Oregon
(ORMAP .net)
Page 5 of 24
~
~
ENCL
N.W.1/4SEC.5T.18S. R.12E. W.M.
18 12 0580
& INDEX
DESCHUTES COUNTY
1"
= 200'
C11ncelledNos
1400A1
-~~--~-~L--'~----
SEE MAP
1812 OSBA
yCENCOR
4709
1/2/14
~
Tax lot map- Tax Map T18 R12 058, portions of tax lots 400 and 500
Colorado Dam Paddle Trail project area in Bend, Oregon
(ORMAP.net)
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2013-83
Page 6 of 24
~
~
ENCL
NW1/4 NW1/4 SEC. 05 T. 18S. R.12E. W.M.
DESCHUTES COUNTY
4709
1/2/14
~
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2013-83
Tax Lot Map- Tax Map T18 R12 0588, oortions of tax lots 100,200 and 300
Colorado Dam Paddle Trail project area in Bend, Oregon
(ORMAP.net)
Page 7 of 24
18 12 0588
I FIGUCRE I
2
ENCL
NWP-2013-83
.
MILLERS
LANDING
PARK
.
.~ ·. .r
.. ,/'.
tAx
toT
t!tzoi&t 100
_,.._w;:J4_,,.:::.:.:>-~..:;;,-~' ~J
-~.,
-:,
'j'
/
/''
·
-~DE
/ ,,-
~,
./:Jf
.
~
,o'
~
'
(I
WETLANDF
~lye;;R
oe:scH'ure:S',
~
/
';,q
I
I
-(2?>·
l_
~
/
)\IETlANbl
~
/
/"--~-:"""" ' -;<·-~::~;:a'S''<"
- ,.__. . - Y.-'-· .;:,.___,,,,, '
/
Page 8 of 24
/
~
-.~ M~KA';',PA~I(
-
-
LEGEND
CJ
.l......
Wetland
~..Sq_
/
Ordinary High Water (OHW)
--
/
/
/
/
/
/
T 181206M 400 ·
Property Line
\
'"··-,-,,
c-s""""___
'-.L.
--:".ss- __ _::_
~
75
150
300
~
SCALE IN FEET
Base map provided by OTAK Inc_
Existing Conditions
ENCL
Colorado Dam Safe Passage Project- Bend, Oregon
Pacific Habitat Services, Inc,
9450 SW Commerce Clrde, Suite 180 Wilsonville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\ProJect Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\Fig4_ExistCond.dwg, 3/27/2014 9:01:29 AM
~
03-26-14
NWP-2013-83
~~····.
/
-~· ···· :JNG8":0Ms
.. ,,
d\J.,.~s
o·t::scf'\'
Page 9 of 24
Wetland
Ordinary High Water
~x "?
c --' - I .
,......:.._'/
~
-
·r.-
=;; - - ""'I': -......- /
ENCL
PH~j
', _ -
.
........
\ .--
I
~
- - ........
'-.,
,r
/
-
_.,
--~ ""'"-;!.,
. \>.--'
-.. . .
-'l'
'
50
100
200
SCALE IN FEET
Base map provided by OTAK Inc.
Overall Site
I FISREI
Colorado Dam Safe Passage Project- Bend, Oregon
Pacific Habitat Services, Inc.
9450 'f!N'I Commerce Circ~, Suite 180 Wilsonville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\Project Directones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\FigS_SitePian-Overall.dwg, 3/27/2014 9:09:31 AM
03-26-14
NWP-2013-83
.1N
LEGEND
Ordinary High Water (OHW)
Page 10 of 24
60
30
'
120
SCALE IN FEET
CJ
Permanent Waters Impact
Fill
(0.8 ac I 5,600 cy)
Removal (0.8 ac /3,200 cy)
-3599-
Proposed Contour
Existing Contour
'
LEFT BENCH ELEVAllON
SEE SHEET SPO!
360 )
fTEP05\
359 ;
....
~
P_l2.0~1
~·
_f:~
7
· - · i-;f:;;
-
rST"i"
;-STEP OJ
rSTEP 02
;-STEPO!
-·- · - j-
PO~~
1---.._
~
J
RIGHT BENCH ELEVATION
SEE SHEET SP01
/-\_
\
n
-·g-P60L04·~ .....;,
. .....,, ·a""= .f.
\.._ I
""-----/
POOLOJ_f
~
---
-
,t,
rSTEP06
~7"'
~
~
~
~~
\ ""
'---'-=- ~ I -r·
POOL 07 _
POOL 06
~
'-
,.
-hSTEP 09
/STEP 08
rSTEP 07
-
7
-··-POOL 08
~11-IALWEG
'
~
POOL 09
/
·~
/
"\---._
"'-'-""''''-L'""''"'
·~·
)....
-.:~-
1
-·-
\-
1-·-
I\
I
\x!OOL"
I
\
3600
\
""-'7 ~-_)
-~
....
3596
\TO£ OF LEFT AND
RIGHI BANKS
3592
\__EXISTING GROUND
358 I
3588
Base map provided by OTAK Inc.
Safe Passage Channel Site Plan, Profile and Grading Impacts
ENCL
Colorado Dam Safe Passage Project- Bend, Oregon
IFIEri
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\ProJect Dlrectories\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\F1g6 S1tePian-SafePass.dwg, 3/28/2014 10:43:12 AM
03-26-2014
NWP-2013-83
3@ 10' BLADDERS
+2.0 DYER GROUTED
BOULDER PAD
Page 11 of 24
LEGEND
Ordinary High Water (OHW)
=
--3599-
Permanent Waters Impact
Fill
(1 .6 ac /6,320 cy)
Removal (1.6 ac I 4,500 cy)
~
Proposed Contour
Existing Contour
0
'
30
60
120
SCALE IN FEET
3604
3604
3600t=t==t=l-t-r----t----l-+~~±~-+~---+------+=+=l=r=J~
:J_;=:;:==J
I
I
rPROPOSED GRADE
=r··-··t0J~~--l~:-~~e~·r=~tm=~t-··-··i··-··-··r··-··i-·;r~··--t··-··-J-··~·:i·:~··t
"
3588
t?r ·1::
3eoo
3588
EXISTING GROUND
WHITE WATER CHANNEL PROFILE
Base maps provided by
River Restoration and OTAK Inc.
Whitewater Channel Site Plan Grading Impacts
ENCL
I
FI?REI
Colorado Dam Safe Passage Project- Bend, Oregon
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\Project Directones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA f1gures\F1g? WWaterPian_Profile.dwg, 3/28/2014 10:48:35 AM
03-26-2014
NWP-2013-83
--"';\_____
Page 12 of 24
J
WATE~All
\
Whitewater Channel Area
' See Figure 7 for Site Plan
A'!
I
f:
I
LEGEND
Ordinary High Water (OHW)
CJ
-3599--
Permanent Water Impact
Fill
(1.3 ac I 4,900 cy)
Removal (1.3 ac /1,400 cy)
NOTE
For Habitat Channel
Profile and Impacts
See Figure 8A
Proposed Contour
Existing Contour
30
60
'
120
SCALE IN FEET
ENCL
PH~
Base maps provided by
River Restoration and OTAK Inc.
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\Project Directones\4700\4709 RFP Colorado Dam Paddle Tra1l Improvements\AutoCAD\Piot Dwgs\JPA figures\FigB S1tePian-Habitat.dwg, 3/27/2014 9:37:33 AM
FlaRE!
Habitat Channel Site Plan Grading and Impacts
Colorado Dam Safe Passage Project- Bend, Oregon
1
03-26-2014
NWP-2013-83
3604
I
~
I
3600
rPROPOSED GRADE
3596
-'-~"
3592
""~-'--
,-:::-'_'_ -
_,_---
--..,.
ORDINARY HIGH WATER
I I
_,_ --- -·-- -t-r-_---· _,_ - ---
'""''
""'
3588
_
,_,
·
-~=''11',
I
""' '-EXISTING
I
GROUND
'-·--
,_,
JYf
_
/f+l
F
1+00
3+00
2+00
4+00
-
-
--
3604
3600
3596
3592
3588
I
3584
-
5+00
3584
Page 13 of 24
Habitat Channel Profile
LEGEND
-- -·-
Ordinary High Water (OHW)
D
Permanent Water lm~act
Fill
(1.3 ac /4,900 cy)
Removal (1.3 ac /1,400 cy)
I
'~'
ENCL
~611
Profile provided by OTAK
Design by River Restoration
Pacific Habitat Services, Inc,
9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070
Phone (503} 570-0800
Fax (503} 570-0855
\ProJect Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\F1g8A HabJtatProfile.dwg, 3/27/2014 9:40:46 AM
Habitat Channel Profile and Impacts
Colorado Dam Safe Passage Project- Bend, Oregon
IF8AEI
03-26-2014
NWP-2013-83
Ordinary High Water (OHW)
Page 14 of 24
~::.,...-...,_._
~
,#"i",._
/ / -_ ,
.........· - · - · - · ~-- .,_,'-"'..,_-:. "--' ..__-:::-·,..'-_
'
-= ==: ::::- .
-""'---
.__..
-
Permanent Waters Impact
Fill
(0.2 ac /144 cy)
Removal (0.1 ac I 50 cy)
Temporary Wetland "H" Impact
Fill
(155 sf /10 cy)
Existing Contour
-J59B---
Proposed Contour
NOTE:
For Section
A-A and B-B
See Figure 9A
ELEVAnQN
ENCL
Base map snd Elevation
provided by OTAK Inc.
Pedestrian Bridge Plan, Elevation and Section Locations
IFlgREI
Colorado Dam Safe Passage Project- Bend, Oregon
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 1SO Wilsooville, Oregon 97070
Phone (503) 570-0800
Fax (503) 570-0855
\Project Dlrectories\4700\4709 RFP Colorado Dam Paddle Traillmprovements\AutoCAD\Piot Dwgs\JPA figures\Fig9 Plan_Eiev PedBndge.dwg. 3/28/20141:43.25 PM
03-26-2014
NWP-2013-83
""·..---,...----,----,---==;==----~----T---~""
CONCRETE RETAINING
WALL
,.,.,L----1-~d"-----+---r--
~~~--~==~~~
_.L.::.. ~~;...-n--.b'""":-~
-
HABITAT CHANNEL
GRADING
'---------
li!OO
-~---"""-"-[;~-·······
···.·_'"'"
....
SECTION A-A
SCAL£:HOR.=1"=5
Page 15 of 24
-
'oUIT=J"r5'
n+B4.o61
-
COLORADO
EXISTING!~
6'GASLINEI
AVENUE\
BRIDGE
"
\
LEGEND
Ordinary High Water (OHW)
--+~~~--~~----4JOoo
PROPOSEC
Permanent Waters Impact
Fill
(0.1 ac I 40 cy)
RIP RAP
-
-
~
SECTION B-B
SCALE.
HOR.~1·~5'
VERT~!·~s·
-~-
ENCL
lr~
Sections provided by OTAK Inc.
Pedestrian Bridge Cross Sections and Impacts Below (OHW)
Colorado Dam Safe Passage Project- Bend, Oregon
IF9AEI
Pacific Habitat Services, Inc.
9450 SW Commerce Clrde, Suite 180 WilsorlVifle, Oregor~ 97070
Phone (503) 570-0800
Fax (503) 570-0855
·\ProJect Dlrectorles\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\Fig9A PedBndge_Xsect1ons.dwg, 3/28/2014 10:53:48 AM
03-26-2014
NWP-2013-83
0
WHITEWATER TRAFflC
AND SECONDARY TAKEOUT
. CONCRETE VAULT
. .
Wetl2mdl
.·
........ ·....·... ·..
o.,··
· ·· ~ tr-,·.
·~"'~cVc.ss
···...··..·.·.··.··.··. ·. .·.·. .···.·...·....· ·.·.·.·.·.··.·..·..·.··..·...·.·.· ·..·· ....· . ··.·. .·..· ..···.······.·.·.·.· ...··..·".··.···X'·"'···
.··.
.
·,.·.·
·'
·
.
'.
'
.
.
.
.
.
.
.
-
.
.. .
ANCHOR TO
CONCRETE VAULT
.
1UBERS
p..~D o1:tlER
Page 16 of 24
.~·'·""""""c
LEGEND
-3597--
r\
Ordinary High Water (OHW)
Permanent Waters Impact
Fill 0.003 ac I 20 cy)
Existing Contour
Proposed Contour
30
60
'
120
SCALE IN FEET
Plan Provided by River Restoration
ENCL
Floating Booms Site Plan
Colorado Dam Safe Passage Project- Bend, Oregon
I F10E[
Pacific Habitat Services, Inc.
Phone (503) 570-QSOO
\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwqs\)PA fiqures\F1glO_S1tePian-Boom.dwg, 3/28/2014 10:55:10 AM
03-26-2014
NWP-2013-83
~
MCKAY PARK
Page 17 of 24
NOTE
No permanent waters or
wetlands impacts.
LEGEND
-
· · -
-3599-
Ordinary High Water (OHW)
Proposed Contour
Existing Contour
ENCL
PH~A
Base map provided by OTAK Inc.
McKay Park Site Plan and Grading
Colorado Dam Safe Passage Project- Bend, Oregon
Pacific Habitat Services,lnc.
Phone· (503)570-0800
\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwqs\JPA fiqures\F1gll SitePian-McKayPark.dwg, 3/27/2014 11:02.54 AM
!FriEl
03-26-2014
NWP-2013-83
~
........
·
.........
..
£-,.,.. .. __ ORDINARY~
.........
WETLAND "A"
.......
HIGH
..
WATER
/
//
/
/
~ "~~//.
-·-·-~~~-·-·-·-·-s;-
---.---<>-- _, ____ % ___
) 0
Page 18 of 24
LEGEND
PLAN
Ordinary High Water (OHW)
SCALE: 1"~10'
0
z
<(
r=
~
u_
EXISTING GROUND
359
0
D
0
z
;;
~
~
u_
0
lu:s\,'0~~
:
';eoco~mi!::
359
-3599.
3592
CROSS- SECTION D-D
ENCL
PH~
Permanent Wetland "B" Impact
Fill
(0.007 ac I 26 cy)
Removal (0.007 ac I 27 cy)
Existing Contour
3596
1
Permanent Waters Impact
Fill
(0.1 ac I 231 cy)
Removal (0.1 acl 190 cy)
Proposed Contour
~
10"
,.
,.
,..
Base map provided by OTAK Inc.
McKay Park Beach Site Plan, Grading, Impacts and Cross Section
Colorado Dam Safe Passage Project- Bend, Oregon
IF12EI
Pacific Habitat Services, Inc.
03-26-2014
Phona (503) 570-0800
\Project Dll·ectones\4700\4709 RFP Colorado Dam Paddle Traillmprovements\AutoCAD\Piot Dwgs\JPA figures\Figl2
SltePian~McKayBeach.dwq,
3/27/201411:05:16 AM
NWP-2013-83
oEiSCfiVTES
-~
~.../
10' POWE:RLINE EASEMENT:-:::--_
PER VOL. 320, PG. 192, O.R.
.J
Page 19 of 24
.s'N·sy\t:\Jl\~
,/
:,
CONSTRUCTION/SEQUENCING NOTES
CD
0
0
1
ISOLATE RIVER RIGHT WITH APPROVED BMP'S.
(SEE SHEETS TW04- TW06 FOR DETAILS).
INSTALL EROSION COUNTER MEASURES ALONG
STREAMBED AND STREAMBANK TO EL=3598.0.
INSTALL PROTECTIVE LINER ON EXISTING ISLAND.
(SEE SHEETS TW04- TWOS FOR DETAILS.)
ENCL
p~
0 rs~~~F~H~~~ toN~ F ~~T~;~ !~~~~~~~:o~A6~TAILS)
0
0
INSTALL FIRST SPANS OF WORK BRIDGES.
(SEE SHEET TW04- TW06 FOR DETAILS.)
GENERAL NOTES
IMPACT NOTES
1. MAX BYPASS FLOW IS 1600
CFS. ISOLATION SYSTEM
ALLOWS FLOWS ABOVE THIS
RATE TO OVERTOP THE
DIVERSION FACILITIES AND
INUNDATE THE WORK AREA.
TEMPORARY WATERS IMPACT
FOR ISOLA llON MEASURES
AND WORK BRIDGES
FILL (0.9 AC I 1,30D CY)
ISOLATE BEACH AREA AND CONSTRUCTION
PROPOSED BEACH AREA. (SEE SHEET C10 FOR
DETAILS.
TEMPORARY WETLAND IMPACT
(C,F,G) (0.08 SF I I CY)
ORDINARY HIGH WATER (OHW)
50
100
SCALE IN FEET
Base map provided by OTAK Inc.
FIGURE
Temporary Water Management Plan - Stage 1
Colorado Dam Safe Passage Project - Bend, Oregon
Pacific Habitat Services, Inc.
13A
03-26-2014
9450 SW Commerce C1rde. Suite 180 Wilsonville, Oregon 97070
\Project Dtrectorres\4700\4709 RFP Colorado Dam Paddle Trail lmprovements\AutoCAD\Piot Dwqs\JPA
200
~
figures\Figl3A_ErosCntri~Staqel.dwg,
3/28/201411:27:32 AM
NWP-2013-83
c~
D
T
Page 20 of 24
CONSTRUCTION/SEQUENCING NOTES
(j) f;:~N~H:~~:~~~~~ T~~~K F~~DggAILS)
0
EXISTING PEDESTRIAN BRIDGE WILL ALSO
BE USED FOR CONSTRUCTION ACCESS.)
0
0
DRIVE SHEET PILE IN RIGHT ISLAND. (SEE
SHEET C05 FOR DETAILS)
COMPLETE ISOLATION IN RIGHT ISLAND
(SEE SHEETS TW04- TW06 FOR DETAILS)
0
ISOLATE RIVER LEFT UPSTREAM OF
PROJECT (WHITEWATER AND SAFE
PASSAGE CHANNELS)
(SEE SHEETS TW04- TW06 FOR DETAILS)
ISOLATE RIVER LEFT DOWNSTREAM OF
PROJECT (WHITEWATER AND SAFE
PASSAGE CHANNELS)
(SEE SHEETS TW04- TW06 FOR DETAILS)
0
0
INSTALL WHITEWATER AND SAFE
PASSAGE CHANNEL FEATURES. (SEE
SHEETS C01-C03 FOR DETAILS.)
BEGIN REMOVAL OF EXISTING PEDESTRIAN
BRIDGE.
0 ~~~~NST~~z~T~~~g~~N (~~E N~:EETS
BR01-BRD2 FOR DETAILS)
0
ISOLATE AREA AND INSTALL
FLOATING BOOM ANCHORS.
(SEE SHEETS C12 FOR DETAILS)
GENERAL NOTES
1. MAX BYPASS FLOW IS 1600
CFS. ISOLATION SYSTEM
ALLOWS FLOWS ABOVE THIS
RATE TO OVERTOP THE
DIVERSION FAGILITIES AND
INUNDATE TIHE WORK AREA.
IMPACT NOTES
LEGEND
TEMPORARY WATERS IMPACT
FOR ISOLATION MEASURES
AND WORK BRIDGES.
FILL (0.9 AC I 1,300 CY)
-··-··-
TEMPORARY WETLAND IMPACT
(C,F,G) (0.08 SF I I CY)
50
~
ORDINARY HIGH WATER (OHW)
100
SCALE IN FEET
Base map provided by OTAK Inc.
FIGURE
ENCL
Temporary Water Management Plan - Stage 2
Colorado Dam Safe Passage Project - Bend, Oregon
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Surte 180Wisoovrlle, Oregon 97070
\ProJect Drrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piat Dwqs\JPA fiqures\Ftq13B_ErosCntri-Stage2.dwq, 3/28/201411:29:09 AM
200
~
138
03-26-2014
NWP-2013-83
CONSTRUCTION/
SEQUENCING NOTES
CD
EXTEND MIDDLE WORK BRIDGE TO
HABITAT CHANNEL. (SEE SHEETS
TW004- TW06 FOR DETAILS).
0
0
0
0
DIVERT RIVER TO WHITEWATER AND SAFE
PASSAGE CHANNELS.
0
0
®
_/-.-./
ISOLATE HABITAT CHANNEL
(SEE SHEETS TW04- TW06 FOR DETAILS)
REMOVE TEMPORARY GATE.
REMOVE TEMPORARY EROSION COUNTER
MEASURES OR INCORPORATE THEM INTO
CONSTRUCTION AS SHOWN IN PLANS.
INSTALL HABITAT CHANNEL FEATIURES.
COMPLETE NEW PEDESTRIAN BRIDGE.
(SEE SHEETS BR01-BR02 FOR DETAILS.)
REMOVE REMAINDER OF EXISTING
PEDESTRIAN BRIDGE.
GENERAL NOTES
D
Page 21 of 24
·~··
..
MAX BYPASS FLOW IS 1600 CFS. ISOLATION
SYSTEM ALLOWS FLOWS ABOVE THIS RATE TO
OVERTOP THE DIVERSION FACILITIES AND
INUNDATE THE WORK AREA.
,··.
,·,
IMPACT NOTES
······..·· ···········. ' ....
~~
. '..
.
TEMPORARY WATERS IMPACT
FOR ISOLATION MEASURES
AND WORK BRIDGES.
FILL (0.9 AC /1,30D CY)
:·;,_
TEMPORARY WETLAND IMPACT
(C,F,G) (0.08 SF / I CY)
LEGEND
50
'
100
200
SCALE IN FEET
Base map provided by OTAK Inc.
Temporary Water Management Plan -Stage 3
ENCL
Colorado Dam Safe Passage Project - Bend, Oregon
FIGURE
13C
Pacific Habitat Services, Inc.
9450 SW Commerce C1rcle, Suile 180 Wilsonville. Oregon 97070
\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Tralllmprovements\AutoCAD\Piot Dwqs\JPA flgures\Fiql3C_ErosCntri-Stage3.dwq, 3/28/201411"42:24 AM
03-26-2014
NWP-2013-83
PLANT COMMUNITY ZONES
REFER TO SHEETS LOJ AND L04 FOR PLANTING DETAILS. PLANTING DETAILS APPLY TO All PLANTS SHOWN ON THE LEGEND AND LAYOUT SHEETS
TYP. PLOT
10
'
~
RIPARIAN UPLAND
15"'''·'·1
PLANT THE FOLLOWING TREES AT 8' D.C. MAX. SPACING AND SHRUBS 3' 0 C. MAX.
NATIVE SEED MIX
(10,853sq.fl.)
SEE SPECIFICATIONS FOR SEEDING REQUIREMENTS
(TYPICALPLOT.100SF).
QTY. PER
QTY.PER
LAYER
PLOT
OVER STORY
LAYER
SEED
ELYMUS GLAUCUS
ALMELANCH/ER ALNIFOLIA · SASKATOON SERVICEBERRY
SLBS/AC
BLBSIAC
BLBSIAC
SLBSIAC
1 LBSIAC
.5LBSIAC
5LBSIAC
2LBS/AC
5LBSIAC
FESTUCS IDAHOENSIS
ELYMUS HYSTRIX
STIPAOCCIDENTAUS
ACHILLEA MJLLEFOUUM
ASTERCAPESTRIS
ERIOPHYLLUM LANA TUM
LUPI~US SPP.
LOTUS PURSHIA~US
UNDERSTORY
CHRYSOTHAMNUS NAUSEOSA- RUBBER RABBITBRUSH
PRUNUS VIRGIN/ANA ·CHOKECHERRY
PURSHIA TR/OENTATA-BITIERBRUSH
SYMPHORICARPOS ALBUS. COMMON SNOWBERRY
TYP.PLOT
NOTES:
1.
CONTRACTOR SHALL PROVIDE TOPSOIL, SOIL AMENDMENTS AND MULCH AS SPECIFIED.
2.
ALL PLANTS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND
SPECIFICATIONS PROVIDED AS PART OF THE CONSTRUCTION DOCUMENTS PACKAGE.
3,
FOLLOW DETAIL 5/LOJ FOR RANDOM PLANnNG PA TIERN FOR All PLANT COMMUNITY
ZONE PLANTING.
10'
.
1O
.;.;.;.;.;.
1
·· · · ·· · ·· · ·
: ·: ·: ·: ·: ·:
RIPARIAN FRINGE
i<.sBO"'·'·I
PLANT THE FOLLOWING TREES AT 8' O.C. MAX. SPACING AND SHRUBS 3' O.C. MAX
(TYPICAL PLOT. 100 SF)
ORNAMENTAL PLANTING
(4,262sq.fl.)
SEE SPECIFICATIONS FOR PLANTING REQUIREMENTS
QTY. PER
PLOT
Page 22 of 24
OVERSTORY
ALNUS INCANA. MOUNTAIN ALDER
BETULA OCCIDENTAL/S · WATER BIRCH
SHRUBS I GRASSES
CALAMAGROSnS X ACUnFLORA 'KARL FOERSTER'
FEATHERREEDGRASS
1GAL.,24'0.C.
DESCHAMPS/A CAESPITOSA 'NORTHERN LIGHTS'
1 GAL, 12' O.C
NORTHERN LIGHTS TUFTED HAIRGRASS
HEMEROCAWS X'STELLA DE ORO'- STELLA DE ORO DWARD OAYULY1 GAL, 12' O.C
LAVANDULAANGUSTIFOLIA · MUNSTEAO LAVENDER
1 GAL, 24' D.C.
PENNISETUM ORIENTALE· TALL TAILS'· TALL TAILS FOUNTAIN GRASS 1 GAL, 24' D.C.
SPIRAEA BETULIFOL/A TOR'· BIRCHLEAF SPIRAEA
1 GAL., 36' O.C
CORNUS SERICEA ·REO OSIER DOGWOOD
RIBES CEREUM ·WAX CURRANT
ROSA NUTKANA. NOOTKA ROSE
ROSA WOODS/I· WOOD'S ROSE
SALIX BOOTH/I· BOOTH'S WILLOW
SALIX GEYER/ANA ·GEYER'S WILLOW
SPIRAEA DOUGLAS//. DOUGLAS' SPIRAEA
WETLAND SOD
GROUND LAYER
COTONEASTER DAMMERI'LOWFAST'. BEARBERRY COTONEASTER
(11,090sq.ft)
SEE SPECIFICATIONS FOR REQUIREMENTS
ENCL
p~
SIZE/
SPACING
SOD LAWN
1 GAL, 24' O.C.
(11,991sq.ft.)
SEE SPECIFICATIONS FOR SODDING REQUIREMENTS
Base map provided by
GREEN WORKS
FIGURE
Planting Legend
Colorado Dam Safe Passage Project- Bend, Oregon
14A
Pacific Habitat Services, Inc.
!~~n~W(~~~~;;~~~~~ '""" ""'~::·;~·;,~;';';:~;;:~'
\Project Dtrectones\4700\4709 RFP Colorado Dam Paddle TraiiJmprovements\AutoCAD\Piot Dwqs\JPA fiqures\Ftg14A Plantleqend.dwq, 3/27/201411:47:47 AM
03-26-2014
NWP-2013-83
Page 23 of 24
[~---~~
GENERAL LEGEND
-
·
·-
~
(/J({f)
ORD!NARYHIGHWATERLINE
LARGE WOODY DEBRIS
HABITATBOULDERS
m
PLANTING ZONES
[SEESHEETLDOFORPLANTLEGEND)
RIPARIAN UPLAND
[ ]
....
D
NATIVESEEMIX
RIPARIAN FRINGE
·
ORNAMENTAL PLANTING
WETLANDSOD
Or---LAWN_ _
o-o
gggg~
0
o~o
Base map provided by
GREEN WORKS
-
20'
"""'''r:
ENCL
Right Bank I Habitat Channel Planting Plan
Colorado Dam Safe Passage Project- Bend, Oregon
0'
2ft
40'
IN Fm
FIGURE
148
Pacific Habitat Services, Inc.
03-26-2014
Phone (503) 570-0800
\Project Dtrectones\4700\4709 RFP Colorado Dam Paddle Trarllmprovements\AutoCAD\Piot Dwgs\JPA frgures\Ftq14B RB-PiantinqPian.dwg, 3/27/2014 12:12:04 PM
NWP-2013-83
l'
MCKAY PARK
1/XON DRIVE
Page 24 of 24
!
~
~
:::,;
"(
g
~
()
8
GENERAL LEGEND
-
·
·-
ORDINARYHIGHWATERLINE
m
PLANTING ZONES
'<
(SEESHEETLOOFORPLANTLEGEND)
RIPARIANUPLAND
WRIPARIANFRINGE
D
·
NATIVESEEMIX
DRNAMENTALPLANTING
:<<<·
WETLAND SOD
~~LAWN_ _
-
2IJ'
Base map provided by GREEN WORKS
2IJ'
40'
FIGURE
ENCL
Left Bank and McKay Park Planting Plan
Colorado Dam Safe Passage Project- Bend, Oregon
14C
Pacific Habitat Services, Inc.
03-26-2014
Phone (503) 570-0800
\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail lmprovements\AutoCAD\Piot Dwqs\)PA figures\Fig14C LB-PiantmqPian.dwq, 3/27/2014 12:13:20 PM