Carol Franson is the Regulatory point-of-contact for this permit application from the Bend Park and Recreation District for work at River Mile 167.5 of the Deschutes River in Bend, Ore.

PUBLIC NOTICE for Permit Application Issue Date: June 4, 2014 Expiration Date: July 3, 2014 US Army Corps of Engineers No: NWP-2013-83 30-Day Notice Oregon Department of state Lands No: 56095-RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United states, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Carol Franson (carol.s.franson@usace.army.mil) Eugene Field Office 211 E. 7th Ave., Ste. 105 Eugene, OR 97401-2722

Applicant: Bend Park and Recreation District 799 SW Columbia St. Bend, OR 97702-3218

Location: The project is located in the Deschutes River at the Colorado Street Dam, in the city of Bend, Deschutes County, Oregon. The site is in Section 5 of Township 18 South, Range 12 East. (44.049979/-121.3200605)

Waterway: Deschutes River – River Mile 167.5

Project description: The applicant proposes to discharge 17,215 cubic yards of material and remove 9,340 cubic yards of material from the Deschutes River. Approximately 26 cubic yards of material would be discharged into Wetland B. The project consists of the following: Safe-Passage/Fish Passage Channel; Floating Boom; Whitewater Channel; a Habitat Channel; Pedestrian Bridge Replacement; and McKay Park Improvements. All in-water work areas would be isolated from the flowing river channel and staged so as to allow a portion of the river channel to remain free flowing throughout construction. Project site access and staging would occur along existing roadways, parking areas, and previously disturbed upland areas. In-water work below the dam would likely require the installation of two temporary work bridges and would be constructed using wooden platforms spanned over steel pilings, each with three clear-spans of 48 feet. Working directly with earth moving equipment could occur in the isolated and dewatered section of the river. Geotechnical exploration conducted on the site in March 2014, indicated the riverbed is capable of supporting an excavator. The existing dam structure would be modified throughout each phase of the project.

a. Safe passage channel / fish passage restoration: The safe passage channel would be located along McKay Park (river left) immediately below the existing dam and comprised of 10 step pools varying in width and length based on their location. The upstream-most step would include a concrete pad for anchoring pneumatic bladders, steel gates, and a floating boom. Three bladders would be installed at the upstream invert of the safe passage channel to manage upstream water levels and flow distribution. Three bladders would be installed upstream invert of the safe passage channel to manage upstream water levels and flow distribution. The bladders would receive air supply from a conduit network fed by a compressor located in a new concrete vault structure at McKay Park. The safe passage channel would be separated from the adjacent proposed whitewater channel by a man-made island comprised of natural boulders and alluvium.

b. Floating boom: Upstream of the Colorado Street Dam, a floating boom would be installed to guide less skilled boaters and less maneuverable watercraft toward the safe passage channel. The boom would be removed outside of the boating season to allow for debris and ice management during the winter months. The boom would be approximately 260 feet in length and consist of 10-foot modular units linked together. A steel channel would run along the bottom of each modular unit for tensile strength and used to bolt the units together. The boom would be assembled onshore and floated out to the anchor points. The anchor would consist of a precast, concrete box with attachment points. The boom would attach to these anchor points via cables and rods. The anchor box would be transported out to the installation point in the river. The box would be placed on an aggregate base for structural support and then filled with boulders/riprap to provide the necessary anchor weight.

c. Whitewater channel: The whitewater channel would be installed in the center of the river immediately below the existing dam. The channel would consist of three drop pools formed with boulders and coarse alluvium substrate. The grade control structures into each of the three pools would range in height from 12 to 30 inches and constructed of large boulders, cobbles, and wave enhancement features such as grouted boulders and concrete wave blocks. Cast-in-place concrete cutoff walls would be incorporated into grade control structures below Pools 1 and 3. A total of 24 bladders would be installed along the grade control structure within the whitewater channel to manage upstream water levels and flow distribution for altering wave heights. The whitewater channel would be separated from the adjacent safe passage channel (river left) and habitat channel (river right) by man-made islands comprised of natural boulders and alluvium. A portion of the island separating the habitat channel (river right) would also be supported by approximately 300 linear feet of sheet pile wall.

d. Habitat channel: The habitat channel would be constructed along Miller’s Landing side of the river (river right). The channel would consist of small peninsulas, alcoves, large woody debris, habitat boulders, and a small island to increase sinuosity and habitat complexity in the channel and along the shoreline. The newly created peninsula and island located along the river right shoreline would also contain small pools recharged by hyporheic flow. [The hyporheic zone is a region beneath and alongside a stream bed, where there is mixing of shallow groundwater and surface water.] A rock weir would be constructed at the upstream end of the habitat channel to prevent boaters and recreationists from floating through the habitat channel. The habitat channel would be separated from the adjacent whitewater channel by a man-made island comprised of natural boulders and alluvium supported by approximately 300 linear feet of sheet pile wall.

Two existing osprey nests poles located in the grassed area along the right bank would be moved approximately 40 feet closer to the river centerline. The poles would have concrete footings and installed when this portion of the channel would be isolated.

e. Pedestrian bridge: The existing pedestrian bridge would be removed and replaced with a 230-foot long, three-span, steel truss bridge, placed slightly upstream of the existing bridge. The new bridge would be constructed of pre-cast concrete slabs supported by two mid-span concrete piers and two concrete bridge abutments. The new bridge would be 16 feet wide at the center span and 12 feet wide at each of the end spans. The concrete bridge piers would be installed through the core island separating the channels. The piers would not come in contact with flowing water and would be faced with rock above the islands. The bridge pier and abutment would be comprised of driven H-piles and concrete pile caps.

f. McKay Park improvements: The existing designated beach area along the shoreline of McKay Park (river left) would be relocated approximately 100 feet downstream of its current location. Three rock groins would be positioned perpendicular to the beach to reduce velocities in and around the beach area during flood events. A six-foot wide concrete pathway would run from the sidewalk on Shelvin Hixon Drive down through the new beach area into the water. A ribbon of riparian vegetation would be planted in a 40-foot wide swath between the safe passage channel and McKay Park to restore the riparian corridor along the river bank and to restrict pedestrians in the park from accessing the safe passage channel.

Mitigation: Approximately 26 cubic yards would be discharged into 0.007 acre of Wetland B located at McKay Park. Temporary impacts include 10 cubic yards discharged into Wetland H and one cubic yard would be discharged into 0.08 acre of Wetlands C, F, & G located north side of the river near Millers Landing Park.

If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To provide safety, recreation, fish passage, improve fish and wildlife habitat, and access improvements to the Colorado Street dam.

Drawings: Twenty-four (24) drawings are attached and labeled NWP-2013-83 enclosure.

Additional information may be obtained from Carol Franson, Project Manager, U.S. Army Corps of Engineers at 541-465-6894, or email carol.s.franson@usace.army.mil

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United states.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural resources: An initial evaluation of the proposed project area indicates that n historic properties investigation has been conducted within the permit area. No sites determined eligible for or listing on the National Register of Historic Places were found to exist within the permit area. The Corps has requested the applicant to provide documentation to avoid ground disturbance where a positive shovel test exists. If the applicant cannot avoid this area, an archaeological monitor would be required.

This notice has been provided to the state Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: state law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification

Corps of Engineers No: NWP-2013-83 Notice Issued: June 4, 2014 Oregon Department of State Lands No: 56095-RF Written Comments Due: July 3, 2014 WHO IS THE APPLICANT: Bend Park & Recreation District LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the state of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900. PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Corps No. NWP-2013-83

Page 1 of 2

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No. NWP-2013-83

Page 2 of 2

NWP-2013-83

Page 1 of 24

ENCL

NWP-2013-83

L ~ ~'..-r.---I ')

. Ctn

Pit--f"

-v"'·

---~ - ~ --1 ~:~-:; -)~ -=~ -II I .. . ~=..-_ ::..: ' 111-.-;'l- '- . .- - · ~·\. ·= . ~~ ,_~.o~ ·ir- L_J .____.L_; '-;;_,~ I ' -:F ~.--. ~ I :.~ .....,,~ ., ~ ..~~ .-~ ! ,;.- -

_L..::;L

' ·· ·r ·

"""' ( "! . :·":':~

..

<:U' ·\ ¢> '·_.\1

\

·. ~'.~~-.

' .... "~. .'~.\~.· " a

. --,""'

'\\

" -~~'-

,,

'

T~nks ' -

.."I'·

-~ - · ~L-=::~ ·~-·t

~r

\.

ertt:Jrf

·

' 'r~L-1,

- "L

90~ s· ~tt. L ~ \L - h CO·'iMe:;f.Lll ..~ci · ,--.,...--,....-

~- -~i'

.l'iL..}Xi.· ..:::.::.·,. .

'\

.

I · ·

~:

.,

=·_:. . · , · . ~

Page 2 of 24

....- ~ - :.::;:;' [ -:. -~ - ./"'/ ~ .,.. · ~C t n er P1t · · · : \

·'

)_ -

I -,..,

~/;..~

I

I I I I

/ If

'---.W(.~ .

i ..,

"' "'~~"'·

c: )

Q'

'·'

; ::.-"' ~- ~ -::.~ ~ -,~~~erndrit-~;~-~ . ~~ ~

{..,/

\

I

~:

I

~ !=-"':. -:::-::--=--=

·· · :r. . '.. . :··... ,I · ··s~fr"-:····. .-; . ·Y . -

r ·· · ·

.·l. ...· 3_

... , ..~

·

T f3tl~ l

Par·k

1 ~.·- .~~-' w

5202 4/11/13

~

ENCL

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

FIGrE

Location and General Topography for Riverbend Park Pump Station in Bend, OR (USGS Bend, OR Quadrangle, 1962) 1

1

4709 1/2/14

~

Recent aerial photo- Colorado Dam Paddle Trail project area in Bend, Oregon I FIG URE I (Google Earth, 8/12/2012)

3

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2013-83

Page 3 of 24

ENCL

4709 1/2/14

~

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2013-83

Location and general topography (USGS Map) Colorado Dam Paddle Trail project area in Bend, Oregon (www.usgs.gov, 2013)

Page 4 of 24

I FIG URE I

1

ENCL

18 12 05BA & INDEX

NE1/4 NW1/4 SEC. 05 T.18S. R.12E. W.M. DESCHUTES COUNTY

REYISED.\1/10/2008

SEEt.IAP171232CO c __ _ _ _ _ __j

"'

~I;;

'-----___]

Caf\celledNos 199

SEE MAP 18 12 05BA SUPPLEMENTAL MAP NO. 2

200 101

2200

1!16COR~

,...-1J16COO

-!'

SEEUAP\812058

18 12 05BA & INDEX

4709 112/14

~

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2013-83

Tax Lot Map- T18 R12 S05BA, Portions of tax lots 300 and 400 Colorado Dam Paddle Trail project area in Bend, Oregon (ORMAP .net)

Page 5 of 24

~

~ ENCL

N.W.1/4SEC.5T.18S. R.12E. W.M.

18 12 0580 & INDEX

DESCHUTES COUNTY 1"

= 200' C11ncelledNos 1400A1

-~~--~-~L--'~----

SEE MAP 1812 OSBA

yCENCOR

4709 1/2/14

~

Tax lot map- Tax Map T18 R12 058, portions of tax lots 400 and 500 Colorado Dam Paddle Trail project area in Bend, Oregon (ORMAP.net)

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2013-83

Page 6 of 24

~

~

ENCL

NW1/4 NW1/4 SEC. 05 T. 18S. R.12E. W.M. DESCHUTES COUNTY

4709 1/2/14

~

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2013-83

Tax Lot Map- Tax Map T18 R12 0588, oortions of tax lots 100,200 and 300 Colorado Dam Paddle Trail project area in Bend, Oregon (ORMAP.net)

Page 7 of 24

18 12 0588

I FIGUCRE I

2

ENCL

NWP-2013-83

.

MILLERS LANDING PARK

.

.~ ·. .r

.. ,/'.

tAx

toT

t!tzoi&t 100

_,.._w;:J4_,,.:::.:.:>-~..:;;,-~' ~J -~., -:, 'j' /

/''

·

-~DE / ,,-

~,

./:Jf

.

~

,o'

~

'

(I

WETLANDF

~lye;;R

oe:scH'ure:S',

~

/

';,q

I I

-(2?>·

l_

~

/

)\IETlANbl

~

/

/"--~-:"""" ' -;<·-~::~;:a'S''<" - ,.__. . - Y.-'-· .;:,.___,,,,, '

/

Page 8 of 24

/

~

-.~ M~KA';',PA~I(

-

-

LEGEND

CJ

.l......

Wetland

~..Sq_

/

Ordinary High Water (OHW) --

/

/

/

/

/ /

T 181206M 400 ·

Property Line

\

'"··-,-,, c-s""""___

'-.L.

--:".ss- __ _::_

~

75

150

300

~ SCALE IN FEET

Base map provided by OTAK Inc_

Existing Conditions

ENCL

Colorado Dam Safe Passage Project- Bend, Oregon Pacific Habitat Services, Inc, 9450 SW Commerce Clrde, Suite 180 Wilsonville, Oregon 97070 Phone (503) 570-0800

Fax (503) 570-0855

\ProJect Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\Fig4_ExistCond.dwg, 3/27/2014 9:01:29 AM

~ 03-26-14

NWP-2013-83

~~····.

/

-~· ···· :JNG8":0Ms .. ,, d\J.,.~s o·t::scf'\' Page 9 of 24 Wetland Ordinary High Water

~x "? c --' - I .

,......:.._'/

~

-

·r.-

=;; - - ""'I': -......- /

ENCL

PH~j

', _ -

.

........

\ .--

I

~

- - ........

'-.,

,r /

-

_., --~ ""'"-;!., . \>.--' -.. . .

-'l'

'

50

100

200

SCALE IN FEET

Base map provided by OTAK Inc.

Overall Site

I FISREI

Colorado Dam Safe Passage Project- Bend, Oregon Pacific Habitat Services, Inc. 9450 'f!N'I Commerce Circ~, Suite 180 Wilsonville, Oregon 97070 Phone (503) 570-0800

Fax (503) 570-0855

\Project Directones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\FigS_SitePian-Overall.dwg, 3/27/2014 9:09:31 AM

03-26-14

NWP-2013-83

.1N LEGEND Ordinary High Water (OHW)

Page 10 of 24

60

30

'

120

SCALE IN FEET

CJ

Permanent Waters Impact Fill (0.8 ac I 5,600 cy) Removal (0.8 ac /3,200 cy)

-3599-

Proposed Contour Existing Contour

' LEFT BENCH ELEVAllON SEE SHEET SPO!

360 ) fTEP05\ 359 ;

....

~

P_l2.0~1

~·

_f:~

7

· - · i-;f:;;

-

rST"i"

;-STEP OJ

rSTEP 02

;-STEPO!

-·- · - j-

PO~~

1---.._

~

J

RIGHT BENCH ELEVATION SEE SHEET SP01

/-\_

\

n

-·g-P60L04·~ .....;,

. .....,, ·a""= .f.

\.._ I

""-----/

POOLOJ_f ~

---

-

,t,

rSTEP06

~7"' ~

~

~

~~

\ "" '---'-=- ~ I -r· POOL 07 _

POOL 06

~

'-

,.

-hSTEP 09

/STEP 08

rSTEP 07

-

7

-··-POOL 08

~11-IALWEG

'

~

POOL 09 /

·~ /

"\---._

"'-'-""''''-L'""''"'

·~·

)....

-.:~-

1

-·-

\-

1-·-

I\ I

\x!OOL"

I

\

3600

\

""-'7 ~-_)

-~

....

3596

\TO£ OF LEFT AND RIGHI BANKS

3592

\__EXISTING GROUND

358 I

3588

Base map provided by OTAK Inc.

Safe Passage Channel Site Plan, Profile and Grading Impacts

ENCL

Colorado Dam Safe Passage Project- Bend, Oregon

IFIEri

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070 Phone (503) 570-0800

Fax (503) 570-0855

\ProJect Dlrectories\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\F1g6 S1tePian-SafePass.dwg, 3/28/2014 10:43:12 AM

03-26-2014

NWP-2013-83 3@ 10' BLADDERS +2.0 DYER GROUTED BOULDER PAD

Page 11 of 24

LEGEND Ordinary High Water (OHW)

=

--3599-

Permanent Waters Impact Fill (1 .6 ac /6,320 cy) Removal (1.6 ac I 4,500 cy)

~

Proposed Contour Existing Contour

0

'

30

60

120

SCALE IN FEET

3604

3604

3600t=t==t=l-t-r----t----l-+~~±~-+~---+------+=+=l=r=J~ :J_;=:;:==J I

I

rPROPOSED GRADE

=r··-··t0J~~--l~:-~~e~·r=~tm=~t-··-··i··-··-··r··-··i-·;r~··--t··-··-J-··~·:i·:~··t "

3588

t?r ·1:: 3eoo

3588

EXISTING GROUND

WHITE WATER CHANNEL PROFILE

Base maps provided by River Restoration and OTAK Inc.

Whitewater Channel Site Plan Grading Impacts

ENCL

I

FI?REI

Colorado Dam Safe Passage Project- Bend, Oregon Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070 Phone (503) 570-0800

Fax (503) 570-0855

\Project Directones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA f1gures\F1g? WWaterPian_Profile.dwg, 3/28/2014 10:48:35 AM

03-26-2014

NWP-2013-83

--"';\_____

Page 12 of 24

J WATE~All \ Whitewater Channel Area ' See Figure 7 for Site Plan A'!

I

f:

I

LEGEND Ordinary High Water (OHW)

CJ -3599--

Permanent Water Impact Fill (1.3 ac I 4,900 cy) Removal (1.3 ac /1,400 cy)

NOTE For Habitat Channel Profile and Impacts See Figure 8A

Proposed Contour Existing Contour 30

60

'

120

SCALE IN FEET

ENCL

PH~

Base maps provided by River Restoration and OTAK Inc.

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070 Phone (503) 570-0800

Fax (503) 570-0855

\Project Directones\4700\4709 RFP Colorado Dam Paddle Tra1l Improvements\AutoCAD\Piot Dwgs\JPA figures\FigB S1tePian-Habitat.dwg, 3/27/2014 9:37:33 AM

FlaRE!

Habitat Channel Site Plan Grading and Impacts Colorado Dam Safe Passage Project- Bend, Oregon

1 03-26-2014

NWP-2013-83 3604

I

~

I

3600

rPROPOSED GRADE 3596

-'-~" 3592

""~-'--

,-:::-'_'_ -

_,_---

--..,.

ORDINARY HIGH WATER

I I _,_ --- -·-- -t-r-_---· _,_ - ---

'""''

""'

3588

_

,_,

·

-~=''11',

I ""' '-EXISTING I GROUND

'-·--

,_,

JYf

_

/f+l

F

1+00

3+00

2+00

4+00

-

-

--

3604

3600

3596

3592

3588

I

3584

-

5+00

3584

Page 13 of 24

Habitat Channel Profile LEGEND

-- -·-

Ordinary High Water (OHW)

D

Permanent Water lm~act Fill (1.3 ac /4,900 cy) Removal (1.3 ac /1,400 cy)

I

'~'

ENCL

~611

Profile provided by OTAK Design by River Restoration

Pacific Habitat Services, Inc,

9450 SW Commerce Circle, Suite 180 Wilsonville, Oregon 97070 Phone (503} 570-0800 Fax (503} 570-0855

\ProJect Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\F1g8A HabJtatProfile.dwg, 3/27/2014 9:40:46 AM

Habitat Channel Profile and Impacts Colorado Dam Safe Passage Project- Bend, Oregon

IF8AEI 03-26-2014

NWP-2013-83 Ordinary High Water (OHW)

Page 14 of 24

~::.,...-...,_._ ~ ,#"i",._ / / -_ , .........· - · - · - · ~-- .,_,'-"'..,_-:. "--' ..__-:::-·,..'-_ ' -= ==: ::::- . -""'---

.__..

-

Permanent Waters Impact Fill (0.2 ac /144 cy) Removal (0.1 ac I 50 cy) Temporary Wetland "H" Impact Fill (155 sf /10 cy)

Existing Contour -J59B---

Proposed Contour

NOTE: For Section A-A and B-B See Figure 9A

ELEVAnQN

ENCL

Base map snd Elevation provided by OTAK Inc.

Pedestrian Bridge Plan, Elevation and Section Locations

IFlgREI

Colorado Dam Safe Passage Project- Bend, Oregon Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 1SO Wilsooville, Oregon 97070 Phone (503) 570-0800 Fax (503) 570-0855

\Project Dlrectories\4700\4709 RFP Colorado Dam Paddle Traillmprovements\AutoCAD\Piot Dwgs\JPA figures\Fig9 Plan_Eiev PedBndge.dwg. 3/28/20141:43.25 PM

03-26-2014

NWP-2013-83

""·..---,...----,----,---==;==----~----T---~""

CONCRETE RETAINING

WALL

,.,.,L----1-~d"-----+---r--

~~~--~==~~~

_.L.::.. ~~;...-n--.b'""":-~

-

HABITAT CHANNEL GRADING

'---------

li!OO

-~---"""-"-[;~-······· ···.·_'"'" ....

SECTION A-A SCAL£:HOR.=1"=5

Page 15 of 24

-

'oUIT=J"r5'

n+B4.o61

-

COLORADO

EXISTING!~ 6'GASLINEI

AVENUE\

BRIDGE

"

\

LEGEND Ordinary High Water (OHW) --+~~~--~~----4JOoo PROPOSEC

Permanent Waters Impact Fill (0.1 ac I 40 cy)

RIP RAP

-

-

~

SECTION B-B SCALE.

HOR.~1·~5' VERT~!·~s·

-~-

ENCL

lr~

Sections provided by OTAK Inc.

Pedestrian Bridge Cross Sections and Impacts Below (OHW) Colorado Dam Safe Passage Project- Bend, Oregon

IF9AEI

Pacific Habitat Services, Inc.

9450 SW Commerce Clrde, Suite 180 WilsorlVifle, Oregor~ 97070 Phone (503) 570-0800

Fax (503) 570-0855

·\ProJect Dlrectorles\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwgs\JPA figures\Fig9A PedBndge_Xsect1ons.dwg, 3/28/2014 10:53:48 AM

03-26-2014

NWP-2013-83

0

WHITEWATER TRAFflC AND SECONDARY TAKEOUT

. CONCRETE VAULT

. .

Wetl2mdl .·

........ ·....·... ·..

o.,

··

· ·· ~ tr-,

·.

·~"'~cVc.ss

···...··..·.·.··.··.··. ·. .·.·. .···.·...·....· ·.·.·.·.·.··.·..·..·.··..·...·.·.· ·..·· ....· . ··.·. .·..· ..···.······.·.·.·.· ...··..·".··.···X'·"'···

.··.

.

·,.·.· ·' ·

.

'.

'

.

.

.

.

.

.

.

-

.

.. .

ANCHOR TO CONCRETE VAULT

.

1UBERS

p..~D o1:tlER

Page 16 of 24

.~·'·""""""c

LEGEND

-3597--

r\

Ordinary High Water (OHW) Permanent Waters Impact Fill 0.003 ac I 20 cy) Existing Contour Proposed Contour

30

60

'

120

SCALE IN FEET

Plan Provided by River Restoration

ENCL

Floating Booms Site Plan Colorado Dam Safe Passage Project- Bend, Oregon

I F10E[

Pacific Habitat Services, Inc. Phone (503) 570-QSOO

\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwqs\)PA fiqures\F1glO_S1tePian-Boom.dwg, 3/28/2014 10:55:10 AM

03-26-2014

NWP-2013-83 ~

MCKAY PARK

Page 17 of 24

NOTE No permanent waters or wetlands impacts. LEGEND -

· · -

-3599-

Ordinary High Water (OHW) Proposed Contour Existing Contour

ENCL

PH~A

Base map provided by OTAK Inc.

McKay Park Site Plan and Grading Colorado Dam Safe Passage Project- Bend, Oregon

Pacific Habitat Services,lnc. Phone· (503)570-0800

\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piot Dwqs\JPA fiqures\F1gll SitePian-McKayPark.dwg, 3/27/2014 11:02.54 AM

!FriEl 03-26-2014

NWP-2013-83

~

........

·

.........

..

£-,.,.. .. __ ORDINARY~ ......... WETLAND "A"

.......

HIGH

..

WATER

/

//

/

/

~ "~~//.

-·-·-~~~-·-·-·-·-s;-

---.---<>-- _, ____ % ___

) 0

Page 18 of 24

LEGEND

PLAN

Ordinary High Water (OHW)

SCALE: 1"~10' 0

z

<(

r=

~ u_

EXISTING GROUND

359

0

D

0

z

;; ~

~

u_

0

lu:s\,'0~~ : ';eoco~mi!::

359

-3599.

3592

CROSS- SECTION D-D

ENCL

PH~

Permanent Wetland "B" Impact Fill (0.007 ac I 26 cy) Removal (0.007 ac I 27 cy) Existing Contour

3596

1

Permanent Waters Impact Fill (0.1 ac I 231 cy) Removal (0.1 acl 190 cy)

Proposed Contour

~

10"

,.

,.

,..

Base map provided by OTAK Inc.

McKay Park Beach Site Plan, Grading, Impacts and Cross Section Colorado Dam Safe Passage Project- Bend, Oregon

IF12EI

Pacific Habitat Services, Inc. 03-26-2014 Phona (503) 570-0800

\Project Dll·ectones\4700\4709 RFP Colorado Dam Paddle Traillmprovements\AutoCAD\Piot Dwgs\JPA figures\Figl2

SltePian~McKayBeach.dwq,

3/27/201411:05:16 AM

NWP-2013-83 oEiSCfiVTES

-~

~.../ 10' POWE:RLINE EASEMENT:-:::--_ PER VOL. 320, PG. 192, O.R. .J

Page 19 of 24

.s'N·sy\t:\Jl\~ ,/

:,

CONSTRUCTION/SEQUENCING NOTES

CD

0 0

1

ISOLATE RIVER RIGHT WITH APPROVED BMP'S. (SEE SHEETS TW04- TW06 FOR DETAILS). INSTALL EROSION COUNTER MEASURES ALONG STREAMBED AND STREAMBANK TO EL=3598.0. INSTALL PROTECTIVE LINER ON EXISTING ISLAND. (SEE SHEETS TW04- TWOS FOR DETAILS.)

ENCL

p~

0 rs~~~F~H~~~ toN~ F ~~T~;~ !~~~~~~~:o~A6~TAILS) 0 0

INSTALL FIRST SPANS OF WORK BRIDGES. (SEE SHEET TW04- TW06 FOR DETAILS.)

GENERAL NOTES

IMPACT NOTES

1. MAX BYPASS FLOW IS 1600 CFS. ISOLATION SYSTEM ALLOWS FLOWS ABOVE THIS RATE TO OVERTOP THE DIVERSION FACILITIES AND INUNDATE THE WORK AREA.

TEMPORARY WATERS IMPACT FOR ISOLA llON MEASURES AND WORK BRIDGES FILL (0.9 AC I 1,30D CY)

ISOLATE BEACH AREA AND CONSTRUCTION PROPOSED BEACH AREA. (SEE SHEET C10 FOR DETAILS.

TEMPORARY WETLAND IMPACT (C,F,G) (0.08 SF I I CY)

ORDINARY HIGH WATER (OHW)

50

100

SCALE IN FEET

Base map provided by OTAK Inc.

FIGURE Temporary Water Management Plan - Stage 1 Colorado Dam Safe Passage Project - Bend, Oregon

Pacific Habitat Services, Inc.

13A 03-26-2014

9450 SW Commerce C1rde. Suite 180 Wilsonville, Oregon 97070

\Project Dtrectorres\4700\4709 RFP Colorado Dam Paddle Trail lmprovements\AutoCAD\Piot Dwqs\JPA

200

~

figures\Figl3A_ErosCntri~Staqel.dwg,

3/28/201411:27:32 AM

NWP-2013-83

c~

D

T

Page 20 of 24 CONSTRUCTION/SEQUENCING NOTES

(j) f;:~N~H:~~:~~~~~ T~~~K F~~DggAILS)

0

EXISTING PEDESTRIAN BRIDGE WILL ALSO BE USED FOR CONSTRUCTION ACCESS.)

0 0

DRIVE SHEET PILE IN RIGHT ISLAND. (SEE SHEET C05 FOR DETAILS) COMPLETE ISOLATION IN RIGHT ISLAND (SEE SHEETS TW04- TW06 FOR DETAILS)

0

ISOLATE RIVER LEFT UPSTREAM OF PROJECT (WHITEWATER AND SAFE PASSAGE CHANNELS) (SEE SHEETS TW04- TW06 FOR DETAILS) ISOLATE RIVER LEFT DOWNSTREAM OF PROJECT (WHITEWATER AND SAFE PASSAGE CHANNELS) (SEE SHEETS TW04- TW06 FOR DETAILS)

0 0

INSTALL WHITEWATER AND SAFE PASSAGE CHANNEL FEATURES. (SEE SHEETS C01-C03 FOR DETAILS.) BEGIN REMOVAL OF EXISTING PEDESTRIAN BRIDGE.

0 ~~~~NST~~z~T~~~g~~N (~~E N~:EETS BR01-BRD2 FOR DETAILS)

0

ISOLATE AREA AND INSTALL FLOATING BOOM ANCHORS. (SEE SHEETS C12 FOR DETAILS)

GENERAL NOTES 1. MAX BYPASS FLOW IS 1600 CFS. ISOLATION SYSTEM ALLOWS FLOWS ABOVE THIS RATE TO OVERTOP THE DIVERSION FAGILITIES AND INUNDATE TIHE WORK AREA.

IMPACT NOTES

LEGEND

TEMPORARY WATERS IMPACT FOR ISOLATION MEASURES AND WORK BRIDGES. FILL (0.9 AC I 1,300 CY)

-··-··-

TEMPORARY WETLAND IMPACT (C,F,G) (0.08 SF I I CY)

50

~ ORDINARY HIGH WATER (OHW)

100

SCALE IN FEET

Base map provided by OTAK Inc.

FIGURE

ENCL

Temporary Water Management Plan - Stage 2 Colorado Dam Safe Passage Project - Bend, Oregon Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Surte 180Wisoovrlle, Oregon 97070

\ProJect Drrectones\4700\4709 RFP Colorado Dam Paddle Trail Improvements\AutoCAD\Piat Dwqs\JPA fiqures\Ftq13B_ErosCntri-Stage2.dwq, 3/28/201411:29:09 AM

200

~

138 03-26-2014

NWP-2013-83

CONSTRUCTION/ SEQUENCING NOTES

CD

EXTEND MIDDLE WORK BRIDGE TO HABITAT CHANNEL. (SEE SHEETS TW004- TW06 FOR DETAILS).

0 0 0 0

DIVERT RIVER TO WHITEWATER AND SAFE PASSAGE CHANNELS.

0 0 ® _/-.-./

ISOLATE HABITAT CHANNEL (SEE SHEETS TW04- TW06 FOR DETAILS) REMOVE TEMPORARY GATE. REMOVE TEMPORARY EROSION COUNTER MEASURES OR INCORPORATE THEM INTO CONSTRUCTION AS SHOWN IN PLANS. INSTALL HABITAT CHANNEL FEATIURES. COMPLETE NEW PEDESTRIAN BRIDGE. (SEE SHEETS BR01-BR02 FOR DETAILS.) REMOVE REMAINDER OF EXISTING PEDESTRIAN BRIDGE.

GENERAL NOTES

D

Page 21 of 24

·~·· ..

MAX BYPASS FLOW IS 1600 CFS. ISOLATION SYSTEM ALLOWS FLOWS ABOVE THIS RATE TO OVERTOP THE DIVERSION FACILITIES AND INUNDATE THE WORK AREA.

,··.

,·,

IMPACT NOTES

······..·· ···········. ' .... ~~

. '..

.

TEMPORARY WATERS IMPACT FOR ISOLATION MEASURES AND WORK BRIDGES. FILL (0.9 AC /1,30D CY)

:·;,_

TEMPORARY WETLAND IMPACT (C,F,G) (0.08 SF / I CY)

LEGEND

50

'

100

200

SCALE IN FEET

Base map provided by OTAK Inc.

Temporary Water Management Plan -Stage 3

ENCL

Colorado Dam Safe Passage Project - Bend, Oregon

FIGURE

13C

Pacific Habitat Services, Inc. 9450 SW Commerce C1rcle, Suile 180 Wilsonville. Oregon 97070

\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Tralllmprovements\AutoCAD\Piot Dwqs\JPA flgures\Fiql3C_ErosCntri-Stage3.dwq, 3/28/201411"42:24 AM

03-26-2014

NWP-2013-83

PLANT COMMUNITY ZONES

REFER TO SHEETS LOJ AND L04 FOR PLANTING DETAILS. PLANTING DETAILS APPLY TO All PLANTS SHOWN ON THE LEGEND AND LAYOUT SHEETS

TYP. PLOT

10 '

~

RIPARIAN UPLAND

15"'''·'·1

PLANT THE FOLLOWING TREES AT 8' D.C. MAX. SPACING AND SHRUBS 3' 0 C. MAX.

NATIVE SEED MIX

(10,853sq.fl.)

SEE SPECIFICATIONS FOR SEEDING REQUIREMENTS

(TYPICALPLOT.100SF). QTY. PER

QTY.PER LAYER

PLOT

OVER STORY

LAYER SEED

ELYMUS GLAUCUS

ALMELANCH/ER ALNIFOLIA · SASKATOON SERVICEBERRY

SLBS/AC BLBSIAC BLBSIAC SLBSIAC 1 LBSIAC .5LBSIAC 5LBSIAC 2LBS/AC 5LBSIAC

FESTUCS IDAHOENSIS ELYMUS HYSTRIX STIPAOCCIDENTAUS ACHILLEA MJLLEFOUUM ASTERCAPESTRIS ERIOPHYLLUM LANA TUM LUPI~US SPP. LOTUS PURSHIA~US

UNDERSTORY CHRYSOTHAMNUS NAUSEOSA- RUBBER RABBITBRUSH PRUNUS VIRGIN/ANA ·CHOKECHERRY PURSHIA TR/OENTATA-BITIERBRUSH SYMPHORICARPOS ALBUS. COMMON SNOWBERRY TYP.PLOT

NOTES: 1.

CONTRACTOR SHALL PROVIDE TOPSOIL, SOIL AMENDMENTS AND MULCH AS SPECIFIED.

2.

ALL PLANTS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS PROVIDED AS PART OF THE CONSTRUCTION DOCUMENTS PACKAGE.

3,

FOLLOW DETAIL 5/LOJ FOR RANDOM PLANnNG PA TIERN FOR All PLANT COMMUNITY ZONE PLANTING.

10'

.

1O

.;.;.;.;.;. 1

·· · · ·· · ·· · · : ·: ·: ·: ·: ·:

RIPARIAN FRINGE

i<.sBO"'·'·I

PLANT THE FOLLOWING TREES AT 8' O.C. MAX. SPACING AND SHRUBS 3' O.C. MAX (TYPICAL PLOT. 100 SF)

ORNAMENTAL PLANTING

(4,262sq.fl.)

SEE SPECIFICATIONS FOR PLANTING REQUIREMENTS QTY. PER PLOT

Page 22 of 24

OVERSTORY ALNUS INCANA. MOUNTAIN ALDER BETULA OCCIDENTAL/S · WATER BIRCH

SHRUBS I GRASSES CALAMAGROSnS X ACUnFLORA 'KARL FOERSTER' FEATHERREEDGRASS 1GAL.,24'0.C. DESCHAMPS/A CAESPITOSA 'NORTHERN LIGHTS' 1 GAL, 12' O.C NORTHERN LIGHTS TUFTED HAIRGRASS HEMEROCAWS X'STELLA DE ORO'- STELLA DE ORO DWARD OAYULY1 GAL, 12' O.C LAVANDULAANGUSTIFOLIA · MUNSTEAO LAVENDER 1 GAL, 24' D.C. PENNISETUM ORIENTALE· TALL TAILS'· TALL TAILS FOUNTAIN GRASS 1 GAL, 24' D.C. SPIRAEA BETULIFOL/A TOR'· BIRCHLEAF SPIRAEA 1 GAL., 36' O.C

CORNUS SERICEA ·REO OSIER DOGWOOD RIBES CEREUM ·WAX CURRANT ROSA NUTKANA. NOOTKA ROSE ROSA WOODS/I· WOOD'S ROSE SALIX BOOTH/I· BOOTH'S WILLOW SALIX GEYER/ANA ·GEYER'S WILLOW SPIRAEA DOUGLAS//. DOUGLAS' SPIRAEA

WETLAND SOD

GROUND LAYER COTONEASTER DAMMERI'LOWFAST'. BEARBERRY COTONEASTER

(11,090sq.ft)

SEE SPECIFICATIONS FOR REQUIREMENTS

ENCL

p~

SIZE/ SPACING

SOD LAWN

1 GAL, 24' O.C.

(11,991sq.ft.)

SEE SPECIFICATIONS FOR SODDING REQUIREMENTS

Base map provided by GREEN WORKS

FIGURE Planting Legend Colorado Dam Safe Passage Project- Bend, Oregon

14A

Pacific Habitat Services, Inc.

!~~n~W(~~~~;;~~~~~ '""" ""'~::·;~·;,~;';';:~;;:~' \Project Dtrectones\4700\4709 RFP Colorado Dam Paddle TraiiJmprovements\AutoCAD\Piot Dwqs\JPA fiqures\Ftg14A Plantleqend.dwq, 3/27/201411:47:47 AM

03-26-2014

NWP-2013-83 Page 23 of 24

[~---~~ GENERAL LEGEND -

·

·-

~ (/J({f)

ORD!NARYHIGHWATERLINE

LARGE WOODY DEBRIS

HABITATBOULDERS

m

PLANTING ZONES

[SEESHEETLDOFORPLANTLEGEND)

RIPARIAN UPLAND

[ ]

....

D

NATIVESEEMIX

RIPARIAN FRINGE

·

ORNAMENTAL PLANTING

WETLANDSOD

Or---LAWN_ _

o-o

gggg~

0

o~o

Base map provided by GREEN WORKS

-

20' """'''r:

ENCL

Right Bank I Habitat Channel Planting Plan Colorado Dam Safe Passage Project- Bend, Oregon

0'

2ft

40' IN Fm

FIGURE

148

Pacific Habitat Services, Inc. 03-26-2014 Phone (503) 570-0800

\Project Dtrectones\4700\4709 RFP Colorado Dam Paddle Trarllmprovements\AutoCAD\Piot Dwgs\JPA frgures\Ftq14B RB-PiantinqPian.dwg, 3/27/2014 12:12:04 PM

NWP-2013-83

l'

MCKAY PARK

1/XON DRIVE

Page 24 of 24

!

~

~ :::,; "(

g ~

()

8 GENERAL LEGEND -

·

·-

ORDINARYHIGHWATERLINE

m

PLANTING ZONES

'< (SEESHEETLOOFORPLANTLEGEND)

RIPARIANUPLAND

WRIPARIANFRINGE

D ·

NATIVESEEMIX

DRNAMENTALPLANTING

:<<<· WETLAND SOD

~~LAWN_ _

-

2IJ'

Base map provided by GREEN WORKS

2IJ'

40'

FIGURE

ENCL

Left Bank and McKay Park Planting Plan Colorado Dam Safe Passage Project- Bend, Oregon

14C

Pacific Habitat Services, Inc. 03-26-2014 Phone (503) 570-0800

\Project Dlrectones\4700\4709 RFP Colorado Dam Paddle Trail lmprovements\AutoCAD\Piot Dwqs\)PA figures\Fig14C LB-PiantmqPian.dwq, 3/27/2014 12:13:20 PM

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas