PUBLIC NOTICE for Permit Application
Issue Date: June 19, 2014
Expiration Date: July 21, 2014
US Army Corps of Engineers No: NWP-2014-195
30-Day Notice Oregon Department of State Lands No: 56309
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Chelsea Bowman, Chelsea.B.Bowman@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: City of Salem Public Works
C/O: Ken Roley
555 Liberty St. SE
Salem, OR 97301-3503
Location: Geren Island on the North Santiam River near Stayton, in Marion County, Oregon
Section 13, 14, and 18 of Township 9 South, Range 1 West and 1 East
Latitude: 44.788633, Longitude: -122.743878
Waterway: North Santiam River
Project description: The City of Salem Public Works Department has proposed a project that involves channel restoration and management actions to maintain channel stability and consistent water flow to the Geren Island treatment facility’s primary and emergency intakes and Oregon chub channel. These actions include removal of accumulated bed material at four locations, installation of five large wood structures within the river, construction of a point bar along the North Channel, construction of two engineered riffles (grade control structures) in the North Channel, and incremental placement of removed bed material into the South Channel below the dam. The project will involve permanent fill of 5.11 acres of waters ( 41,770 cubic yards), temporary impacts to 0.48 acres of waters (4,120 cubic yards) and 0.04 acres of wetlands. The project also involves 6.35 acres of permanent removal of waters (41,770 cubic yards), 0.02 acre of permanent removal of wetlands (80 cubic yards), and temporary removal of 1.54 acres of waters (8,700 cubic yards).
Mitigation: The applicant has proposed a compensatory wetland mitigation plan for permanent impacts to Wetland A (0.02 acres of permanent removal). This will be accomplished by purchasing 0.02 acres of mitigation credit (a ratio of 1:1) from the Marion Wetland Mitigation Bank.
If a permit is issued, the Corps will determine what appropriate and practicable compensatory mitigation is. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The purpose of the proposed project is to increase low summer flows and reduce high winter flows in the North Channel of the North Santiam River in order to maintain channel stability and consistent water flow to the City of Salem’s (City’s) primary and emergency intakes and the Oregon chub channel.
Drawings: Geren Island Flow Maintenance Project, Figures 1- 13.1 (32) drawings are attached and labeled NWP-2014-195 enclosure.
Additional information may be obtained from Chelsea Bowman, Project Manager, U.S. Army Corps of Engineers at 503-808-4383 or email Chelsea.B.Bowman@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
-The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.
Cultural resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties is justified and would be required prior to the Corps’ final permit decision.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
Appendix A
Figures
5092
12/4/13
Pacific Habitat Services, Inc.
Location and General topography
Geren Island Flow Maintenance Project, Stayton, Oregon
(USGS Stayton, OR Quadrangle, 2011)
I FIGURE I
1
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2014-195
LECEND
~~·.~
~~...e
..,,'""-'"'
~
0tiiiC
~
;V».c
··~-·
·+,..._
.... --._.,..
111111-
000 00 00 0
~
..
-..&,....,~
u.y,..........,'!ft'.Lll:
........
...._ 1fd-..:.. ~
~.,..
tJIX ....... .,....· 't'CIIt . . . .
,jlf.»t&,...-----·
~·---~
==~~-=......
:~-.
.......
<·
r·
----t
..... ·
...... "!ff.,~~·
·+
wt.~~
Plat fh.~Heatad; No"mtnra~ 1'006
~--·~·
5092
12/4/13
Patllic Habltat Services, Inc.
Tax lot map, Marion County
Geren Island Flow Maintenance Project, Stayton Oregon
(ormap.net, 2013)
I
FIG URE
I
2
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
NWP-2014-195
5092
1214/13
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 1eo
Wilsonville, OR 97070
G
11 d
.
Aerial Photo
eren san Flow Mamtenance Project, Stayton Oregon
(Google Earth, 2013)
Lr]
FIG3URE
NWP-2014-195
GEREN ISLAND FLOW MAINTENANCE PROJECT
NORTH SANTIAM RIVER, OREGON
DRAFT
~ PERMIT DRAWINGS ~
PROJECT PARTNERS
CITY~~
<....J AT YOUR SERVICE
!UJ u-,
w
w 0
0:
1- a.
PROJECT DESCRIPTION
0
WEST CONSUI.TAHTS, INC. RETAINED RIVER DESIGN GROUP, INC. TO HELP DEIIELOP FLOW MI\INTENANCE AND
RESTORATION CONCEPTS AS PART OF A COMPREHENSIVE EFFORT TO IMPROVE THE CITY OF SI\LEM WATER !NTAKE
SYSTEM AT GEREN ISlAND ON THE NORTH 1!1\NTIAM RIVER. THE RESULTING PROJECT CONCEPTS FOCUS ON THE
OEVEJ..OPMIEN'r OF TECHNIQUES AND STRUCTURES: TO HELP REDUCE MAJNTEN..\NCE AND IMPROVE ASHERtES
HASITAT.
z zwu
zm
c~
DATA PROVIDED BY ~ST CONSULTANTS, INC.
Cl:S:
HORIZONTAL PROJECT10N: OREGON STATE PLANE NORTH
HOR!Z DATUM: NA083
UNITS: INTERNATIONAL FEET
VERT DATUM: NAIIDI!8
UNITS: US SURVEY FEET
THESE DRAVIRNGS, THE IDEAS AND OESIGNI!INCDRPOAATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SER\IIC<, ARE
THE PRoPERTY OF RIVER DESIGN GROUP, INC. (RllG)ANO ARE NOT TO !!E USED, IN WHOLE DR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE \1\/RlTTEN AUTHORIZATION OF ROO. UKEWJS<, THESE DRAWINGS MAY NOT !!E AlTERED OR
MOOII'IEO WITHOUT AUTHORIZATION OF RtlG. ORAW!NG OUPUCATION IS AU.OWEO IF THE ORIGINAL CONTENT IS NOT
MODIFIED.
3.1
3.2
4.0
SITE 1 STRUCTURES DETAILS
SITE !INTAKE SYPASS Fill
SITE 2 LAYOUT
4.1
5.0
SITE 2 SECTIONS
SITE 3 Vv'OOO STRUCTURE
11.1
12.D
12.1
12.2
12.3
5,1
SITE 3 STRUCTURE DETAILS
8.0
SITE 4 LAYOUT
SITE 4 SECT!ON.S
SITESLAYOUT
SITESSECTJONS
SITE 8 LAYOUT
6.1
1.0
7.1
8.0
stTE 12 STRUCTURE DETAILS
SATE 1 &3WORKAAEA.ISOLATION
Sn"E2\IIIORKAREAISOI.ATION
StTE 4 VVORK A~ ISOLATION
SITE 6 YJORK AREA ISOlATION
12.4 SITE 8 WORK AREA ISOLATION
12.5 SITE 10, 11. & 12\I\'ORK AREA ISOlATION
12.6 'WORK AREA lsotATION AND EROS10N CONTROL NOTES
12.7 TYPICAL TEMPORARY BRIDGE
13.0 SITE RESTORA11DN & REVEGETATION
13.1 RE\IEGETA'!JON NOTES
w::i
z
UJ
0 0:
w
(!)
5~
DRAWING INDEX
SITE 1 WOOO STRUCTURES
~
:t
0
RDQ V\IORKS EXCLUS!VELY IN THE RlVER EN\'I.RONMENT AND EMPLOYS THE MOST CURRENT AND ACCEPTED PRACTICES
AVAILABLE FOR PlANNING AND DESIGN OF ResTORATION AND CHANNEL ENHANCEMENT PROJECTS. AlL PLANNING IM)RK
WAS PERFORMED DR DIRECTED 9Y A REQISTEREO PROFESSIONAL CML ENGINEER WITH PAST EXPERIENCE IN THE DESIGN
AND IMPLEMENTATION OF STREAM HABITAT RESTORATION.
3.0
<(
<9
a..u..
>!!2z
STANDARD OF PRACTICE ·
ttO SITE 10 LAYOUT
10.0 SITE 11 l.AYOUf
11.0 SITE 12 WOOD STRUCTURE
r:i
~~ IY0
REUSE OF DRAWINGS
COVER PAGE AND NOTES
EXISTING CONDITIONS & PI!OJECT KEY
OVERAlL SITE ACCESS & STAGING
w
0::
0
<(~ ~
oc
w~ ;;;
SPATIAL REFERENCE
FIELD SURVEY DATA AND EXISTING CONDITIONS TERJVJN SURFACE OTM COMPRfSED OF UOAR AND BATHYMETRIC SURVEY
1.11
1.1
2Jl
z
0
Cl
z'=
o"'
T.09S., R.01E., WILLAMETTE MERIDIAN
MARION COUNTY, OREGON
USGS QUADRANGLE: STOUT MOUNTAIN, OR
STAYTON, OR
fl!i
B"'
Ill~.,
.
~ SECTION OR DETAIL
SECTION'
-
DIRECTION OF
SHEET WHERE SECTION
OR DETAIL IS SHOWN
CROSS..SECTION SHEET REFERENCE
1.0
NWP-2014-195
FlOW MAINTENANCE PROPOSED TREATMENTS
SITE ID
DRAWINGS
3.0-3.2.12.0, 13Jl
TREATMENT DESCRIPTION
INSTALLATION OF ENGINEERED LARGE WOOD STRUCTURE'S AT INLET TO INTAKE BYPASS CHANNEL
4.0~4.1,
12.1, 13.(J
DREDGiNG OF MAINSTEM AND NORTH CHANNELS AND STOCKPJLE OF EXCAVATED MATERIAL
5.0~5.1,
12..0,131.0
INSTALI.ATION OF ENGINEER EO LARGE WOOD STRUCTI!RE IN INTAKE BYPASS CHANNEL
e.o ~ e.1, 12.2, 13.o
PLACEMENT OF OREOGEO STREAMBED GRAVELS
7.0-7.1,12.3,13.0
INSTAUATJON OF lNTA.KE CHANNEL IMPROVEMENTS tNCLUDING: AN ENGINEERED LARGE WOOD
STRUCTI!RE,INTAKE CHANNEL DREDGING, AND ENOINEEREO RifFLE IN NORTH CHANNEL
a.D,12..4, 1a.o
DREDGE MATERIAL FROM NORTH CHANNEL LEFT BANK ALONG ISLAND 2 AND BUILD POINT ON NORTH
CHANNEL RIGHT BANK
10
9.D,12.S.13.D
11
10.0, 12.:5, 13.D
INSTALLATION OF ENGINEERED RIFFLE AT UPSTREAM END OF ISLAND 1
DREOOING EAST CHANNEL ALONG ISLAND 1
12
b
w
a
tr
a. z
w 0
u (!!
w
~ a:
0
zw
!z ii!~
~
::;;
0
~
~
...J
u.
.0::
z 0~
Cl
:5
~
z
z
w
a:
w
(.!)
REACH CHARACTERISTICS
0
EXISTING CONDinONS
EXISTING 1' CONTOURS
1
1"" 400';;;;;
DRAFT
~PERMIT D
NWP-2014-195
NWP-2014-195
0
SITE 1 LAYOUT
ee
44
1"=30'
® INLET BYPASS SEC:I'I'l!!.
;;;;;;
~~!f,r:lcV
NWP-2014-195
LWS TIER 1 !BOTTOM)
1"=40'
CONSTRUCTION NOTES
G)
EXCAVATE lOG STRUCTURE fOOTPRtNT TO sPECiFIED OESfGN ELEVATIONS. STAGE EXCAVATEO BOUt...OERS AND MATERIAL N&\R8Y
ANO OUTSIDE OF MOVlNG WATER. EXCAVATED MATER!AL WU,..l aEIJSED TO BA.CKFtt.l STRUCTURE AND AS 8AU.AST FOR: LARGE
WOCil.
®
®
PlACE LON@
\'\lEAVE SMALl.. DIAMETER WOOD INTO BASE MEMBERS AN0 KEY MEMBERS AT VARIABLE VERTlCAL ANGLES ANO EXTEND TO TOP OF
LOG STRUCTURE. WOCD TO BE PUSHED INTO UNDISTUASED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CIJT If
NECESSARY SO AS TO NOT EXTEND MORE THAN$' ABOVE TOP OF STRUCTURE. AU. SAWED ENOS SHAL.l BE ROUGHENED AND
®
®
®
PlACE KEY MEMBERS (TIER 3) AND CONNECTTO BASE MEMBERS [TIER 1) AND KEY MEMSERS (TIER 2) WITH 1" DIAMETER All·THREAO
ROD AS DESIGNATED IN CONSTRUCTION NOTE B. EACH MEMBER SHAU- BE. CONNeCTED 1N AT LEAST 2 LOCA.TtoNS.
®
ANCHOR LARGE WOOD MEMBERS TOGETHER USING 1" DIAMETER AU.·THREAD ROD AT A MINIMUM OF 2 LOCATIONS FOR EACH PieCE
OF LARGE WOCil. UTIU!:E 1" DIAMETERASTM Mill WITH~· 0.0. HEAVY PlATE WASHERS AND NUTS {A563B HEX HEAD NUT). ROD
SHAll BE CIJT FI.USH WITH NUT HEAD AFTER TIGHTENED AND EXPOSED END SHALL BE PAINTED WITH llROWN, RUST INHIBITING All
WEATHER PAINT.
BEl'VIf'EEN BOUJ..DERS IF .PRESENT~
PlACE KEY MEMBERS (TIER 2) WITH AND WITHOUT AOOTWADS AND CONNECT TO BASE MEMBERS (TIER 1) WITH 1" DIAMETER
AlJ...THREAD ROO AS DESfGNATEO IN CONSTRUCTION NOTE 6. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2LOCATIONS.
MO~~
NORTH SANTlAM RIVER
~ow-
1" =40'
'
PlACE TOP MEMBERS (TIER 4) WITH AND WITHOUT RDDTWADS AND CONNECT TO 1NORTH SANTIAM RIVER
....,.._ftow-
1" = 40'
w z0::
t::
tl)
Ul
Ul
(')
lliiij
NORTH SANTlAM RIVER
~ow-
"'!::
.
;;"'ffi
g"oi
LWS TIER 4 (TOP)
,. =40'
0
LWS SECTION
e-;:;oRiZ 1" =~
....
'""'
VERT1"=10'
NWP-2014-195
t;
UJ
a
a:
a.. z
UJ
0
z
D.~
0
~
w
0:::
0
)-Ul ci
m~
w~
Ei
I-LL
(3
:5
z
~
~
~~ i=z
z~ ~
0
!:2
z
w
a:
UJ
(!)
0
SITE 1 TO 3 FILL PR~E
HORIZ 1" =SO'
VERT1"=20'
~
DRAFT
PERMIT DRAWINGS
~~:.:==:-:::--~
NWP-2014-195
NWP-2014-195
~~
;!:·
500
i>~fllNARYi!l'*' WAlER !OHWt · · · · ''"
······
495
-1~----~~--~~~~~~~~~~~~~~~~~~~~~~~~~~~f7~~~~4~
490
490
485
~
~·~OO~----~--~~----~------r-----~----3r+~OO-----J-----4-+0r-O----~----~~oo----~-----6-+TOO----~~--~~----~-----T----~L-----~----~----~------L-----4-
0
SITE 2 N. SANTI AM ,!;g21LE
g"
<~;i;;
500
... ... ..
HORIZ 1"= 80'
VERT1"=20'
... . . .. . .
-
~
490
500
~
490
485
4~
460·~----------~----~----~----.-----L-----r---~----~----~----~-----L-----r----~----------~----,-----4-----~----~----~--~~480
0+50
1+00
2+00
3+00
4+00
0
5+00
6+00
7+00
$+00
9+00
10+00
11+00
11+50
SITE 2 N. CHANNELJ;ROFILf-.
=
.
HORIZ 1" 80'
VERT1"=20'
505
005
500
495
490
~
480>~-L~--L-~-r~--L-~-L~~L-~~-L~r-k-~-L~--r-~-L~--L-~~~--L-~-r~~L-~~-r~--L-~-L~·490
0+00
0+50
1+00
1+50
2+50
2+00
3+00
4+00
3+00
13' N. SANTIAM SECTI~A 7cif!O
~
=
............ 005
490
485
················
.
...:.................... .: .................... .............
'
~
000
495
~
~
~
..
HORIZ 1"" 40'
VERT 1'' 20'
.
.
.................
.... ' .. ;" ..... ' ............. : .....................:.....................;.. ........... ' ...... .
....................~.................... ~... "'"''""''''" ..~.~~~~-~~~~~-~.:. ····
¥ :OH\1\!·· .............. ~ .............~+~·.":-:".-:-.:7.:--: ..
,,A".~ :7:::::::-: ::-7:::.-::.-::.. ... ~....
·
:
· --- .... ~EXISTING GROUND
505 .............. ..
······ ,
...,"'
.
10:1SJOESL.OPE.
40'
. ...................... 1,j,.........
..
.,...............................
..
····:;~:~~~·~~~~·····;
·
(REVISEOt\52213)
. .................. -. .............. .
~··
500
495
490
~
488+~00~L-~~--L-0+~5-0~~~~~-1,+00--L-~~--L-1~+50~~-L~--L-2,+00--~~-4--k-2+~50r-~-L~--L-3-~ro~--L-~~-3-+r50~--L-~~-4~+~o~90
f4\ N. SANTIAM SECTI'!!'!,STA 11:!0
\.:::.J
HORIZ 1"= 40'
VERT 1"=20'
500
I
~
li
~~~--~~o~~ro~~~~~1-+~0-0~-L~--L-1+~00--L-~~~-2-+r00~--~~~r2+~5r0~-L~~~~~~
485
f5\
N. CHANNEL SECTig!t STA
g:.so
DRAFT
41
~~----------------------------------~------------~~~o~~~z~~~~=t~9--------------~~=-~P~E~R~ftn~IT~~D~RA~~VV~I~N~43~S~~~t~~~~~·t·~~~aj
NWP-2014-195
0
SITE 3 LAYOUT
!§I
DRAFT
PERMIT DRAWINGS
~~~
NWP-2014-195
LWS TIER 1 !BOTTOM)
1"=30'
'i,
\~\
i\~
\lp\
CONSTRUCTION NOTES
CD
EXCAVATE LOG STRUCTURE FOOTPRINT TO sPECIFIED OESJGN ElEVATIONS. STAGE EXCAVATED BOULDERS AND MATERIAL NE.ARBY
AND OUTSIDE OF MOVING WATER. EXCAVATED MATERIAL WIU.. BE USED TO BACKFJLL STRUCTURE AND AS BALLAST FOR I.A.RGE
®
PLACE LONGlTUOfNAL LARGE \NOOO BASE MEMBERS (TIER 1)1N STRUCTURE FOUNDATION FOOTPRiNT. WEDGE I.A.RGE \111000
ElETVEEN BOULDERS IF PRESENT.
@
PLACE KEY Ma!BERS (TIER 2) WITH AND \NITHOUT R@
WEAVE SMAU.. DIAMETER 'WOOD INTO BASE MEMBERS AND KEY MEMBERS AT VARtABLE VERTICAL ANGLES AND EXTEND TO TOP OF
LOG STRIJCTURE. WOOD TO 9E PUSHED INTO UND\STURBED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CUT IF
NECESSARY SO AS TO NOT EXTEND MORE THAN 5' ABOVE TOP OF STRUCTURE. AU.. SAWED ENDS SHALL BE ROUGHENe:t AND
®
®
®
PLACE KEY MEMBERS (llER 3} AND CONNECT TO BASE MEMBERS OlER 1) AND KEY MEMBERS (TTER 2) \IIIlTH 1" DlAMETER AU..~THREAD
WOOD.
BROKEN,
LWS TIER 2
t" = 30'
;
ROD AS DESIGNATED IN CONSTRUCTION NOTE 8. EACH MatBER SHALL BE CONNECTED IN AT lEAST 2 LOCAT10NS,
PLACE ToP MEMBERS (11B* 4) \IVITH AND WITHOUT ROOTWADS AND CONNECT TO KEY MEMBERS OlER 2 & 3) vvtTH 1.. DIAMETER
AU~THREAD ROO AS OESIGM\TEO IN CONSTRUCnON NOTE fl. EACH MEMBER SHALL BE CONNECTED IN AT LEAST 2 LOCATIONS.
PLACE BALlAST BOULDERS \NITHIN STRUCTURE CONSISTING OF l FT DIAMETER SOULDERS. PLACE A MINIMUM OF 4 BOUlDERS PER
PIECE OF lARGE WOOD EXCI.UDING SMAlL DIAMETER WOOD PIECES. BACKFILL IN AND AROUND STRUCTURE \NITH GRAVELS AND
COSBLES EXCAVATED FROM THE STRUCTURE FOOTPRINT. 8ACKF1U.. SHAll BE WASHED INTO THE LARGE WOOD DPENING TO
ENSURE ADEQUATE BAllAST. NEARBY CLUMP PL.ANTlNGS OF 'MI...lOWAND OTHER RIPARIAN Pl.MfTS SHALL BE SECURED AND
PLACED lft!ITHtN THE BACKRU.AREAS AT A MINIMUM OF 1 CLUMP PlANT EVERY 10 FEET TliROUGHOUT THE STRUCTURE.
\a~
~\%
\'%.
\ lp\
®
ANCHOR LARGE WOOD MEMBERSTOGETHER USING 1" DIAMETER AU·THREAD ROD AT A MINIMUM OF 2 LOCATIONS FOR EACH PIECE
Of lARGE WOOD. UTIUZE 1" DIAMETER ASTM AA49 wmu· O.D. HEAW PlATE WASHERS AND NUTS (A51108 HEX HEAD NUTI. ROD
SHAlL BE Cl.lf FlU!lH WITH NUT HEAD AFTER TIGHTENED AND EXPOSED END llHAU BE PAINTED WITH BROWN, RUST INH!BmNLWSTIER 3
1"=30'
LWS TIER 4 (TOP)
1" =30'
0
LWS SECTION
~
DRAFT
PERMIT DRAWINGS
""""""""""...
~~---.,...::::....:~·'-'-,~---~,.
NWP-2014-195
tw
6
a:
0..
w z
(.) 0
z C)a::w
zw 0
ri
....
z ~
a::
<(
~
;; ~
0
-1
1-u..
_o
'
cnz::5
~
~
~0
z
z
w
a:
w
G
............ ·:: ............. , ..... ' ..... :· .... .
~
DRAFT
PERMIT DRAWINGS
~~--------
NWP-2014-195
495
495
490
490
...............
495
4ll5
490
490
475
475
470~~~--~~-r~~~~~-r~--L-~~_,--~~-L~--.-~~~--~~~~~~~~470
0+00
0+50
0
1+00
1+50
2+00
2+50
3+00
CHANNEL SECTION,!;fA~
HORIZ ·· =-4"'
\IERT1''=21i'
...
495
490
485
490
.
...
495
. . . . .·~.~~~r.
.
.>:;~;·:::::;::::::::::·::::¥::;::::~;;w::::·:·:::::;::·:::::·A
!J ~. '-~,: -···;,,;.: ;,.:. .·;. :. : ~
._ -.-..""f"!".~. ~; ':"':"". ~ · ·J-RU.
.,_f
:
· · EXtSTtNG GR;-N;-.
(REVISED 052213)
WfciTH tsr
.
490
495
490
475~~~~~L-,_~~~~~-r~--~~-L_,--~~-L~----~-L~~~~~~~~~~475
0+00
0+50
0
1+00
1+50
2+00
3+00
CHANNEL SECTION STA S+?a.
~lf11~~~·
J
I
OO:AWING NUMBER
~~------------------------------------------------~~~P~E~R_M__I~_RA_D~RA~FT~W_I~N~G~S~~~-~~~~~·~,!~~~3
NWP-2014-195
NOE>3MO 'M3AIM l"l\tllN\IS HlMON
1::>3rm:td 30N'v'N3lNI\iVtl MOl.::! ON\ilSI
N3~30
NWP-2014-195
CONSTRUCTION NOTES
EXCAVATE LOG STRUct\JRE FOOTPRINT TO sPECIFIED DESIGN ELEVATIONS. STAGE EXCAVATED BOUlDERS AND MATERIAL NEARBY
AND OUTSIDE OF MOVING WATER. EXCAVATED MATERIAL WILL BE USED TO eACKFJLL STRUCTURE AND AS BAllAST FOR LARGE
WOOD.
®
®
PlACE LONGITUDINAL LARGE WOOD BASE MEMBERS [TIER 1) IN STRUCTURE FOUNDATION FOOTPRINT. WEDGE LARGE WOOD
BETWEEN BOULDERS If PRESENT.
@
WEAVE SMAU. DIAMETER 'NOOO INTO BASE MEMBERS AND KEY MEMBERS AT VARlABLE VERTICAL ANGLES AND EXTEND TO TOP OF
LOG STRUCTURE. WOOD TO BE PUSHED INTO UNDISTURBED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CUT lF
NECESSARY SO AS TO NOT EXTEND MORE THAN !I ABOVE TOP OF STRUCTURE. AU SAWED ENOS SHALL BE ROUGHENED ANO
®
PlACE KEY MEMBERS (TIER 3) AND CONNECT TO BASE MEMBERS {TIER 1) AND KEY MEMBERS (TIER 2) WiTH 1" otAMETER AU..~THREAD
PLACE KEY MEMBERS [TIER 2) WITH AND WITHOUT ROOTWADS AND CONNECT TO eASE MEMBERS (TIER 1) WITH 1" DIAMETER
ALL--THREAD ROD AS DESlGNAl"ED IN CONSTRUCT10N NOTE 8. EACH MEMBER SHALl
CONNEcTED IN AT lEAST 2LOCATIONS.
ae
BROKEN.
ROD AS DESIGNATED IN CONSTRUCTION NOTE 8. EACH MEMBER SHAU. BE CONNECTED fN AT I..EA.ST 2 LOCA.nONS,
®
PlACE TOP MEMBERS [TIER 4) WITH AND WITHOUT ROOTWADS AND CONNECT TO KEY
MEMBERS (TIER 2 & 3) WITH 1" DIAMETER All-THREAD ROO AS DESIGNATED IN
CONSTRUCTioN NOTE 8.. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2
LOCATIONS.
f'2" STRUCTURE SECTION
(j)
PLACE l!ALLAST BOULDERS WITH!N STRUCTURE CONSISTING OF 3fT DIAMETER
BOULDERS. PLACE A. MINIMUM OF 4 BOULDERS PER PIECE OF LARGE WOOD EXCLUDING
SMALL 01AMETER WOOD PIECES. BACKFILL IN AND AROUND STRUCTURE WITH GRAVELS
AND COBaLE:S EXCAVATED FROM THE STRIJCTUru:; FOOTPRWT, 9ACKF1U. SHALL BE
WASHED INTO THE LARGE WOOD OPENING TO !!IISUREADEOUATE BALLAST. NEARBY
CWMP PLAN'1'1NGS OF WILLOW ANO OTHER RWAA"IAN PLANTS SHALL SE SECtlREO AND
PLACED WITHIN THE BACl®
ANCHOR lARGE WOOO MEMBERS TOGETHER UStNG 1'" DIAMETER ALL-THREAD !WO AT A
M!NlMUM OF 2 LOCATIONS FOR EACH PIECE Of LARGE WOOD. tmlJZE 1· DIAMETER
ASTM !1440 \iii!TH 4" D.O. HEAW PLATE WASHERS AND NUTS jJ\111138 HEX HEAD NUT). ROD
SHALL BE CUT FLUSH WITH NUT HEAD AFTER TIGHTENED AND EXPCSEO END SHALL BE
PAINTED WITH BROWN, RUST INHISITJNG ALL WEATHER PAINT.
--
\.:::/
HORIZ1"=10'
500 · · · · · · · · · · · · · · · · · · · ·· · · · · ·. · · .... · · ..·. · ·- .· ·· .. ··VERT .f"·=· W. .. · · · ·............ ; ..·......... · ...
EXISTING SIDE CHANNEL
(REVISED TIN 052213)
495
~0~~~~~~~~~~~~~~~~~~··~···~-·~··~·~~~~~~--~-----t--~~~~~~::::=:j:====~~~~~~t
485
6+00
5+00
5+50
4+50
0
1+50
~~!f 1r::2'W
___,~~:~--------450 ~~~~~----~------~~v---~-(R_~__·e_D_n_N_~
485
2+00
2+50
INTAKE DREDGING UOFILL
EX!STtNG CHANNEl
ORDINARY HIGH WATER (OHW)
3+00
3+50
4+00
...··.··.··.
450
4~T-~~~~;-~~~~-r-L-L~~-.~~~~-T~~~~~~~~~~~~~~~r-~~~~r-~~~~T-~~~~~
5+00
4+50
4+00
3+50
0
3+00
2+50
2+00
N. CHANNEL RIFFLYROFII£.
HORIZ 1"=40'
VERT 1"=20'
1+50
1+00
0+50
DRAFT
5I PERMIT DRAWINGS
~~--'--'-"---'
NWP-2014-195
0
SITE 8 LAYOUT
e
=;;;;
w
1. =50'
HORIZ 1" = 40'
VERT1"=20'
~
DRAFT
PERMIT DRAWINGS
liil3~~
NWP-2014-195
0
SITE 10 LAYOUT
0
SITE 10 SECTION
e-
;;;;;;:;;;
HORIZ 1" = 40'
VERT 1"=20'
~
DRAFT
PERMIT DRAWINGS
~~~
NWP-2014-195
0+50
0
1+00
1+50
2+00
SITE 11 CHANNEL SJ_C.BONiiiiWi
HORIZ 1" = 40'
VERT 1""20'
S+OO
5+50
S+llO
DREDGING VOLUME= 1,22ll CUBIC YARDS
0
SITE 11 LAYOUT
-- 1"=40' ---='
1'CONTOURS
3+00
2+5ll
2+00
~
1+50
DRAFT
PERMIT DRAWINGS
~s----:-=~
NWP-2014-195
NOD3l:!O 'l:l3Ail:l IWI.J.N\tS Hl.l:!ON
.L:J3rOHd 3:JNVN31NIVII't MOl.:l ONV1SI N3l:l38
..,
0
II
::-
...
:::1
0
j
...w
N
;
...
NWP-2014-195
LWS TIER 1 !BOTTOM)
i" =40'
16
~a
~0~
CHue
~~':.!:.!.'-'r4k~
LWSTIEit 2
1" = 40'
16
~a~'\
CONSTRUCTION NOTES
®
®
PLACE LONGITU01NALLARGE WOOD BASE MEMBERS ('TlER 1) IN STRUCTURE FOUNDATION FOOTFRINT. WEDGE LARGE WOOD
!lEIWEEN 90UI.DERS IF PRESENT.
ll!iiiOC
PLACE KEY MEMBERS (TIER 2) 1MTfi AND WITHOUT ROOTWADS AND CONNECT TO BASE MEMBERS {TIER 1)\MTfi 1" DIAMETER
~0
@
WEAVE SMALL !AAMETSR WOOO 1NTO aA$E MEMBERS AND KEY MEMBERS AT VARIABLE VERTICAL ANGLES AND EXTEND TO TOP OF
toG STRUCTURE. WOOO"TO BE PI.JSHEO fNTO UNDtSTURBED GROUNO .BELOW EXCAVATED FOOTPRIHT. 'INOOOTC BE CUf tF
NECESSARY SOAS TO NOl' EXTEND MOR:E THAN 5' ABOVE lOP OF STRUCTURE. AU. SA\NEO ENDS SHALL SE ROUGHENED AND
BIW!®
®
PLACE KaY MEMBERS mat 31 AND CONNECT TO BASE MEMBERS (nER 1) AND KEY MEMBERS (11ER l) WTH 1" DIAMETER All.-THREAD
ROD AS OEstfl.NATED iN CONSTR1JCTtON NOTE 8.. EACH Ma.BER SHALL BE CONNeCTED IN AT LEAST 2 I..OCATIONB.
®
\~
~
CD
EXCAVATE lOG STRUCTURE FOOTPRtNT TO SPEOtAEO DESIGN ElEVATiONS. STAGE EXCAVATED OOOlDERS AND MATERIAL NeARBY
ANO OUTSIDE Of MOVING WATER. EXCAVATED MATERtAL WILL BE USED TO BACtz~
WOOD.
CJO
ww(j
All.-TifREAD ROO AS OES!GWATED IN COI>ISTRUCTION NOTE 8. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2LOCATIONS.
Jl
m!i~
Ue
u~
PLACE TOP MEMI!ERS (TIERS <1-Bl WITH AND WITHOUT ROOlWADS AND CONNECT TO KEY MEMSERS {TIER 2 & 3) WITH 1" DIANETER
AU.-THREAD ROO AS DE!l!GNATED IN CONSTRUCTION NOTE B. EACH MEMBER SHAlL BE CONNECTED IN AT UEAST 2lDCATIDNS.
UJ
PLACE BALLAST BOULDERS WITHIN STRUCTURE COI>ISlSTING Of 3FT 01AMETER BOULDERS. PLACE A MINIMUM OF 4 BOULDERS PER
PleCE OF LARGE WOOD EXCLU01NG SMAll. !>!1\METER WOOD PIECES. BAClUJ
<( 0...,
t- a:
a..
ANCHOR lARGE WOOD MEltSERS TOGETHER USING 1" DIAMETER ALL-THREAD ROO AT A MINIMUM OF 2LOCATIONS FOR EACH PIECE
OF LARGE WOOD. UTIUZE 1" DIAMETER ASTN 1\4411 WITH 4" D.O. HEAVY PLATE IM'SHERS AND NUTS {A563B HEX HEAD NUT). ROD
SHALL BE CUT FLUSH \JVffH NUT HEAD AFTER TJGHTENED AND EXPOSED END SHAlL BE PAINTEn 'NITH BRO\VN, RUST 1NHmtTfNG AU
WEATHER PMNT.
0
..J
w
1()
UJ
()
w~
fXw
;:::)~
CHua
~N~I.IN"r.
OJt- )\J(~
1-<
u~
~:\
;:::)~
IX-'
i-LL
LWST!Eit 3
1" =40'
z
0
Cl
UJ
a::
0
~
0:
i
:I:
UJ~ 1:2
0
N:) z
'I:"'"~
z
a:
UJ
UJ
\~'("
(!)
CHue
~'-'12t..~Nr,
OJt- 4irJ2
LWS TIERS 4,5 16 !TOP)
1" =40'
16
'{\
\~
HORIZ 1" = 10'
VERT1"=10'
CHue
o,._
...::::'-'12L 11v1"4JQ;
~
DRAFT
PERMIT DRAWINGS
OftAWONGNUM8ER
~~--:-l::..,-:.1 -: - : .:J': -1,.
NWP-2014-195
WORK AREA ISOLATION· CONSTRUCTION NOTES
ACTIVATE PUMPING SYSTEM AT ENGINEERED'LARGE Yl/000 STRUCTURES. PUMPS ARE TO BE
USEO TO DRAIN WORK SITE. AlLOWING FOR CONSTRUCTION Of THE WOOO STRUCTURE TO
OCCUR fN DRY OR PARTIAU.V 1NET CONDtTIONS.
FISH SALVAGE PlAN SHAll BE ACTlVATED FOR THE ISOLATED .AREAS YJITHIN THE INTAKE BYPASS
CHANNEL ALL AREAS SHAll BE OEASHED BY LO\NEmNa THE WATER ELEVA110N \!\llTH PUMPS
WHEN APPUCASLE AND THEN DEFISHING WITH SEINE NETS AND ELECTROSHOCICARE AND DIVERSION OF WATER
FLOW OONomoNS DURING iN-WATER W'Ofitl<
THE PROJECT WILL BE IMPLEMENTED OURtNG THE !N-STREAM \M:lRK WINDOW JULY 15 ·AUGUST 31.
FlOWS ARE EXPECTED TO BE APPROXIMATE!.Y 10!10 CFS.
METHOD OFVIIORK AREA lsot.ATtON
THE WORK AREA \liJfU. Be fSOLATEO 9Y USE OF A SU:LK BAG OR APPROVED ALTERNATIVE COFFER DAMS.
BULK aAGS WtU.· BE tNSTA11..EO FROM THE SANKUNE EXTENOING UIT IS ANTICJPATED THAT ACTIVE PUMPING \\AlL BE REQUIRED TO OEWATER THE ENGINEERED LARGE
WOOD STRUCTURE FOOTPRINTS~ PUMPS USED FOR DEWATERING SHAll HAVE INTAKE SCREENS THAT
l!IIEET NMFS ANO OFOWSCREEN CRITERJA OR BE OPERATED JN AN AREA WHERE FISH ARE NOT ABLE TO
ENTER THE AREA ISOlA TEO.
0
TYP. BULK BAG PLASMENL
HORIZ 1· = 20'
VERT 1"=20'
0
WORK AREA ISOLATIOJL
1"=60'
___,.
~
DRAFT
PERMIT DRAWINGS
iljs---:-=~
NWP-2014-195
NWP-2014-195
NWP-2014-195
WORK AREA ISOLATION· CONSTRUCTION NOTES
INSTAll BUU< !lAGS, !WID SAGS, OR Al'l'RO\IEP ALTERNATIVE PER DRAWING 12.6 TO ISOlATE
ACTIVE !'LOW FROM WORK AREAS. BUU< !lAGS WILL BE PLACED IN A PHASED APFROI\CH TO
PRO\ItOE ISOLATION WHILE AllOWING !'LOW THROUGH THE PROJECT SITE. TOP OF BULl( BAGS TO
BE P!..ACED AT MIN 487' EUEVAT10N..
INSTAU. TEMPORARY BmDGE CROSSING PER DRA"WJN'G 12.7 TO CROSS THE NORTH CHANNEl TO
PROVIDE ACCESS TO RIGHT PDRTlON OF SITE 8 .ENGINEEReD RIFFLE DEVELOPMENT. TEMPORARY
BRtOOE TO MAiNTAIN A M!NlMUM. CLEAR O?ENWB Dr 40'.
®
ACTIVATE PUMPING SYSTEM AT ENGINEERED RIFFlE SITE. PUMPS ARE TO BE USED TO DRAIN
WORK SfTE. AllOVJI.NG FOR CONSTRUCTION OF THE RIFFLE TO OCCUR fN THE DRY OR PARTIALLY
\MET CONDITIONS.
ACT1VATE PUMPfNG SYSTEM. AT ENGINEERED LARGE WOOD STRUCTURE. PUMPS ARE TO BE USED
TO DRAIN WORk SfTe. AllowtNG FOR CONSTRUCTION OF THE WOOD STRUCTURE TO OCCUR JN
THE DRY OR PAATW...lV WET CONOmONS.
®
@
FISH SALVAGE PLAN SHALL BE ACTIVATED FOR THE ISOlATED AREAS WITHIN THE INTA!IE
CHANNEl. ANO NORTH CHANNEL ALl AREAS SHA.U. BE DEftSHEO 9'V LOWERJNG THE WATER.
ELEVATION wmi PUMPS WHEN APPUCASLEANO THEN OEASHtNG \ftATH SSNE NETS AND
El.ECTROSHOCK!NG IF NECESSARY. EN111!E SALVAGE SHALL TA!IE LESS THAN 24 HOURS.
~NSTALL Ft.OATING SiLT CURTAINS
PER DRAWING 2..8 AT DOWNSTREAM EXTENTS Of" WORK lO
TRAP SILT liND SEDIMENT WITHIN THE DISTURBED WOilK ZONES.
METHO!) Ol'WOOJ!\ Al!§A !SO!J\T!9N- INTA!IE CHIINNE!. OREDG!!IG
THE WORK AREA WILL NOT BE ISOlATED FROM ACTIVE FLOW. OUE TO EXCAVATION OCCURRING IIi
ACTIVE FlOW A BEST MANAGE PRACTICE {aMP) OF OI'E!!Al!NG 3D MINUTES IN THE WATER WITH 1 HOUR
WAIT MAY BE tMPLEMENTED tFWATER QUAUTV rSS:UES ARJS£. A StlT CURTAIN WILL SE: !NSTAU.EO AT
THE DOWNSTREAM DREDGING EXTENT TO TRAP S1tT ANO SEO!MENT WITHIN THE OlSTURSED WORK
ZONE.
NO DEASHING WILL OCCUR AT THts SITE DUE TO ACTIVE FLOW AND WATER OEPTHS-~
IT IS ANTICIPATED THAT ACTIVE PUMPING WILL BE REDU!RED TO DEWATER THE E!IGINEERED RIFflE
SITE. PUMPS USED FOR DEWATERING SHALL HAVE INTAKE SCREENS THAT MEET NMI'S AND OFOW
SCREEN CRITERIA OR BE OI'E!!ATED IN AN AREA WHERE FISH ARE NOT A!ll.E TO ENTER THE AREA
ISOLATED.
IT Ill ANTlCli'ATED THAT 1\CTlVE PUMl'lNG WILl BE REQUIRED TO D!'lWATER THE ENGINEERED LARGE
WOOO STRUCTURE FOOT!'R!NT, PUMPS USED FOR O!lWATERlNG SHALL HAVE INTA!IE SCREENS THAT
MEET NM!'S AND OfDW SCREEN CRITERIA OR BE OI'E!!ATED IN AN AREA \I,IHJ;RE FISH ARE NOT ABLE TO
ENTER THE AREA ISOlATED.
0
WORK AREA ISOLA"!]gN
1"=60'
;;;;;;;
~
DRAFT
PERMIT DRAWINGS
~t---'-=~
NWP-2014-195
f'1\ WORK AREA ISOLA'!JSN
\.:...)
......,
1"=60'
WORK AREA ISOLATION · CONSTRUCTION NOTES
FLOW CO!IOITlONS OL!RING !N:WATER WQRK
'
,
THE PROJECT \iVfU. BE IMPLEMENTED DURING THE !N-STREAM WORK WINDOW JULY 15 "'AUGUST 31,
FLOWS ARE EXPECTED TO SE APPROXIMATELY 10atl CFS.
®
®
INSTAU. FLOATING SILT CURTAINS PER DRAWING 12.6 AT DOWNSTREAM EXTENTS OF \tVORK TO
TRAP SILT AND SEDIMENT WITHlN THE DISTURBED \1\'DRK ZONES.
FISH SALVAGE·PlAN SHALL BE ACTIVATED FOR THE ISOLATED AREAS WITHIN THE tNTAIELECTROSHOCKING IF NECESSARY. ENTIRE SALVAGE SHALL TAKE LESS THAN 24 HOURS.
MatiDO OF WORK AREA ISOlATION* RIVER~LEFT AND iSLAND 2 OREDGtNG
THE WORK AREA WILl NOT BE tsOLATED FROM ACTIVE Fl..OVII. CUE TO EXCAVATION OCCURRING !N
ACTM FLOW A BEST MANAGE PRACTICE (BMP) OF OI'ERATING 30 MINUTES IN THE WATER WITH 1 HOUR
WAIT MAV BE IMPLEMENTED IF WATER QUAUTV ISSUES ARISE.
METHOD OF \1\'DRK AR§A ISOlATION ·POINT SAR AND ENGINEERED lARGE \1\'DOO OEVEU:l!'MENT
THE \IVORK AREA V\IIU.. NOT BE ISOLATEO FROM ACTJVE FLOW. DUE TO EXCAVATION OCCURRING IN
ACTIVE FLOW A BEST MANAGE PRACTICE !BMP) OF OPERATING 30 MINUTES IN THE WATER WITH 1 HOL!R
WAIT MAY BE IMPlEMENTED IF \\VATER QUAUTY ISSUES ARISE. A SilT CURTAIN-WILL BEINSTI\LLED
ALONG THE CHANNEl. EDGE TO TRAP S1LT AND SEDtMENT WITHIN THE DtSTURB£0 \NORK .ZONE.
1SOLATEO AREAS TO BE 0£Ff5HED IF PRATICAL
~
DRAFT
PERMIT DRAWINGS
~~~
NWP-2014-195
0
WORK AREA ISOLATION· CONSTRUCTION NOTES
WORK AREA ISOLA!!2!.-es;;;.
>
INSTAU. TEMI'OAA!!Y BRIDGE CROSS!NG fi£QUIREO TO CROU THE WEST SI'UT Ol' THE »>RTH
CHANNEL l'E!llli'IIIIMNG 12,7 TO PRO\IIOE ACCe&!l TO IS\ANO 1 FOR ENGINEERED RlfFI.E
ClE\IE!.OI'MENT AND EAST SPUT CHANNEL El1"=60'
INSii\U. BW< BAGS, SAND !lAGS, OR APPROIIEll 1\LTERNATIIIE l'E!l O!li\IMNG 117TO ISOlATE
ACTIIIE R-OW FROM WORK AREAS. BW< BAGS WIU. BE PLACED IN A I'HI\SED Al'I'ROACH TO
I'RO\IIOE ISOlATION WH!Ll! i\LLOIMNG FLOW THOIJGH THE l'f®
®
®
®
ACTIVATE I'UMJ'ING BYSra.t AT ENGINEERED IUff\.E SITE. PUMPS ARE TO BE USED To DRAIN
WORK SITE. Ati.OWING FOR CONSTRUCTION Ol' THE RIFFI.E TO OCCUR IN THE CRY.
ACTIVATE PUMPING BYSTEM 1\T ENGINEERED lARGE WOOD STRIJCTURE PUMPS ARE TO BE USED
l'O ORAfHWORKSfTE. ALLOW.NG FOR CONSTRUC110N OF THE \tVOOD STRUCTURE TO OCCUR IN
THEORY.
FISH SALVAGE PLAN SHALL ae ACTiVATED FOR THE tsOlATEO AREAS \IIATHIN THE NORTH
CHANNEL ALL AREA$ SHAll BE OEFISHEO eY LOWERiNG THE WATER ELEVATlON V\IITH PUMPS
\NHf:N APPUCABlE ANO THEN Dl:::ASHlNG \o\I!TH SEJNE NETS- AND El.ECTROSHOCKlNG tF
NECESSARY. ENTIRE SALVAGE. SHALL TAKE LESS THAN 24 HOURS.
INSTAll. FLOATING SltT CURTAINS l'Eillli'IIIWING :ta AT OOWNSTREAM EXTENTS Ol' WORK TC
TRAP SILT AND SEOfMENT WITHIN THE Of:STURSE:O WORK ZONES.
CARE AND DIVERSION OF WATER
FtOWCONOmON:S OURmG ~TER WORK
THE PROJECT Wit!. SE IMPU!MEIITEO DURING THE IN-STREAM WORK WINDOW JULY 15 -AUGUST 31.
FLOWS ME EKPECTEO TO BE APPROXIMATELY 1000 CFS.
z
0
si= at;
w
0
·~
<(
a::
0..
w 0z
rx:
<(
w
w <(0z
ISOLATED.
~
i=
.... IJ. ~
0
~
0
....
~
.... !:!2 z
0 w
.... 0:::z
N
IT fS ANTICIPATED THAT ACTIVE PUMPING \MLL BE REOUIRED TO DEWATER THE EIIGIIIEEREO RIFFLE
SITE PUMPE USEO FOR DEWATERl!IGSHALl HAVE ll!TAKE SCREENS THAT MEET IIMFSAIID OfOW
SCREEN CRITERIA OR BE OPERATED IN AN AREA WHERE ASH ARE NOT ABLE TO ENTER THE AREA
a:
zw 0
ti
lie:: z1- ~
a: <( oc
0 ~ ~
~
METHOD OF VIIORK AREA tSOLA.TION ~NORTH CHANNa ENGINEERED RIFFLE
THE WORK AREA WILL SE ISOlATEll BY USE OF A llULK SAG OR AP!'RO\IEO 1\LTERNATIIIE COFFER DAM.
BULK BAGS WILL BE INSTALLED FROM THE BAIIKL\NE EXTEII!li!IG INTO THE CHANNEl. COMPU!TELY
ISOLATING PORTIONS OF THE NORTH CHANNEL THE ENGINEERED RIFFl-E WILL SE CONSTRUCTED IN A
PHASED APPROACH WITH THE RIVER-RIGHT !'DimON OF THE CHANNEL !SOLATED AIIO COIISTRUCTEO
FIRST AIID THEN THE RIVER-LEFT PORTION BEl!IG ISOLATED A CONSTRUCTED SECOND. A SILT CURTAIN
W1ti. SE INSTALLED AT THE DOWNSTREAM EXTSNT OF THE RIFFU! TO TRAP SILT AIID SEDIMENT WITHIN
THE !llSTURBED WORK ZONE.
(!)
..J
olJ
U)
w
w
(!)
!::
U)
IT IS AN11CIPATEO THAT AC11VE PUMPING \NILL BE REOVIREOTO OE'\NATER THE ENGINEERED LARGE
WOOD STRUCTURE FOOTPRINT. PUMPS USEO FOR DEWATERING SHAll. HAVE iNTAKE SCREENS THAT
MEET NMF'S AND OFOW SCREEN CfUTE:RlA OR BE oPERA TEO IN 1\N,AAEA \NHERE ASH ARE NOT ABlE TO
ENT'ER THE AREA tSOl.A"TEO.
PHASE U: ISOLATE RIIIER-l.EFT PORTION OF NORTH CHANNEL RIVER BYPASS R-OW TO BE THROUGH
RWER-ffiGHT ?DimON OF IIORTH CHANNEL COMPU!TE CONSTRUCTION Of RIIIER-RlGHT
PORTION OF ENGINEERED RIFFLE AND ENGINEERED LARGE WOOD STRIJCTURE
~
DRAFT
PERMIT DRAWINGS
NWP-2014-195
EROSION CONTROL NOTES
AT A MINIMUM, EROSION CONTROL MEASURES SHOWN ON THE PlANS SHALL BE IN PLACE PRJOR TO COMMENCI.NG CONSTRUCTlON.
WORK AREA ISOLATED FROM
FLov.lNG WATER
OURlNG CONSTRUCTION, All EROSION CONTROLS SHALl BE INSPECTED BY THE PROJECT ENGINEER DAILY TO ENSURE THEY ARE
WOR~ING ADEQUATELY.
(1)1F INSPECTION SHOWS THAT THE EROSION CONTROLS ARE INEFFECTIVE, WORK CREWS WILl BE MOBIUZEO IMMEDIATELY TO
MAKE REPAIRS, INSTALL REPLAC:EMENTS, OR INSTALL ADDITIONAL CONTROlS AS NECESSARY.
(2} SEDJMENT MUST SE RBtOVED FROM EROSION CONTROLS ONCE li HAS REACHED 113 OF THE EXPOSED HEIGHT OF THE CONTROL
.,..
CONTRACTOR SHALL PRO\IlDE MEASURES TO PREVENT MOVEMENT OF SOIL INTO WATERWAYS OR VIIETI..ANOS, E.G. FILTER BAGS,
SEotMENT TRAPS OR CATCH BASINS, VEGETATIVE STRIPS, BERMS, JERSEY BARRIERS, FIBER BLANKETS, BONDED ABER MATfUCES,
GEOTE.XTILE.S, MUlCHES OR COMPDST, WATTLES AND SEDIMENT FENCES.
/
/
CONTRACTOR SHALl. PRCMDE MEASUAES TO PREVENT STOCKPII..E EROSlON DURING RAIN EVENTS OR WH:EN THE STOCKPILE SITE IS
NOT MOVED OR RESHAPED FOR MORE THAN 48 HOURS, BV SURROUNOU-lG PU.ES WITH COMPOST BERMS, COVERING PILES INIITH
iMPERVIOUS MATERIAl.S OR OTHER EQUAU.Y EFFECTIVE METHODS.
/
/
-------- --0
_,./
CONTRACTOR SKAU PROVIDE MEASURES TO PREVENT CONSTRUCTION VEHIClES FROM lRACKlNO StmiMENT OFFStTE OR ONTO
ROADWAYS WHERE 11' IS SUBJECT TO WASHiNG INTO STORM DRAINS, WATERWAYS, OR WETLANDS; INCt.JJOING GRAVEL ACCESS PADS,
wtiEEl WASH STA11DNS, OR OTHER EQUAlLY .EFFECTIVE METHOOS.
CONTRACtOR SHAll INSTAU. REMOVABLE PADS OR MATS TO PREVENT SOIL COMPACTtON IN ALL TEMPORARY CONSTRUCTION ACCESS
POINTS AND STAGING AREAS IN RIPARIAN OR WETLAND AREAs.
WORK AREA ISOLATION ·TYPICAL
NOT TO SCALE
CONTRACTOR SHAlL PREPARE ANO HAVE ON-SITE A SPfLL CONTAINMENT AND CONTROL PLAN VVITH NOTIFtCAnON PROCEDURES,
EQUIPMENT. SPECIAC CLEANUP AND OlSPOSAliNSTRIJCTIONS FOR AU. PRODUCTS USED ON SJTE.
CONTRACTOR BHAI..l HAVE AN EMERGENCY SUPI'!.Y OF SEDIMENT CONTROL MATERIAI.S ON HAND (SILT FENCE, STRAW BALES, ETC.t AN
OIL ADSORBING FLOATING BOOM, AND ABSORBENT PADS.
STATIONARY Pov.1ER EQUIPI.IENT, SUCH AS GENERATORS, WITHIN 150 FEET OF THE WATER SHALl BE DIAPERED TO PREVENT LEAKS.
All POWEJi EQUIPMENT 'IMTHIN 150 FEET OF THE WATER SHALl BE INSPECTED DAILY FOR FWID LEAKS AND REPAIRED. THE
CONTRACTOR MUST KEEP DAILY INSPECTION REPORTS IN A DIARY.
All EQUIPMENT TO REMAIN WITHIN THE BOUNDS OF THE CONSTRUCTION STAGING AREA, ACCESS ROAOs, OR PROJECT CONSTRUCTION
AREA.
DUST CONTROL: All HEAVY' USE AREAS ARE TO BE MAINTAINED IN A CONDITION THAT MlMMIZES OUST ON THE PROJECT SfTE. AND THE
CONTRACTOR SHAU HAVE ACCESS TO A WATER TRUCK FOR OUST MANAGENJENT lF REOUlReD. THE PROJECT ENGINEER WI'U. NOTIFY
THE CONTRACTOR TO MOSIUZE OUST CONTROL ACTI\IITIES (INCWDING WATERING) IF CONDITIONS REQUIRE.
BULK BAG NOTES
3"..01A CHAIN WEIGHT BAL.LAST
POCKET
FLOATING SILT CURTAIN SHAlL BE A 'I.A\'FlEI.O FSC 13" OR APPROVED EQUAL THE BQOV Qf THE FLOATING SILT CURTAIN IS MADE FROM A
STRONG. HIGH-Fil"!RATION FABRIC THAT RETAINS FINE SILTS ANO SEDIMENTS ON-SITE. THE FLOAT AND BOTTOM SI.EEVE ARE CONSTRUCTED
FROM A IN.sTABLE, HIGH-STRENOTH POLYETHYlENE (I.E. RIPSTOP..TYPE MATERIA!..). THE FLOATING SILT CURTAIN IS INCREASED IN LENGTH
BY .IOINJNG AOOITIONAL secnoNS OF CURTAIN, WHICH TYPICALlY COM!lS IN 5(1' LENGTHS.
BUll< SAGS ARE ALSO CAUEO FLEXIBLE INTERMEDIATE BULK CONTAiNERS (ABC} THAT CAN BE CUSTOM MADE FROM VARIOUS
FASRtC. THE FOLlOWING REQUIREMENTS ARE NECESSARY FOR THE RlVER ENVIRONMENT:
BULK SAGS..SHAU SE CONSTRUCTED OF 8 ox \oVOVEN FABRiC, 1200 HOUR UV RESISTANT 'AIITH SEVtiN UFTING LOOPS. WHEN RUED
'INITH NATIVE RIVER SAND AND GRAVEL. THE BAGS ARE APPROXIMATELY B' WIDE x 6' LONG x -4' HIGH.
BULK BAGS SHAlL BE CAREFULLY PLACED TO ENSURE NO TEARING OR CUTIING OF THE BAGS OCCURS,
BULK BAGS SHALl BE PLACED USING A HYORAUUC CRANE OR TRACK HOE USING UFllNG BARS AND STEEl CABLES TO EQUAUZE
lOAD ON UFfiNG LOOPS.
j
!
;i;
I
PROJECT NUMBER
DRAFT
ORA==...
i~--~------'-''~~_"''-~''"_··gr_,~_;"-r_·'''-~-T~'_"~_,.,,.~,_.,~r--------------------------~~~P~E~R=M~I~T~D~RA~~W~I~N~G~S~~~=~~~~~=~~·?~n·
NWP-2014-195
. jll
Lei
z~ IIi
!jQ E
510
. .................. 510
............. .
!'.\(iii Q!
ww0
>
Ci
II
::to~
ll·
EXCAVATED GRAVElS
500
490
j;
I '
w 0
C) w
........ .
490
0
a:
m
TYP. SUMMER LOW Fl.OW (·1000 CFS)
490
~is=o--------~--------~--------~--------~------~1+~oo~-------L---------L---------L---------L--------1~+~90--------~--------~--------1~+eo·490
0
~
~
a
0:::
0..
w 0z
0
z ffl
<
zw 0a:
ti
z1-
~ ::0~:;!;
:5 ~
w
0
D..
"'('YPICAL TEMPORAR,_.! BRIDf!
HORIZ 1' = 10' .
_J
VERT 1'= 10'
1-
..J
<(
u.
0
:5
0
!:2
~
0:::
c:
~
J:
z lr
0
z
z
w
w
G
....."'
l
g.
!
I
DRAFT
12 7
~~----------------------------------------------~~~P~E~R~M~IT~D~RA~W~I~N~G~S~~~~~~.~v~·~~u
1
NWP-2014-195
SITE RESTORATION NOTES
ALL DAMAGED DR DISTURBED STREAMBANKS ARE TO BE RESTORED TO A NATURAL SLOPE
PATIERN AND PROFILE SUITABLE FOR ESTABUSHIIENf OF PERMANENT WOODY.VEGETATION.
ALL DISTURBED STREAM BANK VEGEtATION lS TO BE REPlACED. USE A VARIETY OF SPECIES
NATIVE TO THE PROJECT ARE PER DAAW\NG 13.1, REPlANT AND RESEED EACH AREA REQU1RING
REVEGETATION BEFORE THE END OF THE ARST PLANTING SEASON FOLLO\f\ltNG CONSTRUCTION.
NO PESTICIDES, INCLUDING HERSlCtDES, WILL BE ALLOWED WITHIN 150 FEET OF WATERS OF THE
STATE. MECHANICAL, HAND, OR OTHER METHODS MAY BE USED TO CONTROL WEEDS AND
UNWANTED VEGETATION. FERTILIZER APPUCATION VVITHlN 50 FEET OF ANY STREAM CHANNEL
IMU. NOT BE AIJTliORlZED.
STOCKPiLE ALL WOODY MATERIAL, NATIVE VEGETATION, TOPSOU., AND NATIVE CHANNEL
MATERiAL DISPLACED BY CONSTRUCTION, AND USE AS APPROPRiATE FDR SITE RESTORATION
ACTMTIES.. THE RESTORED SITE SHOULD SHOW THE FOLLOWING FEATURES, AS APPROPRIATE,
AT THE END OF THE MONITORING PERIOD: BARE BOlL SPACES SHALL APPROX1MA.TE THE SIZE AND
DISPERSAL PATTER OF PRE-EXISTING CONC»TIONS; SOIL MOVEMENT, SUCH AS ACTIVE RILLS OR
GUWES AND SOIL DePOSITION AROUND PLANTS OR IN SMAll BASINS, SHOUi..D BE ABSENT OR
SUGHT AND LOCAL
OBUTERATIDN OF TEMPORARY
ACCESS ROADS
TREATED PROJECT AREA
PER DWG 13.1
-QSO FT OF ACCESS ROAD
-2.2ACRES
..320 FT OF ACCESS ROAD
-D.3ACRES
-D.1 ACRES
10
-1,000 FT OF ACCESS ROAD
-D..f.ACRES
·120FT OF ACCESS ROAD
-ll.2ACRES
-350FT OF ACCESS ROAD
...OAACRES
-180' FT OF ACCESS ROAD
-o.3ACRE5
...240 FT OF ACCESS ROAD
--D.1 ACRES
11
12
0
PRE-PROJECT ERODED AREAS SHOULD BE STABIUZED. PLANT MATERiAL, E.G., LEAVES,
BRANCHES, ETC., SHOULD BE WElL DISTRIBUTED AND EFFECTJVE IN PROTECTING THE SOIL 'MTH
FEW OR NO UTTER DAMS PRESENT. NA.TfVE WOODY AND HERBACEOUS VEGETATION, AS
APPROPRIATE FOR THE SITE CONDITIONS, SHOULD BE PRESENT AND WELL O!STRiBUTEO ACROSS
THE SITE PER DRAWING 13.1. VEGETATION STRUCTURE SHOULD RESULT IN ROOTING
THROUGHOUT THE AVAtLABLE SOIL PROflLE. PLANTS SHOULD HAVE NORMAL. VIGOROUS
GROWTH FORM, AND A HIGH PROBABIUTY OF REMAINING VIGOROUS, HEALTHY AND DOMINANT
OVER UNDESIRED COMPETING VEGETATION. STREAMBANKS SHALL HAVE LESS THAN 5%
EXPOSED SOIL \IVITH MARGINS ANCHORED BY DEEPLY ROOTED VEGETATION OR
COARSE-GRAINED AlllMAL MATERIAL
TEMPORARY ACCESS ROUTES AND OTHER AREAS DISTURBED DURING CONSTRUCTION \NILL BE
REHABfUTATEO TO SlMit.AR OR BETTER THAN PRE-VVORK CONDITIONS. AT A MINIMUM SITE
RECI..AMATJON ..\CTMT!ES St-IALL RESULT IN PlANT 01STR!BUTION AND DENSITY THAT MATCH
PRE..PR:OJECT CONDITIONS IN ACCORDANCE YiiTH DRAWING 13.1.
SHORT-TERM STABlUZATION MEASURES W:LL BE IMPLEMENTED UNTIL PERMANENT EROS toN
CONTROL MEASURES (PLANT RESTORA TtoN) ARE EFFECTIVE. RECLAMATION PLANTING PER
DRAWING 13.1 Sl-tALL BE COMPLETED NO LATER THAN SPRING PlANTING SEASON OF THE YEAR
FOLLOWING COMPLETION OF CONSTRUCTION.
SITE RESTORATIO't!;AYOUL
1"=400'
~
DRAFT
PERMIT DRAWINGS
~~~
NWP-2014-195
REVEGETATION NOTES
GENERAL NOTES
,
1.
AU. PL\~ MATERIAL MUST BE CLASSIFIED AS NATIVE FROM THIS REGION AND NON-CLON~ IN ORIGIN.
AU. NATIVE P~ MATERIAL TO BE USED IN PLANTING AREM TO ORIGINATE FROM PA~ SOURCES
WITHIN 50 MILES OF SITE.. SEED SOURCE MUST BE AS LOCAL AS POSSIBLE.
2.
INSTALL TREE AND SHRUB SPC:CfES IN RANOOM GROUF'INOS, AVOIDING UNEA.R ROWS OR AS OtRECTEO
IN FIELO,\MTHIN CLOSE PROX1MITY OF EXISTING PLANTINGS OR NEWlY PL\NTED MATERIAL THE
INT~ IS TO REPUCATE NATURAL PLANT COMMUNITIES BY PROVIOING A LAYERED UNDERSTORY
CANOPY IMTH A lllXTURE OF TREES.
3.
THE PLANTING 1\ND SEEDING AREA IS TO COVERED \!\liTH TOPSOIL
WILLOW CWMP PLANTING
1.
\MU.OW CLUMPS SHALL BE SAlVAGED FROM Tlif EXCAVATED CHANNEL AREA. ALLIN AN'f HOLES
WHERE DONOR CLUMPS ARE EXTRACTED IF OUTSIDE THE CI2.
IMUOWCLUMP PL\NTINGS SHALL FOLLOW THE NATURAL RESOURCE CONSERVATION SER\I1CE !NRC$)
3.
LOCATE AND !ITll!ZE YOUNG AHO VIGOROUS !8' · 20' TAU.) WLLOW CLLIMPS IN CONSULTATION WTH
THE PROJECT ENGfNEER. otG THE WV!LLOW CLUMP UTlUZlNG A TRACKHOE BUCKET AND OSTAJN AT
LEAST 75% OF THE ROOT MASS. 00 NOT AU.OW ClUMPS TO SIT MORE THEN 1 HOUR OR DRY out.
4.
DIG A HOLE UTIUZJNG THE TRACKHOE SUCKET TO THE SAME SIZE AND SHAPE OF THE CLUMP. HOLE
PLANT MATERIALS TECHNlCAL NOTE 42 (2003).
tF THIS TOPSOIL tS DEEMED BV
PRoJECT ENGINEER TO 9E INAOEOUATE, IMPORTED MATERIAL SHAlL BE USED TO POCJ'
TRANSPORT CWMPS TO PlANTING SrTE.
SHALL BE TO A DEPTH JUST ABOVE THE STANC»NG WATER TABLE AND NOl INTO THE WATER TABlE.
4.
THOROUGIPACK THE SOIL FIRMLY IN THE EXCAVATED HOLE UPON INSTALLATlON.
5.
AFTER lNSTAUATION, CUT OFF APPROXIMATELV 33%-50% OP THE WIU..OWTOPS STRAIGHT ACROSS.
IMUOW CLUMPS SHALL 9E PLACED AI'PROXIMATELY 15 FEET APART.
WILLOW STAKE PLANTING
1.
VVILLOW STAKES SHAll HAVE MINIMUM D1AMETER OF 1.5" AND MINIMUM LENGn-t 4'. TiiE STAKES SHAU.
BE CUT FROM NEARBY PLANTS TO ENSURE COMPATIBIUTY IF POSSIBLE, OR LOCAL 'ECDTTPES'.
STAKES SHALL HAVE SIDE BRANCHES CLEANLY REMOVED WITH BARK INTACT, BASAL ENDS CUT AT AN
ANGLE AND TOPS CUT SQUARE.
:Z.
STAKES SHALL BE CUT AND INSTAllED oN THE SAME DAY.
3.
STAKES SHALL BE. iNSTAllED WHitE IN THE DORMANT STAGE., NOVEM:BER 1 TO FEMUARY 151N THE
ROGUE VALLEY, UNLESS lRRiGATION IS PROVIDED.. STAKES SHOUW BE DEEP ENOUGH TO CONTACT
SOD&SO!LSALVAGE
Fl.OOOPLAIN SOO AND SOIL SHALL BE SALVAGED TO THE MAXIMUM EXTENT PRACTICABLE IN AREAS THAT
ARE TO 9E DISTURBED. SOD AND SOIL SlW.L BE TRANSPORTED AND STOCKPILE!l AT A CONVENIENT
LOCATION DETERMINED SY THE PROJECT ENGINEER AND CLEARLY FLAGGED. STOCKP!l.E SHALL ee
iRRIGATED ON A ReGULAR BASlS AS NECESSARY TO MAtNTAtN MOISTURE tN THE SOO AND son_ THE SOO
AND SOIL SHAlL BE USED TO COVER OISTIJRBED AREAS OR AS OIRECTE!l BY THE FIELD ENGINEER TO
PREPARE AREAS FOR PL\NTING. TRANSPLANTED SOD AND SOIL SHAll 9E TRACKED OVER IMTH AN
EXCAVATOR AND GAPS BElWEEN SOD STRIPS SHALL BE FILLED 1MTH NATIVE SOU AND SEEDED IMTH A
NATIVE SEED MIX.
z
THE lOW SUMMER WATER LEVEL
~.
STAKES SHALL BE INSTALLED ON 'r CENTERS WlTH 80% OF THE STAKE LENGTH INSTALLED INTO THE
GROUND WITH ARM SOl LIN CONTACT WITH THE WlllOW STAKE. A P1ECE OF REBAR SHOULD BE USED
AS A PILOT HOLE FOR THE STAKE.
5,
TAMP STAKES INTO GROUND WTH A DEAD BLOW HAMMER (HAMMER HEAD FILLED Vti'ITH SHOT OR
SAND}.
B.
'MUOWCWMPS ARE PREFERRED TO LIVE STAKES ON THE LO'AIER HALF OF THE STREAMBANK.
INSTALL PER NRCS PlANT MATERIALS TECHNICAL NOTE 42,
7.
'1;
EROSION CONTROL SEEDING
ALL OJSTim&EO AREAS SHAU.. BE BROADCAST SEEDED WTH AN "EROSION CON'm'Ol." SEED fiHX AND
COVERED WITH STERtLE STRAW. AREAS SHALL BE BROADCAST SEEDED WITH A SEEO MfX CONTAINING
NATIVE SEED {SEE RfPARtAN REVSGE-TATION SCHEDULE THtS SHEET) AND STERILE CER:EAL RYES. ms
SHAll BE ACCOMPUSHED WITH A HANOIB:ROAOCAST SEEOI:NG METHOD ANO THE SEED SHALL .BE RAKED
ONE OIJAATER (.25) INCH INTO THE SOIL AND COMPACTE!llMTH A 5.000 POUND OR LESS TRACKED \IEHICI£
AND THEN COVERED WITH STERILE STRAW. THE MINIMUM AI'PUCATIDN RATE'MLL BE THE
MANUFACTURER'S RATE OR 30 LBS PER ACRE. CONTRACTOR WJU.. PROVIDE SEED MIX CONSTITUENTS TO
PROJECT INSPECTOR FOR APPROVAL.
0
AlTERNATE INSTAllATION PROCEDURES MAY BE USED UPON CONSULTATION IJVITH RIVER DESIGN
GROUP PROJECT ENGINEER.
g
1\ll. LATERAl BRANCHES
SlW.L BE TRIMMED TC
AVO!O DAMAGE.
w
IX
0
I
A MINIMLIM OFTWO
LATERAL BUDS SHALL BE
ASOVE THE P~ING
DEPTH
I
~WTAPERED
8111TEND
X
l:r
0
WILLOW STAKING DETAIL
z
NOT TO SCALE
EMER~
AND WETLAND
ZONE
RIPARIAN REVEGETATION SCHEDULE
"'"'::::>0::
::c
U)
~fn
COMMON NAME
SIZE
INSTALLATION
REO-OSIER DOGWOOD
2TOSGAU..ON
SNOW BERRY
2TOSGALLON
±e:OIACRE
ti!OIACRE
ROSE
1GALLON
il!ll/ACRE
RED FESCUE
BWEVVILDRYE
SEED
SEED
7LBSIACRE
1$LBSIACRE
~Ill
INFREQUENTLY SATURATED S01lS
SEASONALLY SATURATED SOILS
:m
~
!;J;
i
POOJECT IIUIISER
ROG-l~
NOre
~~-------------------0-1__P_LA_N_T_I_N_G_G_U_ID_E_L_I_~_E_:_T_o_s_CALE
~_~_~s_~_ZONE_ON_"_!_:V_R=- ~-~-~:0_P_: _~_I\l_MA_·i i._:" -No-P-~-IA-; -:wr _Cles-~-c-:_~_~_es-~-STICS.-RM_I_~_RA_D_RA_F_T_w
__I_N
__G_S
__~
......_!-::..._
__
,.,1_~_3~:. :,._".~" " _:=·~~
______
__
..
NWP-2014-195
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP-2014-195
Oregon Department of State Lands No: 56309
Notice Issued: June 16, 2014
Written Comments Due: July 21, 2014
WHO IS THE APPLICANT: City of Salem Public Works
C/O: Ken Roley
555 Liberty St. SE
Salem, OR 97301-3503
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at 503-229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at 503-229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Corps No. NWP-2014-195
Page 1 of 2
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 SW 4th Ave. Ste. 400
Portland, OR 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - 503-229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.
Corps No. NWP-2014-195
Page 2 of 2