Chelsea Bowman is the Regulatory point-of-contact for this permit application from the City of Salem Public Works for work on the North Santiam River near Stayton, Ore.

PUBLIC NOTICE for Permit Application Issue Date: June 19, 2014 Expiration Date: July 21, 2014 US Army Corps of Engineers No: NWP-2014-195 30-Day Notice Oregon Department of State Lands No: 56309

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Chelsea Bowman, Chelsea.B.Bowman@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: City of Salem Public Works C/O: Ken Roley 555 Liberty St. SE Salem, OR 97301-3503

Location: Geren Island on the North Santiam River near Stayton, in Marion County, Oregon Section 13, 14, and 18 of Township 9 South, Range 1 West and 1 East Latitude: 44.788633, Longitude: -122.743878

Waterway: North Santiam River

Project description: The City of Salem Public Works Department has proposed a project that involves channel restoration and management actions to maintain channel stability and consistent water flow to the Geren Island treatment facility’s primary and emergency intakes and Oregon chub channel. These actions include removal of accumulated bed material at four locations, installation of five large wood structures within the river, construction of a point bar along the North Channel, construction of two engineered riffles (grade control structures) in the North Channel, and incremental placement of removed bed material into the South Channel below the dam. The project will involve permanent fill of 5.11 acres of waters ( 41,770 cubic yards), temporary impacts to 0.48 acres of waters (4,120 cubic yards) and 0.04 acres of wetlands. The project also involves 6.35 acres of permanent removal of waters (41,770 cubic yards), 0.02 acre of permanent removal of wetlands (80 cubic yards), and temporary removal of 1.54 acres of waters (8,700 cubic yards).

Mitigation: The applicant has proposed a compensatory wetland mitigation plan for permanent impacts to Wetland A (0.02 acres of permanent removal). This will be accomplished by purchasing 0.02 acres of mitigation credit (a ratio of 1:1) from the Marion Wetland Mitigation Bank. If a permit is issued, the Corps will determine what appropriate and practicable compensatory mitigation is. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose of the proposed project is to increase low summer flows and reduce high winter flows in the North Channel of the North Santiam River in order to maintain channel stability and consistent water flow to the City of Salem’s (City’s) primary and emergency intakes and the Oregon chub channel.

Drawings: Geren Island Flow Maintenance Project, Figures 1- 13.1 (32) drawings are attached and labeled NWP-2014-195 enclosure.

Additional information may be obtained from Chelsea Bowman, Project Manager, U.S. Army Corps of Engineers at 503-808-4383 or email Chelsea.B.Bowman@usace.army.mil.

Authority: This permit will be issued or denied under the following: Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat. -The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.

Cultural resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties is justified and would be required prior to the Corps’ final permit decision.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Appendix A Figures

5092 12/4/13 Pacific Habitat Services, Inc.

Location and General topography

Geren Island Flow Maintenance Project, Stayton, Oregon (USGS Stayton, OR Quadrangle, 2011)

I FIGURE I 1

9450 SW Commerce Circle, Suite 180

Wilsonville, OR 97070

NWP-2014-195

LECEND

~~·.~

~~...e

..,,'""-'"'

~

0tiiiC

~

;V».c

··~-·

·+,..._

.... --._.,..

111111-

000 00 00 0

~

..

-..&,....,~

u.y,..........,'!ft'.Lll:

........

...._ 1fd-..:.. ~ ~.,..

tJIX ....... .,....· 't'CIIt . . . .

,jlf.»t&,...-----· ~·---~

==~~-=......

:~-.

.......

<·

r·

----t

..... ·

...... "!ff.,~~·

·+

wt.~~

Plat fh.~Heatad; No"mtnra~ 1'006

~--·~·

5092 12/4/13

Patllic Habltat Services, Inc.

Tax lot map, Marion County Geren Island Flow Maintenance Project, Stayton Oregon (ormap.net, 2013)

I

FIG URE

I

2

9450 SW Commerce Circle, Suite 180

Wilsonville, OR 97070

NWP-2014-195

5092 1214/13

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 1eo Wilsonville, OR 97070

G 11 d . Aerial Photo eren san Flow Mamtenance Project, Stayton Oregon (Google Earth, 2013)

Lr] FIG3URE

NWP-2014-195

GEREN ISLAND FLOW MAINTENANCE PROJECT NORTH SANTIAM RIVER, OREGON DRAFT ~ PERMIT DRAWINGS ~ PROJECT PARTNERS

CITY~~ <....J AT YOUR SERVICE

!UJ u-, w w 0 0: 1- a.

PROJECT DESCRIPTION

0

WEST CONSUI.TAHTS, INC. RETAINED RIVER DESIGN GROUP, INC. TO HELP DEIIELOP FLOW MI\INTENANCE AND RESTORATION CONCEPTS AS PART OF A COMPREHENSIVE EFFORT TO IMPROVE THE CITY OF SI\LEM WATER !NTAKE SYSTEM AT GEREN ISlAND ON THE NORTH 1!1\NTIAM RIVER. THE RESULTING PROJECT CONCEPTS FOCUS ON THE OEVEJ..OPMIEN'r OF TECHNIQUES AND STRUCTURES: TO HELP REDUCE MAJNTEN..\NCE AND IMPROVE ASHERtES HASITAT.

z zwu zm c~

DATA PROVIDED BY ~ST CONSULTANTS, INC.

Cl:S:

HORIZONTAL PROJECT10N: OREGON STATE PLANE NORTH HOR!Z DATUM: NA083 UNITS: INTERNATIONAL FEET VERT DATUM: NAIIDI!8 UNITS: US SURVEY FEET

THESE DRAVIRNGS, THE IDEAS AND OESIGNI!INCDRPOAATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SER\IIC<, ARE THE PRoPERTY OF RIVER DESIGN GROUP, INC. (RllG)ANO ARE NOT TO !!E USED, IN WHOLE DR IN PART, FOR ANY OTHER PROJECT WITHOUT THE \1\/RlTTEN AUTHORIZATION OF ROO. UKEWJS<, THESE DRAWINGS MAY NOT !!E AlTERED OR MOOII'IEO WITHOUT AUTHORIZATION OF RtlG. ORAW!NG OUPUCATION IS AU.OWEO IF THE ORIGINAL CONTENT IS NOT MODIFIED.

3.1 3.2 4.0

SITE 1 STRUCTURES DETAILS SITE !INTAKE SYPASS Fill SITE 2 LAYOUT

4.1 5.0

SITE 2 SECTIONS SITE 3 Vv'OOO STRUCTURE

11.1 12.D 12.1 12.2 12.3

5,1

SITE 3 STRUCTURE DETAILS

8.0

SITE 4 LAYOUT SITE 4 SECT!ON.S SITESLAYOUT SITESSECTJONS SITE 8 LAYOUT

6.1

1.0 7.1 8.0

stTE 12 STRUCTURE DETAILS SATE 1 &3WORKAAEA.ISOLATION Sn"E2\IIIORKAREAISOI.ATION StTE 4 VVORK A~ ISOLATION SITE 6 YJORK AREA ISOlATION

12.4 SITE 8 WORK AREA ISOLATION 12.5 SITE 10, 11. & 12\I\'ORK AREA ISOlATION 12.6 'WORK AREA lsotATION AND EROS10N CONTROL NOTES

12.7 TYPICAL TEMPORARY BRIDGE 13.0 SITE RESTORA11DN & REVEGETATION 13.1 RE\IEGETA'!JON NOTES

w::i

z

UJ

0 0: w (!)

5~

DRAWING INDEX

SITE 1 WOOO STRUCTURES

~

:t

0

RDQ V\IORKS EXCLUS!VELY IN THE RlVER EN\'I.RONMENT AND EMPLOYS THE MOST CURRENT AND ACCEPTED PRACTICES AVAILABLE FOR PlANNING AND DESIGN OF ResTORATION AND CHANNEL ENHANCEMENT PROJECTS. AlL PLANNING IM)RK WAS PERFORMED DR DIRECTED 9Y A REQISTEREO PROFESSIONAL CML ENGINEER WITH PAST EXPERIENCE IN THE DESIGN AND IMPLEMENTATION OF STREAM HABITAT RESTORATION.

3.0

<(

<9 a..u..

>!!2z

STANDARD OF PRACTICE ·

ttO SITE 10 LAYOUT 10.0 SITE 11 l.AYOUf 11.0 SITE 12 WOOD STRUCTURE

r:i

~~ IY0

REUSE OF DRAWINGS

COVER PAGE AND NOTES EXISTING CONDITIONS & PI!OJECT KEY OVERAlL SITE ACCESS & STAGING

w

0:: 0

<(~ ~ oc w~ ;;;

SPATIAL REFERENCE FIELD SURVEY DATA AND EXISTING CONDITIONS TERJVJN SURFACE OTM COMPRfSED OF UOAR AND BATHYMETRIC SURVEY

1.11 1.1 2Jl

z

0

Cl

z'= o"'

T.09S., R.01E., WILLAMETTE MERIDIAN MARION COUNTY, OREGON USGS QUADRANGLE: STOUT MOUNTAIN, OR STAYTON, OR

fl!i

B"' Ill~.,

.

~ SECTION OR DETAIL SECTION' -

DIRECTION OF

SHEET WHERE SECTION OR DETAIL IS SHOWN

CROSS..SECTION SHEET REFERENCE

1.0 NWP-2014-195

FlOW MAINTENANCE PROPOSED TREATMENTS SITE ID

DRAWINGS 3.0-3.2.12.0, 13Jl

TREATMENT DESCRIPTION INSTALLATION OF ENGINEERED LARGE WOOD STRUCTURE'S AT INLET TO INTAKE BYPASS CHANNEL

4.0~4.1,

12.1, 13.(J

DREDGiNG OF MAINSTEM AND NORTH CHANNELS AND STOCKPJLE OF EXCAVATED MATERIAL

5.0~5.1,

12..0,131.0

INSTALI.ATION OF ENGINEER EO LARGE WOOD STRUCTI!RE IN INTAKE BYPASS CHANNEL

e.o ~ e.1, 12.2, 13.o

PLACEMENT OF OREOGEO STREAMBED GRAVELS

7.0-7.1,12.3,13.0

INSTAUATJON OF lNTA.KE CHANNEL IMPROVEMENTS tNCLUDING: AN ENGINEERED LARGE WOOD STRUCTI!RE,INTAKE CHANNEL DREDGING, AND ENOINEEREO RifFLE IN NORTH CHANNEL

a.D,12..4, 1a.o

DREDGE MATERIAL FROM NORTH CHANNEL LEFT BANK ALONG ISLAND 2 AND BUILD POINT ON NORTH CHANNEL RIGHT BANK

10

9.D,12.S.13.D

11

10.0, 12.:5, 13.D

INSTALLATION OF ENGINEERED RIFFLE AT UPSTREAM END OF ISLAND 1 DREOOING EAST CHANNEL ALONG ISLAND 1

12

b w

a tr

a. z w 0 u (!! w ~ a: 0 zw

!z ii!~ ~

::;;

0

~

~ ...J

u.

.0::

z 0~

Cl

:5

~

z

z

w a: w

(.!)

REACH CHARACTERISTICS

0

EXISTING CONDinONS EXISTING 1' CONTOURS

1

1"" 400';;;;;

DRAFT ~PERMIT D NWP-2014-195

NWP-2014-195

0

SITE 1 LAYOUT

ee

44

1"=30'

® INLET BYPASS SEC:I'I'l!!.

;;;;;;

~~!f,r:lcV

NWP-2014-195

LWS TIER 1 !BOTTOM)

1"=40'

CONSTRUCTION NOTES

G)

EXCAVATE lOG STRUCTURE fOOTPRtNT TO sPECiFIED OESfGN ELEVATIONS. STAGE EXCAVATEO BOUt...OERS AND MATERIAL N&\R8Y ANO OUTSIDE OF MOVlNG WATER. EXCAVATED MATER!AL WU,..l aEIJSED TO BA.CKFtt.l STRUCTURE AND AS 8AU.AST FOR: LARGE WOCil.

® ®

PlACE LON

@

\'\lEAVE SMALl.. DIAMETER WOOD INTO BASE MEMBERS AN0 KEY MEMBERS AT VARIABLE VERTlCAL ANGLES ANO EXTEND TO TOP OF LOG STRUCTURE. WOCD TO BE PUSHED INTO UNDISTUASED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CIJT If NECESSARY SO AS TO NOT EXTEND MORE THAN$' ABOVE TOP OF STRUCTURE. AU. SAWED ENOS SHAL.l BE ROUGHENED AND

® ® ®

PlACE KEY MEMBERS (TIER 3) AND CONNECTTO BASE MEMBERS [TIER 1) AND KEY MEMSERS (TIER 2) WITH 1" DIAMETER All·THREAO ROD AS DESIGNATED IN CONSTRUCTION NOTE B. EACH MEMBER SHAU- BE. CONNeCTED 1N AT LEAST 2 LOCA.TtoNS.

®

ANCHOR LARGE WOOD MEMBERS TOGETHER USING 1" DIAMETER AU.·THREAD ROD AT A MINIMUM OF 2 LOCATIONS FOR EACH PieCE OF LARGE WOCil. UTIU!:E 1" DIAMETERASTM Mill WITH~· 0.0. HEAVY PlATE WASHERS AND NUTS {A563B HEX HEAD NUT). ROD SHAll BE CIJT FI.USH WITH NUT HEAD AFTER TIGHTENED AND EXPOSED END SHALL BE PAINTED WITH llROWN, RUST INHIBITING All WEATHER PAINT.

BEl'VIf'EEN BOUJ..DERS IF .PRESENT~ PlACE KEY MEMBERS (TIER 2) WITH AND WITHOUT AOOTWADS AND CONNECT TO BASE MEMBERS (TIER 1) WITH 1" DIAMETER AlJ...THREAD ROO AS DESfGNATEO IN CONSTRUCTION NOTE 6. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2LOCATIONS.

MO~~

NORTH SANTlAM RIVER ~ow-

1" =40'

'

PlACE TOP MEMBERS (TIER 4) WITH AND WITHOUT RDDTWADS AND CONNECT TO 1

NORTH SANTIAM RIVER

....,.._ftow-

1" = 40'

w z0::

t:: tl)

Ul Ul

(')

lliiij NORTH SANTlAM RIVER ~ow-

"'!::

.

;;"'ffi

g"oi

LWS TIER 4 (TOP)

,. =40'

0

LWS SECTION

e-;:;oRiZ 1" =~

.... '""'

VERT1"=10'

NWP-2014-195

t; UJ

a a:

a.. z UJ 0

z D.~

0

~

w

0:::

0

)-Ul ci

m~ w~

Ei

I-LL

(3

:5

z

~

~

~~ i=z

z~ ~ 0 !:2 z w

a:

UJ

(!)

0

SITE 1 TO 3 FILL PR~E HORIZ 1" =SO' VERT1"=20'

~

DRAFT PERMIT DRAWINGS

~~:.:==:-:::--~

NWP-2014-195

NWP-2014-195

~~

;!:·

500

i>~fllNARYi!l'*' WAlER !OHWt · · · · ''"

······

495

-1~----~~--~~~~~~~~~~~~~~~~~~~~~~~~~~~f7~~~~4~

490

490

485

~

~·~OO~----~--~~----~------r-----~----3r+~OO-----J-----4-+0r-O----~----~~oo----~-----6-+TOO----~~--~~----~-----T----~L-----~----~----~------L-----4-

0

SITE 2 N. SANTI AM ,!;g21LE g" <~;i;;

500

... ... ..

HORIZ 1"= 80' VERT1"=20'

... . . .. . .

-

~

490

500

~

490

485

4~

460·~----------~----~----~----.-----L-----r---~----~----~----~-----L-----r----~----------~----,-----4-----~----~----~--~~480

0+50

1+00

2+00

3+00

4+00

0

5+00

6+00

7+00

$+00

9+00

10+00

11+00

11+50

SITE 2 N. CHANNELJ;ROFILf-.

=

.

HORIZ 1" 80' VERT1"=20'

505

005 500 495 490 ~

480>~-L~--L-~-r~--L-~-L~~L-~~-L~r-k-~-L~--r-~-L~--L-~~~--L-~-r~~L-~~-r~--L-~-L~·490

0+00

0+50

1+00

1+50

2+50

2+00

3+00

4+00

3+00

13' N. SANTIAM SECTI~A 7cif!O ~

=

............ 005

490 485

················

. ...:.................... .: .................... ............. '

~

000 495

~

~

~

..

HORIZ 1"" 40' VERT 1'' 20'

. . ................. .... ' .. ;" ..... ' ............. : .....................:.....................;.. ........... ' ...... . ....................~.................... ~... "'"''""''''" ..~.~~~~-~~~~~-~.:. ···· ¥ :OH\1\!·· .............. ~ .............~+~·.":-:".-:-.:7.:--: .. ,,A".~ :7:::::::-: ::-7:::.-::.-::.. ... ~.... · : · --- .... ~EXISTING GROUND

505 .............. ..

······ ,

...,"'

.

10:1SJOESL.OPE.

40'

. ...................... 1,j,.........

..

.,...............................

..

····:;~:~~~·~~~~·····;

·

(REVISEOt\52213)

. .................. -. .............. .

~··

500 495

490 ~

488+~00~L-~~--L-0+~5-0~~~~~-1,+00--L-~~--L-1~+50~~-L~--L-2,+00--~~-4--k-2+~50r-~-L~--L-3-~ro~--L-~~-3-+r50~--L-~~-4~+~o~90

f4\ N. SANTIAM SECTI'!!'!,STA 11:!0 \.:::.J

HORIZ 1"= 40' VERT 1"=20'

500

I

~

li

~~~--~~o~~ro~~~~~1-+~0-0~-L~--L-1+~00--L-~~~-2-+r00~--~~~r2+~5r0~-L~~~~~~

485

f5\

N. CHANNEL SECTig!t STA

g:.so

DRAFT

41

~~----------------------------------~------------~~~o~~~z~~~~=t~9--------------~~=-~P~E~R~ftn~IT~~D~RA~~VV~I~N~43~S~~~t~~~~~·t·~~~aj NWP-2014-195

0

SITE 3 LAYOUT

!§I

DRAFT PERMIT DRAWINGS

~~~

NWP-2014-195

LWS TIER 1 !BOTTOM)

1"=30'

'i,

\~\

i\~

\lp\

CONSTRUCTION NOTES

CD

EXCAVATE LOG STRUCTURE FOOTPRINT TO sPECIFIED OESJGN ElEVATIONS. STAGE EXCAVATED BOULDERS AND MATERIAL NE.ARBY AND OUTSIDE OF MOVING WATER. EXCAVATED MATERIAL WIU.. BE USED TO BACKFJLL STRUCTURE AND AS BALLAST FOR I.A.RGE

®

PLACE LONGlTUOfNAL LARGE \NOOO BASE MEMBERS (TIER 1)1N STRUCTURE FOUNDATION FOOTPRiNT. WEDGE I.A.RGE \111000 ElETVEEN BOULDERS IF PRESENT.

@

PLACE KEY Ma!BERS (TIER 2) WITH AND \NITHOUT R

@

WEAVE SMAU.. DIAMETER 'WOOD INTO BASE MEMBERS AND KEY MEMBERS AT VARtABLE VERTICAL ANGLES AND EXTEND TO TOP OF LOG STRIJCTURE. WOOD TO 9E PUSHED INTO UND\STURBED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CUT IF NECESSARY SO AS TO NOT EXTEND MORE THAN 5' ABOVE TOP OF STRUCTURE. AU.. SAWED ENDS SHALL BE ROUGHENe:t AND

® ® ®

PLACE KEY MEMBERS (llER 3} AND CONNECT TO BASE MEMBERS OlER 1) AND KEY MEMBERS (TTER 2) \IIIlTH 1" DlAMETER AU..~THREAD

WOOD.

BROKEN,

LWS TIER 2

t" = 30'

;

ROD AS DESIGNATED IN CONSTRUCTION NOTE 8. EACH MatBER SHALL BE CONNECTED IN AT lEAST 2 LOCAT10NS,

PLACE ToP MEMBERS (11B* 4) \IVITH AND WITHOUT ROOTWADS AND CONNECT TO KEY MEMBERS OlER 2 & 3) vvtTH 1.. DIAMETER AU~THREAD ROO AS OESIGM\TEO IN CONSTRUCnON NOTE fl. EACH MEMBER SHALL BE CONNECTED IN AT LEAST 2 LOCATIONS.

PLACE BALlAST BOULDERS \NITHIN STRUCTURE CONSISTING OF l FT DIAMETER SOULDERS. PLACE A MINIMUM OF 4 BOUlDERS PER PIECE OF lARGE WOOD EXCI.UDING SMAlL DIAMETER WOOD PIECES. BACKFILL IN AND AROUND STRUCTURE \NITH GRAVELS AND COSBLES EXCAVATED FROM THE STRUCTURE FOOTPRINT. 8ACKF1U.. SHAll BE WASHED INTO THE LARGE WOOD DPENING TO

ENSURE ADEQUATE BAllAST. NEARBY CLUMP PL.ANTlNGS OF 'MI...lOWAND OTHER RIPARIAN Pl.MfTS SHALL BE SECURED AND PLACED lft!ITHtN THE BACKRU.AREAS AT A MINIMUM OF 1 CLUMP PlANT EVERY 10 FEET TliROUGHOUT THE STRUCTURE.

\a~

~\% \'%. \ lp\

®

ANCHOR LARGE WOOD MEMBERSTOGETHER USING 1" DIAMETER AU·THREAD ROD AT A MINIMUM OF 2 LOCATIONS FOR EACH PIECE Of lARGE WOOD. UTIUZE 1" DIAMETER ASTM AA49 wmu· O.D. HEAW PlATE WASHERS AND NUTS (A51108 HEX HEAD NUTI. ROD SHAlL BE Cl.lf FlU!lH WITH NUT HEAD AFTER TIGHTENED AND EXPOSED END llHAU BE PAINTED WITH BROWN, RUST INH!BmN

LWSTIER 3

1"=30'

LWS TIER 4 (TOP)

1" =30'

0

LWS SECTION

~

DRAFT PERMIT DRAWINGS

""""""""""...

~~---.,...::::....:~·'-'-,~---~,.

NWP-2014-195

tw 6

a: 0.. w z (.) 0

z C)a::w zw 0 ri .... z ~ a::

<(

~ ;; ~ 0

-1

1-u.. _o '

cnz::5

~

~

~0 z

z w

a: w

G

............ ·:: ............. , ..... ' ..... :· .... .

~

DRAFT PERMIT DRAWINGS

~~--------

NWP-2014-195

495

495

490

490 ...............

495

4ll5

490

490

475

475

470~~~--~~-r~~~~~-r~--L-~~_,--~~-L~--.-~~~--~~~~~~~~470

0+00

0+50

0

1+00

1+50

2+00

2+50

3+00

CHANNEL SECTION,!;fA~ HORIZ ·· =-4"' \IERT1''=21i'

...

495

490

485 490

.

...

495

. . . . .·~.~~~r. .

.>:;~;·:::::;::::::::::·::::¥::;::::~;;w::::·:·:::::;::·:::::·A

!J ~. '-~,: -···;,,;.: ;,.:. .·;. :. : ~ ._ -.-..""f"!".~. ~; ':"':"". ~ · ·J-RU. .,_f :

· · EXtSTtNG GR;-N;-. (REVISED 052213)

WfciTH tsr

.

490 495 490

475~~~~~L-,_~~~~~-r~--~~-L_,--~~-L~----~-L~~~~~~~~~~475

0+00

0+50

0

1+00

1+50

2+00

3+00

CHANNEL SECTION STA S+?a.

~lf11~~~·

J

I

OO:AWING NUMBER

~~------------------------------------------------~~~P~E~R_M__I~_RA_D~RA~FT~W_I~N~G~S~~~-~~~~~·~,!~~~3 NWP-2014-195

NOE>3MO 'M3AIM l"l\tllN\IS HlMON

1::>3rm:td 30N'v'N3lNI\iVtl MOl.::! ON\ilSI

N3~30

NWP-2014-195

CONSTRUCTION NOTES EXCAVATE LOG STRUct\JRE FOOTPRINT TO sPECIFIED DESIGN ELEVATIONS. STAGE EXCAVATED BOUlDERS AND MATERIAL NEARBY

AND OUTSIDE OF MOVING WATER. EXCAVATED MATERIAL WILL BE USED TO eACKFJLL STRUCTURE AND AS BAllAST FOR LARGE WOOD.

® ®

PlACE LONGITUDINAL LARGE WOOD BASE MEMBERS [TIER 1) IN STRUCTURE FOUNDATION FOOTPRINT. WEDGE LARGE WOOD BETWEEN BOULDERS If PRESENT.

@

WEAVE SMAU. DIAMETER 'NOOO INTO BASE MEMBERS AND KEY MEMBERS AT VARlABLE VERTICAL ANGLES AND EXTEND TO TOP OF LOG STRUCTURE. WOOD TO BE PUSHED INTO UNDISTURBED GROUND BELOW EXCAVATED FOOTPRINT. WOOD TO BE CUT lF NECESSARY SO AS TO NOT EXTEND MORE THAN !I ABOVE TOP OF STRUCTURE. AU SAWED ENOS SHALL BE ROUGHENED ANO

®

PlACE KEY MEMBERS (TIER 3) AND CONNECT TO BASE MEMBERS {TIER 1) AND KEY MEMBERS (TIER 2) WiTH 1" otAMETER AU..~THREAD

PLACE KEY MEMBERS [TIER 2) WITH AND WITHOUT ROOTWADS AND CONNECT TO eASE MEMBERS (TIER 1) WITH 1" DIAMETER ALL--THREAD ROD AS DESlGNAl"ED IN CONSTRUCT10N NOTE 8. EACH MEMBER SHALl CONNEcTED IN AT lEAST 2LOCATIONS.

ae

BROKEN. ROD AS DESIGNATED IN CONSTRUCTION NOTE 8. EACH MEMBER SHAU. BE CONNECTED fN AT I..EA.ST 2 LOCA.nONS,

®

PlACE TOP MEMBERS [TIER 4) WITH AND WITHOUT ROOTWADS AND CONNECT TO KEY MEMBERS (TIER 2 & 3) WITH 1" DIAMETER All-THREAD ROO AS DESIGNATED IN

CONSTRUCTioN NOTE 8.. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2 LOCATIONS.

f'2" STRUCTURE SECTION

(j)

PLACE l!ALLAST BOULDERS WITH!N STRUCTURE CONSISTING OF 3fT DIAMETER BOULDERS. PLACE A. MINIMUM OF 4 BOULDERS PER PIECE OF LARGE WOOD EXCLUDING SMALL 01AMETER WOOD PIECES. BACKFILL IN AND AROUND STRUCTURE WITH GRAVELS AND COBaLE:S EXCAVATED FROM THE STRIJCTUru:; FOOTPRWT, 9ACKF1U. SHALL BE WASHED INTO THE LARGE WOOD OPENING TO !!IISUREADEOUATE BALLAST. NEARBY CWMP PLAN'1'1NGS OF WILLOW ANO OTHER RWAA"IAN PLANTS SHALL SE SECtlREO AND PLACED WITHIN THE BACl

®

ANCHOR lARGE WOOO MEMBERS TOGETHER UStNG 1'" DIAMETER ALL-THREAD !WO AT A M!NlMUM OF 2 LOCATIONS FOR EACH PIECE Of LARGE WOOD. tmlJZE 1· DIAMETER ASTM !1440 \iii!TH 4" D.O. HEAW PLATE WASHERS AND NUTS jJ\111138 HEX HEAD NUT). ROD SHALL BE CUT FLUSH WITH NUT HEAD AFTER TIGHTENED AND EXPCSEO END SHALL BE PAINTED WITH BROWN, RUST INHISITJNG ALL WEATHER PAINT.

--

\.:::/ HORIZ1"=10' 500 · · · · · · · · · · · · · · · · · · · ·· · · · · ·. · · .... · · ..·. · ·- .· ·· .. ··VERT .f"·=· W. .. · · · ·............ ; ..·......... · ... EXISTING SIDE CHANNEL (REVISED TIN 052213)

495

~0~~~~~~~~~~~~~~~~~~··~···~-·~··~·~~~~~~--~-----t--~~~~~~::::=:j:====~~~~~~t 485

6+00

5+00

5+50

4+50

0

1+50

~~!f 1r::2'W

___,~~:~--------450 ~~~~~----~------~~v---~-(R_~__·e_D_n_N_~ 485

2+00

2+50

INTAKE DREDGING UOFILL

EX!STtNG CHANNEl

ORDINARY HIGH WATER (OHW)

3+00

3+50

4+00

...··.··.··.

450 4~T-~~~~;-~~~~-r-L-L~~-.~~~~-T~~~~~~~~~~~~~~~r-~~~~r-~~~~T-~~~~~

5+00

4+50

4+00

3+50

0

3+00

2+50

2+00

N. CHANNEL RIFFLYROFII£. HORIZ 1"=40' VERT 1"=20'

1+50

1+00

0+50

DRAFT 5I PERMIT DRAWINGS

~~--'--'-"---'

NWP-2014-195

0

SITE 8 LAYOUT

e

=;;;;

w

1. =50'

HORIZ 1" = 40' VERT1"=20'

~

DRAFT PERMIT DRAWINGS

liil3~~

NWP-2014-195

0

SITE 10 LAYOUT

0

SITE 10 SECTION

e-

;;;;;;:;;;

HORIZ 1" = 40' VERT 1"=20'

~

DRAFT PERMIT DRAWINGS

~~~

NWP-2014-195

0+50

0

1+00

1+50

2+00

SITE 11 CHANNEL SJ_C.BONiiiiWi HORIZ 1" = 40' VERT 1""20'

S+OO

5+50

S+llO

DREDGING VOLUME= 1,22ll CUBIC YARDS

0

SITE 11 LAYOUT

-- 1"=40' ---='

1'CONTOURS

3+00

2+5ll

2+00

~

1+50

DRAFT PERMIT DRAWINGS

~s----:-=~

NWP-2014-195

NOD3l:!O 'l:l3Ail:l IWI.J.N\tS Hl.l:!ON

.L:J3rOHd 3:JNVN31NIVII't MOl.:l ONV1SI N3l:l38

..,

0

II

::-

...

:::1 0

j

...w N

;

...

NWP-2014-195

LWS TIER 1 !BOTTOM) i" =40'

16

~a

~0~

CHue

~~':.!:.!.'-'r4k~ LWSTIEit 2 1" = 40'

16

~a~'\

CONSTRUCTION NOTES

® ®

PLACE LONGITU01NALLARGE WOOD BASE MEMBERS ('TlER 1) IN STRUCTURE FOUNDATION FOOTFRINT. WEDGE LARGE WOOD !lEIWEEN 90UI.DERS IF PRESENT.

ll!iiiOC

PLACE KEY MEMBERS (TIER 2) 1MTfi AND WITHOUT ROOTWADS AND CONNECT TO BASE MEMBERS {TIER 1)\MTfi 1" DIAMETER

~0

@

WEAVE SMALL !AAMETSR WOOO 1NTO aA$E MEMBERS AND KEY MEMBERS AT VARIABLE VERTICAL ANGLES AND EXTEND TO TOP OF toG STRUCTURE. WOOO"TO BE PI.JSHEO fNTO UNDtSTURBED GROUNO .BELOW EXCAVATED FOOTPRIHT. 'INOOOTC BE CUf tF NECESSARY SOAS TO NOl' EXTEND MOR:E THAN 5' ABOVE lOP OF STRUCTURE. AU. SA\NEO ENDS SHALL SE ROUGHENED AND BIW!

® ®

PLACE KaY MEMBERS mat 31 AND CONNECT TO BASE MEMBERS (nER 1) AND KEY MEMBERS (11ER l) WTH 1" DIAMETER All.-THREAD ROD AS OEstfl.NATED iN CONSTR1JCTtON NOTE 8.. EACH Ma.BER SHALL BE CONNeCTED IN AT LEAST 2 I..OCATIONB.

®

\~

~

CD

EXCAVATE lOG STRUCTURE FOOTPRtNT TO SPEOtAEO DESIGN ElEVATiONS. STAGE EXCAVATED OOOlDERS AND MATERIAL NeARBY ANO OUTSIDE Of MOVING WATER. EXCAVATED MATERtAL WILL BE USED TO BACt

z~

WOOD.

CJO

ww(j

All.-TifREAD ROO AS OES!GWATED IN COI>ISTRUCTION NOTE 8. EACH MEMBER SHAU. BE CONNECTED IN AT LEAST 2LOCATIONS.

Jl

m!i~

Ue u~

PLACE TOP MEMI!ERS (TIERS <1-Bl WITH AND WITHOUT ROOlWADS AND CONNECT TO KEY MEMSERS {TIER 2 & 3) WITH 1" DIANETER AU.-THREAD ROO AS DE!l!GNATED IN CONSTRUCTION NOTE B. EACH MEMBER SHAlL BE CONNECTED IN AT UEAST 2lDCATIDNS.

UJ

PLACE BALLAST BOULDERS WITHIN STRUCTURE COI>ISlSTING Of 3FT 01AMETER BOULDERS. PLACE A MINIMUM OF 4 BOULDERS PER PleCE OF LARGE WOOD EXCLU01NG SMAll. !>!1\METER WOOD PIECES. BACl

UJ <( 0..., t- a: a..

ANCHOR lARGE WOOD MEltSERS TOGETHER USING 1" DIAMETER ALL-THREAD ROO AT A MINIMUM OF 2LOCATIONS FOR EACH PIECE OF LARGE WOOD. UTIUZE 1" DIAMETER ASTN 1\4411 WITH 4" D.O. HEAVY PLATE IM'SHERS AND NUTS {A563B HEX HEAD NUT). ROD SHALL BE CUT FLUSH \JVffH NUT HEAD AFTER TJGHTENED AND EXPOSED END SHAlL BE PAINTEn 'NITH BRO\VN, RUST 1NHmtTfNG AU WEATHER PMNT.

0

..J

w

1()

UJ

()

w~

fXw

;:::)~

CHua

~N~I.IN"r. OJt- )\J(~

1-< u~

~:\

;:::)~ IX-' i-LL

LWST!Eit 3 1" =40'

z

0

Cl

UJ

a:: 0

~

0:

i :I:

UJ~ 1:2 0 N:) z

'I:"'"~

z a: UJ UJ

\~'("

(!)

CHue

~'-'12t..~Nr, OJt- 4irJ2 LWS TIERS 4,5 16 !TOP) 1" =40'

16

'{\

\~ HORIZ 1" = 10'

VERT1"=10'

CHue

o,._

...::::'-'12L 11v1"4JQ;

~

DRAFT PERMIT DRAWINGS

OftAWONGNUM8ER

~~--:-l::..,-:.1 -: - : .:J': -1,.

NWP-2014-195

WORK AREA ISOLATION· CONSTRUCTION NOTES

ACTIVATE PUMPING SYSTEM AT ENGINEERED'LARGE Yl/000 STRUCTURES. PUMPS ARE TO BE

USEO TO DRAIN WORK SITE. AlLOWING FOR CONSTRUCTION Of THE WOOO STRUCTURE TO OCCUR fN DRY OR PARTIAU.V 1NET CONDtTIONS. FISH SALVAGE PlAN SHAll BE ACTlVATED FOR THE ISOLATED .AREAS YJITHIN THE INTAKE BYPASS CHANNEL ALL AREAS SHAll BE OEASHED BY LO\NEmNa THE WATER ELEVA110N \!\llTH PUMPS

WHEN APPUCASLE AND THEN DEFISHING WITH SEINE NETS AND ELECTROSHOCI

CARE AND DIVERSION OF WATER FLOW OONomoNS DURING iN-WATER W'Ofitl< THE PROJECT WILL BE IMPLEMENTED OURtNG THE !N-STREAM \M:lRK WINDOW JULY 15 ·AUGUST 31. FlOWS ARE EXPECTED TO BE APPROXIMATE!.Y 10!10 CFS. METHOD OFVIIORK AREA lsot.ATtON THE WORK AREA \liJfU. Be fSOLATEO 9Y USE OF A SU:LK BAG OR APPROVED ALTERNATIVE COFFER DAMS. BULK aAGS WtU.· BE tNSTA11..EO FROM THE SANKUNE EXTENOING U

IT IS ANTICJPATED THAT ACTIVE PUMPING \\AlL BE REQUIRED TO OEWATER THE ENGINEERED LARGE WOOD STRUCTURE FOOTPRINTS~ PUMPS USED FOR DEWATERING SHAll HAVE INTAKE SCREENS THAT l!IIEET NMFS ANO OFOWSCREEN CRITERJA OR BE OPERATED JN AN AREA WHERE FISH ARE NOT ABLE TO

ENTER THE AREA ISOlA TEO.

0

TYP. BULK BAG PLASMENL HORIZ 1· = 20' VERT 1"=20'

0

WORK AREA ISOLATIOJL 1"=60'

___,.

~

DRAFT PERMIT DRAWINGS

iljs---:-=~

NWP-2014-195

NWP-2014-195

NWP-2014-195

WORK AREA ISOLATION· CONSTRUCTION NOTES INSTAll BUU< !lAGS, !WID SAGS, OR Al'l'RO\IEP ALTERNATIVE PER DRAWING 12.6 TO ISOlATE ACTIVE !'LOW FROM WORK AREAS. BUU< !lAGS WILL BE PLACED IN A PHASED APFROI\CH TO PRO\ItOE ISOLATION WHILE AllOWING !'LOW THROUGH THE PROJECT SITE. TOP OF BULl( BAGS TO BE P!..ACED AT MIN 487' EUEVAT10N.. INSTAU. TEMPORARY BmDGE CROSSING PER DRA"WJN'G 12.7 TO CROSS THE NORTH CHANNEl TO PROVIDE ACCESS TO RIGHT PDRTlON OF SITE 8 .ENGINEEReD RIFFLE DEVELOPMENT. TEMPORARY BRtOOE TO MAiNTAIN A M!NlMUM. CLEAR O?ENWB Dr 40'.

®

ACTIVATE PUMPING SYSTEM AT ENGINEERED RIFFlE SITE. PUMPS ARE TO BE USED TO DRAIN

WORK SfTE. AllOVJI.NG FOR CONSTRUCTION OF THE RIFFLE TO OCCUR fN THE DRY OR PARTIALLY

\MET CONDITIONS. ACT1VATE PUMPfNG SYSTEM. AT ENGINEERED LARGE WOOD STRUCTURE. PUMPS ARE TO BE USED TO DRAIN WORk SfTe. AllowtNG FOR CONSTRUCTION OF THE WOOD STRUCTURE TO OCCUR JN THE DRY OR PAATW...lV WET CONOmONS.

® @

FISH SALVAGE PLAN SHALL BE ACTIVATED FOR THE ISOlATED AREAS WITHIN THE INTA!IE CHANNEl. ANO NORTH CHANNEL ALl AREAS SHA.U. BE DEftSHEO 9'V LOWERJNG THE WATER. ELEVATION wmi PUMPS WHEN APPUCASLEANO THEN OEASHtNG \ftATH SSNE NETS AND El.ECTROSHOCK!NG IF NECESSARY. EN111!E SALVAGE SHALL TA!IE LESS THAN 24 HOURS. ~NSTALL Ft.OATING SiLT CURTAINS

PER DRAWING 2..8 AT DOWNSTREAM EXTENTS Of" WORK lO

TRAP SILT liND SEDIMENT WITHIN THE DISTURBED WOilK ZONES.

METHO!) Ol'WOOJ!\ Al!§A !SO!J\T!9N- INTA!IE CHIINNE!. OREDG!!IG THE WORK AREA WILL NOT BE ISOlATED FROM ACTIVE FLOW. OUE TO EXCAVATION OCCURRING IIi ACTIVE FlOW A BEST MANAGE PRACTICE {aMP) OF OI'E!!Al!NG 3D MINUTES IN THE WATER WITH 1 HOUR WAIT MAY BE tMPLEMENTED tFWATER QUAUTV rSS:UES ARJS£. A StlT CURTAIN WILL SE: !NSTAU.EO AT

THE DOWNSTREAM DREDGING EXTENT TO TRAP S1tT ANO SEO!MENT WITHIN THE OlSTURSED WORK ZONE. NO DEASHING WILL OCCUR AT THts SITE DUE TO ACTIVE FLOW AND WATER OEPTHS-~

IT IS ANTICIPATED THAT ACTIVE PUMPING WILL BE REDU!RED TO DEWATER THE E!IGINEERED RIFflE SITE. PUMPS USED FOR DEWATERING SHALL HAVE INTAKE SCREENS THAT MEET NMI'S AND OFOW SCREEN CRITERIA OR BE OI'E!!ATED IN AN AREA WHERE FISH ARE NOT A!ll.E TO ENTER THE AREA ISOLATED.

IT Ill ANTlCli'ATED THAT 1\CTlVE PUMl'lNG WILl BE REQUIRED TO D!'lWATER THE ENGINEERED LARGE WOOO STRUCTURE FOOT!'R!NT, PUMPS USED FOR O!lWATERlNG SHALL HAVE INTA!IE SCREENS THAT MEET NM!'S AND OfDW SCREEN CRITERIA OR BE OI'E!!ATED IN AN AREA \I,IHJ;RE FISH ARE NOT ABLE TO ENTER THE AREA ISOlATED.

0

WORK AREA ISOLA"!]gN 1"=60'

;;;;;;;

~

DRAFT PERMIT DRAWINGS

~t---'-=~

NWP-2014-195

f'1\ WORK AREA ISOLA'!JSN \.:...)

......,

1"=60'

WORK AREA ISOLATION · CONSTRUCTION NOTES FLOW CO!IOITlONS OL!RING !N:WATER WQRK ' , THE PROJECT \iVfU. BE IMPLEMENTED DURING THE !N-STREAM WORK WINDOW JULY 15 "'AUGUST 31, FLOWS ARE EXPECTED TO SE APPROXIMATELY 10atl CFS.

® ®

INSTAU. FLOATING SILT CURTAINS PER DRAWING 12.6 AT DOWNSTREAM EXTENTS OF \tVORK TO TRAP SILT AND SEDIMENT WITHlN THE DISTURBED \1\'DRK ZONES. FISH SALVAGE·PlAN SHALL BE ACTIVATED FOR THE ISOLATED AREAS WITHIN THE tNTAI

ELECTROSHOCKING IF NECESSARY. ENTIRE SALVAGE SHALL TAKE LESS THAN 24 HOURS.

MatiDO OF WORK AREA ISOlATION* RIVER~LEFT AND iSLAND 2 OREDGtNG

THE WORK AREA WILl NOT BE tsOLATED FROM ACTIVE Fl..OVII. CUE TO EXCAVATION OCCURRING !N ACTM FLOW A BEST MANAGE PRACTICE (BMP) OF OI'ERATING 30 MINUTES IN THE WATER WITH 1 HOUR WAIT MAV BE IMPLEMENTED IF WATER QUAUTV ISSUES ARISE. METHOD OF \1\'DRK AR§A ISOlATION ·POINT SAR AND ENGINEERED lARGE \1\'DOO OEVEU:l!'MENT THE \IVORK AREA V\IIU.. NOT BE ISOLATEO FROM ACTJVE FLOW. DUE TO EXCAVATION OCCURRING IN ACTIVE FLOW A BEST MANAGE PRACTICE !BMP) OF OPERATING 30 MINUTES IN THE WATER WITH 1 HOL!R WAIT MAY BE IMPlEMENTED IF \\VATER QUAUTY ISSUES ARISE. A SilT CURTAIN-WILL BEINSTI\LLED ALONG THE CHANNEl. EDGE TO TRAP S1LT AND SEDtMENT WITHIN THE DtSTURB£0 \NORK .ZONE.

1SOLATEO AREAS TO BE 0£Ff5HED IF PRATICAL

~

DRAFT PERMIT DRAWINGS

~~~

NWP-2014-195

0

WORK AREA ISOLATION· CONSTRUCTION NOTES WORK AREA ISOLA!!2!.-es;;;. >

INSTAU. TEMI'OAA!!Y BRIDGE CROSS!NG fi£QUIREO TO CROU THE WEST SI'UT Ol' THE »>RTH CHANNEL l'E!llli'IIIIMNG 12,7 TO PRO\IIOE ACCe&!l TO IS\ANO 1 FOR ENGINEERED RlfFI.E ClE\IE!.OI'MENT AND EAST SPUT CHANNEL El

1"=60'

INSii\U. BW< BAGS, SAND !lAGS, OR APPROIIEll 1\LTERNATIIIE l'E!l O!li\IMNG 117TO ISOlATE ACTIIIE R-OW FROM WORK AREAS. BW< BAGS WIU. BE PLACED IN A I'HI\SED Al'I'ROACH TO I'RO\IIOE ISOlATION WH!Ll! i\LLOIMNG FLOW THOIJGH THE l'f

® ® ®

®

ACTIVATE I'UMJ'ING BYSra.t AT ENGINEERED IUff\.E SITE. PUMPS ARE TO BE USED To DRAIN WORK SITE. Ati.OWING FOR CONSTRUCTION Ol' THE RIFFI.E TO OCCUR IN THE CRY. ACTIVATE PUMPING BYSTEM 1\T ENGINEERED lARGE WOOD STRIJCTURE PUMPS ARE TO BE USED l'O ORAfHWORKSfTE. ALLOW.NG FOR CONSTRUC110N OF THE \tVOOD STRUCTURE TO OCCUR IN THEORY. FISH SALVAGE PLAN SHALL ae ACTiVATED FOR THE tsOlATEO AREAS \IIATHIN THE NORTH CHANNEL ALL AREA$ SHAll BE OEFISHEO eY LOWERiNG THE WATER ELEVATlON V\IITH PUMPS

\NHf:N APPUCABlE ANO THEN Dl:::ASHlNG \o\I!TH SEJNE NETS- AND El.ECTROSHOCKlNG tF NECESSARY. ENTIRE SALVAGE. SHALL TAKE LESS THAN 24 HOURS. INSTAll. FLOATING SltT CURTAINS l'Eillli'IIIWING :ta AT OOWNSTREAM EXTENTS Ol' WORK TC TRAP SILT AND SEOfMENT WITHIN THE Of:STURSE:O WORK ZONES.

CARE AND DIVERSION OF WATER FtOWCONOmON:S OURmG ~TER WORK THE PROJECT Wit!. SE IMPU!MEIITEO DURING THE IN-STREAM WORK WINDOW JULY 15 -AUGUST 31. FLOWS ME EKPECTEO TO BE APPROXIMATELY 1000 CFS.

z

0

si= at; w

0

·~ <(

a:: 0.. w 0z

rx: <(

w

w <(0z

ISOLATED.

~

i=

.... IJ. ~ 0 ~ 0 .... ~ .... !:!2 z 0 w .... 0:::z N

IT fS ANTICIPATED THAT ACTIVE PUMPING \MLL BE REOUIRED TO DEWATER THE EIIGIIIEEREO RIFFLE SITE PUMPE USEO FOR DEWATERl!IGSHALl HAVE ll!TAKE SCREENS THAT MEET IIMFSAIID OfOW SCREEN CRITERIA OR BE OPERATED IN AN AREA WHERE ASH ARE NOT ABLE TO ENTER THE AREA

a:

zw 0 ti lie:: z1- ~ a: <( oc 0 ~ ~

~ METHOD OF VIIORK AREA tSOLA.TION ~NORTH CHANNa ENGINEERED RIFFLE THE WORK AREA WILL SE ISOlATEll BY USE OF A llULK SAG OR AP!'RO\IEO 1\LTERNATIIIE COFFER DAM. BULK BAGS WILL BE INSTALLED FROM THE BAIIKL\NE EXTEII!li!IG INTO THE CHANNEl. COMPU!TELY ISOLATING PORTIONS OF THE NORTH CHANNEL THE ENGINEERED RIFFl-E WILL SE CONSTRUCTED IN A PHASED APPROACH WITH THE RIVER-RIGHT !'DimON OF THE CHANNEL !SOLATED AIIO COIISTRUCTEO FIRST AIID THEN THE RIVER-LEFT PORTION BEl!IG ISOLATED A CONSTRUCTED SECOND. A SILT CURTAIN W1ti. SE INSTALLED AT THE DOWNSTREAM EXTSNT OF THE RIFFU! TO TRAP SILT AIID SEDIMENT WITHIN THE !llSTURBED WORK ZONE.

(!)

..J

olJ

U)

w

w

(!)

!:: U)

IT IS AN11CIPATEO THAT AC11VE PUMPING \NILL BE REOVIREOTO OE'\NATER THE ENGINEERED LARGE WOOD STRUCTURE FOOTPRINT. PUMPS USEO FOR DEWATERING SHAll. HAVE iNTAKE SCREENS THAT MEET NMF'S AND OFOW SCREEN CfUTE:RlA OR BE oPERA TEO IN 1\N,AAEA \NHERE ASH ARE NOT ABlE TO ENT'ER THE AREA tSOl.A"TEO.

PHASE U: ISOLATE RIIIER-l.EFT PORTION OF NORTH CHANNEL RIVER BYPASS R-OW TO BE THROUGH RWER-ffiGHT ?DimON OF IIORTH CHANNEL COMPU!TE CONSTRUCTION Of RIIIER-RlGHT PORTION OF ENGINEERED RIFFLE AND ENGINEERED LARGE WOOD STRIJCTURE

~

DRAFT PERMIT DRAWINGS NWP-2014-195

EROSION CONTROL NOTES AT A MINIMUM, EROSION CONTROL MEASURES SHOWN ON THE PlANS SHALL BE IN PLACE PRJOR TO COMMENCI.NG CONSTRUCTlON.

WORK AREA ISOLATED FROM FLov.lNG WATER

OURlNG CONSTRUCTION, All EROSION CONTROLS SHALl BE INSPECTED BY THE PROJECT ENGINEER DAILY TO ENSURE THEY ARE WOR~ING ADEQUATELY. (1)1F INSPECTION SHOWS THAT THE EROSION CONTROLS ARE INEFFECTIVE, WORK CREWS WILl BE MOBIUZEO IMMEDIATELY TO MAKE REPAIRS, INSTALL REPLAC:EMENTS, OR INSTALL ADDITIONAL CONTROlS AS NECESSARY. (2} SEDJMENT MUST SE RBtOVED FROM EROSION CONTROLS ONCE li HAS REACHED 113 OF THE EXPOSED HEIGHT OF THE CONTROL

.,..

CONTRACTOR SHALL PRO\IlDE MEASURES TO PREVENT MOVEMENT OF SOIL INTO WATERWAYS OR VIIETI..ANOS, E.G. FILTER BAGS, SEotMENT TRAPS OR CATCH BASINS, VEGETATIVE STRIPS, BERMS, JERSEY BARRIERS, FIBER BLANKETS, BONDED ABER MATfUCES, GEOTE.XTILE.S, MUlCHES OR COMPDST, WATTLES AND SEDIMENT FENCES.

/

/

CONTRACTOR SHALl. PRCMDE MEASUAES TO PREVENT STOCKPII..E EROSlON DURING RAIN EVENTS OR WH:EN THE STOCKPILE SITE IS NOT MOVED OR RESHAPED FOR MORE THAN 48 HOURS, BV SURROUNOU-lG PU.ES WITH COMPOST BERMS, COVERING PILES INIITH iMPERVIOUS MATERIAl.S OR OTHER EQUAU.Y EFFECTIVE METHODS.

/ /

-------- --0

_,./

CONTRACTOR SKAU PROVIDE MEASURES TO PREVENT CONSTRUCTION VEHIClES FROM lRACKlNO StmiMENT OFFStTE OR ONTO ROADWAYS WHERE 11' IS SUBJECT TO WASHiNG INTO STORM DRAINS, WATERWAYS, OR WETLANDS; INCt.JJOING GRAVEL ACCESS PADS, wtiEEl WASH STA11DNS, OR OTHER EQUAlLY .EFFECTIVE METHOOS. CONTRACtOR SHAll INSTAU. REMOVABLE PADS OR MATS TO PREVENT SOIL COMPACTtON IN ALL TEMPORARY CONSTRUCTION ACCESS POINTS AND STAGING AREAS IN RIPARIAN OR WETLAND AREAs.

WORK AREA ISOLATION ·TYPICAL NOT TO SCALE

CONTRACTOR SHAlL PREPARE ANO HAVE ON-SITE A SPfLL CONTAINMENT AND CONTROL PLAN VVITH NOTIFtCAnON PROCEDURES, EQUIPMENT. SPECIAC CLEANUP AND OlSPOSAliNSTRIJCTIONS FOR AU. PRODUCTS USED ON SJTE. CONTRACTOR BHAI..l HAVE AN EMERGENCY SUPI'!.Y OF SEDIMENT CONTROL MATERIAI.S ON HAND (SILT FENCE, STRAW BALES, ETC.t AN

OIL ADSORBING FLOATING BOOM, AND ABSORBENT PADS. STATIONARY Pov.1ER EQUIPI.IENT, SUCH AS GENERATORS, WITHIN 150 FEET OF THE WATER SHALl BE DIAPERED TO PREVENT LEAKS. All POWEJi EQUIPMENT 'IMTHIN 150 FEET OF THE WATER SHALl BE INSPECTED DAILY FOR FWID LEAKS AND REPAIRED. THE CONTRACTOR MUST KEEP DAILY INSPECTION REPORTS IN A DIARY.

All EQUIPMENT TO REMAIN WITHIN THE BOUNDS OF THE CONSTRUCTION STAGING AREA, ACCESS ROAOs, OR PROJECT CONSTRUCTION

AREA. DUST CONTROL: All HEAVY' USE AREAS ARE TO BE MAINTAINED IN A CONDITION THAT MlMMIZES OUST ON THE PROJECT SfTE. AND THE CONTRACTOR SHAU HAVE ACCESS TO A WATER TRUCK FOR OUST MANAGENJENT lF REOUlReD. THE PROJECT ENGINEER WI'U. NOTIFY THE CONTRACTOR TO MOSIUZE OUST CONTROL ACTI\IITIES (INCWDING WATERING) IF CONDITIONS REQUIRE.

BULK BAG NOTES 3"..01A CHAIN WEIGHT BAL.LAST

POCKET FLOATING SILT CURTAIN SHAlL BE A 'I.A\'FlEI.O FSC 13" OR APPROVED EQUAL THE BQOV Qf THE FLOATING SILT CURTAIN IS MADE FROM A STRONG. HIGH-Fil"!RATION FABRIC THAT RETAINS FINE SILTS ANO SEDIMENTS ON-SITE. THE FLOAT AND BOTTOM SI.EEVE ARE CONSTRUCTED FROM A IN.sTABLE, HIGH-STRENOTH POLYETHYlENE (I.E. RIPSTOP..TYPE MATERIA!..). THE FLOATING SILT CURTAIN IS INCREASED IN LENGTH BY .IOINJNG AOOITIONAL secnoNS OF CURTAIN, WHICH TYPICALlY COM!lS IN 5(1' LENGTHS.

BUll< SAGS ARE ALSO CAUEO FLEXIBLE INTERMEDIATE BULK CONTAiNERS (ABC} THAT CAN BE CUSTOM MADE FROM VARIOUS FASRtC. THE FOLlOWING REQUIREMENTS ARE NECESSARY FOR THE RlVER ENVIRONMENT:

BULK SAGS..SHAU SE CONSTRUCTED OF 8 ox \oVOVEN FABRiC, 1200 HOUR UV RESISTANT 'AIITH SEVtiN UFTING LOOPS. WHEN RUED 'INITH NATIVE RIVER SAND AND GRAVEL. THE BAGS ARE APPROXIMATELY B' WIDE x 6' LONG x -4' HIGH. BULK BAGS SHAlL BE CAREFULLY PLACED TO ENSURE NO TEARING OR CUTIING OF THE BAGS OCCURS, BULK BAGS SHALl BE PLACED USING A HYORAUUC CRANE OR TRACK HOE USING UFllNG BARS AND STEEl CABLES TO EQUAUZE

lOAD ON UFfiNG LOOPS.

j !

;i;

I

PROJECT NUMBER

DRAFT

ORA==...

i~--~------'-''~~_"''-~''"_··gr_,~_;"-r_·'''-~-T~'_"~_,.,,.~,_.,~r--------------------------~~~P~E~R=M~I~T~D~RA~~W~I~N~G~S~~~=~~~~~=~~·?~n· NWP-2014-195

. jll

Lei

z~ IIi

!jQ E

510

. .................. 510

............. .

!'.\(iii Q!

ww0

> Ci

II ::to~

ll·

EXCAVATED GRAVElS

500

490

j;

I '

w 0 C) w

........ .

490

0

a: m TYP. SUMMER LOW Fl.OW (·1000 CFS)

490 ~is=o--------~--------~--------~--------~------~1+~oo~-------L---------L---------L---------L--------1~+~90--------~--------~--------1~+eo·490

0

~ ~

a

0:::

0..

w 0z

0

z ffl < zw 0a: ti z1-

~ ::0~:;!; :5 ~ w 0

D..

"'('YPICAL TEMPORAR,_.! BRIDf! HORIZ 1' = 10' .

_J

VERT 1'= 10'

1-

..J <(

u. 0

:5

0

!:2

~

0:::

c:

~

J:

z lr 0 z

z w w

G

....."' l

g.

!

I

DRAFT

12 7 ~~----------------------------------------------~~~P~E~R~M~IT~D~RA~W~I~N~G~S~~~~~~.~v~·~~u

1

NWP-2014-195

SITE RESTORATION NOTES ALL DAMAGED DR DISTURBED STREAMBANKS ARE TO BE RESTORED TO A NATURAL SLOPE

PATIERN AND PROFILE SUITABLE FOR ESTABUSHIIENf OF PERMANENT WOODY.VEGETATION. ALL DISTURBED STREAM BANK VEGEtATION lS TO BE REPlACED. USE A VARIETY OF SPECIES NATIVE TO THE PROJECT ARE PER DAAW\NG 13.1, REPlANT AND RESEED EACH AREA REQU1RING REVEGETATION BEFORE THE END OF THE ARST PLANTING SEASON FOLLO\f\ltNG CONSTRUCTION. NO PESTICIDES, INCLUDING HERSlCtDES, WILL BE ALLOWED WITHIN 150 FEET OF WATERS OF THE STATE. MECHANICAL, HAND, OR OTHER METHODS MAY BE USED TO CONTROL WEEDS AND UNWANTED VEGETATION. FERTILIZER APPUCATION VVITHlN 50 FEET OF ANY STREAM CHANNEL IMU. NOT BE AIJTliORlZED. STOCKPiLE ALL WOODY MATERIAL, NATIVE VEGETATION, TOPSOU., AND NATIVE CHANNEL MATERiAL DISPLACED BY CONSTRUCTION, AND USE AS APPROPRiATE FDR SITE RESTORATION ACTMTIES.. THE RESTORED SITE SHOULD SHOW THE FOLLOWING FEATURES, AS APPROPRIATE, AT THE END OF THE MONITORING PERIOD: BARE BOlL SPACES SHALL APPROX1MA.TE THE SIZE AND DISPERSAL PATTER OF PRE-EXISTING CONC»TIONS; SOIL MOVEMENT, SUCH AS ACTIVE RILLS OR GUWES AND SOIL DePOSITION AROUND PLANTS OR IN SMAll BASINS, SHOUi..D BE ABSENT OR SUGHT AND LOCAL

OBUTERATIDN OF TEMPORARY ACCESS ROADS

TREATED PROJECT AREA PER DWG 13.1

-QSO FT OF ACCESS ROAD

-2.2ACRES

..320 FT OF ACCESS ROAD

-D.3ACRES

-D.1 ACRES

10

-1,000 FT OF ACCESS ROAD

-D..f.ACRES

·120FT OF ACCESS ROAD

-ll.2ACRES

-350FT OF ACCESS ROAD

...OAACRES

-180' FT OF ACCESS ROAD

-o.3ACRE5

...240 FT OF ACCESS ROAD

--D.1 ACRES

11

12

0

PRE-PROJECT ERODED AREAS SHOULD BE STABIUZED. PLANT MATERiAL, E.G., LEAVES, BRANCHES, ETC., SHOULD BE WElL DISTRIBUTED AND EFFECTJVE IN PROTECTING THE SOIL 'MTH FEW OR NO UTTER DAMS PRESENT. NA.TfVE WOODY AND HERBACEOUS VEGETATION, AS APPROPRIATE FOR THE SITE CONDITIONS, SHOULD BE PRESENT AND WELL O!STRiBUTEO ACROSS THE SITE PER DRAWING 13.1. VEGETATION STRUCTURE SHOULD RESULT IN ROOTING THROUGHOUT THE AVAtLABLE SOIL PROflLE. PLANTS SHOULD HAVE NORMAL. VIGOROUS GROWTH FORM, AND A HIGH PROBABIUTY OF REMAINING VIGOROUS, HEALTHY AND DOMINANT OVER UNDESIRED COMPETING VEGETATION. STREAMBANKS SHALL HAVE LESS THAN 5% EXPOSED SOIL \IVITH MARGINS ANCHORED BY DEEPLY ROOTED VEGETATION OR

COARSE-GRAINED AlllMAL MATERIAL TEMPORARY ACCESS ROUTES AND OTHER AREAS DISTURBED DURING CONSTRUCTION \NILL BE REHABfUTATEO TO SlMit.AR OR BETTER THAN PRE-VVORK CONDITIONS. AT A MINIMUM SITE RECI..AMATJON ..\CTMT!ES St-IALL RESULT IN PlANT 01STR!BUTION AND DENSITY THAT MATCH PRE..PR:OJECT CONDITIONS IN ACCORDANCE YiiTH DRAWING 13.1.

SHORT-TERM STABlUZATION MEASURES W:LL BE IMPLEMENTED UNTIL PERMANENT EROS toN CONTROL MEASURES (PLANT RESTORA TtoN) ARE EFFECTIVE. RECLAMATION PLANTING PER DRAWING 13.1 Sl-tALL BE COMPLETED NO LATER THAN SPRING PlANTING SEASON OF THE YEAR FOLLOWING COMPLETION OF CONSTRUCTION.

SITE RESTORATIO't!;AYOUL 1"=400'

~

DRAFT PERMIT DRAWINGS

~~~

NWP-2014-195

REVEGETATION NOTES GENERAL NOTES

,

1.

AU. PL\~ MATERIAL MUST BE CLASSIFIED AS NATIVE FROM THIS REGION AND NON-CLON~ IN ORIGIN. AU. NATIVE P~ MATERIAL TO BE USED IN PLANTING AREM TO ORIGINATE FROM PA~ SOURCES WITHIN 50 MILES OF SITE.. SEED SOURCE MUST BE AS LOCAL AS POSSIBLE.

2.

INSTALL TREE AND SHRUB SPC:CfES IN RANOOM GROUF'INOS, AVOIDING UNEA.R ROWS OR AS OtRECTEO IN FIELO,\MTHIN CLOSE PROX1MITY OF EXISTING PLANTINGS OR NEWlY PL\NTED MATERIAL THE INT~ IS TO REPUCATE NATURAL PLANT COMMUNITIES BY PROVIOING A LAYERED UNDERSTORY CANOPY IMTH A lllXTURE OF TREES.

3.

THE PLANTING 1\ND SEEDING AREA IS TO COVERED \!\liTH TOPSOIL

WILLOW CWMP PLANTING 1.

\MU.OW CLUMPS SHALL BE SAlVAGED FROM Tlif EXCAVATED CHANNEL AREA. ALLIN AN'f HOLES WHERE DONOR CLUMPS ARE EXTRACTED IF OUTSIDE THE CI

2.

IMUOWCLUMP PL\NTINGS SHALL FOLLOW THE NATURAL RESOURCE CONSERVATION SER\I1CE !NRC$)

3.

LOCATE AND !ITll!ZE YOUNG AHO VIGOROUS !8' · 20' TAU.) WLLOW CLLIMPS IN CONSULTATION WTH THE PROJECT ENGfNEER. otG THE WV!LLOW CLUMP UTlUZlNG A TRACKHOE BUCKET AND OSTAJN AT LEAST 75% OF THE ROOT MASS. 00 NOT AU.OW ClUMPS TO SIT MORE THEN 1 HOUR OR DRY out.

4.

DIG A HOLE UTIUZJNG THE TRACKHOE SUCKET TO THE SAME SIZE AND SHAPE OF THE CLUMP. HOLE

PLANT MATERIALS TECHNlCAL NOTE 42 (2003).

tF THIS TOPSOIL tS DEEMED BV

PRoJECT ENGINEER TO 9E INAOEOUATE, IMPORTED MATERIAL SHAlL BE USED TO POCJ

'

TRANSPORT CWMPS TO PlANTING SrTE.

SHALL BE TO A DEPTH JUST ABOVE THE STANC»NG WATER TABLE AND NOl INTO THE WATER TABlE. 4.

THOROUGI

PACK THE SOIL FIRMLY IN THE EXCAVATED HOLE UPON INSTALLATlON. 5.

AFTER lNSTAUATION, CUT OFF APPROXIMATELV 33%-50% OP THE WIU..OWTOPS STRAIGHT ACROSS.

IMUOW CLUMPS SHALL 9E PLACED AI'PROXIMATELY 15 FEET APART.

WILLOW STAKE PLANTING 1.

VVILLOW STAKES SHAll HAVE MINIMUM D1AMETER OF 1.5" AND MINIMUM LENGn-t 4'. TiiE STAKES SHAU. BE CUT FROM NEARBY PLANTS TO ENSURE COMPATIBIUTY IF POSSIBLE, OR LOCAL 'ECDTTPES'. STAKES SHALL HAVE SIDE BRANCHES CLEANLY REMOVED WITH BARK INTACT, BASAL ENDS CUT AT AN ANGLE AND TOPS CUT SQUARE.

:Z.

STAKES SHALL BE CUT AND INSTAllED oN THE SAME DAY.

3.

STAKES SHALL BE. iNSTAllED WHitE IN THE DORMANT STAGE., NOVEM:BER 1 TO FEMUARY 151N THE ROGUE VALLEY, UNLESS lRRiGATION IS PROVIDED.. STAKES SHOUW BE DEEP ENOUGH TO CONTACT

SOD&SO!LSALVAGE Fl.OOOPLAIN SOO AND SOIL SHALL BE SALVAGED TO THE MAXIMUM EXTENT PRACTICABLE IN AREAS THAT ARE TO 9E DISTURBED. SOD AND SOIL SlW.L BE TRANSPORTED AND STOCKPILE!l AT A CONVENIENT LOCATION DETERMINED SY THE PROJECT ENGINEER AND CLEARLY FLAGGED. STOCKP!l.E SHALL ee iRRIGATED ON A ReGULAR BASlS AS NECESSARY TO MAtNTAtN MOISTURE tN THE SOO AND son_ THE SOO AND SOIL SHAlL BE USED TO COVER OISTIJRBED AREAS OR AS OIRECTE!l BY THE FIELD ENGINEER TO PREPARE AREAS FOR PL\NTING. TRANSPLANTED SOD AND SOIL SHAll 9E TRACKED OVER IMTH AN EXCAVATOR AND GAPS BElWEEN SOD STRIPS SHALL BE FILLED 1MTH NATIVE SOU AND SEEDED IMTH A NATIVE SEED MIX.

z

THE lOW SUMMER WATER LEVEL ~.

STAKES SHALL BE INSTALLED ON 'r CENTERS WlTH 80% OF THE STAKE LENGTH INSTALLED INTO THE GROUND WITH ARM SOl LIN CONTACT WITH THE WlllOW STAKE. A P1ECE OF REBAR SHOULD BE USED AS A PILOT HOLE FOR THE STAKE.

5,

TAMP STAKES INTO GROUND WTH A DEAD BLOW HAMMER (HAMMER HEAD FILLED Vti'ITH SHOT OR SAND}.

B.

'MUOWCWMPS ARE PREFERRED TO LIVE STAKES ON THE LO'AIER HALF OF THE STREAMBANK. INSTALL PER NRCS PlANT MATERIALS TECHNICAL NOTE 42,

7.

'1; EROSION CONTROL SEEDING ALL OJSTim&EO AREAS SHAU.. BE BROADCAST SEEDED WTH AN "EROSION CON'm'Ol." SEED fiHX AND COVERED WITH STERtLE STRAW. AREAS SHALL BE BROADCAST SEEDED WITH A SEEO MfX CONTAINING

NATIVE SEED {SEE RfPARtAN REVSGE-TATION SCHEDULE THtS SHEET) AND STERILE CER:EAL RYES. ms SHAll BE ACCOMPUSHED WITH A HANOIB:ROAOCAST SEEOI:NG METHOD ANO THE SEED SHALL .BE RAKED ONE OIJAATER (.25) INCH INTO THE SOIL AND COMPACTE!llMTH A 5.000 POUND OR LESS TRACKED \IEHICI£ AND THEN COVERED WITH STERILE STRAW. THE MINIMUM AI'PUCATIDN RATE'MLL BE THE MANUFACTURER'S RATE OR 30 LBS PER ACRE. CONTRACTOR WJU.. PROVIDE SEED MIX CONSTITUENTS TO PROJECT INSPECTOR FOR APPROVAL.

0

AlTERNATE INSTAllATION PROCEDURES MAY BE USED UPON CONSULTATION IJVITH RIVER DESIGN

GROUP PROJECT ENGINEER.

g

1\ll. LATERAl BRANCHES SlW.L BE TRIMMED TC AVO!O DAMAGE.

w

IX

0

I

A MINIMLIM OFTWO LATERAL BUDS SHALL BE ASOVE THE P~ING

DEPTH

I

~WTAPERED

8111TEND

X

l:r 0

WILLOW STAKING DETAIL

z

NOT TO SCALE

EMER~

AND WETLAND ZONE

RIPARIAN REVEGETATION SCHEDULE

"'"'::::>0::

::c U)

~fn

COMMON NAME

SIZE

INSTALLATION

REO-OSIER DOGWOOD

2TOSGAU..ON

SNOW BERRY

2TOSGALLON

±e:OIACRE ti!OIACRE

ROSE

1GALLON

il!ll/ACRE

RED FESCUE BWEVVILDRYE

SEED SEED

7LBSIACRE 1$LBSIACRE

~Ill

INFREQUENTLY SATURATED S01lS SEASONALLY SATURATED SOILS

:m

~

!;J; i

POOJECT IIUIISER

ROG-l~

NOre

~~-------------------0-1__P_LA_N_T_I_N_G_G_U_ID_E_L_I_~_E_:_T_o_s_CALE

~_~_~s_~_ZONE_ON_"_!_:V_R=- ~-~-~:0_P_: _~_I\l_MA_·i i._:" -No-P-~-IA-; -:wr _Cles-~-c-:_~_~_es-~-STICS.-RM_I_~_RA_D_RA_F_T_w __I_N __G_S __~ ......_!-::..._ __ ,.,1_~_3~:. :,._".~" " _:=·~~

______

__

..

NWP-2014-195

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification Corps of Engineers No: NWP-2014-195 Oregon Department of State Lands No: 56309

Notice Issued: June 16, 2014 Written Comments Due: July 21, 2014

WHO IS THE APPLICANT: City of Salem Public Works C/O: Ken Roley 555 Liberty St. SE Salem, OR 97301-3503

LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Corps No. NWP-2014-195

Page 1 of 2

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 SW 4th Ave. Ste. 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Corps No. NWP-2014-195

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas