Home

Portland District

Run scraper

the Port of Newport

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Tom Taylor is the Regulatory point-of-contact for this updated permit application from the Port of Newport for work in the Yaquina Bay and estuary, in Newport, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: July 25, 2014 Expiration Date: August 11, 2014 US Army Corps of Engineers No: NWP-2007-832-4 REVISED 15-day noticeOregon Department of State Lands No: 44953 RF

On October 2, 2013, the U.S. Army Corps of Engineers issued a public notice (NWP-2007-832-3) for a proposed modified permit. The modified permit has not been issued. Interested parties are hereby notified that a newly revised, application has been received for a Department of the Army modified permit for certain work in waters of the United States, as described below and shown on the attached plans.

Comments: The Corps is interested particularly in receiving any comments pertaining to the newest elements of the proposed project (i.e., the ocean dumping of a portion of the dredge material and the revised proposed mitigation plan).

Comments on the described work should reference the Corps number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers ATTN: CENWP-OP-GP (Taylor) P.O. Box 2946 Portland, OR 97208-2946

Applicant: Port of Newport Attn: Kevin Greenwood, General Manager 600 SE Bay Blvd. Newport, OR 97365

Location: The project is located on the north side of the Yaquina Bay and estuary, Yaquina River Mile 2.2, in Newport, Lincoln Co., Ore. (Section 9, Township 11 South, Range 11 West). The disposal site for dredged siltstone material is located on the north side of the Bay (RM 2.5) on McLean Point, east of the project area, in Newport, Ore. (Section 9, Township 11 South, Range 11 West). The disposal site for dredged unconsolidated (i.e., sandy) material would be at the South Site (cells 49-66) of the Yaquina Ocean Dredge Material Disposal Site located approximately 1.98 nautical miles (2.28 miles) from the Yaquina Bay entrance channel. The area of the designated cells is approximately 1,500 ft. wide by 3,000 ft. long (See Enclosure 1).

Waterway: Yaquina Bay and Pacific Ocean

Project description: The Port of Newport proposes to modify its existing U.S. Army Corps of Engineers Section 404/Section 10 permit [NWP-2007-832-2] and Oregon Department of State Lands Removal/Fill permit [DSL #44953 RF]. The original project has been completed. The modifications will include additional dredging of the existing shipping berth and the placement of additional riprap on the shoreline. The additional dredging may involve ocean dumping of a portion of the dredge material. The Port has revised its proposed mitigation plan for the loss of subtidal habitat.

Additional dredging

The proposed total 21,000 cubic yards of additional dredging will cover an area of approximately 2.25 acres. This includes a 0.76 acre area previously dredged under the current authorization [NWP-2007-832-2] to -29.26 feet NAVD, plus approximately 1.49 acres of existing subtidal habitat, including approximately 0.4 acre of undredged area located outside the navigation channel. The proposed dredge area also will include approximately 1.09 acres of the Yaquina River identified as the Federal Navigation Channel that prior to 2000 was maintained annually to its Congressionally authorized depth of -30 + 2 feet advanced maintenance depth NAVD. The difference in volume between the originally permitted dredging and the proposed dredging is 16,300 cubic yards (See Enclosure 2).

The Port is currently in talks with the Corps about the possibility of coordinating the proposed Port dredging with Federal maintenance dredging of the Federal Navigation Channel. The Corps also will be conducting maintenance dredging of the FNC beginning after July 22, 2014, and concluding no later than October 31, 2014. The Corps dredging will be accomplished using a clamshell dredge from a crane mounted on a barge. Sediment from the bucket will be placed on a barge for disposal at the Yaquina ODMDS Site.

If the Port is able to coordinate the additional dredging for berth deepening with the Corps' scheduled maintenance dredging, a clamshell dredge also would be used to remove the unconsolidated materials within the Port’s proposed dredge prism (i.e., approximately 11,600 cubic yards of the total proposed 21,000 cy of dredging). That portion of the dredged material also will likely be disposed at the Yaquina South ODMDS. The Port’s unconsolidated material will be excavated using an open bucket dredge from the FNC (a.k.a. Turning Basin), an area previously authorized and dredged in 2009, and the undredged area outside the FNC.

The contractor will utilize the 2,250 cy capacity ABS load line dump scow, WJ Marston, for disposal events to the ODMDS. A tug of sufficient size and horsepower will transport the scow to the ODMDS as needed. The approximately seven disposal events may occur on a six hour time cycle with an estimated 1,800 cy disposed on each event.

No dredged material would be placed into wetlands. Management of the ocean dumping will be conducted per the Corps’ 2012 Yaquina Bay North and South Ocean Dredged Material Disposal Sites Site Management/Monitoring Plan and in conjunction with the Portland District’s Ocean Dumping Coordinator, Wendy Briner.

Of the total 21,000 cubic yards proposed for dredging, the Port proposes to remove 9,400 cubic yards of siltstone. The excavation will be accomplished using a long-reach extended arm trackhoe equipped with an open bucket capable of excavating siltstone that underlies the unconsolidated sediment. The trackhoe will be mounted on a flexifloat modular barge that will be anchored in front of the west cargo dock. On the shore will be a 110-ton crawler crane equipped with a clam bucket. The trackhoe will place the material into a contained area on a barge, where it will be transferred by the crane to off-highway trucks with higher ends to contain water (i.e., the material will not be set on the dock). The material will then be hauled to an upland disposal area located on McLean Point east of the International Terminal. Water from the dredge material will not be allowed to immediately enter the Bay, but will first flow overland where it will be filtered.

The Port anticipates the proposed dredging will require approximately eight weeks of in-water work if conducted independently of the Corps's maintenance dredging. If the two dredging projects are coordinated, it is anticipated that the total amount of dredging time for the two projects would be reduced. Dredging and disposal of the Port’s material, if coordinated with the Corps’ dredging activities, is expected to occur between September 1 and October 31. If the dredging activities cannot be coordinated, then the Port’s activities will be conducted during the November 1-February 15 in-water work window.

The Port has completed sediment characterization analyses as per the Sediment Evaluation Framework for the Pacific Northwest dated May 2009 and will ensure consistency with the SEF prior to conducting the deepening project. The Portland Sediment Evaluation Team has determined that the dredge prism material and new surface material across the entire project area are suitable for unconfined, aquatic exposure.

Although maintenance dredging is not included in this modification proposal, the Port estimates that maintenance dredging will be needed approximately every 10 years to remove a volume of approximately 2,000 cubic yards of sediment. The Port will periodically monitor the new dredge prism to determine maintenance dredging needs.

Riprap placement

The proposed 180 cubic yards of additional riprap will cover an area of approximately 0.05 acre on the slope near the former west end of the S.S. Paisley. This slope is currently riprapped down to -29.26 feet NAVD to provide structural support for the western sheet pile wall, which must remain stable. The proposed depth of additional dredging will require that the toe of riprap be continued (at a 3:1 slope) to the new dredge depth of -35.00 feet NAVD. The riprap will be placed with a long-reach trackhoe (operating from a barge) onto subtidal sand ranging in depth from -13 to -35 feet NAVD.

Mitigation: The applicant has revised its proposed compensatory wetland mitigation, with the primary objective to restore estuarine habitat within Yaquina Bay, by proposing to accomplish the following: a) removing approximately 0.5-acres of a manmade berm to restore the area to the elevation of the surrounding mudflats and b) hydrologically enhancing a 1.8-acre former log pond by replacing an undersized culvert with a box culvert set at a lower elevation to establish a fuller tidal regime. The mitigation site will be located on Port property located near the Oregon Coast Aquarium (See Enclosure 3).

If a permit modification is authorized, the Corps will determine what is appropriate and practicable, compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose of the proposed project is to establish and maintain the corrected navigational depth clearances required for the current fishing vessel operations and the larger and deeper berth for deeper drafting Handysize vessels projected to use the Port facilities.

Drawings: Twelve (12) drawings are attached and labeled NWP-2007-832-4 enclosure.

Additional information may be obtained from Tom Taylor, Project Manager, U.S. Army Corps of Engineers, at 503-808-4386 or via email: thomas.j.taylor@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), to transport dredged material for the purpose of dumping it into ocean waters.

Ocean dumping: The Corps has requested concurrence from the U.S. Environmental Protection Agency for the Port’s proposal to transport and dispose of approximately 11,600 cubic yards of dredged material at the Section 103 (Marine Protection, Research, and Sanctuaries Act) Yaquina ODMDS, South Site.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's revised notice advertising the request for certification.

Coastal zone management: A permit for the described work will not be issued until the Department of Land Conservation and Development, as provided in Section 307(c) of the Coastal Zone Management Act, has provided the Corps with a determination of consistency with the Oregon Coastal Management Program.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect endangered or threatened species and their critical habitat. An amended Biological Assessment and Essential Fish Habitat Assessment has been prepared. The Corps has initiated consultation with the National Marine Fisheries Service under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844). A permit modification for the proposed new activities will not be issued until the consultation process is completed.

Cultural Resources: The original permit (NWP-2007-832-2) authorized the renovation of the Port’s International Terminal. This included the installation of a permanent bulkhead wall, the construction of two new docks, the construction of a new Port building and warehouse. These activities involved the remediation of the Pasley and the Hennebique (two concrete-hulled vessels previously used as docks), the removal of the Pasley and the upper deck of the Hennebique, dredging and excavation activities, and the placement of riprap.

Associated with the original permit, the Corps made a “no effect” determination for cultural resources in the project area. The State Historic Preservation Office verified the Corps’ determination in their letter, dated July 28, 2010. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. As before, the Corps concludes that there are no historic properties that would be affected by the action proposed under the permit modification.

Evaluation: The decision whether to issue a modified permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Proposed Mitigation Site

Proposed Dredging Area

#4540 6/24/2014

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2007-832

Proposed Newport Terminal dredging and mitigation relative to Location of ocean dredged material disposal sites (ODMDS) for Corps of Engineers' Maintenance Dredging Activities at Yaquina Bay. Source: Biological Opinion and EFH Consultation for the Corps Maintenance Dredging Program for the Oregon Coastal Projects. 2009/01756. (NMFS 2010)

FIGURE

5

Enclosure 1

NWP-2007-832 Trans Load Box / Excavator Truck Load Out

Haul Route

Spill Control Barge with drip pans

Sediment Barge

4540 Enclosure 1

8/15/13

~· Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

Proposed Dredging and Disposal Areas Port of Newport -International Terminal (Google Earth, 201 3)

I FIGURE I 1

Original Dredge Limits

Original Dredge Limits

Turning Basin Limits

YAQUII\IA ElAY

LEGEND Silt Stone (0.75 ac) Unconsolidated (1.45 ac)

0

100

SCALE IN FEET

Base map Provided by KPFF

Results of Substrate Investigation Within Proposed Dredging Prism Port of Newport - International Terminal, Newport, Oregon Pacific Habitat Services, Inc. !MOOSW Commen:eefro:e, SWis 16t'W11s:m6, 01'6P 'if!f170 Phone: (503) 570.0SOO Fax (503.) 570-0855

NWP-2007-832 :\AUTOCAD\4500\4540 Newprnt Terminai\AutcCAD\Piot Dwgs\BAfigures·DredgeMitigation\fig6 MkigotionDetermination.dwg, 5!28/2014 3:38:50 PM

05-28-14 Enclosure 1

Yaquina South ODMDS Dump Plan #2 for 2013 BLUE Lines = grid ( ells) Cells are used to uide the intitial release point for ea h load placed within D~IDS, to promote EVEN deposition o dredged material on s abed. Cell size = 500 x 50 ft ea.

GVT Hoppe · Dredge YAQUIN at 1,000 cy/load 3 63000 ~+---~3~0~c~e~ ll~ s~ x ~3~I~a ~d ~s~ /c~e~ ll~=~ 90~ 00 ~0~ C~------------~----~

7255000 coordinates are SPCS Oregon, north, ft NAD83 elevations are in ft, below MLLW. 2012 Data

7257000

7259000

Easting, ft

7261000 US Army Corps of Engineers Portland Distirct

Figure 4. Yaquina South ODMDS, 2013 Dump Plan 2.

NWP-2007-832

Enclosure 1

"'v~--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

N N

/

I

I /

I

---7

c ___~

~

(

J __;

I

I

\

I I

/

/

-

I

f"""

\

-.

I

\

-

--

APPROX. LOCATION OF ~ TIMBER PILES CUT-OFF AT MUDLINE FROM OLD TRIDENT m DOCK r_j

. SHEET PILE WALL (C) REFER TO STRUCTURAL PLANS

---- ------- -

-- -

I

w

(j)

r

0)

.... I

"' "X N

----l

I

\

I

'\

/

(

\

\

/

/ /

\

/

~

/

I

/ /

\

\<\

/''

'~~\

/

/

/

/

/

/

(

/

/

I

/

/

-------.....

,-..::::...._--

<::-,

~

r\

I

/

/

-- --

ORIGINAL DREDGE LIMITS\

;I

~

~

'-...... \ I /"'...

/ /

\

"" \

--.....

/

\

\

-------

\

\

\

~

""\

OF DOCK BERTH 1

II I

"-

u

DC

/

"-

/

' YAQUINA BAY

/

---

FACE OF DOCK BERTH

/

/

I

I

fl

~ ){g7680.68

~

X

"'

4001607.0,Y

1:;/

I I

/ I

I

I

I

\

I I

\ \

\

\

___ J ___ l _

I I I

""

""

$f I

"'-

I

~.___

""

\

\ \ \ · ·

""

U'\

\

"-

"-

~ "-

YAQUINA BAY

/

I

\ \ \

\

\

\ \ \

"" \ \

\

\ \ \

\

'-NI~W

\ \

DREDGE LIMITS

\

\ "-.._

I

CURRENT BATHYMETRY SURVEY: ACOE SOUNDINGS ON MAY 29, 2012 ORIGINAL BATHYMETRIC SURVEY: ACOE SOUNDINGS 2009

NORTH

307815.10

\

.......___

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

\

~

'\

"-

\ \

\

\

"-

\

\

\

"'.....I

\

\

\

\

\ \

"-

"" \

/

U'\

\ ""\

--.___/

"J"" /

\

"- "-

\

\

\

"' """ "' "' ""

SCALE

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

EME EME MS 11/1/12 7:31pm eeykelbosch 7815-600-sect.dwg C6.0

NWP-2007-832(3)

Page 3 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

C6.0

EXCAVATION / DREDGE PLAN RECORD NO.

307815.60

ENCLOSURE

RECORD DRAWINGS - MARCH 11, 2011

I I I

I

~~--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

"' N N

ORIGINAL DREDGE BREAKDOWN ~ ORIGINAL DREDGE TO REMAIN

·

--7

·

rn

33,050 SQ. FT. (D.76 AC)

(

I

I

NEW DREDGE OVER ORIGINAL FOOTPRINT

33,050 SQ. FT. (0. 76 AC)

NEW DREDGE VIRGIN GROUND

65,000 SQ. FT. (1.49 AC)

~

(

\

I I \

I

49,800 SQ. FT. (1.14 AC)

TOTAL ORIGINAL DREDGE FOOTPRINT

\

98,050 SQ. FT. (2.25 AC)

TOTAL NEW DREDGE

/

\

/ /

\

______ 0

0

"' "' \ "' ............ ............

---~

Cil

r_j

/

\

/

\ \

/

/

/

\

- --

N I

-" ~

\

0

n

I

\..____/

u

,.........-

/

-----l

, ..:".::, " ' - - - - - - - ............

I

-

.............

/

x ......__......__

"'CL:

/

/ /

/ /

/

I

I I

/ / / /

/ /

....-----

::::

/ /

/

/

!

/

/

CXl

c-.

/

I

I

I I

/

/

I

I

(

/

/

I

I

/

/

/

/ I

X

/

/

w

"coc-.

/

I

/

[J]

ADDITIONAL RIP RAP AREA (2,200 SQ. FT.)

/

/

(

I

/

/

I

/

/

/0

/

\

---

-<

/

/

/

I

/

/

/

......__/

1

8+5o

~.*~.A[-+fll43t-+--l

I

/

I I

/

I I I

I I I

I I I

l__

" ""'

/!?

I

"'

............ ......__ ......__

I

/

'\ \

\ \

\

\

\ \ \

'u>

\

~ ......__

I I

YAQUINA BAY

\...

......__

'u>

U'\

\ \ \ \

\

\

\

\

/

'u>

\

''\

......__;

";)~ \

\

......__

..........

......__

'~

"' "' "-

~

'-..... ......__

......__

"-...

~

......

'.J"

......__

........... ........... ...........

~

......__

~

......__

\

"'-._

........,_

"'

""

...........

"' "'

/

'-......

'\ ...........

...........

""-._

""- ""-._

\

\

,.......

I

........... ......__

\

~d'

'<> ""-._

\

"'

\

\

.....

""-._

'....

.....

.....

""-._

'....

'....

""-._

'....

'....

\

'....

'....

'....

""-._

"

""-._

""-._

'....

"'

\

"'

"' "' "' "' \

""-._

'

'....

\

\

I

\

\

'

""-._

"'

\

\

\

\ ""-._

"'

\

\

\ \ \

\

\

........,_

\ \......

\

'

\

\ \

\ \

\

\

\

\ \

\

\

\

\

\

\

\

\ \

\

\

""-._

""-._

""-._

\

\

""-._

""-._

"'

\

\

""-._

\

\

\

\

""-._

""-._

'....

\

.....

\

~

'\

""-._

""-._

""-._ ""-._

\

\

'....

'....

""-._ ""-._

""-._

'....

'....

""-._

""-._

""-._

""-._

""-._

""-._

""-._

""-._

""-._

'....

'....

'....

""-._

""-._

'....

""-._

""-._

'....

""-._ ""-._

'....

\

\

""-._

I

I

'"i.

'.... ""-._

""-._

c;.

~

\'

I

""-._

""-._ ""-._

tO

C\1

""-._

""-._

\

·

\

6<

""-._

'....

""-._

""-._

""-._

""-._

I I I

\

\

~

""-._

""-._

""-._

I.

""-._

""-._ ""-._

""-._

\ \

I \

""-._

\

...........

\

~

\

...........

/

.9\

\

...........

...........

\

\

"''.Jo \

I \ I "6-\

/

\

'\

I I

I I I

___ J ___ l _

: I

I

...........

'-....

"' "' "' "' "'

NORTH

SCALE

307815.10

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

SHEET NO.

EME EME MS 11/1/12 7:24pm eeykelbosch 7815-600-sect.dwg C6.0A

NWP-2007-832(3)

Page 4 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

C6.0A

EXCAVATION / DREDGE PLAN NO.

307815.60

ENCLOSURE

RECORD DRAWINGS - MARCH 11, 2011

I

NEW DREDGE BREAKDOWN

16,750 SQ. FT. (0.38 AC)

NEW DREDGE OVER ORIGINAL FOOTPRINT

I

~~------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~ X

"' N N

LEGEND: 1,~

25

-

\

15

---.___

--'

5 0

'Xx

)< -5

~

Cil

v

/

-10

~

w

U1

I

"c-.

-15

2/ k'l 1 /

-20

X

-,:

I ~

0 D

-25

~

I

u

0> X

co

'

-30

~

c-.

-35

X

-40

u

CL:

~

\ I~....

SLT' TOI\IE EV = -3 1.0±'

"'

-80

-70

-60

-50

-40

EXIST. GROUND

""~ ·i f;f

1 <::;= 90

V"- 2012

A

-30

-20

-10

0

10

I

~~ r-.. t:Q ,..,-h ~ ~~ A Ay ~ ~y~

SECllON 6

CXl

STA. 1+55

c-.

11

t

~{

-~

~

-- j-c

10

I

i= ffi Ill

5

g

0

40

= -35.00 ( -34.26 MLLW)

50

60

I

-

:--- =

1

EXIr T. GR ou ~ o 1

70

80

-5

-10

-10

90

100

110

120

-

-

-15

-15

- -20

-20

-25

-25

-30

-30

--

-35

-35

-

= - 9. 6'

,..

I

-5

DREDGE (BELOW HMT)

EXCAVATION (WITHIN TEMPORARY CONTAINTMENT WALL) FILL

-15 -20

NEW DREDGE (BELOW HMT)

~

J'"$

~ p.. ~

130 - 1 4-40 0

~

~

NEW RIPRAP

~

SECllON 20 STA. 5+87 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1''=1 0'

HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=1 0'

"'o_

~

.· ..

0

10

I

-

5

PROPOSED RIPRAP

~

co

NEW DREDGE UMITS

1/

A.

D

X

I l I I... cRE~GJ ulrri J~ l 1 >0

I

20~

FILTER BLANKET

0

1-

~>'0, ~ 1~

15

0

1---

~ ~

15

5

I~

~ :'<

15

.

li

v ~ v

20

10

It::

~

20

f MT = 11.p1'

I~

v

20

- 11. p1'

I~

I-

--' --'

~

I

~

~ ~ <

CXl

r---

r-g

1\

f

f MT

I/

LLI

Ill

v/ D / '· v ~ v / 1>-

~ /

N

-"

i= 0::

/ / \ ~ /

co

~--- ~---

I

0

~,

/

!'--- 1'---

...:::;

/"'

V")' '" v/Vv /

:X :X )<

v

i-APPROX. OUTLINE OF PASLEY HULL

~

[\

I

1'--- :---._

\

10

r_j

~

25

20

RIPRAP

I

0

c

~'-- :---.. ~ .

- r---. ---.___

15

v

~'--- r---.

i-APPROX. OUTLINE OF PASLEY HULL

~ 1'---

r-r-r-r-r-r-r-r-+-+-+-+-+-+-+-+-+-+-+-~ 20

-

-----r---

15

20

20

15

15

fMT- 11. ~1'

f MT = 11 ~1'

-

10

10

10

10

5

5

5

0

0

0

-5

-5

-5

1---

-10

-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-r-+-+_, -10

-10

-10

-15

-t--t--t--t--t--l -15

-15

-15

-20

-t--t---l -20

-20

-20

-25

-25

-

-25

-25

-30

-

-30

-30

-35

-

-35

-~90 -80 -70 -60 -50 -40 -30 -20 -10

0

10

20

RECORD DRAWINGS - MARCH 11, 2011

20

.29 ~6'

l\_

30

30 SECllON 26 STA. 7+65 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=10'

SECllON 12 STA. 3+50 HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=10'

307815.10

Port of Newport, 600 S.E. Bay Boulevard, Newport, Oregon 97635

SHEET NO.

EME EME MS 11/1/12 7:19pm eeykelbosch 7815-600-sect.dwg EXH-A

NWP-2007-832(3)

Page 5 of 6

PORT OF NEWPORT INTERNATIONAL TERMINAL RENOVATION

EXCAVATION / DREDGE CROSS SECTIONS

EXH-A SHEET

OF

RECORD NO.

307815.60

ENCLOSURE

Proposed Mitigation Site

Proposed Dredging Area

4540 6/24/2014

Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

NWP-2007-832

General Location and Topography Location of Proposed Dredging and Mitigation Site for the Port of Newport International Terminal in Newport, Oregon (USGS The National Map Viewer, 2014)

FIGURE

1 Enclosure 3

Photo Point Approximate area to be excavated to restore estuarine conditions

N CONSTRUCTIO S ACCES

New 4'x8' box culvert to replace existing culvert

B

A'

C D A

B

A

B'

STAGING AREA

OREGON COAST AQUARIUM

Overview of Proposed Mitigation Site and Cross Section Locations with Aerial Photo Port of Newport - International Terminal, Newport, Oregon Pacific Habitat Services,Inc. Phone: (503) 570-0800

FIGURE

2 06-27-14

Fax (503) 570-0855

NWP-2007-832

Enclosure 3

LEGEND Approximate area to be excavated to restore estuarine conditions New 4'x8' box culvert to replace existing culvert 11.5 - Highest Measured Tide (HMT)

A

A'

B

B' 11.5 feet Highest Measured Tide (HMT)

YAQUINA BAY

OREGON COAST AQUARIUM

Half foot Lidar contours - DOGAMI 2009

Overview of Proposed Mitigation Site and Cross Section Locations, with Lidar Contours Port of Newport - International Terminal, Newport, Oregon Pacific Habitat Services,Inc. Phone: (503) 570-0800

FIGURE

3 06-27-14

Fax (503) 570-0855

NWP-2007-832

Enclosure 3

14 E I

~

\ ''. '

13

e v

12

a

11

t

10

n i

'\

8

'\

7 6

e e t N

I I I I

'

9

n f

,,

\

i 0

Cross section of mitigation site (vertical exaggeration 20x)

I

5

I I I I I I

,....., I

\ \

"'-·

I

_,I

4

\

3

'

---'

\

· ' I I I

\ \

-

-

existing surface

-

· · mitigation surface

- - highest measured tide

\ \ \

\

I I

-- . -.- ........... \

\_,·'I

.._

.... - ,

2

,.,

.....

A

v

1

D

0 0

50

100

150

200

250

300

'

"

·'

350

400

Mitigation Cross Section B-B' Port of Newport - International Terminal, Newport, Oregon Pacific Habitat Services,Inc. 9450 SW CommetDe ()ode, SUite 1110 WIDVAie, Oregcrl970711 Phone: (503) 570-0800 Fax (503) 570-0855

NWP-2007-832

D FIGURE

6

06-27-14

Enclosure 3

Existing Roadway

Proposed 4' x 8' Box Culvert

Existing Culvert

Existing Ground

New Box Culvert Cross Section A-A' Port of Newport - International Terminal, Newport, Oregon Pacific Habitat Services,Inc. Phone: (503) 570-0800

FIGURE

7 06-27-14

Fax (503) 570-0855

NWP-2007-832

Enclosure 3

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification

Corps of Engineers No: NWP-2007-832-4 Oregon Dept. of State Lands No: 44953 RF WHO IS THE APPLICANT:

Notice Re-issued: July 25, 2014 Written Comments Due: Aug. 11, 2014

Port of Newport Attn: Kevin Greenwood, General Manager 600 SE Bay Blvd. Newport, OR 97365

LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900. PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Corps No. NWP-2007-832(4)

Page 1 of 3

Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email: 401publiccomments@deq.state.or.us Mail: Oregon Dept. of Environmental Quality, Northwest Region 2020 SW 4th Ave., Ste. 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax: 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No. NWP-2007-832(4)

Page 2 of 3

PUBLIC NOTICE OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION

Date: July 25, 2014 U.S. Army Corps of Engineers No: NWP-2007-832-4 Oregon Dept. of State Lands No: 44953 RF

NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office. DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to: DLCD 635 Capital St. NE, Ste. 150 Salem, OR 97301-2540 Comments may also be coast.permits@state.or.us.

sent

by

fax

to

503-378-6033

or

by

email

to

All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit Application. For further information, you may call DLCD at 503-373-0050.

REVIEW CRITERIA: Comments should address consistency with the applicable elements of the Oregon Coastal management Program. These elements include the following: Acknowledged local comprehensive plans & implementing ordinances Statewide planning goals Applicable state authorities incorporated into the Oregon Coastal Management Program (e.g. removal-fill law, water quality standards, beach bill, etc.) as applicable.

INCONSISTENT? If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program. Corps No. NWP-2007-832(4)

Page 3 of 3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas