Public notice for the Harbor South Bay Lateral Extension Project.

The proposed project (Carson Extension Lateral) entails construction of approximately 4,900 lineal feet of 12-inch recycled water pipeline that will serve the users in the City of Carson and will extend the existing Carson City Mall Lateral. Installation of the project lateral would be performed by both the U.S. Army Corps of Engineers (Corps) and West Basin Municipal Water District (WBMWD). WBMWD is the local sponsor for the proposed project. This project is a segment of the Harbor-South Bay Water Recycling Project that was addressed in a 2003 Environmental Assessment/Initial Study (EA/MND), a 2007 Supplemental EA/Mitigated Negative Declaration (SEA/MND) and a 2009 Supplemental EA/Subsequent MND. This document serves to notify interested parties of the Corps’ intent to prepare another Supplemental EA and Finding of No Significant Impact (FONSI) to address a modification to the Carson Extension Lateral.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas